This document describes the updates and fixes made to Alpha Anywhere in 2017 and earlier.
To see the 'What's New in V12' document (which describes all of the new features in Alpha Anywhere's initial release) please click here.
Please note that Alpha Anywhere patches are only available to users with
a current subscription.
You can verify your subscription status from within Alpha Anywhere by going to Help, About, or by clicking this link shown here (https://activation.alphasoftware.com/subscriptionStatus.aspx). If you install an update for which your subscription is not entitled, you will need to uninstall the update and rollback to an older version that you are authorized to use in order to continue using Alpha Anywhere.
To see release notes for other periods, click the appropriate link:
Release notes for 2025 to present
Release notes for 2023 and 2024
Release notes for 2021 and 2022
Release notes for 2018 and 2019 and 2020
NOTE: This build has introduced a bug in the Javascript Action to refresh the data in a UX Component ViewBox control. After you install this update you can install a hotfix for the bug by downloading this file. Click here for instructions on how to install a htofix.
| UX Component - Tree Control | Populating a Tree Control using a SQL Query and Defining a Javascript Event for Each Tree Leaf Node |
The Tree control can be automatically populated
with data derived from a SQL query. When doing
this it is common to want to execute some
Javascript code when the user selects a leaf
node in the tree. In this video we show how this is done. Watch Video Download component Date added: 2017-11-02 |
| UX Component | Selecting Multiple Values in an Auto-suggest or Edit Combo Control |
The Auto-suggest and Edit Combo controls have
always allowed you to set a mode where multiple
selections can be made. However, each time you
make a selection the pick list is closed and you
must reopen the pick list before you can make
your next selection. Now, a new property in these controls allows you to specify that the pick list should stay open after each selection, allowing you to make multiple selections more easily. Watch Video Date added: 2017-11-15 |
| UX Component - ControlBars | Using the Built-in ControlBar Templates |
The ControlBar is highly configurable. This
allows you to create solutions for many
different use cases. There are several common
patterns that developers use and for many of
these patterns you can get a quick start by
selecting one of the pre-defined ControlBar
templates. For example, common patterns
addressed by the pre-defined templates
are:ControlBar with a menu button that animates
in a menu from the left or right side of the
Panel, ControlBar with buttons that reveal
animated drop-down menus, ControlBar with
buttons that allow you to create a tabbed user
interface. In this video we show how you can create a new ControlBar from a template and then continue to modify the resulting ControlBar. Watch Video Date added: 2017-11-28 |
| UX Component | Sample UX Component - Amazon Mobile Shopping Look Alike Example |
The Amazon mobile shopping App is one of the
most recognizable mobile Apps. In this video we
show how the look and feel of this App can be
recreated using the UX component. Open the App in a Browser Watch Video - Overview How the Products List is Populated Watch Video How the Back Button in the ControlBar is Implemented Watch Video How the Badge on the Shopping Cart Icon is Implemented Watch Video How the Search Box is Implemented Watch Video How the Product List Layout is Implemented Watch Video 1 Watch Video 2 How the Detail View is Implemented using a ViewBox Control Watch Video 1 Watch Video 2 Watch Video 3 Date added: 2017-12-13 |
Application Server for IIS - Unlicensed Mode - The
Alpha Anywhere Application Server for IIS is will now run in
unlicensed mode. Five users can be active on an unlicensed
server allowing development and testing to be done without
needing a license. If more users are needed or the server is
running in production a license is required.
This change brings the Application Server for IIS in line with
the Standard Application Server for use in development and
testing.
You can download the installer for the Application Server for IIS here.
Application Server For IIS - Installer - Pending Reboots - When you run the installer for the Application Server for IIS the installer will now warn you if your machine has any pending reboots mandated by previously installed Windows, or other, updates.
UX Component - {dialog.object}.refreshExpandingMenuData() Method - This method makes an Ajax callback to refresh the data in an Expanding Menu. This method is useful if the Expanding Menu control has assigned security or server-side show/hide expressions to any of the branches or nodes in the data for the expanding menu.
For example, after a user has logged into an application, you might want to use this method to refresh the choices shown in the expanding menu so that only choices for the user's role are shown.
Syntax:
{dialog.object}.refreshExpandingMenuData(expandingMenuIds);
Where:
UX Component - {dialog.object}.{dialog.object}.populateExpandingMenuControl() Method - This method will repopulate the data shown in an Expanding Menu control.
Syntax:
{dialog.object}.populateExpandingMenuControl(id,data)
Where:
Example:
var obj = {dialog.object}.getControl('EXPANDINGMENU1');
var data = {
items:[
{
html: 'Category 1',
value: 'category1',
icon: 'svgIcon=#alpha-icon-addCircleBorder:icon,24',
action: '',
children: [
{
html: 'Action 1',
value: 'action1',
action: 'action:1',
icon: 'svgIcon=#alpha-icon-bandAidCrossed:icon,24'
},
{
html: 'Action 2',
value: 'action2',
action: 'action:2',
icon: 'svgIcon=#alpha-icon-bellRing:icon,24'
}
]
},
{
html: 'Category 2',
value: 'category2',
action: '',
icon: 'svgIcon=#alpha-icon-heartSolid:icon,24',
children: [
{
html: 'Action 4',
value: 'action4',
action: '',
icon: 'svgIcon=#alpha-icon-map:icon,24',
children: [
{
html: 'Action 4a',
value: 'action4a',
action: 'action:4a',
icon: 'svgIcon=#alpha-icon-trendingDown:icon,24'
},
{
html: 'Action 4b',
value: 'action4b',
action: 'action:4b',
icon: 'svgIcon=#alpha-icon-trendingDown:icon,24'
}
]
},
{
html: 'Action 5',
value: 'action5',
action: 'action:5',
icon: 'svgIcon=#alpha-icon-trendingDown:icon,24'
}
]
},
{
html: 'Category 3',
value: 'category3',
action: '',
icon: 'svgIcon=#alpha-icon-shield:icon,24',
children: [
{
html: 'Action 7',
value: 'action7',
action: 'action:7',
icon: 'svgIcon=#alpha-icon-shuffle:icon,24'
}
]
} ],
actions: {
action: function(arg){
alert('Action' + arg);
}
}
}
{dialog.object}.populateExpandingMenuControl('EXPANDINGMENU1',data);
sql_upsert() Function - The sql_upsert() function is a high level Xbasic function that complements the sql_update() and sql_insert() functions. The sql_upsert() function will update a record if the record exists in the database. Otherwise it will insert a new record into the database.
Syntax
p result = sql_upsert(A connection,c tablename,c fieldValuePairs [,c primaryKey [, a primaryKeyValue [, L execute [, P e ]]]])
Where
Example:
dim cn as sql::Connection
cn.open("::Name::myconnstring")
tablename = "mytable"
fieldsValuePairs = <<%str%
name=fred smith
date of birth=1952/12/18
salary=78000
%str%
'You can also specify field values using JSON
fieldsValuePairs = <<%str%
{
"name" : "fred smith",
"date of birth" : "1954/11/25",
"salary" : "78000"
}
%str%
primaryKey = "id"
primarykeyValue = "1"
p =
sql_upsert(cn,tablename,fieldsValuePairs,primaryKey,primaryKeyvalue)
Amazon Look Alike Sample Mobile Application - A new sample template is available. The Amazon look-alike sample mobile application is a sample Alpha Anywhere application designed to show how a familiar mobile app could be built using a UX component.
You can load the sample app in your web browser, or on your mobile device from this url:
http://alphamediacapture.s3.amazonaws.com/sampleamazonlookalikeapp/index.html
You can watch a video showing a quick overview of the application by clicking here.
NOTE: When you create a new UX Component, you can select this sample application from the list of template applications.
The images below show screenshots from various parts of the application:

Main App screen. This screen shows a List control listing the various products that can be purchased. Each row in the List is rendered using a freeform layout template that uses Alpha Anywhere's client-side templating feature to create a highly customized layout.

Navigation menu. The navigation menu is shown when the user taps on the menu icon in page header. The menu it rendered using the Expanding Menu control.

This is the Detail View for a particular product. This Panel is shown when the user taps on a row in the List. The ViewBox control is used to render the Detail View and the template that is used in the ViewBox control to render the Detail View makes extensive use of client-side templating features.

This is the scrolled view of the Detail View for a particular product.

This is the shopping cart showing a list of products that have been added to the cart. This Panel also uses a List control with a freeform Layout to display each row in the shopping cart.
Notice that the shopping cart icon in the header has a badge indicating how many products are in the cart.

This screen shows the page that is displayed when the user taps on the Quantity button on the product detail page.

After the user selects a quantity, the Quantity button on the product detail page is updated to show the selected quantity.
Understanding How the App Was Built
The entire App was built using a single UX component as shown in the image below.

The key building blocks of the app are:
The app structure is shown below:

Each 'page' in the App is contained in a Panel Card and the Panel Cards are contained in a Panel Navigator. The Panel Navigator has been configured as "Programmatic" - meaning that the user cannot swipe left-to-right, or right-to-left on a Panel to navigate to the next Panel. Instead Javascript code is used to control which Panel is shown in the Panel Navigator.
The Panels in the App are:
NOTE: This demo app is not a complete application. It is only meant as a teaching tool to show how a compelling mobile user interface can be created using the UX components. For example, the navigation menu displays, but when you make a selection from the menu, the product list is not updated.
Videos Explaining How Various Features Are Implemented
How the Products List is Populated
How the Back Button in the ControlBar is Implemented
How the Badge on the Shopping Cart Icon is Implemented
How the Search Box is Implemented
How the Product List Layout is Implemented
How the Detail View is Implemented using a ViewBox Control
JSON_shred() Function - This function has been enhanced. The input schema that describes how the JSON should be shredded is now optional. Also, the function can automatically inject linking values into the JSON if the JSON does not already have appropriate linking values. If the input schema is not specified then linking values are automatically injected.
The purpose of the JSON_shred() function is to take a complex JSON document (with one or more nested arrays) and decompose the JSON into multiple flat arrays, none of which have nested arrays.
The new syntax for the function is:
C result = JSON_shred(C json [,C schema [,C topArrayName [,L flagAddSurrogatePrimaryKey [,C surrogateKeyName ]]]])
Where:
Example:
dim json as c
json = <<%str%
[
{"Firstname": "John", "Lastname" : "Smith", "City" : "Boston", "State" : "MA", "Children": [
{"Name" : "Callie", "Age" : 5},
{"Name" : "Griffin", "Age" :3},
{"Name" : "Luke", "Age" : 1}
]
},
{"Firstname": "Henry", "Lastname" : "Rhodes", "City" : "New York", "State" : "NY", "Children": [
{"Name" : "Howard", "Age" : 15},
{"Name" : "Robert", "Age" : 11}
]
}
]
?json_shred(json)
{
"__top": [
{
"__surrogatePrimaryKey": "475750b196554658b2518fde4bfaec6e",
"Firstname": "John",
"Lastname": "Smith",
"City": "Boston",
"State": "MA"
},
{
"__surrogatePrimaryKey": "c970381d48aa4abfa92d0f46d02ead27",
"Firstname": "Henry",
"Lastname": "Rhodes",
"City": "New York",
"State": "NY"
}
],
"Children": [
{
"ParentLinkingValue": "475750b196554658b2518fde4bfaec6e",
"LinkFieldName": "__surrogatePrimaryKey",
"__surrogatePrimaryKey": "16963be3261c4d82a50152dfb18f9ff0",
"Name": "Callie",
"Age": 5
},
{
"ParentLinkingValue": "475750b196554658b2518fde4bfaec6e",
"LinkFieldName": "__surrogatePrimaryKey",
"__surrogatePrimaryKey": "556ed6b0264544bd93ebe1382578347a",
"Name": "Griffin",
"Age": 3
},
{
"ParentLinkingValue": "475750b196554658b2518fde4bfaec6e",
"LinkFieldName": "__surrogatePrimaryKey",
"__surrogatePrimaryKey": "32558171e17c41f88dffc6594b4f73c3",
"Name": "Luke",
"Age": 1
},
{
"ParentLinkingValue": "c970381d48aa4abfa92d0f46d02ead27",
"LinkFieldName": "__surrogatePrimaryKey",
"__surrogatePrimaryKey": "7ea305b5205844c5abde8728b68f08ae",
"Name": "Howard",
"Age": 15
},
{
"ParentLinkingValue": "c970381d48aa4abfa92d0f46d02ead27",
"LinkFieldName": "__surrogatePrimaryKey",
"__surrogatePrimaryKey": "98ff8b3ccc1b4fa1a79bdee2620daee2",
"Name": "Robert",
"Age": 11
}
]
}
%str%
Dynamic Storage Connection Strings - Storage - SQL Server Reporting Services (SSRS) - Alpha Anywhere has had the concept of dynamic connection strings for AlphaDAO connection strings for some time now. But dynamic connection strings for storage and SSRS did not exist. A dynamic connection string is particularly useful in multi-tenant SaaS applications. Now, you can define dynamic storage connection strings for both storage and SSRS.
A dynamic connection string will resolve differently based on a the value of a session variable.
To define a dynamic storage connection string, your named connection string must start with DynamicConnection_. For example: DynamicConnection_myS3Storage.
You must also have a session variable named
__protected__<name>
where <name> is the text to the right of DynamicConnection_ in the named connection string.
So for example, if your named connection string is:
DynamicConnection_myS3Storage
You would need a session variable called:
__protected__myS3Storage
When the named connection string is resolved, it will resolve to the value of the __protected__myS3Storage session variable.
Xbasic csv_to_json() Function - Escaping Doublequotes - This function now supports two different methods for escaping double quotes.
The default is use use two double quote characters. .e.g
"fred","smith","the ""computer"" store","boston"
But you can also use Javascript style escapement. e.g.
"fred","smith","the \"computer\" store","boston"
Syntax:
c json = csv_to_json(c csvtxt, c escapeMethodForQuotes)
Where:
UX Component - Frame Container - Modern Frames - If a modern frame container is configured to have a show/hide button, you can specify that if the current frame is opened and another frame is subsequently opened, the current frame will be closed.

UX Component - Mobile Applications - Panel Card - Drag Scrolling - Previously if you dragged on an input control in a Panel Card, the Panel did not scroll. Now, as long as you have not actually given focus to the input control (i.e. the keyboard has not come up) then the panel will still scroll.
UX Component - ControlBar Builder - User-Defined Templates - You can now save a ControlBar that you have designed as a template. Your user-defined templates will be listed when you click the Load Sample ControlBar hyperlink on the Home pane of the ControlBar builder.

To save the toolbar that you are currently editing in the ControlBar builder as a template, click the Save ControlBar as a Template hyperlink on Home pane of the ControlBar builder.
The dialog shown below will be displayed where you can give the template a name and a description. The description can use HTML markup.

After you have saved the template, you can save an image of how the ControlBar looks. The image filename that you must use is shown in the next dialog.
When you use the Load Sample ControlBar command the image you have saved will be shown in the list of available templates, making it easier to choose the template you wish to use.

Application Server - Publishing - The publish genie now
has an option on the 'Clear
Publishing History' button to clear the publish history for
just the currently selected publish profile. The ability to clear
all history is still available as an option.
UX Component - New Starter Template for Mobile App - A new starter UX template is available. The template, called MobileAppFramework_FlyInMenu_to_select_Active_Panel ) is a Panel Navigator, with multiple Panel Cards, and a Control Bar with a menu button that displays an expanding menu that flies in from the left.

Xbasic - Arrays - Change_type() Method - Changes the data type of an Xbasic array.
When you create an Xbasic array by parsing some JSON text, the array's type is set to 'A'. This is because a JSON array can contain items that are of different type.
For example, consider the following code
dim json as c
json = <<%txt%
[
{name: "fred"},
3
]
%txt%
dim p as p
p = json_parse(json)
If you were to check the type of p[1], (using typeof(p[1]) ), it would return 'P'.
However, if you were to check the type of p[2], it would return 'N'.
So the array elements in the array can be of any type. You can also dim an array where the items can be of any type like as follows:
dim array1[10] as A
Now consider a JSON string that defines an array in which all items are of the same type:
dim json as c
json = <<%txt%
[
{name: "fred"},
{name: "john}
]
%txt%
dim p as p
p = json_parse(json)
In this case all of the elements in the array are of type 'P'.
However, if you insert or append elements to the array, the new elements will be of type 'N' and not 'P' as you might have expected. This is because the internal type of the array is 'A' (as is always the case when an array is created by parsing a JSON string).
In some cases you will want to change the type of the array to a specific type so that items inserted into the array, or appended to the array are also of the same type as the other items in the array.
For example:
dim json as c
json = <<%txt%
[
{name: "fred"},
{name: "john}
]
%txt%
dim p as p
p = json_parse(json)
dim result as c
result = p.change_type("P")
if result <> "" then
ui_msg_box("Error","Could not change array type: " + result)
end if
p.insert(1,1)
?typeof(p[1])
= "P" '<<----- would have been 'N' had the .change_type() method not been called!
UX Component - ControlBar - ControlBar Builder - Pre-defined Templates - New pre-defined templates are available when you create a new ControlBar from a template and the template picker has been enhanced to show a preview of each template.
When you create a new ControlBar, you can set all of the properties in the ControlBar by selecting a template (i.e. sample ControlBar). To select a template, click the Load Sample ControlBar hyperlink on the ControlBar builder Home pane.

When you click the hyperlink a window showing the templates is shown:

UX Component - ControlBar - DisclosureButtons - Disclosure Position - Three new disclosure positions are now available: flyout, flyout-element and flyout-element-cover. Using these positioning directives, it is possible to create controlbars with dropdown menus. See example below.

In the image below, the button on the toolbar opens another disclosure positioned using the flyout-element position.

NOTE Sample ControlBars that use the new
flyout-element
position directive can be seen by selecting the Load Sample
ControlBar hyperlink on the ControlBar builder Home tab.

sql_import() function - Upsert - The SQL_Import() function is a helper function that imports new records into a SQL table. It is called a 'helper' function because it is an alternative to writing the low level Xbasic AlphaDAO commands to import data. This function now supports both 'insert' and 'upsert'. An 'upsert' performs an update on existing records and an insert if there is no existing record.
The syntax for the function is now:
p result = sql_import(connectionString as c, tableName as c , tableOwner as c, csv_or_json_data as c , replicateIdentity = .f., inputfield_to_sql_table_column_map = "", action="insert", primaryKey = "")
Where:
Example
p = sql_import("::name::myconnstring","table1","","c:\data\datatoimport.xlsx",.f.,"","upsert","id")
UX Component - List Control - Freeform Layout - List Item Footer - Freeform layouts now support the List-item Footer property. The state of the list item footer can be toggled on each row from open to closed, or vice versa using the <listObject>.toggleRowExpander() method.
UX Component - Multi-select Token Control - Keep List Open - A new option has been added to the Multi-select Token Control to keep the pick list of choices open after the user makes a selection.
UX and Grid Components - Arguments - Upper Case Names - When you add a new argument or rename an existing argument, the argument name is now converted to uppercase. By using the convention that argument names are always uppercase, a class of bugs that can result when the same argument name is used in multiple linked components is used and in each of these components, the argument name is defined using a different case.
UX Component - List Control - Detail View - onStateChanged Event - A new event has been added to the List control. The onStateChanged event fires when the Detail View goes from clean to dirty, or vice versa.
UX Component - Auto-Suggest and Edit-Combo Control - Multiple
Selections - Keep List Open - The Auto-suggest and Edit Combo
controls have always allowed you to set a mode where multiple
selections can be made. However, each time you make a selection the
pick list is closed and you must reopen the pick list before you can
make your next selection.
Now, a new property in these controls allows you to specify that
the pick list should stay open after each selection, allowing you to
make multiple selections more easily.

If you have turned on multiple selections, you can delete previously made selections by either backspacing to delete one character at a time, or use Shift+Cntrl+Backspace to delete complete selections.
If you have turned on multiple selections, you can prevent the user from selecting the same value more than once by setting the Allow duplicate selections property.

PhoneGap App Builder - Core Plugins And Some Key 3rd Party Plugins - Added a version specification to all core and some essential 3rd Party Plugins plugins to resolve
problems with updated plugins and Android on PhoneGap Build.
Many of the core plugins were updated recently and specified a requirement for a minimum PhoneGap version of Android 6.3.0. PhoneGap Build cli-7.0.1
(the latest release supported by PhoneGap Build) includes Android PhoneGap Version 6.2.3 so the changes to the plugins configuration files causes the build to
fail on the current release on PhoneGap Build. This change ensures that PhoneGap Build will work with the specified plugins.
PhoneGap App Builder - 3rd Party Plugins - Added support for the PDF417-Phonegap plugin. This plugin is a small but powerful scanner that handles bar code and PDF417 scanning.
Alpha Style Sheet - SVG Icons - Several new SVG icons have been added to the Alpha stylesheet. These are:
UX Component - List Control - List Virtualization - onNavigate Event - The onNavigate event's behavior is different depending on whether the list is virtualized or not. If the List is not virtualized, the onNavigate event fires when the List is scrolled. If it is, then the onNavigate event fires when the user navigates to a new page of records.
In order to allow the behavior of this event to be consistent regardless of the virtualization option, a new property has been added to the list. The onNavigate event behavior property can be set to Navigate, Scroll or Both. When set to Scroll, the behavior is the same as a non-virtualized list.

Application Server - OpenSSL - Updated to build 1.0.2m of OpenSSL.
Web Security - Utility for SQL tables in Standard Server -
A revised utility has been added to the 'Utilities'
option in the Web Security menu when using SQL based tables on the
standard server. The new utility will still verify if the defined
security tables can be found, but has additional options.
If the security system connects to the SQL tables with Active Link
tables, the utility has an option to 'Validate
Field Maps'. The action will verify if the field map saved in
the Active Link tables map to the correct field names in the SQL
table.
The option will only check a single table if one is selected. If a
table is selected, the option 'Clear
Selected' will remove the selection and allow checking all
tables.
The option 'Show Connection
String' will show the actual connection string used by a
table if the table is selected. The normal configuration would have
the same connection for all tables.
Errors cannot be corrected if using Active Link tables, but the
utility will show a message on close if any errors were found
Changes can be made and saved if the security system is using a 'DataLink'
file in place of Active Link tables. The option to 'Show
Connection String' is still shown, but the option to 'Validate
Field Maps' will open a genie to remap the fields if any
errors were found in the existing map. The genie will only allow
selecting fields that are of the correct data type and length.
A new option is shown to 'Change
Connection String'. This shows a list of available
connections and can change the connection for all tables. The
utility will check if the current tables exist in the new connection
and will run the validation option is tables with the same names are
found.
Another new option is 'Select
New Table'. This will show a list of tabled found in the SQL
database that uses the connection. When a table is selected, the
field map validation will run to allow remapping the field as
needed. This option can also create a new table in the target
database, but will not populate the new table with any data.
Changes can be saved by the 'Save
Changes' button which is activated if any changes were made.
PhoneGap App Builder - iOS Launch Images - Added static (legacy) image generation support for iPhone X and the 10.5 inch iPad Pro launch images. If you are planning to support the new iPhone X and/or the 10.5 inch iPad Pro, you previously had to use storyboard images for your app launch image. This is no longer the case. If you choose to use static (legacy) launch images, then the appropriate size is automaticaly generated for the iPhone X and the 10.5 inch iPad Pro. Remember to center weight your image (look at Twitter's launch image) and verify that each generated image looks correct. The iOS launch images can be found in the PhoneGapProjects\ProjectName\www\res\screen\ios folder.
PhoneGap App Builder - PhoneGap Project Template The PhoneGap new project template was modified to support better code formatting for legacy (static), iOS Storyboard and Android 9-Patch launch images. These sections are dynamically replaced within the PhoneGap config.xml file when the launch and storyboard images are generated by the PhoneGap App Builder genie.
UX Component - List Control - No Records in List HTML - Specify Message Using Javascript - The List Builder allows you to specify a message to show in the List if there are no records in the List.
Previously, you could only define some static HTML to display. Now you can specify some Javascript code to return the message to be shown. To specify that the message is returned by some Javascript code, prefix the message with javascript:
For example, assume that you had defined a local function called norecordsmessage in the List Builder (Turn on the optional Javascript tab in the List Builder and define a function at the This object level).
You would set the No Records HTML to:
javascript:this.norecordsmessage()
You can also include a5-item attributes in the message text. For example, assume you wanted to display a message if the user tapped on the no records message. Assume also that the message was to be returned by a local function called norecordsmessage(). Here is how this could be done:
First, define an item in the List Builder's Items tab (by turning on the optional Template Items tab - check the box at the bottom of the List Builder window. For example, you could define an item called 'norecords' that displayed a message when clicked.
Then define the norecordsmessage function as follows:
return '<span a5-item="norecords">List has no records</span>'
Xbasic Functions - convert_ts_to_js() - Converts TypeScript files (with .ts extension) to Javascript files (with same name, but .js extension)
Syntax
result = convert_ts_to_js(files)
Where
UX Component - Client-side Event - OnBeforeCreate - Fires before any code to render the UX is executed. Allows you to change settings in the Alpha Anywhere Javascript library that affect how the UX is rendered. For example you could override the definition of the A5.listBox.prototype.populate() method in this code.
NOTE: The {dialog.object} object cannot be referenced in the code for this event handler as it has not yet been instantiated.
Xbasic - a5_XbasicTreeToJSONTree() Function - This function, which takes a CRLF delimited string, and converts it into a complex JSON structure that can be used to populate a Tree or Menu control, has been enhanced and now allows you to define the Javascript code to execute when the user clicks on a tree leaf.
Consider the following example, which produces a tree showing Countries, Cities, then ContactName. ContactName is the tree leaf. When the user clicks on a leaf, you want to call a Javascript function. The data for the tree should come from a SQL query.
Here is how this is achieved:
dim cn as sql::Connection
cn.open("::Name::northwind")
cn.PortableSQLEnabled = .t.
dim sql as c
dim flag as l
'define the sql query that will return the
data in the correct format
sql = <<%str%
select country, city,
concatenate(contactname,'```onclick:findCustomer(','''',customerId,''')')
from customers where not (country = '') order by country, city,
contactname
%str%
flag = cn.Execute(sql)
dim txt as c
txt = cn.ResultSet.tostring(-1,-1,.t.,"|")
'this will generate a crlf delimited string like this
'France|Nantes|Carine Schmitt```onclick:findCustomer('FRANR')
'France|Nantes|Janine Labrune```onclick:findCustomer('DUMON')
'France|Paris|Dominique Perrier```onclick:findCustomer('SPECD')
'France|Paris|Marie Bertrand```onclick:findCustomer('PARIS')
'France|Reims|Paul Henriot```onclick:findCustomer('VINET')'
'notice that the tree branches are separated by a | character.
'the leaf nodes specify an onclick event.
'the syntax for the onclick event is ```onclick:javascript to
execute
'notice that we pass the primary key to the leaf as the argument to
the function
txt = a5_XbasicTreeToJSONTree(txt,"|","html")
The resulting JSON string is:
[
{
"html": "Argentina",
"children": [
{
"html": "Buenos Aires",
"children": [
{
"html": "Patricio Simpson",
"onClick": function() { findCustomer('CACTU')}
},
{
"html": "Sergio Gutiérrez",
"onClick": function() { findCustomer('RANCH')}
},
{
"html": "Yvonne Moncada",
"onClick": function() { findCustomer('OCEAN')}
}
]
}
}...... ]
UX Component - Spreadsheet Input Control - Get and Set Column State - Two new methods have been added to the control
Example
var obj = {dialog.object}.getControl('myspreadsheetcontrol_1');
var json = obj.getColumnState()
//store the column state in local storage
localStorage.setItem('columnstate',json);
//restore the column state
var obj = {dialog.object}.getControl('myspreadsheetcontrol_1');
var json = localStorage.getItem('columnstate');
obj.setColumnState(json);
UX Component - List Control - Media Files - Events - In a disconnected application you can configure the media files in the List to download to the mobile device and be stored in the filesystem on the device. The UX component will fire the beforeMediaFiles download and afterMediaFilesDownload events. Previously, even if there were no media files to download, these events would fire. Now, if there are no media files to download a new event, onNoMediaFilestoFetch will be fired.
UX and Grid Components - Reports - Send via Email - A new option in the Action Javascript command to display a report, now allows you to email the report rather than displaying it.

When you check the Email report property the Email settings property is shown when you can configure the email that will be sent with the report as an attachment.
The Email Settings dialog is shown below.

UX Component - Frame Control - Modern Frame - Set Open/Close State Programmatically - A new method allows you to set a modern frame to be open. closed, or to toggle its state.
The method, {dialog.object}.frameOpenStateChange(frameId, state) takes two arguments:
Alpha Style - IE 11 - Browser Hang - Under some circumstances it was possible to hang IE 11 when using a Grid or UX component that used the Alpha style. The Alpha style uses SVG icons for all icons shown in the components. If a button had an SVG icon and you clicked directly on the icon, and as a result of the click, the icon was replaced (perhaps with a disabled version of the icon), IE11 would occasionally hang.
UX Component - SpreadsheetInput Control - Column Width - The column width property was not being honored when the control was rendered.
Alpha Anywhere Server for IIS - Install Error - An install error introduced in approximately build 4710 has been corrected.
bus_days_between() Function - Fixed a bug in this function when using a .dbf table for the list of holidays. The bug did not exist when using a SQL table for the holiday list.
AlphaCloud - All Components - Local CSS - SASS - If any local CSS defined in a component used SASS syntax, the definition was not properly converted to CSS. This bug was a recent regression.
SASS Processing - This build now includes a new version of the SASS processor that converts SASS to CSS. This new SASS processor can report errors in the input SASS file.
UX and Grid Components - Client-side Watch Expressions - Stack depth exceeded Error - Certain types of client-side watch expression (for example myFunction('{grid.componentName}'), would cause a 'stack depth exceeded' error message when the component was saved.
Page Layout Component - Fixed an issue when a Page Layout component contained a Grid component.
UX Component - Edit-Combo Control - Automatically Displaying the List of Choices - In some situations you might want the pick list for an edit-combo box to be displayed automatically as soon as the user gives focus to the control.
This is easily done by getting a pointer to the button that opens the pick list and then calling the object's .click() method.
For example, assume that the variable name for your edit-combo control was MYEDITCOMBO. You could add this code to the control's onFocus event:
ele = $('DLG1.V.R1.MYEDITCOMBO.BUTTON');
ele.click()
However, on a mobile device this will not work because the events are all abstracted on a mobile device. To get the above code to work on a both a standard desktop browser and a mobile device change the code to use the $e.execute() method, which allows you to execute abstract events.
ele = $('DLG1.V.R1.MYEDITCOMBO.BUTTON');
$e.execute(ele,A5.d.evnts.click);
| UX Component - List Control | Reorder List Rows by Dragging Row to a new Group when Client-side Grouping is Enabled |
When client-side grouping is enabled in a List,
the order of the rows in the List is determined
by the sort expression that is applied to the
data so that the List data can be grouped
correctly. That means that if you drag a row to
a new position, and then drop, the row will
immediately snap back to its original position
(because the client-side sort will be re-applied
to the List data). However, you might want to use drag reorder to move a row from one group to another. This is done by changing data in the row that is moved so that in the onMoveEnd event, the data in the row is updated and then, when the client-side sort is applied to the List data, the row will continue to appear in the target group. In this video we show how a list of customers, grouped by Country, can be re-arranged by dragging a customer from one country to another. Watch Video Download component Date added: 2017-09-14 |
| UX Component - Spreadsheet Input Control | Using the Spreadsheet Input Control |
In certain applications where a user needs to
input data quickly, a spreadsheet style data
entry control can be very efficient. In this video we show how you can add a Spreadsheet Input control to a UX component. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download component Date added: 2017-10-02 |
{dialog.Object}.frameOpenStateChange(frameId,state)"
a2[..].description = <<%html%
Sets the open/closed state of a Frame control. Frame control must be
configured as a 'Modern' frame and must have
the 'Has show/hide buttons' property checked. Where: <br>
PhoneGap App Builder - Added PhoneGap CLI Support for Cordova
Version 7.0.1 - Added support within the PhoneGap CLI
builder for Cordova Version 7.0.1, Android Studio 2.3.3 and XCode
Version 9.0.
Handling of Launch Images, Splashscreens and Icons was modified and
tested with the latest releases of PhoneGap, Android Studio and
Xcode.
Note: The script for Android Studio 2.3.3 was modified to kill all aapt.exe (Android Asset Packaging Tool) instances that remain open after a successful Android Cordova Build. This appears to be a bug in the Windows Android SDK or Cordova 7.0.1.
Xbasic - JSON - extension::json::ForEachString() Method - This method is similar to the Xbasic *for_each() function, except that it is designed to operate on property values in a JSON string.
For example:
dim json as c = <<%str%
{
"name" : "name Smith " ,
"alias" : [ "jj " , "name " ] ,
"id" : {
"name" : "name_01 "
}
}
%str%
Notice that the string 'name' appears in the above JSON as both a property name and also in a property value.
We want to change 'name' to 'John', without changing the names of
any of the property values. Also, note that each property value has
trailing spaces.
'change 'name' to 'John'
json =
extension::json::ForEachString(json,"strtran(value,'name','John')")
'trim trailing spaces from each property
value
json = extension::json::ForEachString(json,"trim(value)")
Result:
{
"name" : "John Smith" ,
"alias" : [ "jj" , "John" ] ,
"id" : {
"name" : "John_01"
}
}
Notice that none of the property names were changed.
UX Component - SpreadsheetInput Control - A new control type is now available in the UX component. The SpreadsheetInput Control allows you to display a spreadsheet style grid of cells in which the user can enter/edit data. The spreadsheet columns can be resized and also reordered.
For example, in the image below, a SpreadsheetInput Control has been defined with 3 columns and 5 rows. The user can use keyboard navigation (tab, shift-tab, up and down ) to move between the cells in the control.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part
3
Download component
When the UX is submitted, the data in the control is submitted as a JSON string.

For example, if the control had been filled in as shown below:

then, when the UX was submitted, the data submitted for the SpreadsheetInput control would be as string with this value:
"[{"field1":"alpha","field2":"beta","field3":""},{"field1":"","field2":"","field3":"gamma"}]"
To, add a SpreadsheetInput control to a UX, select the [More..] control from the Data Controls section of the UX toolbox.

Then select the SpreadsheetInput control from the list.

To configure the control, click the smart field for the Control properties.

This will open the genie where you can configure the control.

The most important property to configure is the Column definitions property. This property allows you to define the columns shown in the SpreadsheetInput control.
Click the smart field to open the editor, as shown in the image below.

You can add columns one at a time by clicking the Add Column button. You can click the Quick Select using Genie hyperlink to add columns to match the fields in a SQL table.
The onNavigate property allows you to specify Javascript code to execute when a cell in the control gets focus.
Defining Row Prefixes and Suffixes
You can define row prefixes (i.e. row labels) and row suffixes so that the control looks even more like a spreadsheet. The prefix displays at the left side of each row and the suffix displays at the right edge of each row. For example, in the image below a prefix has been defined to show the row number.

Here is how the control is configured to show the prefix:
The Has row prefix (label) property is checked.
The Row prefix HTML is a defined using Javascript code that can reference row - the zero based row number and data - the array of data with which the control is populated. To show the row number as the row prefix, the Javascript for the Row prefix HTML is set to:
return (row + 1);
The Width property is set to 50px to set the width of the prefix column.
The Style property is set to font-size: 75%; text-align: right; to make the font slightly smaller than the text in the input control and also to right align the text in the row labels.

Methods
Since the SpreadsheetInput control is a standard UX Data Control, you can use the {dialog.object}.setValue() method to populate the cells in the control with data and the {dialog.object}.getValue() method to get the data in the control. When you use these methods, the value is a JSON string.
For example, if the SpreadsheetInput control has 3 columns (field1, field2 and field3), you could use the following Javascript to populate the control:
var _data = [
{field1: 'alpha', field2: 'beta'},
{field2: 'gamma', field3: 'delta'},
{field3: 'epsilon'}
];
var _string = JSON.stringify(_data);
{dialog.object}.setValue('mySpreadsheetControl',_string);
.setColumnAndPopulate() Method
You can also dynamically change the columns shown in the control to match the columns in some data with which you want to populate the control. For example, say that the SpreadsheetInput control was initially configured to show a single column (say 'Field1') and you wanted to populate it with the the following data:
[
{firstname: 'John', lastname: 'Smith', city: 'London'},
{firstname: 'Harry', lastname: 'Jones', city: 'Boston'},
{firstname: 'Winston', lastname: 'Flowers', city: 'Harare'}
]
You can call the control's .setColumnsAndPopulate() method.
For example:
var obj = {dialog.object}.getControl('mySpreadsheetControl');
var _data = [
{firstname: 'John', lastname: 'Smith', city: 'London'},
{firstname: 'Harry', lastname: 'Jones', city: 'Boston'},
{firstname: 'Winston', lastname: 'Flowers', city: 'Harare'}
]
obj.setColumnsAndPopulate(_data);
The columns shown in the control will now be 'firstname', 'lastname' and 'city'.
.getColumnState() and .setColumnState() Methods
Since the columns in the Spreadsheet input control are resizeable and reorderable, you might want to capture the state of the Spreadsheet input control's column layout so that you can restore it the next time the user runs the component.
For example
var obj = {dialog.object}.getControl('myspreadsheetcontrol_1');
'get the spreadhseet control state as a JSON string
var json = obj.getColumnState();
'store in local storage
localStorage.setItem('spreasheet_01_State',json);
Then, to restore the state
var json = localStorage.getItem('spreasheet_01_State');
var obj = {dialog.object}.getControl('myspreadsheetcontrol_1');
obj.setColumnState(json)
UX Component - Client-side Events - onWatchEvent - A new client-side event has been added. The onWatchEvent fires when any of the client-side watch events (show/hide, enable, readOnly) fires. For example, when a client-side show/hide expression on a control is executed the event is fired. The type of event, the name of the control on which the expression is being evaluated and the result of the expression are passed into the event handler.
Possible values for the type parameter passed to the event handler are
UX Component - Set Tab Order - By default, the tab order in a UX component is the same as the order in which the controls were defined. However, you can now define a custom tab order without having to reorder the controls in the builder.
To open Tab Order dialog, select the Set tab order... menu item in the dropdown Menu


In the dialog, select the tab order that you want.

UX Component - List Control - Event - onBeforeListClear - Fires before the list data is cleared.
UX Component - Client-side Events - canAjaxCallback and onAjaxCallbackComplete - callbackId Parameter - A new parameter is available in the e object passed to these events. The e.callbackId property is a GUID that identifies the callback and allows you to match the onAjaxCallbackComplete event with a particular AjaxCallback.
UX Component - List Control - .setDisplay() Method - This method has been enhanced and can now be used to operate on List columns.
For example, the following method will hide columns 0, 1 and 2 in a columnar List layout:
var lObj = {dialog.object}.getControl('list1');
lObj.setDisplay('column',{column: [0,1,2], display: [false,false,false]})
Documentation - List Control - The documentation system now contains in-depth description of the List object. Note that in the documentation the List is referenced as ListBox, its official internal name.
NOTE: The documentation referenced here does not include the List control methods that are only available when the List has a Detail View. These methods are currently documented here.
PhoneGap Builder : Added support for PhoneGap Build Version cli-7.0.1
PhoneGap Build recently added support for PhoneGap 7.0.1 which aside from security and performance enhancements includes some important changes behind the scenes in the build infrastructure.
There are now two distinct builders that can be used by PhoneGap Build, the original and the new and this option is exposed in the Alpha PhoneGap App Builder as the PhoneGap Builder Version property, values 1 and 2.
By default this value is set to 1 which will use the original builder which will most likely be deprecated at some point in the future. If you set this option to 2, then the new builder will be
used by the PhoneGap Build Service.
If you plan to support the new iPhone X, you will need to use storyboard launch images (now supported, see below) and you must use cli-7.0.1 and PhoneGap Builder Version 2.
Please see the PhoneGap Build Blog PhoneGap 7.0.1 Release Notes
for all of the details on the cli-7.0.1 release.
PhoneGap Builder: Added support for iOS Storyboards and Android 9 Patch images
With the release of PhoneGap Build cli-7.0.1, support for iOS Launch Storyboards is now inherently supported within the new builder. If you plan to support the new iPhone X or the iPad Pro 12.9’s
native resolution or split screen/slide-over multitasking, you’ll need to use iOS storyboard launch images.
Launch storyboard images are sized based on scale, idiom, and size classes. They supports all devices, and can be used with split-screen/slide-over multitasking.
Apple is moving away from legacy launch images. There is no official support for providing a native-resolution launch image for the iPad Pro 12.9 or for providing launch images that
work with split-screen multitasking or slide-over. If your app doesn't need to support these contexts, then you can continue to use legacy launch images for as long as you like.
The preferred method of providing launch images is to use a launch storyboard.
These are similar to the legacy launch images, but there are crucial differences:
Designing launch storyboard images (Applies to Android 9-patch images as well)
The key to designing a launch storyboard image is understanding that the edges of the image will almost certainly be cropped. Therefore, one should not place any important information near
the edges of any images provided to the launch storyboard. Only the center is a safe area, and this all but guarantees that following Apple's advice of presenting an
unpopulated user interface will not work well.
Instead, the following tips should enable you to create a launch image that works across a multitude of form factors, viewports, and orientations:
Of the images supplied to the launch storyboard, iOS will choose the image that best matches the device and viewport and render that image.
The Alpha PhoneGap Builder will generate all of the rerquired storyboard images from a single user supplied square 2732px x 2732px (min) png file. The iOS storyboard file is generated from the image specified
for the Portrait splash screen.
Changes to the PhoneGap Build config.xml file
The Alpha Anywhere PhoneGap App Builder will automatically remove and replace certain sections of the config xml file that reference legacy splashscreens, storyboards or Android 9-patch images,
based on the properties set within the builder. All of the sections are marked with XML comments and those comments need to remain in place. If legacy splashscreens are specified then the sections
for the storyboard and Android 9-patch images are removed, but the comment tags are left intact. If storyboards and Android 9-patch images are specified, then the legacy sections are removed.
If you are modifying an older PhoneGap project with a legacy config.xml file (the comment tags we added around April of 2017), these sections will be added to the older config.xml file
and a message will be displayed, indicating that an older config.xml file was modified. In this case, you should edit the config.xml file to remove the older legacy splashscreen section, prior to
submission to PhoneGap Build.
Grid Component - Arguments - Session Variables - Arguments that are bound to session variables are now updated on every Ajax callback. Previously, the argument values were only set when the Grid was initially run.
Xbasic - email_send_sparkpost() Function - SparkPost Options - SparkPost allows you to specify options, such as open_tracking and click_tracking (see SparkPost API documentation).
You can now pass in these options to the email_send_sparkpost() function as shown below:
dim ms as p
'xbasic commands to set required properties of mp not shown
ms.options.open_tracking = .f.
ms.options.click_tracking = .f.
dim key as c = "your sparkpostkey"
dim pp as p
pp = email_send_sparkpost(key,ms)
UX Component - DropdownBox Controls - Client-side Data Cache - DropdownBox Box controls can now be populated with data that is stored in the Client-side Data Cache.
This is particularly useful in the case of mobile applications that are deployed as PhoneGap applications, or in static HTML applications that use the Application Cache, because in these applications the DropdownBox controls are populated with data at the time the application in built. When the applications are run, the DropdownBox controls will still continue to show the data that they were populated with at build-time.
In many cases it will be desirable to update the choices shown in
a DropdownBox with up-to-date data and to continue to use the most
up-to-date data available when the App is launched, even if there is
no connection available at that time.
To solve this problem, you can populate DropdownBox controls with
data from the Client-side Data Cache.
In order to indicate that data from the Client-side Data Cache should be used, set the first line of the static choices to this:
client-side-data-cache:cacheItemName(displayDataColumn,storedValueColumn)
When the App is launched, if a connection is available, the
Client-side Data Cache will be refreshed and the DropdownBox will be
populated with fresh data. If no connection is available the first
time the App is launched the choices you specify in the second and
subsequent lines of the defined Static choices will be used.
For example, assume you had a Client-side Data Cache item called
Products and that
this item had two columns,
Description and Code.
In order to populate the DropdownBox to use the
Description field as
the display value and the
Code field as the stored value, you would use this directive
in the first line of the Static Choices:
client-side-data-cache:Products(Description,Code)
If you want the display value and stored value to be the same, then
just specify the name of the display value column for the stored
value.
client-side-data-cache:itemName(displayColumn,storedValueColumn)
The image below shows how the choices in a DropdownBox control would be defined to read the data from a Client-side Data Cache item called weekdays.
The choices shown starting on line two are the fallback choices that will be used if there is no connection available the first time the App is launched (which means that the Client-side Data cache cannot be populated).

Xdialog - Dynamic Titles - It is now easier to dynamically change the title on an Xdialog. The {title} directive can now display the value of a variable. When the value in the variable changes, the Xdialog title is also changed.
To specify that the {title} directive should use a variable, use this syntax:
{title=@variable_name}
Example:
dim dyn_title as c = "The Title"
ui_dlg_box("dynamicTitleExample",<<%dlg%
{title=@dyn_title};
Title [.80dyn_title!change];
{line=1};
{justify=right}<&Ok>
%dlg%,<<%code%
if a_dlg_button = "change" then
a_dlg_button = ""
end if
%code%)
Clone Workspace - You can now clone a Workspace. The Clone Workspace command is on the File menu when the Web Control Panel or the standard Control Panel have focus.

UX Component - Slider Controls - Client-side Data Cache - You can now set the data in a slider control based on data in a Client-side Data Cache item.
UX Component - Client-side Events - afterControlBasedOnClientSideDataCacheRefreshed Event - Several control types (e.g. SpinList, ButtonList, Slider) can be populated from data in a Client-side Data cache. This event fires after a control that is populated from a client-side data cache item has been populated.
UX Component - Expanding Menu Control - Define Menu Choices Using JSON - You can now define the menu choices in an expanding menu control by defining a JSON object.

Xbasic - Handlebars.js Templating Library - You can now use the popular Handlebars.JS templating library in Xbasic code.
NOTE: The Alpha Anywhere templating library is also available to Xbasic code through the a5_merge_JSON_into_template() Function.
Example:
dim hb as nodeservices::handlebars
dim source as c = <<%str%
<p>Hello, my name is {{name}}. I am from {{hometown}}. I have
{{kids.length}} kids:</p>
<ul>
{{#kids}}
<li>{{name}} is {{age}}</li>
{{/kids}}
</ul>
%str%
dim json as c = <<%str%
{
"name": "Alan",
"hometown": "Somewhere, TX",
"kids": [
{ "name": "Jimmy", "age": "12" },
{ "name": "Sally", "age": "4" }
]
}
%str%
html = hb.RunTemplate(source,json)
Resulting text:
<p>Hello, my name is Alan. I am from Somewhere,
TX. I have
2 kids:</p>
<ul>
<li>Jimmy is 12</li>
<li>Sally is 4</li>
</ul>
UX Component - SpinList and ButtonList Controls - Client-side Data Cache - You can now specify that the data source for a SpinList or ButtonList control is a Client-side Data Cache item. This is particularly useful in PhoneGap applications that are designed to work offline. Here is why:
Say you build a UX component that has a SpinList control and you specify that the control should be populated with data from a Data Series. At the time your PhoneGap application is built, the SpinList with be populated with the data in the Data Series.
Once the PhoneGap app is installed on a device, the SpinList will continue to have the data that was in the Data Series at the time the PhoneGap app was built. If you refresh the Data Series the SpinList will now have up to date data, but this data has not been persisted on the device. So, this means that if you exit the App and re-launch it you are back to having stale data in the SpinList. If you do not have a connection you would not be able to make a callback to the server to refresh the data in the SpinList.
However, if you specify that the SpinList is populated from data in a Client-side Data Cache, the Client-side Data cache will be refreshed automatically when the App is launched and then the SpinList will be populated with the up-to-date data. The data that was retrieved from the server will be persisted on the device (assuming the Client-side Data Cache item was configured to persist data on the device). This means that if you exit the App and then re-launch it (while no connection is available), the SpinList will be populated with the data that was fetched from the server the previous time the App was launched (presuming that at that time a connection to the server was available).
UX Component - List Control - Search Part - Server-side After Search Expression Computed Event - New server-side event when performing a search on a List using the List's Search Part.
The Grid component exposes a server side event, onSearchPartFilterCompute, that allows developers to override the filter that was computed from the submitted search data. This event fires before the actual search query is executed.
Analogous behavior can now be added to searches performed from the Search Part of a List control.
The Javascript method to invoke a search is as follows:
{dialog.object}.getControl('name_of_your_list').searchList( searchOptions)
where searchOptions is a JSON object with these properties:
For example:
{dialog.object}.getControl('LIST1').searchList({searchMode : 'auto', xbasicAfterFilterCompute : 'xbmodifysearch'});
The Xbasic function takes e as an input parameter.
The e object contains:
e.searchDefinition contains these properties
searchValue|||field type|argument name
For example:
%UK%|||C|search_country_country1
For example:
(Country LIKE :SEARCH_Country_Country1)
Your Xbasic function can modify any of the properties in the e.searchDefinition object.
UX Components - Alignment Containers - Client-side Show/Hide Expressions - Were not working on alignment containers.
UX Component - List Control - Star Rating and Switch Control - Client-side Sorting - When you set the control type for a column in a List to either a Star Rating or Switch control and the List had a client-side sort applied to the data, the controls did not behave correctly.
UX Component - Javascript Injection Attack - In some cases, the UX was incorrectly reporting that a Javascript Injection Attack had been detected.
UX Component - List Control - Deleting Records - Under some circumstances a Javascript error was thrown when deleting a List row.
Application Server - IIS - Built-in icons were not displaying a disabled when they should have been.
| UX Component | Multi-Lingual PhoneGap Applications |
Normally, UX components can be localized by
wrapping the strings you want to translate in
either language tags (<a5:r>...</a5:r>) or text
dictionary tags (<a5:t>...</a5:t>). The string
translation takes place on the server when the
component is rendered. But in a PhoneGap
application, the component is loaded from the
file system on the device and so you can't use
language or text dictionary tags. Instead, you
must use a client-side approach (using
Javascript) to translate the strings into the
selected language. In this video we show how you can implement client-side language translation. Watch Video - Part 1 Watch Video - Part 2 Download component Date added: 2017-08-04 |
| UX Component - FormView Control | Client-side Show/Hide and Enable Expressions that Reference External Data |
Typically, the client-side show/hide and enable
expressions in a FormView layout reference field
values that are in the data being displayed in
the Form. For example, the Form might have a
field called Country and you might want to show
a container only when the Country field has a
certain value. However, there are also use cases where you want to reference external data (i.e. the value in some other control on the UX) in a client-side expression. This video shows how this is done using FormView state variables. Watch Video - Part 1 Watch Video - Part 2 Download component Date added: 2017-08-14 |
| UX Component - ViewBox Control | Client-side Show/Hide Expressions that Reference External Data |
When you define the layout for a ViewBox
control, the template can use the
{*if}
directive to conditionally show/hide content in
the ViewBox. Typically the expression in the
{*if} directive will reference data in
the ViewBox data. But in some cases you might
want to reference data that is external to the
ViewBox (for example, your UX might have a
control whose value you want to reference in the
{*if}
directive's conditional expression). In order to
do this, you must create a ViewBox state
variable that is set to the value of the
external data. In this video we show how external data is used in a ViewBox conditional expression. Watch Video Download component Date added: 2017-08-15 |
| UX Component - List Control | Displaying Data in a List using a StarRating Control |
Many applications allow you to rate something by
tapping on a star in a StarRating control. The
UX component has a stand-alone StarRating
control (accessed by selecting
[More...] in the UX Builder Controls
toolbox), but in some cases you might want to
display data in a List control using a
StarRating control. In this video we show how this is easily done. Watch Video Download component Date added: 2017-08-18 |
| UX Component - List Control | Row Drag Actions |
A common user interface pattern seen in mobile
apps that use a List is to allow the user to
drag on a row in the List to invoke some type of
action. For example in the iOS Email app a user
can drag on a row to archive the row, mark is as
unread/read, or move the row to another folder. In this video we show how you can implementing row drag behavior an a List control. Watch Video - Part 1 Watch Video - Part 2 Download component Date added: 2017-08-25 |
| UX Component - List Control | Reorder List Rows by Dragging Row to New Position |
In certain applications where a List control is
used, it is necessary to allow the user to
reorder the rows in the List. A common user
interface pattern used to reorder List rows is
to allow the user to drag a row to its new
position in the List. In this video we show how you can add 'drag to move row' behavior to a List control. Watch Video - Part 1 Watch Video - Part 2 Download component Date added: 2017-08-28 |
| UX Component - List Control | Displaying Summary Values in Column Footers |
In some applications you might want to compute
summary values (e.g. count, total, average,
etc.) for data in a List column and then display
that data below the last row of data in that
column. In this video we show how this is done. Watch Video Download component Date added: 2017-09-02 |
| UX Component | Adding Keyboard Shortcuts to a Component |
In this video we show how you can add support
for keyboard shortcuts to a UX component.
Keyboard shortcuts can speed up a user's
interaction with a component. For example, you
could configure the Ctrl-S key as a shortcut for
saving the data in the a UX. Watch Video Download component Date added: 2017-09-02 |
| UX Component | Using the Enter key as a Keyboard Shortcut to Navigate to Next Control |
For users filling in a UX with many controls,
pressing the Enter key to navigate from field to
field, can be a useful productivity boost. In this video we show how the Keyboard Shortcuts feature in the UX component can be used to map the Enter key to navigate between input controls. Watch Video Download component Date added: 2017-09-02 |
| UX Component - List Control | Displaying Data in a List using Switch, Radio Button, Checkbox, Integer Increment and Map Controls |
The UX offers several different control types
that can be used to display data in the List. In this video we demonstrate several of the control types that can be used in a List. Watch Video Download component Date added: 2017-09-02 |
UX Component - Client-side Data Cache - A new option to automatically refresh the Client-side Data Cache before reading it has been added to the following actions in the Client-side Data Cache action in Action Javascript:
When you read the value in a client-side data cache item that has been persisted to storage on a device (either local storage or the file system if in a PhoneGap application), the existing value in the cache will be returned. If you wanted to ensure that you were getting 'fresh' data you would need to first execute an action to refresh the Data Cache. Now you can combine the refresh and read actions into a single step. Both the 'Read Data' and 'Read Multiple Data Items' actions now have a new property - Refresh cache items (if on-line) before read. When you read an item, the cache will first be updated (if the device is on-line and the Alpha Anywhere server is available) and then the refreshed cache will be read. If the device is not on-line, or the Alpha Anywhere server is not available), then the existing data in the cache is read and returned.


UX Component - Client-side Data Cache - Client-Side Data Cache Action in Action Javascript - The Refresh Data Item(s) action now allows you to specify Javascript to handle these situations:

Web Control Panel - Bulk Operations UX Components - The
bulk operations 'Recalculate
UX components' and 'Turn
Pre-render option on for UX Components' have been replaced
with a new single genie for updating UX components. It is listed in
the Web Control Panel menu option
Edit ->
Bulk Operation as 'Update
UX components'
This new genie has options to filter the list of components by
filtering by the 'pre-render'
property, the file save
type (binary or JSON), and if the component was last saved in an
older build. This can make selecting the components to update
easier. The update options include the original recalculate option
and a new option to recalculate all controls as part of the update.
Selected components can be changed to
pre-render or have
the pre-render
option removed. The component save format (binary or JSON) can be
changed at the same time. The genie includes help to explain the
various options.
Some update options will automatically change the filters to show
appropriate components. For example, if you select to change
components to 'pre-render',
only components that are not already pre-rendered will be shown.
Web Security - Using SQL Data - Use DataLink File - A new
option has been added to the web security settings when using SQL
based tables. A special encrypted single
DataLink file is
used to store all of the connection data needed to connect to the
defined back-end SQL security tables. This file is named 'DataLink.SecuritySettings'
and will always be included in every publish with other security
settings files. Active Link tables for security are not used with
this option and will be removed from the web project when the 'Use
DataLink File' option is selected. If the
DataLink option is
not selected or removed, the original Active Link tables will be
recreated as required.
When a DataLink file
has been published, the original security Active Link files named 'websecurity_*.*'
will not be used and can can be deleted from the published web
project. A published application will always use the
DataLink.SecuritySettings
file if it exists.
UX Component - List Control - New Control Types - Several new control types are now available for displaying data in a List. These are:
The images below show the various control types.
Watch Video
Download component

To select any of the above List Column control types, go to the Fields tab in the List builder and click the smart field for the Control type property.

UX Component - Keyboard Shortcuts - You can now define keyboard shortcuts for a UX component. The shortcuts can run Javascript Actions, click a button, or execute arbitrary Javascript code.
Watch Video
Download component
To define Keyboard shortcuts, click the smart field for the Keyboard shortcuts property in the UX builder.

This will open up the genie where you can define key combinations and the corresponding action for the key combination.

UX Component List Control - Columnar Layouts - Column Footer - You can now define footers for columns in a List control.

The ability to define column footers is particularly useful when you want to display summary data (such as totals, averages, etc.) at the bottom of a column of data.
For example, in the image below the total for the Quantity column is shown in column footer for the Quantity column.
Watch Video
Download component

In the above example, the total was added to the column footer for the Quantity column as follows:
1. On the Fields tab of the List builder, the Compute summary values option for the Quantity field was checked. This option computes the summary values on the client-side (after the List has been rendered)

2. The following HTML markup was added to the Column Footer Template for the Quantity column:
<div>
Total: <span id="{dialog.componentName}.{dialog.listid}.QTY.TOTAL"></span>
</div>
3. The following code was added to the afterClientSideSummaryCompute event. The code writes the value for the Quantity total to the element with the id of {dialog.componentName}.{dialog.listid}.QTY.TOTAL. This element was placed in the footer template for the Quantity column. By using the placeholders, {dialog.componentName} and {dialog.listid} in the id, we ensure that the Id is unique.

UX Component - List Control - Template Commands - New directives are available for use in the List template. These are:
Request Enhancements - A new option on the Help menu allows you send enhancement requests to the Alpha Anywhere development team.

UX Component - List Control - Reorder Rows by Dragging on Row - You can now easily implement a pattern where the user drags a row in a List to a new position.
Watch Video - Part 1
Watch Video - Part 2
Download component

To turn on drag-reorder behavior, open the list builder and check the Has row drag reorder behavior property in the List builder on the List Properties pane.

Then open the settings builder.

The builder allows you to specify two different modes of operation, DownHold and Handle.
In the DownHold mode, the user presses and holds on the row to be moved. The List then switches to reorder mode and the user can drag the row to its new location.
In Handle mode, the user simply drags on a portion of the row that has been designated as the drag handle to drag a row to its new location. Dragging on any other portion of the row simply scrolls the List. Typically a icon is used to designate the drag handle, and the icon is hidden until the user puts the List in reorder mode (using some Javascript).
When you click the smart field for the Mode option, a dialog is displayed explaining the modes.
Notice when you select the Handle option, a hyperlink is displayed that will show sample HTML, CSS and Javascript to hide the drag handle until the user explicitly puts the List into reorder mode.

UX Component - List Template Items - You can now display a tab in the List Builder for List template items. Previously you had to open a modal dialog window when you wanted to define or edit List template items.
NOTE: List template items are inserted into a List template using the a5-item attribute in the HTML markup for the List.

You can control the visibility of the Template Items, CSS and Javascript tabs by checking the appropriate checkboxes at the bottom of the List builder screen. If your List definition contains control CSS , items, or user-defined List methods (Javascript), the appropriate tabs are automatically displayed when the List builder is first opened.

UX Component - List Control - CSS - Control Level CSS - You can now define CSS for a List control. This CSS is scoped to the List.
This means that if you have two List controls on a UX and in the first List control you define a CSS selector called .myclass1 as color:red; and in the second List control you define a CSS selector also called .myclass1 as color:blue; the CSS selector defined in the second List will not override the selector defined in the first List.
The List builder now has a new pane where you can define this control level CSS.
NOTE: The advantage of CSS defined at the Control level (besides the fact that it is in its own namespace) is that the List is fully defined in the List definition. It does not rely on any CSS classes that are in linked CSS stylesheets or in local (to the UX component) CSS definitions. If you copy the List from one component to another, it will still render correctly.
You can use SASS syntax when defining the control CSS.

UX Component - List Control - Drag on Row - You can now add support for drag actions on a row in a List. You can define actions for both left-to-right and right-to-left drag actions. For each drag action you can define one or more buttons that are revealed as the user begins dragging on a row.
Watch Video - Part 1
Watch Video - Part 2
Download component

The sequence of images shown below shows a List with both left-to-right and right-to-left drag actions defined in its different states.

This image shows the list with the first row selected and before user has dragged in either direction on the row.

This image shows the List after user begins dragging from left-to-right. Notice that the action button is partially revealed because the user has not dragged sufficiently far to the right.

The user has now dragged sufficiently far to the right and has released her finger from the screen. The action button is now locked in place. User can invoke the action by tapping on the button.

The user can continue dragging to the right past the specified threshold distance. The action button keeps on expanding in size. If the user removes her finger from the row the action will automatically be selected. User does not have to tap on the button to select the action.

In this image the user has previously selected the Unread action to mark the status on the row to read. Now the user has dragged again all the way to the right and the label on the action button has changed from Unread to Read. Releasing on the row will invoke the action and mark the row as read. If, instead of releasing, the user drags back in the opposite direction (toward the left), the action button will gradually be hidden and the action will not be invoked

This List is shown in its normal state after the user has selected the Unread action. Notice that the icon on the row has changed to indicate that the row has been read.

The user now starts dragging from right-to-left. Three action buttons have been defined for this action. The action buttons are only partially shown because the user has not dragged sufficiently far. If the user were to release now, the action buttons would be hidden and no action would be invoked.

The user has now dragged sufficiently far to the right to fully reveal the three action buttons. If the user releases now the action buttons remain visible in the row. Tapping on one of the buttons will invoke the action. Tapping in the area to the right of the buttons will not invoke any action and the List row will be returned to is normal state.

If the user continues dragging on the row (past the threshold distance) after all of the action buttons are fully revealed, the outermost action button (Archive) is auto selected and it begins to fill the row. If the user releases now the Archive action will automatically be invoked.
To define row drag settings open the List builder and check the Has custom row drag behavior property on the List Properties pane.

Then open the genie by clicking on the smart field for the Row drag settings property.
TiP: You can get to the Row drag settings genie more quickly by clicking the Quick Access... button at the bottom of the List builder and then selecting Row drag settings from the menu.

The List Row Action Builder genie is shown below. The builder has two panes. The Action Buttons pane is where you define the action buttons for the drag actions. The Actions pane is where you define the Javascript code to execute when each action button is selected.

NOTE: When you drag on a row and select an
action, the row you dragged on does not automatically become
the selected row in the List. If a previous row was selected, this
row remains selected. If you want the row you drag on to
automatically be selected, add this code to the Javascript for the
Action:
this.setValue(index);
UX Component - List Control - Lazy Image Loading - Virtualized List - The code that the genie generates has been changed so that if your list is virtualized and you scroll back to a page of List records that have previously loaded images, the spinner will not be shown for the previously fetched images.
UX Component - List Control - Star Rating - You can now display data in a List column using a StarRating control. Tapping on one of the stars in the control will update the value in the List.
Watch Video
Download component
For example, in the image below, the selected row in the List (which has an associated Detail View) was edited by tapping on a star and the List row is shown as dirty.

To display data in a List column using a Star control, set the Control type for that field to StarRating in the List builder Fields tab (as shown below).

UX Component - Color Picker - A new color picker is now being used in selected parts of the UX builder.
The color picker has several modes that make selecting colors easier and faster.
The color picker also has support for semi transparent colors (when set into either 'rgba', 'hsla' mode).
In the image below, the 'Fan Decks' (like paint swatch sheets that you get from a paint store) allows you to select from a series of predefined colors.
On the left you can select any color and transparency that you want by dragging the sliders.
The selected color is shown in the rectangle at the top left.
In the top right corner of this rectangle a much smaller square is shown. This is the color that was originally selected when the color picker was first opened. It allows you to quickly switch back to the initial color by clicking on the color square.

In the Palettes mode (shown below) you can select from a palette of pre-defined colors that you define.

You can easily add a new color to the palette by selecting a color in the left hand pane and then clicking the + icon in the Palettes pane.
Another way to add a color to the palette (when the Palettes mode is not selected) is by clicking on the
button in the left
hand pane.
You can manage your palettes by clicking the down arrow icon in the Palettes mode

In the Image mode (shown below) you can load an image into the image picker and then select colors by pointing to different parts of the image.

You can set the mode in which the color picker works by clicking on the button (shown as HEX in the above image)
This brings up a menu showing the mode.

UX Component - Star Rating Control - Color of Un-selected Stars - You can now set the color of un-selected stars as show in the images below. The top image shows the current default color and in the second image both the selected and un-selected colors have been changed.
TIP: The Star Rating Control is selected by selecting the [More...] item in the UX toolbox (in the Data Controls section).

Application Server for IIS - Publishing - IIS publish now supports optimized publishing (like all other publishing types when using the standard server). Previously, when you published to IIS all of the files in your project were automatically published. It was not possible to publish a single file, of a selected subset of files, as is possible when publishing to the Alpha Anywhere server.
When you publish to IIS, a staging folder named
__staging.staging is
now located in the web project folder. This folder will contain the
published application in a form ready to be deployed to an IIS
server.
Application Server for IIS - Page Security - Deny by Default
- Authorization is now denied by default under IIS. The
authorization rules for accessing files under IIS were previously
set on files only known at publish time. This meant that files could
be added to the web root of a published application and access would
be allowed to any of these files. This changes means that a file
needs to have a rule set to expressly allow or allow by group name
in order for it to be accessible in an application.
Grid Component - Detailed Javascript Error Reporting - In V4.5 detailed Javascript error reporting was added to the Grid. This was done by defining a handler for the window.onerror event. This has caused error alerts to be displayed even when the Javascript errors are benign and caused no problem with the Grids that were run in prior versions. Now, detailed Javascript error reporting is off by default, but you can turn it on using this property:

UX Component - PhoneGap - Action Javascript - Open File with Native Application -- SQL Server Reporting Services - This action can now work with SSRS reports.

UX Component - Data Driven Forms Sample Template - The sample template showing how to create a data-driven form (first released in v4.5) has been updated to include a star-rating control.

UX Copmponet - FormView Control - Action Javascript - The Action Javascript action for FormView actions now has two additional actions:
State variables can be referenced in the FormView layout templates (and therefore in client-side show/hide and enable expressions) using this syntax
[temp].state.your_variable_name
Say you had a container in a FormView layout that contained several controls. You wanted to show this container if a session variable (called say myVar1) was equal to 'alpha'.
MOTE: You would, of course, need to publish the value of this session variable to the client-side by setting the Published session variables property.
Here is how you would do this:
Set the show/hide expression for the container to
[temp].state.myVar1 == 'alpha'
In the client-side onRenderComplete event, execute this code to set the FormView control's myVar1 state variable to the value of the session variable.
var myVar1 = {dialog.Object}.getSessionVariable('MYVAR1');
{dialog.object}.formViewSetStateVariables('FORMVIEW_1',{myVar1: myVar1});
Watch Video - Part 1
Watch Video - Part 2
Download component
UX Component - Audio Player/Recorder Control - New Events - Two new events have been added to the Audio Player/Recorder
UX Component - window.onerror Event Handler - In V4.5, the UX component generates a widow.onerror event handler to report Javascript errors. This event handler displays an alert with a full stack. In some cases, where you are loading 3rd party Javascript libraries, that might throw benign errors on loading, you might want to suppress this error reporting.
The Capture detailed
Javascript error information property allows you to turn off
detailed Javascript error reporting.

UX Component - Templates - Localize PhoneGap Application -
A new template is available showing how you can localize a PhoneGap
application at run-time, allowing the user to select the language
used for the app. The template is called
MobileAppFramework_Client-side-Language_Translation.
Watch Video - Part 1
Watch Video - Part 2
Download component
UX Component - Templates - SecurityFramework-LoginComponentMobileApp-Persistent Login - The template showing how to build a mobile app that has a persistent login has been updated. The template now applies security settings when the component is reloaded and a persistent login token is found.
Alpha Anywhere Application Server for IIS - Publish - Delete
Files - Publish to IIS no longer deletes files and folders that
are not part of the web project. This applies to existing publish
profiles and new publish profiles. Previously, any files in the
target webroot folder that were not part of the web project were
deleted when a project was published.
In the event a you want the old delete behavior, the
Delete existing files
option can be checked in the publish profile:

or the Delete existing files option can be checked in the Advanced Settings section when creating a new publish profile:

UX Component - Pre-Defined Date Range Selector Control - The Date Range selector control is useful if your UX component has controls where the user must enter a start date and an end date.
In the image below, the Date Range Selector (a dropdown box) shows the list of date ranges. The user has selected the 'This Year-to-date' range and the two input controls (one for date start, the other for date end) have been filled in.

To add a Date Range Selector control to your UX, select the control from the Defined Controls section of the UX toolbox.

Once you have added the control, you must edit the Javascript in the control's onChange event to define the Ids of the start and end date controls.
The Choices property for the Date Range Selector shows these choices. These are the built in options. You can add text or language tags to the display value if you want to show the choices in a different language.
|
Today|today
Yesterday|yesterday
This Week|thisweek
This Week-to-date|thisweektodate
This Month|thismonth
This Month-to-date|thismonthtodate
Last Week|lastweek
Last Month|lastmonth
Next Month|nextmonth
This Year|thisyear
This Year-to-date|thisyeartodate
This Quarter|thisquarter
This Quarter-to-date|thisquartertodate
Last Quarter|lastquarter
Next Quarter|nextquarter
You can also add your own custom choices to this List. When you define a custom choice you use this syntax
Display value|javascript:javascript code to compute start and end date
The Javascript code that you write must follow these rules:
For example, here is how a customer item called 'Tomorrow' could be added to the choices in the Date Range Selector Control:
(Code shown on multiple lines for clarity. Must all be on a single line)
Tomorrow|javascript:/*custom date range. code must not contain any
commas*/var d1 = new Date(); var d2 = new Date();
d1.setDate(d1.getDate() + 1); d2.setDate(d2.getDate() + 1); var obj
= {}; obj.startDate = d1; obj.endDate = d2; return obj;
Xdialog - Overlays - You can now design Xdialogs with floating 'overlay' windows. The overlays are similar to bubble-help that you can define for toolbar buttons, Xdialog buttons, etc. except that the overlay content can be any HTML text and the overlay can be applied to any part of the Xdialog.
In the images below an overlay is shown when the mouse if over the combo box and another overlay is shown when the mouse is over the button.
![]() |
![]() |
The Xdialog {overlay=variableName} directive is used to define an overlay.
Here is the code to produce the above Xdialog.
dim overlay1.html as c = <<%html%
<div style="margin: 0px; padding: 5px; border: 1px blue solid;
border-radius:10px;">
This <b>combo</b> lets you pick a number on entries<br>
Your choices are one, two, three or four.
</div>
%html%
dim overlay2.html as c = <<%html%
This is the button that performs the action
%html%
dim item as c = "one"
ui_dlg_box("with_help",<<%dlg%
A Combo;
List {overlay=overlay1}[.60item^={one,two,three,four}];
{line=1};
{overlay=overlay2}
<&Do It...>
%dlg%)
UX Control - Multi-select Tokens Control - Text Highlighting - When you start typing into a multi-select tokens control, the list of choices that is displayed, which is filtered, by the text you have typed, now shows the matches in the choice list with the text you have typed in bold.
For example, in the image below, the user has typed an 'a' and the choice list shows all of the items that contain an 'a'. Notice that in the choice list all of the 'a' characters are bolded.
If you have an existing multi-select token control you will need to edit and resave to get this feature.

ViewBox and FormView Control - Post-process event - You can now specify post process Javascript for each Layout. The post process Javascript runs after the HTML for the layout has been rendered. You can use the Post-process event to modify the HTML that is shown in the layout. A common use of this event is using the A5.u.html.highlight() function to highlight some text in the Layout html.
Javascript Library - A5.u.html.highlight() Function - Can be used to add markup to an HTML string to highlight portions of the text in the HTML. Any text in HTML elements or attributes is ignored.
Syntax:
A5.u.html.highlight(html, searchString [, prefix [,suffix]])
Where
Example
var html = '<div>this is some text</div>';
var html2 = A5.u.html.highlight(html,'ome')
The resulting html2 string will be:
<div>this is s<b>ome</b> text</div>
Example using a function for the prefix argument:
count = 0;
var html = '<span>this text is inside a span. But only a single span</span>'
A5.u.html.highlight(html,'span',function(search,match,offset,html){
count++;
return '<i id="match.'+count+'">'+match+'</i>';
}
)
Result
<span>this text is inside a <i id="match.1">span</i>.
But only a single <i id="match.2">span</i></span>
Grid Component - Pre-defined Date Ranges - When you define the Search Part for a Grid, you can specify that any of the search fields are 'range' searches. If you turn on the range search feature, the Search Part will display two search fields for the start date and the end data.
You can now also display an optional pick list to select common date ranges, as shown in the image below. If you select one of the pre-defined date ranges, the dates in the From and To input controls will be filled in.

To turn on the pre-defined data range feature, check the Pre-defined date range selector property.

You can then click the smart field for the Pre-defined date range selector settings control to configure the selector.
The settings dialog allows you to set:
By default a standard set of pre-defined date ranges are shown. These are:
If you want to translate these names into different languages you can customize the list of choices and add language or text dictionary tags to each label.
You can augment this list with your own data ranges, or you can replace the built-in list with your own date ranges.
To define your own entry to appear in the list of choices, add a choices to the choice list that is defined as follows:
display name in the selector|value|javascript
where value is a unique name for the selection. The value must not contain any special characters or spaces. Javascript is some code that returns an object with two properties: startDate and endDate.
For example:

a5_ink_to_png() Function - This function now has a new parameter that lets you control how the image is created from the ink. Previously, the image was bound to the size of the ink with a 20px border. Now you can size the image to the entire ink page, not just the bounds of the ink text.
The new optional parameter is flagUseViewBox. This defaults to .f. (size the image to the bound of the ink). Set to .t. to size the image to the entire ink page.
Syntax:
a5_ink_to_png(c ink ,n heightInPoints,n
widthInPoints,c filename ,l flagUseViewBox)
Code editor - Code Library - The code Library got broken in a recent release. This is now fixed.
Javascript Errors - The previous build was too aggressive in reporting Javascript errors. Benign Javascript errors are no longer reported.
PhoneGap - SQLite - MySQL - Bit(1) Columns - A bug in creating a SQLite database from a MySQL database when a table in the MySQL database has bit(1) columns has been fixed. Alpha Anywhere treats bit(1) columns as Logical columns. So a value of 3 or 4 (for example), are both interpreted as True by Alpha Anywhere.
UX Component - HTML Editor - Display as Pop-up - Double-click - If you configure an HTML editor to act as a pop-up and you specify that the control has a 'click to edit' button, then you can open the HTML editor by clicking the button. However, double clicking on the HTML control will also open the editor. If you want to disable the double click, so that the HTML editor can only be opened by clicking the button, add this code to the UX onRenderComplete client-side event:
var obj = {dialog.object}.getControl('name_of_html_control')
obj.dblClickEdit = false;
| UX Component - List Control | Lazy Image Loading |
A common use case for Lazy Image Loading is when
you have a List that displays images that are
sourced from a server. If the List has a large
number of rows, fetching all of the images from
the server will slow down the initial render of
the List. However, by implementing Lazy Image
Loading, only the images for the rows that are
currently scrolled into view will be fetched.
You can set a wait time that the List will wait after a row comes into view before the images for the visible rows will be fetched. This prevents fetching images for rows that you scroll past without stopping on. When a row that displays an image that has not yet been fetched is displayed, a 'waiting' image will be displayed. Once the image has been fetched, the 'waiting' image will be replaced with the real image. In this video we show how to configure a List control to use Lazy Image Loading. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2017-05-25 |
| UX Component - ControlBar Control | Dynamically Styling Items on a ControlBar |
A common requirement when using ControlBars is
to dynamically style the items on a ControlBar.
For example, you might want some text to be red
under one condition and green under another
condition. In this video we show how client side templating directives (e.g. {*if} ...{*endif} can be used to define dynamic styles and classes. Watch Video Download Component Date added: 2017-06-09 |
| UX Component - ControlBar Control | Showing a List Control in a ControlBar Disclosure |
A powerful feature of the ControlBar is its
ability to display 'disclosures' (i.e. windows).
These disclosures can be animated into view from
various positions on the screen. A common
requirement is to show a List control in a
disclosure. This video shows how this can be done. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2017-06-18 |
| UX Component - FormView Control | Review of Different Field Editors |
Fields in the FormView control are edited using
Field Editors. You can build your own Field
Editors, or chose from the collection of
built-in Field Editors. In this video we review the different built-in Field Editors that are available as of Build 4192. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2017-06-25 |
| UX Component - FormView Control | Displaying Data from Hierarchical Lists in a FormView Control |
(This video is aimed at advanced users of the
FormView control). The FormView control can display data from multiple Lists that are linked in an hierarchical relationship. E.g. A Customer List with a child Orders List. By default, when the FormView displays data for a selected row in the parent (i.e. Customer) List, it will display ALL of the data from the children of the selected row. In other words, the FormView control will display data for the selected customer in the Customer List and it will show ALL of the orders for the selected Customer. However, in some applications, you might want to display only the data for the selected Order in the Orders List. In other words, the FormView control should use BOTH the parent (i.e. Customer) List and the child (i.e. Orders) List as selectors for the data that should be shown in the FormView control. In this video we show how the FormView control is configured to show just the data from the selected row in the child (i.e. Orders) List. Note: Another way to achieve this result would have been to use two separate FormView controls - one for the Customer List and one for the Orders List. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2017-06-26 |
| UX Component | Introduction to Style 'Tweaks' |
In order to change the appearance of a UX
component you can either edit the stylesheet or
you can 'tweak' the style. In this video we show how you can tweak the style to change the colors in the stylesheet and also how you can add a new button sub-theme. Watch Video Date added: 2017-07-05 |
| UX Component - FormView Control | Displaying Editors in a Pop-up Window |
The typical pattern in a mobile UX component
that uses the FormView control is to place the
editors in their own PanelCard that is animated
into view when the user taps on a field in the
form to edit its value. However if you are using a FormView control in a web application, you might prefer the editors to be shown in a pop-up window next to the field you are editing. In this video we show how the editors used in a FormView control can be opened in a drop-down window relative to the form field you are editing. Watch Video Download Component Date added: 2017-07-05 |
| UX Component - List Control | Injecting Arbitrary Headers and Footers into List Data |
You can inject arbitrary HTML into the List.
This can be used to add headers and footers into
the List as shown in this video. Watch Video Download Component Download Component - collapsible headers Date added: 2017-07-12 |
| UX Component - Multi-select Tokens Control | Adding a Multi-select Tokens Control to a UX Component |
The Multi-select Tokens control operates much
like the Gmail app when you address an e-mail to
multiple recipients. You can type values into a
control, or make selections from a drop-down
choice list. Each selection is shown in the
control as a 'token'. Tokens can be removed from
the list of selections by either hitting the
backspace key while focus is in the control, or
by clicking on the 'delete' icon in the token. A common use case for the Multi-select Tokens control is to define selection criteria for a List control. In this video we show how a Multi-select Tokens control is used to select a list of countries. The List control is then filtered to show the countries that match the selected tokens. For example, if tokens for 'USA' and 'UK' are selected, the List is filtered to show customers in either 'USA' or 'UK' Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2017-07-23 |
| UX Component | Data-driven Forms |
A data-driven form is a form whose fields are
determined at run-time (typically by querying a
database) to get a list of the fields to display
in the form. In this video we show how a ViewBox control and an Editor Set with multiple Editors can be used to implement a data driven form. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download component Date added: 2017-07-26 |
Alpha Anywhere Server for IIS - A potential security issue under IIS has been fixed. A UX AJAX request could be crafted to return the content of a file that should not be visible outside of the server. This fix closes this vulnerability.
email_send_sparkPost() Function - Reply To - Support has been added for the 'Reply to' parameter.
Example:
dim ms as p
ms.send_to = "Fred@acme.com"
ms.reply_to = "Harry@acme.com"
ms.from_email = "admin@acme.com"
ms.from_alias = "admin@acme.com"
ms.from_name = "Admin"
ms.subject = "Reply To Now Supported"
ms.message_html = "Message goes here"
dim key as c = "Your api key"
pp = email_send_SparkPost(key,ms)
Grid Component - Column Sorting - Initial Sort Direction - When the user first clicks on a column to sort the Grid on that column an ascending sort is performed. Now you can specify that the initial sort should be descending.

UX Component - Minimum Build Number - You can now specify a minimum build number for a UX component. If a developer tries to edit the component using a build that is older than the specified minimum build, a warning will be displayed. The user will not, however, be prevented from editing the component.

UX Component - Data Driven Forms Sample Template - A new sample template has been adding showing a technique for implementing data driven forms. A data driven form is a form where the fields in the form are determined at run-time, rather than at design-time.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
Download component
Typically, the form is generated by first querying a database to determine what fields the form should display. Then, some Xbasic code is executed to generate a dynamic form definition.
In the example template the form is implemented using a ViewBox control, an Editor Set and numerous Editors for editing the field values shown in the form.
The image below shows how the sample component renders a particular data-driven form. The actual fields shown in the form are easily controlled by editing a JSON object that defines the fields, the field types and the editor to be used to edit the field value.

UX Component - Multi-select Token Control - A new control type is available for the UX component. The Multi-select Token control is similar to the Edit-combo control and the Auto-suggest control. However, the selected values are displayed as 'tokens' (as shown in the image below where 'Belgium', 'Brazil' and 'Canada' are selected).
Watch Video
- Part 1
Watch Video
- Part 2
Download Component

The user can select values from a pick list as shown in the image below. The pick-list can be automatically displayed when the user starts typing in the input control, or can be displayed when the user clicks on the down array (which is optionally displayed). The user can also select tokens by typing the value into the control and then pressing the Enter key.
To delete a previously selected token, click on the X icon in the token, or click to the right of the last selected token and press the Backspace key.

The choices for the pick-list can be statically defined, can be derived from querying a SQL database, or can be computed by an Xbasic function.
How to Add a Multi-select Token Control to a UX Component
To add a Multi-select Token control to your UX component, select the [More...] item in the Data Controls section of the UX toolbox.

The Multi-select Token control is a Data Control. This means it has a .getValue() and a .setValue() method, just like other Data Controls. When the UX is submitted, the data in the Multi-select Token control are submitted as a comma delimited list of token values.
For example, if there are three tokens selected with values of 'USA', 'UK' and 'Canada', the value submitted is 'USA,UK,Canada'
To set the value in a Multi-select Token control you must specify an array of values. For example
{dialog.object}.setValue('MY_MULTISELECT_TOKEN_CONTROL',['USA','UK','Canada']);
To set a default value for the control in the Default value property in the property sheet you can use this syntax
array(USA,UK,Canada)
Setting the Multi-Select Token Control Properties
To set the properties of a Multi-select Token control, click the smart field for the Control properties property in the Property sheet.
The configuration genie window is displayed, as shown below:

Dynamically Populating Choices at Runtime
You can dynamically populate the choices in the Multi-select Token control at runtime by calling the control's .populate() method. For example, assume you have a Multi-select Token control called 'MST1'. You can use the following Javascript to populate the control's choices:
var _d = {
"data":[
{"value" : "Argentina", "display" :
"Argentina"},
{"value" : "Austria", "display" :
"Austria"},
{"value" : "Belgium", "display" :
"Belgium"},
{"value" : "Brazil", "display" :
"Brazil"},
{"value" : "Canada", "display" :
"Canada"},
{"value" : "Denmark", "display" :
"Denmark"},
{"value" : "Finland", "display" :
"Finland"},
{"value" : "France", "display" :
"France"},
{"value" : "Germany", "display" :
"Germany"},
{"value" : "Ireland", "display" :
"Ireland"},
{"value" : "Italy", "display" :
"Italy"},
{"value" : "Mexico", "display" :
"Mexico"},
{"value" : "Norway", "display" :
"Norway"},
{"value" : "Poland", "display" :
"Poland"},
{"value" : "Portugal", "display" :
"Portugal"},
{"value" : "Spain", "display" :
"Spain"},
{"value" : "Sweden", "display" :
"Sweden"},
{"value" : "Switzerland", "display" :
"Switzerland"},
{"value" : "UK", "display" : "UK"},
{"value" : "USA", "display" : "USA"},
{"value" : "Venezuela", "display" :
"Venezuela"}
]
};
var obj = {dialog.object}.getControl('MST1');
obj.populate(_d);
Grid Component - Summary Fields - Headers - You can now specify that column headers should be repeated before the summary values are shown (as shown in the image below). This is useful when you have a Grid with a lot of rows and the page must be scrolled to get to see the summary values.

To turn on this feature, check the Repeat column headings above summary values property.

Web Security - Get User Values When
Using Active Directory - a5ws_GetUserValuesActiveDirectory() -
A function named
a5ws_GetUserValuesActiveDirectory() has been added to Alpha
Anywhere. It can be used in code running on a web server to get
user values when using Active Directory for security
authentication. This function works in the Classic Alpha Anywhere
server and IIS and retrieves a number of default values from Active
Directory. Help about this function is found in the documentation
at
https://www.alphasoftware.com/documentation/index?search=api%20a5ws%20getuservaluesactivedirectory%20function
Xbasic - Arrays - .push() method - A new .push() method has been added for Xbasic arrays. To push onto a property array use JSON syntax to define the object you want to push onto the array. See examples.
Examples:
dim arr[0] as c
arr.push("hello")
arr.push("world")
? arr
= [1] = "hello"
[2] = "world"
'using a property array
dim arrp[0] as p
'push object defined using JSON syntax onto the
array
arrp.push({"text":"hello"})
arrp.push({"text":"world"})
? arrp.size()
= 2
? arrp[1].text
= "hello"
? arrp[2].text
= "world"
UX Component - List Control - Inject Arbitrary Headers and Footers into List Data - You can now inject arbitrary headers and footers into List data using the onBeforeListDraw event. For example, in the image below a header is inserted for each group of 3 rows of data. A footer is also inserted. Both the header and footer can contain arbitrary HTML. As shown in the image, the footer text contains some bold text as well as a SVG icon.
Watch Video
Download Component
Using items (i.e. the a5-item attribute), you can add event handlers to the header and footer text (see video).
The onBeforeListDraw event allows you to return a new array containing the data to be rendered in the List.

In the above example, the following Javascript is defined in the onBeforeListDraw event to add the headers and footers to the List.
var ta = [];
var group = 1;
for(var i = 0; i < data.length; i++) {
//add a user defined title into the data before every 3rd row
if( (i % 3 ) == 0) {
if(i != 0) {
//add the footer html
ta.push({'*static':
'<div a5-item="item1:'+(group-1)+'" style="padding: 10px; border:
solid 1px gray; border-radius: 10px;">
<img src="svgIcon=#alpha-icon-basketFull:26{ fill: #2730d1; stroke: #f52d2d;}" />This is some static <b>HTML</b>.
It shows how you can add arbitrary HTML into the List</div>'});
}
//add the header html
ta.push({'*title': 'Group ' +
group});
group++
}
ta.push(data[i]);
}
//return a new array of data to be used to draw the list
return ta;
To inject a header into the List, add an object into the data array that has a '*title' property name. To add arbitrary HTML (e.g. a footer), add an object into the data array that has a '*static' property name.
Notice that in the above Javascript code, the data array is passed in. But the contents of this array are not modified. Instead a new array (called ta) is created and the Javascript returns this array. The List is then rendered using this new array of data.
Collapsible Headers
The image below shows a slightly more complex example. In this example, each header is made collapsible. For example, Group1 through Group4 have been collapsed. Tapping anywhere on the header will toggle the collapsed state of the group.
Download Component - collapsible headers

The Javascript in the onBeforeListDraw event to accomplish this is shown below:
var ta = [];
var group = 1;
var to = this._to;
if(typeof to == 'undefined') to = {};
var flag;
var iconOpen =
A5.u.icon.html('svgIcon=#alpha-icon-addCircleBorder:icon,24');
var iconClose =
A5.u.icon.html('svgIcon=#alpha-icon-removeCircleBorder:icon,24');;
var icon;
for(var i = 0; i < data.length; i++) {
//add a user defined title into the data before every 3rd row
if( (i % 3 ) == 0) {
if(i != 0) {
if(flag ==
'opened') {
ta.push({'*static': '<div a5-item="item1:'+(group-1)+'"
style="padding: 10px; border: solid 1px gray; border-radius:
10px;"><img src="svgIcon=#alpha-icon-basketFull:26{ fill: #2730d1;
stroke: #f52d2d;}" />This is some static <b>HTML</b>. It shows how
you can add arbitrary HTML into the List</div>'});
}
}
flag = to['Group:' + (group)];
if(typeof flag == 'undefined') flag =
'opened';
if(flag == 'opened') icon = iconClose;
else icon = iconOpen;
ta.push({'*title': '<div
a5-item="toggle:' + group + '" style="line-height: 26px;"><div
style="float:right;">'+icon+'</div>Group' +
group + '</div>' });
group++
}
if(flag == 'opened') {
ta.push(data[i]);
}
}
return ta;
Notice that the header is wrapped in a div that has an a5-item attribute called toggle. Notice also that the list contains a variable called _to that contains an object with the open/closed state of each group. If a group is closed then the code that pushed the list data onto the new array (ta.push(data[i]) is skipped over, thus omitting these rows from the rendered List.
When a user taps on a header, the onClick event in the toggle item is fired. This event will then add the group's open/closed state to the List object's _to variable. The Javascript code in toggle item's onClick event is shown below:
var to = lObj._to;
if(typeof to == 'undefined') to = {};
var flag = to['Group:' + ia];
if(typeof flag == 'undefined') {
to['Group:' + ia] = 'closed'
} else {
if(to['Group:' + ia] == 'closed') to['Group:' + ia] =
'opened';
else to['Group:' + ia] = 'closed';
}
lObj._to = to;
lObj.refresh();
UX and Grid Components - Amazon S3 - V4 Signing - Ohio Region - Amazon has changed the way that URLs must be signed for their newer regions. For example, support for the Ohio region was recently added to the Storage Connection String builder. But in order to upload or download files to/from the Ohio region, URLs must be signed using Amazon's V4 signing scheme. Support has been added for V4 signing, so now uploads and downloads to the Ohio region will work correctly.
UX Component - ExpandingMenu Control - A new control type is available in the UX Component. The Expanding Menu control displays a list of menu choices, some of which may have sub-choices (indicated by an icon at the right edge of the item). When a menu item is clicked, it can invoke Javascript code. If the menu has a sub-menu, the sub-menu is shown using animation.
In the image below the ExpandingMenu is shown in its full collapsed state and it a partially expanded state.
![]() |
![]() |
To add an ExpandingMenu control to your UX component, select the [More...] item in the Data Controls category.
NOTE The ExpandingMenu is in the Data Controls section, because, like all Data Controls, it has a {dialog.object}.setValue() and a {dialog.object}.getValue() method. The 'value' of the current selection in the Expanding menu is defined by the 'value' property for each node in the tree (see below).

Then select the ExpandingMenu option from the dialog.

To configure the ExpandingMenu control, click the smart field for the Control properties property.

This will bring up a genie where you can define the choices shown in the ExpandingMenu and also set other properties.

To define the choices and sub-choices shown in the menu click on the smart field for the Menu data genie property.
This will bring up a dialog where you can type in your menu choices, using tab indents to indicate which menu choices are sub-choices.
For example, in the image below, the top level menu choices are:
item1
item2
item3
item4
Item1 and item2 hav3 sub-choices.

When you close the Add Item dialog, the Tree Data Genie is shown (see image below). This dialog allows you to set properties for each menu item in menu tree.

Properties that you can set include:
Grid Component - Delete Checkbox - Delete All - A new option has been added to the Grid component to allow you to check/uncheck the Delete checkbox in all rows on the current Grid page at once.
To turn on this feature, check the Allow 'delete-all' checkbox property.
Update Settings

The Grid will be rendered as shown below. The Delete column title will have a checkbox in it. Checking this box will check the delete checkbox in all Grid rows on the current Grid page.

UX and Grid Components - Javascript Errors - Error Reporting - Error reporting when a Javascript error occurs has been improved. The error message will now include a stack dump.
UX Component - ViewBox Control - Sample ViewBox - When you create a new ViewBox a new sample ViewBox is is now available when you click on the Load Sample ViewBox hyperlink.

The Menu tree option displays an hierarchical menu as sown in the image.

UX Component - Sample Templates - MobileAppFramework_with_SplitView_ExpandingTreeMenu - A new sample template for mobile apps is available. This template is similar to the the MobileAppFremework_SplitView_Hierarchical_Menu template, except that the menu is rendered using a ViewBox control, not a List control.
The ViewBox menu can contain nested menus. When a menu item that has children is expanded, the ViewBox is animated, creating a very appealing visual effect.
To use the template, chose the template from the list of available templates when you create a new UX component.

On a Phone, the UX will render as shown below.

Tapping on the 'hamburger' menu icon will show the menu in its collapsed state:

You can expand various branches of the menu. When you tap on a menu item that is an endpoint, the associated action for that menu item is executed.

On a tablet, the menu is always shown on the left of the screen.

To edit the list of choices shown in the menu, edit the ViewBox Control. In the ViewBox control, edit the Data Source. The menu structure and the associated menu actions are defined in the Javascript object for the ViewBox data source.
The background color of the menu is set in the CSS tab in the ViewBox builder. To change the menu color, edit the ViewBox and in the CSS tab, edit this value:
$color: #221f22; //this sets the color of
the menu tree.
Xdialog - Simple List View Control - The simple list view control has been enhanced to allow sortable columns and different views of the data.
In the image below, the List has been sorted on the Firstname column and a small icon in the column title indicates the sort direct.
This is the 'report' view of the data.

In the image below, the 'list' view of the data is shown.

In the image below, the 'SmallIcon' view of the data is shown.

To indicate that a column is sortable, add a caret to the column definition. For example:
[%M;K;%.100,20id^"Firstname:30^|Lastname:50^"list!idchange];
In the above example, we have defined both the Firstname and Lastname columns to be sortable.
You can specify if the sort should treat the data as numeric or data/time values by adding a suffix of N or T after the ^. For example
[%M;K;%.100,20id^"Lastname:30^|DateOfBirth:50^T"list!idchange];
To change the view of the List, send a command to the list using the ui_dlg_ctl_command() function, as shown in the example below. The second parameter in the function is any string in the control definition that uniquely identifies it. In the example below, the text string 'idchange' is used to identify the control.
You can also sort the List on multiple columns using the ui_dlg_ctl_command() function. For example to sort on Lastname (column 2) and then Firstname (column 1), you this command:
ui_dlg_ctl_command(dlg_title,"idchange","sort:2,1")
Full example:
dim list as c
list = <<%txt%
{image=$$generic.orb.green}Erica|Jones
{image=$$generic.orb.blue}Tom|Snider
{image=$$generic.orb.yellow}Molly|Maloney
%txt%
list = replicate(list,30)
list = *for_each(x,"{data=" + *index() + "}" + x, list)
dim dlg_title as c = "Quick ListView - Sortable"
ui_dlg_box(dlg_title,<<%dlg%
{wrap=100}
This dialog shows a simple ListView using the new ^" Xdialog
syntax.;
Using this technique, it is possible to create a simple ListView
with substantialy less Xbasic than the {{Listview} Xdialog command.;
The ^ in the control definition makes the column sortable.;
[%M;K;%.100,20id^"Firstname:30^|Lastname:50^"list!idchange];
{lf};
Click button to change List layout;
<List><Report><SmallIcon>
%dlg%,<<%code%
if a_dlg_button = "List" then
a_dlg_button = ""
ui_dlg_ctl_command(dlg_title,"idchange","list")
else if a_dlg_button = "report" then
a_dlg_button = ""
ui_dlg_ctl_command(dlg_title,"idchange","report")
else if a_dlg_button = "smallicon" then
a_dlg_button = ""
ui_dlg_ctl_command(dlg_title,"idchange","SmallIcon")
else if a_dlg_button = "idchange" then
a_dlg_button = ""
ui_msg_box("Note","User clicked on : " + id )
end if
%code%)
UX Component - FormView Control - Pre-defined Editors - AlphaNumeric KeyPad Editor - A new pre-defined editor for editing character and numeric values in a FormView control (without using the Native keyboard on a mobile device) has been added.
The editor, as shown in the two images below, display the AlphaNumeric KeyPad editor in its two possible configurations. In the first image, the KeyPad is shown as it would be displayed on a Phone.
In the second image, the KeyPad is shown as it would be displayed on a Tablet.


To add the editor to a UX component, select the [Editor-AlphaNumericKeyPad] from the Defined Controls section of the toolbox.

To configure the keypad settings, click the smart field for the Editor configuration genie property in the FormView builder.

The genie allows you to configure various aspects of the keypad.

UX Component - FormView Control - Pre-defined Editors - Time Value Editor - A new pre-defined editor for editing time values in a FormView control has been added.
The editor, as shown below, displays SpinList controls for the hour, minutes and AM/PM values.
The editor also displays a button to set the selection in the SpinList controls to the current time.
You can configure the editor to hide the 'Now' button.

To add the TimeSpinLists editor to a UX component, select the [Editor-TimeSpinLists] item in the Defined Controls section of the UX toolbox.

To configure the Time value editor, click the smart field for the Editor configuration genie property in the FormView builder on the Fields tab.
The configuration genie allows you to specify if the 'Now' button should be shown.

UX Component - FormView Control - Pre-defined Editors - Date/Time Value Editor - A new pre-defined editor for editing date/time values in a FormView control has been added.
The editor, as shown below, displays SpinList controls for the month, day, year, hour, minutes and AM/PM values.
The editor also displays a button to set the selection in the SpinList controls to the current date and time.
You can configure the editor to hide the 'Now' button and to show a 'Clear' button which 'un-sets' the date/time value.

To add the DateTimeSpinLists editor to a UX component, select the [Editor-DateTimeSpinLists] item in the Defined Controls section of the UX toolbox.

To configure the Time value editor, click the smart field for the Editor configuration genie property in the FormView builder on the Fields tab.
The configuration genie allows you to specify if the 'Now' button should be shown.
UX Component - FormView Control - Pre-defined Editors - Numeric Keypad Editor - A new pre-defined editor for editing numeric values in a FormView control has been added.
The editor, as shown below, displays a keypad that allows the user to enter numbers. When editing a value using the numeric keypad, the native keyboard on a mobile device is not used.
A configuration genie allows you to specify various settings for the keypad.

To add the Numeric KeyPad editor to a UX component, select the [Editor-NumericKeypad] item in the Defined Controls section of the UX toolbox.

To configure the Numeric KeyPad editor, click the smart field for the Editor configuration genie property in the FormView builder on the Fields tab.

The configuration genie (shown below) allows you to configure various settings for the keypad.

The Custom formatting Javascript allows you to define code that formats the number when it is displayed in the Keypad number display area.
For example, in the image below, the number is formatted to display a $ sign and two decimal places.

To achieve this, the Custom formatting Javascript property was defined as:
return Number(val).toFormat('$#,##0.00;$ (#,##0.00);------');
UX Component - ControlBar Control - Disclosures - Injectible Content - When you create a Disclosure in a ControlBar you can now set the Disclosure type to Injectible Container.
Previously, you could add a special Injectible Content placeholder in the HTML that you defined for the Disclosure. Setting the Disclosure type to Injectible Container is easier than using Injectible Content placeholders in the HTML and it has another advantage -- it makes it very easy to display List controls in the disclosures displayed by the Control Bar.
Watch Video
- Part 1
Watch Video
- Part 2
Download Component

CSS - Shared Styles - You can now define CSS styles that are shared across all stylesheets. Shared styles can be defined at the system level or at the project level.
The shared styles are stored in the following locations:
The shared styles are defined in a file called style.sass in the _sharedStyles folder. The shared styles can include SASS definitions.
For example, if you define a CSS selector called .style1 in the [Project Folder]\css\_sharedStyles\style.sass file, this selector will be available in all components, regardless of what stylesheet the component uses.
UX Components - ControlBar Control - Disclosure Buttons - Margins - You can now specify margins for the content that is displayed in a ControlBar disclosure.

For example, in the image below, the List in Window disclosure button in the ControlBar in the UX footer displays a disclosure and sets the top, bottom, left and right margins to constrain the size of the disclosure content, giving the impression that the List is displayed in a window.

AlphaLaunch - AEX Files - When you register a UX component as an AlphaLaunch App you can now specify that .aex files for this App should be compiled and published.
Xdialog -WaitDialog - You can now set the width of the Xdialog Waitdialog.

Example:
dim p3 as waitdialog
p3.create(3,"bounce",500) 'set with width to 500
p3.set_color("dark green")
p3.Set_Bottom_Message("This is the bottom row message - line1." +
crlf() + "Line2")
p3.Set_Message("This is the top row message.")
'to close the waitdialog
p3.close()
UX Component - List Control - Allow Any Value - The List control now has a new property, Allow any value, that allows you to set the List value to a value not in the List data. If this property is not checked (the default), you cannot set the List value to a value that is not in the List data.
UX Component - Defined Control - Time Editor for FormView Control - A new pre-defined editor for a time value in a FormView control is available.
To select the time value editor, select [Editor-TimeSpinLists] from the list of controls in the Defined Controls section.

The image below shows a form control on the left with a time value and a time value editor on the right. The time value editor is implemented using three spin lists - one for hours, one for minutes and one for AM/PM.
You can modify the values in the hours spin list if you want to user to select minutes in multiples of 5, 10, 15 minutes, etc.

AlphaLaunch - Download Applications from S3 - By default, when you publish an App to AlphaLaunch, the AlphaLaunch client (i.e. the App running on the mobile device) will download the App from the same folder to which the App was published. The App will be published to a folder in the webroot of the standard Alpha Anywhere server, the Alpha Anywhere IIS server, or AlphaCloud.
However, you can also publish the app to a S3 bucket and when the AlphaLaunch user tries to install a new App, the App files will be downloaded from S3, rather than from your Alpha Anywhere server. Of course, once the user actually starts using the App on their device, Ajax callbacks will be handled by your Alpha Anywhere server.
The benefit of downloading Apps from S3 is that you offload work from your Alpha Anywhere server to S3. Also, in certain cases, when using an Android device and downloading an App from an Alpha Anywhere standard server, the install might fail because the App has too many files. By using S3 as the download location, you can circumvent this problem.
If you want to publish the App to S3, check the Use Amazon S3 as download site for AlphaLaunch Apps checkbox on the Publish to AlphaLaunch dialog.

You will need to specify:
Xbasic - SQL Server Reporting Services - a5w_report_saveAs() Function - You can now use the a5w_report_saveAs() function to print SSRS reports.
Syntax
c filenameOut = a5w_report_saveAs(c reportname, c type, c filter, c order, c filename,P globalVariables , P printOptions, sql::arguments Args)
Where
Example:
dim reportName as c
reportName = "customersbystate.ssrs.a5rpt"
dim args as sql::Arguments
args.add("whatcountry","UK")
dim filename as c
filename = a5w_report_saveAs(reportname,"pdf","","","c:\pdf\report1.pdf",null_value(),null_value(),args)
sys_open( filename)
UX Component - List Control - Detail View - Incremental Refresh After List Populate - A pattern that some mobile App developers use when building offline applications is to automatically do an incremental List refresh when the App is first loaded. This ensures that the user has up to date data on their device. An incremental List refresh (rather than a full refresh) is done so that any unsynchronized edits are not lost. There was no obvious event in which the incremental refresh could be triggered, especially if the List had been configured to download media files to the filesystem.
Therefore, to make this pattern easy to set up, a new property has been added to the List. The Do incremental refresh after List is populated property will allow you to kick off an incremental refresh of the List after the List has been populated.

UX Component - Action Javascript - File Upload Action - S3 Timeout - When you upload to S3, you can now specify a timeout setting. If you are uploading a large number of files, you might need to increase this setting otherwise, you might get 'permission expired' errors from S3 indicating that the time window in which uploads are permitted has expired.


PhoneGap Applications - Usage Descriptions for Plugins - PhoneGap
Build now allows the addition of a
<config-file>
element into the config.xml
file.
http://docs.phonegap.com/phonegap-build/configuring/config-file-element/
This lets you add xml directly to the iOS
Info.plist file and
Android AndroidManifest.xml
file.
This solves an error that you might get when submitting an app to
the Apple App Store. The error complains about certain
UsageDescription
strings not being set in PhoneGap Build Plugins.
E.g.
Camera Plugin : NSCameraUsageDescription
Calendar Plugin : NSCalendarsUsageDescription
The entry into the config.xml file to set the UsageDescription strings is:
<config-file platform="ios" parent="NSCalendarsUsageDescription"
mode="replace">
<string>This app will use the Calendar</string>
</config-file>
UX Component - Client-Side Events - onConnectionChange Event - The onConnectionChange event when the device either gets a connection, or looses its connections. The event has a parameter that tells you whether the device has or does not have a connection. Previously, this parameter was not always accurate. Now, it can be relied on.
A common use case for this event is to only show a 'sync' button on a mobile device when a connection is available. In addition, before executing an Ajax callback you might want to first check that the Alpha Anywhere server is responding (it is possible for the Alpha server to be offline even though the device has a connection).
In summary, here are the events and methods that you can use in a Mobile app.
Example use of .serverIsAvailable() method
var _ok = function() {
alert('server responded');
};
var _err = function() {
alert('server did not respond');
};
//wait up to 500 milliseconds before calling
either the _ok or _err callback function
{dialog.Object}.serverIsAvailable(500,_ok,_err);
UX Component - List Control - <listObject>.setValue() Method - Several new options have been added to the .setValue() method.
NOTE: These new options only apply if the List is set to allow multi-selection.
Examples:
//adds values to the current selection
listObj.setValue({select: 'add', value : ['Smith','Jones']});
//remove values from the currently selected value
listObj.setValue({select: 'remove', value: ['Smith','Jones']});
//toggles the selected state of the items in the value array
listObj.setValue({select: 'toggle', value: ['Smith','Jones']});
//select rows in a list programmatically. If function returns true,
row is selected.
listObj.setValue({select: 'match', match: function(value,data) {
//value and data for the current row
if(data.Country == 'USA') return
true;
else return false;
}
}
);
//select rows in a list programmatically. Optionally add to the
existing selection
listObj.setValue({select: 'match', additive: true, match:
function(value,data) {
//value and data for the current row
if(data.Country == 'UK') return true;
else return false
}
}
);
UX Component - Alignment Container - Centering Content - The Alignment container allows you to easily center align content. If you have multiple controls in an Alignment container, each control is horizontally centered on its own line.

However, if you wanted (say) Control 1 and Control 2 to both be on the same line, and center align the combined width of the two controls, you can now wrap Control 1 and Control 2 in a container within the Alignment container.
UX Component - List Control - Lazy Image Loading - A new
genie is available to set up a List to use Lazy Image Loading.
A common use case for Lazy Image Loading is when you have a List
that displays images that are sourced from a server. If the List has
a large number of rows, fetching all of the images from the server
will slow down the initial render of the List. However, by
implementing Lazy Image Loading, only the images for the rows that
are currently scrolled into view will be fetched.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Download Component
You can set a wait time that the List will wait after a row comes
into view before the images for the visible rows will be fetched.
This prevents fetching images for rows that you scroll past without
stopping on. When a row that displays an image that has not yet been
fetched is displayed, a 'waiting' image will be displayed. Once the
image has been fetched, the 'waiting' image will be replaced with
the real image.
To access the Quick Setup Genie, open the List control builder. Click on the Quick access... button at the bottom of the window and then select the List Quick Setup Genie menu item.

Once the Quick Setup Genie opens, select the Lazy Image Loading option.

The genie allows you to configure a number of options, such as the name of field in your List data that contains the image URL for the image to display in each row. You can also set the URL of the wait image (the image to display before the real image has been fetched).
When you exit the genie, the genie will automatically set several properties in the List, such as the onListDraw and onScroll event, the List template, etc.
AlphaDAO - oData - Authentication Options - You can now specify an Authentication option when building an oData connection string.

The options are:
UX Component - List Control - DetailView - addTableRow() Method - The addTableRow() method allows you to programmatically add new rows to a List with a Detail View.
If you are using this method in a loop, then you can add many new rows to a List quite quickly. Under certain circumstances, this might cause a problem.
The circumstances under which this could cause a problem are:
The reason that there is a potential problem under the above scenario is that writing to the FileSystem in PhoneGap is an asynchronous operation. Each time the List is updated, the edits to the List are saved in files written to the FileSystem. But since these write operations are asynchronous, it is possible (actually likely), that the write operation for the next record added to the List will be initiated before the write operation for the current record added to the List has completed, and so on. These overlapping write operations to the FileSystem could corrupt the files used to store the List edits.
The solution to this potential problem is to temporarily suspend persisting the List while the .addTableRow() method is being called in a loop and then once the loop has completed, turn the suspension off and persist the List to storage.
To suspend persisting to the List, you set the List's .suspendPersist property to true.
To turn persisting back on, you set the List's .suspendPersist to false
To manually persist the List after you have turned suspend persist off use the List's .persistToStorage() method. You must pass in an empty object when calling this method.
For example:
//persist multiple rows in a loop
var listObj = {dialog.object}.getControl('list1');
//suspend list persisting
listObj.suspendPersist = true;
//execute the .addTableRow() method in a loop
//turn list persisting back on
listObj.suspendPersist = false;
//persist the list (passing in an empty object to the .persitToStorage()
method.
listObj.persistToStorage({});
UX Component - Panel Navigator - Carousel Mode - If you are
swiping to the left or the right to navigate from one Panel Card to
another, if the Panel Card you are navigating from allows for
vertical scrolling, you could easily start scrolling the Panel Card
vertically while you were also swiping left or right. This creates
an undesirable visual effect. Now, once you start moving the Panel
Card to the left or right (to transition from one Panel Card to
another), vertical scrolling the Panel Card is disabled.
AlphaDAO - SQLite - AlphaDAO now has built-in support for SQLite. Previously, you could connect to a SQLite database by installing an ODBC driver. However, since there was no syntax handler for SQLite, there was no support for Portable SQL or the Portable SQL functions that AlphaDAO exposes. As a result, certain operations would fail.
Now, with built-in support for SQLite, there is no longer any need to install an ODBC driver and all Portable SQL functions (with the exception of Geography functions, which SQLite does not support) are supported.
Full details on SQLite support are in the documentation.
UX Components - Checkbox and Radiobutton Controls - Render as ButtonList - Icon Alignment - A new property has been added to the builder allowing you to better control the placement of the icon relative to the text.
The Button style property has these options:

Application Server - Stripe - The Stripe methods (built into Alpha Anywhere using Action Javascript) did not work when using the Application Server. This was because the Stripe methods use a Node.js module and the Node modules were not getting installed when the Application Server was installed.
UX Components - List Control - Detail View - Persist to FileSystem - Various improvements have been made to the way the List control persists offline data to the file system.
Application Server - Alternate Login - Facebook - As a result of a change Facebook made to the data returned on a successful login, the Facebook Alternate Login was throwing an error. This is now fixed.
UX Component - Apply Security Client-side - If you checked the option to apply security client-side, but did not also check the option to pre-render the component at design-time, the security settings were not applied on the client-side.

UX Component - Image Controls - Touch Events - Mobile Devices - 300ms Delay - If you defined a touch event for an image control, on a mobile device, the browser would add a 300ms delay before firing the event. This is now fixed.
UX Component - List Control With Detail View - CRUD Operations - Regional Settings - If the regional settings on the server specified a comma as the decimal characters, and the UX was configured to show decimals with a period and to require decimal numbers to be entered with a period, update and insert operations would fail.
SSRS Reports - Internal Parameters - When defining a SSRS report you can specify that certain parameters are 'internal' Previously, when printing a report that has internal parameters, the UI would prompt for values for internal parameters. Internal parameters should not have been exposed in the user interface.
AlphaLaunch - Embedded UX Components - The URL for Ajax Callbacks was not getting set correctly for child UX components loaded by the master UX component if the child UX components were set be 'precomputed' (rather than loaded by making an Ajax Callback0.
UX Component - Absolute Container - Bulk Operations - Recalculate UX Components - If you performed a bulk recalculate of UX components, the settings in an Absolute Container were lost.
UX Component - List Control - Detail View - Persist List Data to Storage - FileSystem - Incremental Refresh - In build 4.4.4, the ability to persist the List data to the filesystem, rather than localStorage, was introduced. This provided for a large increase in the amount of data that could be used in offline mobile apps. A bug was fixed when doing an incremental refresh on the List when the List data was being persisted to the filesystem.
UX Component - List Control - Order - Multi-level sort definitions did not work correctly.
UX Component - List Control - Detail View - Client-side Grouping - New Records - If a List had client-side group breaks, then after a new record was added and the List was synced, focus did not remain on the new record.
Reports - Report Server - Storage Connection Strings - If a report had a reference to an Amazon S3 image that used JSON syntax for the image name, the storage connection string could not be resolved if the report was printed using the Report Server.
Sample Mobile Application - Export to Excel - This sample application shows how you can create a mobile application that has a button that makes an Ajax callback to the server. The Xbasic function that handles the callback creates an Excel file and then the mobile device downloads the excel file and opens it using the native Excel viewer on the device.
UX Component - PhoneGap - iOS Keyboard - Next / Previous Keyboard Buttons - When you run a UX component on a native iOS device, the native iOS keyboard has next/prev buttons to navigate to the next and previous input control on the screen. If you have a UX component with multiple panels and focus is on the last input control on the currently visible Panel, if you tap the next button, focus will go to the next input control, which may be a Panel Card that is not currently visible. Clearly, this is undesirable.
The solution is to disable input controls that are not currently on a visible PanelCard.
Assume you have a PanelNavigator (called 'PANELNAVIGATOR_1') with child PanelCards.
You could add the following expression the the client-side enable expression for each of the input controls.
enableControl('PANELCARD_1')
where 'PANELCARD_1' was the name of the Panel Card in which the input control had been placed.
The enableControl() function would be defined as follows:
function enableControl(txt) {
var p = {dialog.object}.panelGet('PANELNAVIGATOR_1');
var ps = p.state;
if( p.state.activePanel == txt) return true;
return false;
}
This function will return true if the active PanelCard name matches the passed in PanelCard name.
So, only input controls on the currently active PanelCard will be enabled and the iOS keyboard next/previous buttons will only cycle through the controls on the current PanelCard.
NOTICE: Alpha Anywhere is now being being built with Visual Studio 2015. Previously Alpha Anywhere was built using Visual Studio 2013.
IMPORTANT: If you have UX components with Lists that have updateable Detail Views and these UX components were defined as pre-rendered then you will need to edit these components and resave them so that the pre-rendered code can be re-generated. You can use the Edit, Bulk Operations, Recalculate UX Components menu item to do a bulk update of your UX components.
| AlphaLaunch | Publishing Apps to a Device using AlphaLaunch |
Publishing Apps to an App store (especially the
Apple App store) can be a time consuming and
frustrating experience. Using AlphaLaunch you
can quickly and easily publish Apps to Apple and
Android devices, completely bypassing the App
stores. In this video we show how you can publish an App to a device using AlphaLaunch Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Date added: 2017-03-26 |
| UX Component | Mobile Applications with Persistent Logins |
A common pattern in mobile applications is to
not require the user to login to the application
after they have successfully logged in for the
first time. The login should be persistent
until is is explicitly revoked by the action of
an Administrator, or until the end of the
persistent login period is reached. Unlike a traditional Web application built using the Alpha Security Framework, the user will not have to log in again once their session expires, or when they restart the application. In this video we show how this pattern is achieved. (Requires build 4307 or above.) Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Download Component Date added: 2017-04-29 |
| UX Component - ViewBox Control | Get Data for Current Row in ViewBox |
A common use case for a ViewBox is a light
weight alternative to the List control. In a
List control it is easy to get the data for the
row that the user clicked on. In this video we show how a ViewBox that is configured to display a list of data can be configured so that the data for the row that was clicked on can be obtained. Watch Video Download Component Date added: 2017-05-14 |
IMPORTANT: If you have UX components with Lists that have updateable Detail Views and these UX components were defined as pre-rendered then you will need to edit these components and resave them so that the pre-rendered code can be re-generated. You can use the Edit, Bulk Operations, Recalculate UX Components menu item to do a bulk update of your UX components.
If you have PhoneGap applications that use Lists with updateable Detail Views, and if you want to update the server that handles the Ajax callbacks from your PhoneGap applications, you will need to rebuild your PhoneGap applications.
Xbasic - JSON - Reshape JSON - extension::JSON::FormatMapped() Method - It is sometimes necessary to 'reshape' a JSON document, changing property names, creating arrays and objects from properties, etc.
The extension::JSON::FormatMapped() method allows you to do this.
The method takes two arguments:
For example, consider the following input JSON file:
dim jsonIn as c
jsonIn = <<%str%
{
"id" : "001",
"fname" : "John" ,
"lname" : "Doe",
"address1" : "12 Main Street",
"address2" : "Box 20"
}
%str%
Say you want to reshape this JSON document so that it looks like this:
{
"person": {
"id": "001",
"firstname": "john",
"lastname": "public",
"address": [
"12 Main
Street",
"box 20"
]
}
}
Here is the Map that would define to achieve the above transformation:
dim jsonMap as c = <<%str%
{
"person" : {
"id" : "id" ,
"firstname" : "fname" ,
"lastname" : "lname" ,
"address" : [ "address1" , "address2"
]
}
}
%str%
Notice that in the input JSON, there is a flat list of properties. The firstname and lastname properties are called "fname" and "lname"
In the output document, the firstname and lastname properties are called "firstname" and "lastname", the two address fields are in an array called "address" and all of the properties are now a child of a new object called "person"
Here is how you would transform the input JSON (jsonIn) using the map (jsonMap)
dim jsonOut as c
jsonOut = extension::Json::FormatMapped(jsonmap,jsonin)
jsonOut2 = json_reformat(jsonOut) 'format the JSON
Xbasic - JSON - Flatten JSON - extension::JSON::ExtractMapped() Method - Creates a flattened JSON object from a complex JSON object. The flattened JSON object has all properties at the top level, with no nested objects are arrays.
The extension::JSON::ExtractMapped() method allows you to do this.
Assume you have a complex JSON document as shown below. Note that the only top-level property is "person"
dim jsonIn as c
jsonIn = <<%json%
{
"person": {
"id": "001",
"firstname": "John",
"lastname": "Dublic",
"address": [
"12 Main
Street",
"Box 20"
],
"otherInfo" : {
"x": "value of x",
"y" : "value of y"
}
}
}
%json%
Say you want to flatten this JSON document so that all properties are at the top level and also change some of the property names. The resulting JSON document should look like this:
{
"id": "001",
"fname": "john",
"lname": "public",
"address1": "12 Main Street",
"address2": "box 20",
"x_value": "value of x",
"this is the y value": "value of y"
}
Here is the Map that would define to achieve the above transformation:
dim jsonMap as c
jsonMap = <<%json%
{
"person" : {
"id" : "id" ,
"firstname" : "fname" ,
"lastname" : "lname" ,
"address" : [ "address1" , "address2"
],
"otherInfo" : {
"x" : "x_value",
"y" : "this is the y value"
}
}
}
%json%
Here is how you would transform the input JSON (jsonIn) using the map (jsonMap)
dim jsonout as c
jsonOut = extension::Json::ExtractMapped(jsonMap,jsonIn)
dim jsonout2 as c
jsonout2 = json_reformat(jsonout) 'format the JSON
UX Component - Style 'Tweaks' - When working with version 3 and above styles (these include iOS7, AndroidLight, AndroidDark, Alpha), you can now define style 'teaks'. Tweaks are adjustments to the style definition that are stored in a separate file in the Web Project folder. The adjustments include new sub-themes and CSS classes, and changes to existing sub-themes and CSS classes.
Normally when you edit a system style (such as 'Alpha'), a local copy of the style is saved in the Web Project folder and your edits are applied to the local copy of the style.js and style.sass files. The disadvantage of this approach is that if, in a future version of Alpha Anywhere, the style is changed (to fix a bug or to add support for a new control type), the changes made to the system version of style.js and style.sass will not be reflected in the local copy of these files that you created when you edited the style. You would need to manually edit the system copy of these files and copy changes to the local copy of these files. This would be complicated because it would not be easy to find the parts of the file that had changed.
On the other hand, since style tweaks are stored in a separate file, there are no local copies of the style files you are tweaking. Therefore if a future version of Alpha Anywhere updates the style, the tweaks are applied to this updated version of the style and your tweaked style will automatically have all of the changes made to the system style.
Style tweaks for a particular style are stored in this file:
<web project folder>\css\StyleTweaks\<style name>\styleTweaks.json
To define style tweaks, click the smart button for the Style sub-theme and CSS 'tweaks' property.

NOTE: If you customize the style colors and fonts using the smart field for the Customize style color and fonts property, the changes to the SASS variables that define the style's colors and fonts are also stored in the style's Tweaks file.
NOTE: You can also adjust the CSS and
sub-themes in a style using these properties:

However, the adjustments made here apply ONLY to the component you
are editing, whereas style 'tweaks' apply to all components in the
Project that use the tweaked style.
UX Component - FormView Control - Pre-Defined Editors - TextArea - A new pre-defined editor for a FormView control is now available in the Defined Controls section of the UX toolbox. The [Editor-TextArea] pre-defined control creates an editor for a FormView value. The editor uses a TextArea control and it has a vertical scroller so that long text can easily be scrolled on touch devices.
Javascript Editor - Auto-complete for built-in Node modules - When you are editing Node Javascript code in a Javascript editor in Alpha Anywhere, you now get auto-complete for built-in Node modules. For example, assume that you enter this code into your Javascript code to get the Node filesystem module:
var fs = require('fs')
Now, when you type
fs.
you will get auto-complete, as shown in the image below:

Node API s - The Web Control Panel now has a new category - Node APIs.

A Node API is similar to a Node Service in that they both allow you to call code written in Node from Xbasic. The difference is in how you call the code.
A Node service exposes a single piece of functionality to Xbasic. You can invoke the Node service using the node_request_result() function.
For example, assume you have a Node service called mergeData. You would call this service, passing in arguments to the service, as follows:
dim p as p
p.name = "Fred"
p.city = "Boston"
dim result as c
result = node_request_result("mergeData",p)
On the other hand, a Node API allows you to define an Xbasic class with multiple methods whose method are implemented using Node. Your Xbasic code invokes the Node code by calling methods on an Xbasic class instance. Your Xbasic code will create an instance of the class by declaring a variable of type ::NodeServices::name_of_your_Node_API and then calling methods of this class.
For example, assume you have created a Node API called myAPI and that this API exposes two methods, method1() and method2() and that each method takes a single character argument. Here is how you would invoke these methods from your Xbasic code:
'Dim an instance of the API class
dim x as ::NodeServices::myAPI
'now call methods of the class
dim result1 as c = x.method1("alpha")
dim result2 as c = x.method2("beta")
In effect, the Node API allows you to extend Xbasic with methods that are implemented using Node.
NOTE: Future versions of Alpha Anywhere will allow for another use of Node APIs. You will be able to expose REST APIs whose endpoints are implemented using a defined Node API.
How to Create a Node API
To create a new Node API, select the Node APIs category in the Web Control Panel and then click the New button.
This will open a dialog where you can name the Node API and define the methods and implementation for the API
The API methods are defined in the Definition pane (shown in the image below). The syntax used for defining the Node API methods is the same syntax used for defining an Xbasic class. Note that the Definition does not include any actual Xbasic code for implementing each method. It simply define the functions that the API will implement.
The actual implementation of the methods is coded in Node code on the Implementation pane.

The Implementation pane fills in the stub Node code to implement the API methods. You will fill in the actual code for each of the functions in the API.

When you click the Save button two files are created in the node_services folder in your Web Project
When you edit a previously create Node API, the .js file is opened in the Alpha Anywhere Javascript editor, but the editor toolbar shows a special button (API Definition...) at the right edge of the toolbar:

The API Definition... button will bring up the Create Node API dialog (shown in the above images) where you can edit the API definition. When you exit the dialog, the the Implementation file (i.e. the .js file you are editing) will be updated to reflect the edited API definition.
Example
In this example, we will show how to create a Node API with four methods:
Here is how this API is defined in the Definition pane of the Create Node API dialog:

The code is reproduced below:
define class fileoperations
function readfile as c(filename as c)
helptext "read file"
end function
function writefile as l(filename as c ,contents as c)
helptext "write a file"
end function
function fileInfo as fileInfo(filename as c)
helptext "return information about a
file"
end function
function specialN as n(n1 as n ,n2 as n)
helptext "does some math"
end function
end class
define class fileInfo
dim filename as c
dim filesize as n
dim fileTime as c
end class
Notice that the fileInfo method's return type is fileInfo. fileInfo is defined as a class that has these properties: filename, filesize and fileTime.
When you create Xbasic functions that return multiple values, it is common to define the return type of the function as P ( as pointer). In the case of a Node API definition, you cannot define a method whose return type is P. If you want to define a method that returns multiple values, you must define a class, as shown above, and set the function return type to the class.
The definition shown above simply defines what the methods of the Node API are and what input parameters each method takes. The Definition does not contain any Xbasic code to implement the functionality of each method.
The implementation for the above definition is shown below:
Note that the implementation is written using Node code.
exports.api = {
//read file
// inputs:
// call.arguments.filename - string
// returns: string
readfile : function(call) {
var fs = require('fs');
var _cb = function(err,data) {
if(err) {
call.error(err);
} else {
call.return(data)
}
}
fs.readFile(call.arguments.filename,'utf8',_cb);
},
//write a file
// inputs:
// call.arguments.filename - string
// call.arguments.contents - string
// returns: bool
writefile : function(call) {
var fs = require('fs');
var _cb = function(err) {
if(err) {
call.return(false)
} else {
call.return(true)
}
}
fs.writeFile(call.arguments.filename,
call.arguments.contents,_cb);
},
//return information about a file
// inputs:
// call.arguments.filename - string
// returns: fileInfo { filename : "" , filesize : 1 ,
fileTime : "" }
fileInfo : function(call) {
var fs =
require('fs');
var _cb =
function(err,stats) {
if(err) {
call.error('file not found');
} else {
var _d = {filesize: stats['size'], 'fileTime' : stats['mtime'],
filename: call.arguments.filename}
call.return( _d );
}
}
fs.stat(call.arguments.filename,_cb);
},
//does some math
// inputs:
// call.arguments.n1 - number
// call.arguments.n2 - number
// returns: number
specialN : function(call) {
var n =
call.arguments.n1 + call.arguments.n2
call.return(n);
}
};
The implementation is a Javascript file that exports an object with the same name as the Node API. This object has function for each of the methods in the API definition.
The prototype for the object is automatically created from the Node API definition.
Notice that the implementation of the fileInfo method returns an object with properties that match the definition of the properties of the fileInfo class in the Node API definition.
Each method defined in the Implementation takes as its input an argument called call. This argument is an object that has a property called arguments which contains the input parameters to the method and it also has two methods, return() and error(), that allow you to return a result from the function, or report an error.
To use this API from your Xbasic code:
'Dim an instance of the API class
dim fo as ::NodeServices::fileoperations
dim p as p
p = fo.fileInfo("c:\myfiles\file1.txt")
?p.filename
= "c:\myfiles\file1.txt"
?p.filesize
= 2942097
?p.fileTime
= "2017-05-10T14:26:04.193Z"
Xbasic - pdf_fillinFields_get() - Gets a list of the fill-in fields in a PDF file. If a PDF file is created with fill-infields, this function will extract the names of all of the fill-in fields in the file. You can optionally extract additional information about each field.
Syntax
c result = pdf_fillinFields_get(c pdfFilename [, L flagExtendedInfo])
IMPORTANT: This function wraps a 3rd party library which you must install yourself before you can use this function. The download link for this library is: https://www.pdflabs.com/tools/pdftk-the-pdf-toolkit/pdftk_server-2.02-win-setup.exe
Examples (from Interactive window):
dim fn as c
fn = "c:\mypdffiles\pdfform1.pdf
?pdf_fillinFields_get(fn)
= {
"first_name": "",
"last_name": "",
"date": "",
"football": "",
"baseball": "",
"basketball": ""
}
Get extended information (from Interactive window):
dim fn as c
fn = "c:\mypdffiles\pdfform1.pdf
?pdf_fillinFields_get(fn,.t.)
= [
{"title": "first_name","fieldType": "Text","fieldFlags":
"0","fieldValue": ""},
{"title": "last_name","fieldType": "Text","fieldFlags": "0","fieldValue":
""},
{"title": "date","fieldType": "Text","fieldFlags": "0","fieldValue":
""},
{"title": "football","fieldType": "Button","fieldFlags":
"0","fieldValue": ""},
{"title": "baseball","fieldType": "Button","fieldFlags":
"0","fieldValue": ""},
{"title": "basketball","fieldType": "Button","fieldFlags":
"0","fieldValue": ""}
]
Xbasic - pdf_fillinFields_merge() - Merges data into a PDF file that has fill-in fields, creating a new PDF file with the filled in data. You can use the pdf_fillinFields_get() function to get the name of the fill-in fields in the PDF file.
Syntax
L result = pdf_fillinFields_merge(c pdfFileIn, c pdfFileOut, c JSONData)
IMPORTANT: This function wraps a 3rd party library which you must install yourself before you can use this function. The download link for this library is: https://www.pdflabs.com/tools/pdftk-the-pdf-toolkit/pdftk_server-2.02-win-setup.exe
The field values that you use in the JSON data must match the defined 'Export value' in the PDF form. Win the PDF form designer, you can specify an 'export value' for each field. In the Example shown below, the 'Export value' for the 'football', 'baseball' and 'basketball' fields was defined as 'Yes'.
Example:
dim jsonData as c
jsonData = <<%str%
{
"first_name": "Fred",
"last_name": "Smith",
"date": "12/18/2003",
"football": "Yes",
"baseball": "Yes",
"basketball": "Off"
}
%str%
dim pdfIn as c
dim pdfOut as c
pdfIn = "c:\mypdffiles\pdfform1.pdf
pdfOut = "c:\mypdffiles\pdfform1_filled.pdf
pdf_fillinFields_merge(pdfIn,pdfOut,jsonData)
Xbasic - Functions - Arguments as Arrays - You can now specify that an input argument is an array by adding a suffix of [] to the argument name. Previously you had to set the input type of the argument to P if the argument was an array.
NOTE: The array is passed to the function by reference.
Example:
function asText as c(arr as c[])
asText = crlf_to_comma( arr.dump() )
end function
Testing:
dim arr[2] as c
arr[1] = "alpha"
arr[2] = "beta"
?asText(arr)
= "alpha,beta"
Xbasic - Functions - Return Arrays - Previously, an Xbasic function could return an array by setting the return type of the function to a Pointer. Now you can explicitly set the return type to an array by adding a suffix of [] to the return type.
function asAnArray as c[] (commaList as c)
commaList = comma_to_crlf(commaList)
asAnArray.resize(line_count(commaList))
asAnArray.initialize(commaList)
end function
Testing:
arr = asAnArray("one,two,three")
?arr.size()
= 3
?arr.dump()
= one
two
three
Xbasic - Functions - Return a typed Array - You can now define Xbasic functions that return arrays of an explicit type by adding a suffix of [] to the return type. Previously you could only return a generic Pointer value.
For example, assume you had defined the following class:
define class mynamespace::point
dim x as n
dim y as n
end class
You can now define a function that returns an array of the mynamespace::point type.
function ToPointArray as
mynamespace::point[](points as c)
points = strtran(points,";",crlf())
ToPointArray.initialize_properties("x,y",points)
end function
Testing:
pa = ToPointArray("1,1;2,2;1,2")
? pa[1]
= x = 1
y = 1
Web Control Panel - UX Components - Pre-rendered Components - Warning Dialog - If you update to a newer version of Alpha Anywhere and you open a web project that contains any UX components that have been set to pre-render and any of these components were last pre-rendered with an older version of Alpha Aynwhere, you will now get a warning telling you that these UX components need to be re-rendered. The warning dialog will allow you to click a 'Bulk Update' button to automatically update all of the UX components that need updating.
UX Component - List Controls - Offline Applications - PhoneGap - Using the File System to Persist List data - When you build a mobile app that is intended to operate offline, the typical pattern is to use List controls with Detail Views and to turn on the option to persist the List data to storage.
The data in the List are persisted to the browser's localStorage, which is limited to about 5mb of data.
Now, if your mobile application is run as a PhoneGap application, you can persist the List data to files in the device's file system. This will allow you to work with much more data while you are offline.
To turn on the feature to persist List data to the file system, set the Persist where property to FileSystem.

When you set the Persist where option to FileSystem, the Persist mode option is automatically set to Edits and the property is hidden.
If you set Persist where to LocalStorage, you can set the Persist mode to either 'Full', or 'Edits'.
In 'Full' mode, each time the data in the List are edited, the entire List is persisted to localStorage (this is the mode that is implicitly used in all versions of Alpha Anywhere prior to this version).
In 'Edits' mode, each time the data in the List are edited, only the edited rows are persisted to storage.
NOTE: f you select the FileSystem option and your component is not running in PhoneGap, Alpha Anywhere will automatically set the option back to LocalStorage.
How Persisting Data to the FileSystem Works
When you persist List data to localStorage, when the List is initially populated the List data is persisted to localStorage. Each time the List data are edited, the entire List is persisted again to localStorage (unless you change the Persist mode option to Edits). Because writing to localStorage is so fast, and because there is a built-in limit (of approximately 5mb) to the amount of data that must be written to localStorage on each edit, there is no perceptible delay when you are editing the data in the List.
However, writing to the FileSystem is much slower than writing to localStorage and because there is no longer a built-in limit as to the amount of data in the List, a different approach is taken when the FileSystem option is used. When the List is initially populated, all of the data in the List are written to a file in the FileSystem. Each time the List is edited, the only the rows in the List that have been edited are written to a second file in the FileSystem. This will file will typically be substantially smaller than the first file (that contains all of the List data), and since the file is likely very small, writing this file to the FileSystem will be very fast, and again, there will be no perceptible delay when you are editing data in the List.
When the List is synchronized data in the synced rows are written to a third file in the FileSystem and the primary keys of any deleted rows are written to a fourth file in the FileSystem.
The filenames of these four files in the FileSystem are:
Where:
<listName> - is the Id of the List.
<namespace> is the value of the Namespace property (see image below).

NOTE: If the List data are being persisted to localStorage, the Namespace property is used in constructing the localStorage key name. If the List data are being persisted to the FileSystem , the Namespace property is used in constructing the filenames for the four files used to persist the List data and edits.
Location of the List Data Files in the FileSystem
The files for the List data are stored in the device's 'saved' filesystem. The location of the device's 'saved' filesystem is returned by the {dialog.object}.phoneGapGetLocalDirURL('saved') method. The files are stored in a directory (called _offline by default) in this location.
The following methods can be use to get the file system URL and folder for the List data files:
{dialog.object}._persistFS() - the file system URL of the directory in which the List data sub-directory is located
{dialog.object}._persistFolder() - the sub-folder in which the files are actually stored - name has a trailing / character.
The actual folder name of the files is therefore:
{dialog.object}._persistFS() + {dialog.object}._persistFolder()
For example, the fully qualified name of the file that contains all of the data in the List when the list is initially populated is therefore (assuming the List id is LIST1 and the UX Local Storage Namespace property was set to NS1):
{dialog.object}._persistFS() + {dialog.object}._persistFolder() + 'NS1.LIST.LIST1'
NOTE: In the case where the component is running in AlphaLaunch, the base folder for the files is in a special folder returned by the A5.shell.getAppFileStorageDir() method. The {dialog.object}._persistFS() will return the appropriate base folder name when the component is running in AlphaLaunch.
List Virtualization
If you are populating a List with a large amount of data, it is strongly recommended that you turn on the List's virtualization feature. With virtualization turned on, populating a List with a large amount of data is substantially faster than populating the List with virtualization turned off.
To turn on List virtualization, set the Virtualization type property to Dynamic as shown in the image below.

DetailView Button Genie
The DetailView Button Genie now has two new options as shown in the image below:

Delete List Storage - This deletes the files used to store the List data. (If the List is set to persist to Local Storage and the Persist mode is set to Edits, this option will delete the List data from localStorage)
Dump storage data - Dumps out the contents of the files that contain the List data (If the List is set to persist to Local Storage and the Persist mode is set to Edits, this option will dump the List data stored in localStorage). The data can be dumped to a file on the server, a bucket on Amazon S3, and can also be written to a DIV or placeholder on the screen.
NOTE The DetailView Button Genie is accessed
by clicking the [List-Detail View-Buttons]
item in the UX toolbox Defined Controls section
.
Deleting Storage
You can delete the files that contain the List data using this Javascript:
var ls = {dialog.object}._localStorageSettings;
{dialog.object}._persistToLocalStorageInitializeKeys(ls,'listId',true);
Deleting the files that contain the List data can be useful when debugging an application.
Grid Components - Publish Meta Data Files - Published grid components do not include meta data that is needed to open the component in the Grid Builder. Therefore the published grid files found in the server webroot can not be edited in the Grid component Builder. A new option has been added to the publish profiles to 'Publish Grid Meta Data Files'. This option is selected by default and a special data file with the component name and a '_a5wcmp_metadata' file extension will be published when the grid is published.
NOTE: The motivation behind publishing meta data files is so that if a developer no longer has access to the original grid component files (.a5wcmp files) from the Web Project Folder, but does have access to the published .a5wcmp files, they will still be able to edit the Grid component files in the Grid builder (as long as they also have access to the published meta data files - _a5wcmp_metadata). The published files for all other component types (i.e. other than Grids) can be edited in the development program component builders (and therefore it is not necessary to publish meta data files for these component types).
The special _a5wcmp_metadata file is not used by the web server, but can be converted
into the original editable grid using an option 'Create Grid
Component From Meta Data File' found in the Web Control Panel 'More...'
drop down.
This option should only be turned off if there are backup copies of
the original grids available outside of the development system.
UX Component - Mobile Applications - Persistent Logins -
A common pattern in mobile applications is to
not require the user to login to the application
after they have successfully logged in for the
first time. The login should be persistent
until is is explicitly revoked by the action of
an Administrator, or until the end of the
persistent login period is reached.
NOTE: The canAjaxCallback server-side event previously would only emit user-defined Javascript if the event denied permission for the callback. Now, user defined Javascript can be emitted even if the Ajax callback is allowed. This change was made to support the Mobile Application with Persistent Login pattern.
For more information on the approach used to implement this pattern,
please
view this document.
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
Watch Video
- Part 4
Watch Video
- Part 5
Watch Video
- Part 6
Download Component
When you create a new UX component a new template is available for the persistent login pattern.

Alpha Anywhere Application Server - Self-signed Certificates - A change has been made in the way self-signed certificates are generated.
Alpha Anywhere Application Server - Request Object - As part of an ongoing initiative to standardize functionality between the Alpha Anywhere Application Server (AA Server) and the Application Server for IIS (AA Server for IIS), the Request object in the AA Server server will be undergoing a number of changes. While no immediate action is required from developers, there are a number of planned changes that will potentially introduce incompatibilities for existing Xbasic code. Alpha Software is committed to minimizing the impact of these changes, and this release of Alpha Anywhere includes several new properties and methods on the Request object to allow developers to begin transitioning their code at their convenience. Future releases will continue to add functionality to ease this transition. All new functionality will work identically when running under either the AA Server or the AA Server for IIS.
The goal of these changes is to ensure that your applications will work identically on both the AA Server and the AA Server for IIS, thus allowing for a seamless transition between servers should you decide to deploy your app using the AA Server for IIS
New Functionality
Request.Cookies
will be changing to be a
System::Web::HttpCookieCollection in the future. Currently it
is an Xbasic property class ("dot variable"). Once changed, any
Xbasic code expecting a property class will fail. To prepare for the
upcoming change, the new
HasCookie() and
GetCookie() methods can be used to replace code that directly
operates on Request.Cookies.
These methods will continue to work even after the underlying type
of Request.Cookies
is changed. These methods also work consistently in both the AA
Server and the AA Server for IIS.
Request.GetCookie()
returns null if the specified cookie does not exist, or returns a
System::Web::HttpCookie
instance if the cookie exists. Existence of the cookie can be
checked in advance with
Request.HasCookie().
Sample to see if a cookie exists:
if Request.HasCookie("MyCookie") then
'cookie exists in the request
else
'cookie is NOT included in the request
end if
Sample to read a cookie's value:
dim GreetingName as c = ""
if Request.HasCookie("Greeting") then
dim GreetingCookie as System::Web::HttpCookie =
Request.GetCookie("Greeting")
GreetingName = GreetingCookie.Value
else
GreetingName = "new user"
end if
Response.Write("Welcome " + GreetingName)
Sample of updating legacy code:
Sample old syntax:
dim MyCookieValue as c = ""
if eval_valid("Request.Cookies.MyCookie")
MyCookieValue = Request.Cookies.MyCookie
end if
Sample new syntax:
dim MyCookieValue as c = ""
if Request.HasCookie("MyCookie")
MyCookieValue = Request.GetCookie("MyCookie").Value
end if
Headers will be changing to a
System::Collections::Specialized::NameValueCollection.
Currently it is a character string containing the raw header text of
the HTTP request. To prepare for the upcoming change, the new
GetHeader() method
can be used to replace code that directly operates on
Request.Headers.
These method will continue to work even after the underlying type of
Request.Headers is
changed. This method also works consistently in both the AA Server
and the AA Server for IIS.
The Request.GetHeader()
method always returns a string value. If the specified header
name does not exist in the request, the returned value will be an
empty string. There is no distinction between a header that does not
exist, and a header that exists with an empty value.
Sample old syntax to get the value of a specific header:
dim HeaderValue as c = ""
HeaderValue = alltrim(extract_string(wr.Headers,"MyHeader:
",chr(10)))
Sample new syntax to get the value of a specific header:
dim HeaderValue as c = Request.GetHeader("MyHeader")
Deprecated Properties
Additional Documentation
Full documentation for the .Net class
System::Web::HttpCookie
can be found at
https://msdn.microsoft.com/en-us/library/system.web.httpcookie.aspx
Full documentation for the .Net class
System::Web::HttpCookieCollection can be found at
https://msdn.microsoft.com/en-us/library/system.web.httpcookiecollection.aspx
Full documentation for the .Net class
System::Collections::Specialized::NameValueCollection can be
found at
https://msdn.microsoft.com/en-us/library/system.collections.specialized.namevaluecollection.aspx
AlphaLaunch - Install Mobile Apps to Apple and Android Devices - AlphaLaunch is a free AppStore app that you can install on an Android or Apple device. Once AlphaLaunch has been installed on a device you can install as many Apps as you want to that device without having to go through the Apple or Android App stores, or without having to go through a PhoneGap build process (either Adobe PhoneGap Build or the Command Line Interface). The Apps are installed into AlphaLaunch, not directly to the device. This makes it extremely easy and quick to install new Apps on a device.
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
Watch Video
- Part 4
NOTE: AlphaLaunch is not licensed for use in a production environment if you do not have a subscription to the Enterprise Edition of Alpha Anywhere.
The use cases for AlphaLaunch include:
Once an App has been installed into AlphaLaunch it operates largely identically to the way in which it would operate had it been installed directly on the device. For example, even when there is no internet connection, you will be able to start any App that is installed in AlphaLaunch.
AlphaLaunch is not suitable as a means of deploying a public facing App that will be installed by many users who will go to the App Store to find and install your App. When an App is installed directly onto a device the App icon will appear on the device's home screen. However, when you publish to AlphaLaunch, the App will not have an icon on the home screen. To launch the App you will first have to launch AlphaLaunch and then you will be able to select the App from the list of Apps installed in AlphaLaunch.
NOTE: Apps installed in AlphaLaunch are PhoneGap applications (even though you did not have to go through the PhoneGap build process) and they can use any of the PhoneGap plugins that AlphaLaunch exposes. For more information see the section Understanding AlphaLaunch Limitations below.
NOTE: On Apple devices, there are other ways that you can allow a user to test an App that you are developing using the Apple Test Flight system. However, setting up Test Flight is complex. Alternatively, you could get the UDID of a user's device and use a special Apple publishing profile with PhoneGap build that allows Apps that you build to be installed on that user's device (without having to submit the App to the App store). However, this too, is complex and you are limited to only 100 devices.
Understanding AlphaLaunch Limitations
To see the list of plugins that AlphaLaunch enables, tap the Settings button in the footer of the AlphaLaunch home screen.
Then make sure that the Show Support Settings switch is on.

Then scroll the screen till you see this menu item:

How to Install AlphaLaunch on a Device
To install AlphaLaunch on a device, simply go to the App Store and search for 'Alpha Launch'.

How to Run an App That Has Been Installed in AlphaLaunch
To run an App that was previously installed in AlphaLaunch, simply launch the AlphaLaunch App on your device by clicking the Launch icon.
![]()
Then scroll the list of installed Apps until you find the App that you want and tap on the App name.
How to Install An App Into AlphaLaunch
To install a new App into AlphaLaunch, tap the Manage/Add button in the footer of the AlphaLaunch App.

If there are any existing installed Apps a screen showing these apps will be shown.
Note that for each installed App, the name of the server from which the App was installed is shown. When an App is run, all Ajax callbacks are made to the same server from which it was originally installed.
'
You can use this screen to reorder the installed Apps. You can also use a 'press-hold' gesture on any of the Apps in the List to bring up a screen that will allow you to uninstall an App or to update the App.
Tap the Add button to bring up a list of the available Apps on the server that AlphaLaunch is currently configured to use.
For each App that is listed, there is either an Install or Reinstall button. The Install button will appear if the App is not currently installed and the Reinstall button will appear if the App has previously been installed. Reinstalling a previously installed App is effectively updating the App to a newer version of the App.

How to Select the Active AlphaLaunch Server
When you click the Add button on the Manage App List screen, the Apps that are available on the active AlphaLaunch server are shown. You can change the active AlphaLaunch server by tapping the Settings button at the AlphaLaunch home screen.

Then, tap on 'Server Web Address for Downloading Apps....
This will bring up the list of registered servers.

Tap on the server you want to select, then tap the Select button.
NOTE: The Active AlphaLaunch server only controls the list of available Apps that you can install when you press the Add button to install a new App. If an App (called 'App1' for example) was installed from 'Server1' and then the active server is changed to 'Server2', when App1 is running, it will make Ajax callbacks to 'Server1', regardless of what server is currently designated as the 'active' server.
How to Register a New AlphaLaunch Server
To register a new AlphaLaunch server, follow the instructions (above) for selecting the Active AlphaLaunch server. On the Server List screen (shown above), tap the Add button.
This will bring up the Edit Server Info screen where you can either type in the server address or scan a special QR code that encodes all of the necessary information.

How To Publish an App to AlphaLaunch
To publish Apps to AlphaLaunch open the Web Control Panel and select the project that contains the Apps that you want to publish.
NOTE: An 'App' is a UX component. The UX
component can call child UX components, but these child UX
components should typically be configured as
Precomputed so that
they can load directly from the device (so as not to be dependent on
an Internet connection).

Before you publish Apps to AlphaLaunch you must first 'register' the Apps you want to publish. Registering an App involves defining how the App will appear when it is shown in the AlphaLaunch home screen and how it will be described when a user displays the list of available Apps that can be installed into Alpha Launch
Registering Apps To Be Published to AlphaLaunch
To register the Apps from a particular Web Project for publication to AlphaLaunch, tap the More... button on the extreme right of the Web Control Panel.
Then select the AlphaLaunch, Publish Apps to AlphaLaunch... menu item.

This will bring up the AlphaLaunch dialog where you can register the Apps from the Web Project that you want to publish to AlphaLaunch.

To register a new UX component, click the Add component button and then select the UX component you want to publish.

The AlphaLaunch dialog will then show the component that you selected and the orange icon will indicate that the settings for this component have not yet been defined.
Either double click on the component name, or click the Edit component settings button to open the AlphaLaunch Settings dialog box.

The important properties on this dialog include:
You can preview how the App will appear in the AlphaLaunch home screen by clicking on the Preview app template hyperlink at the bottom of the screen. For example, here is a preview of a template that is using a purple background color and an SVG icon.

Once you have registered all of the Apps in a Web Project that you want to publish to AlphaLaunch you are now almost ready to publish to AlphaLaunch.
But before you can publish you must first define a Publishing Profile that indicates where the Apps will be published (i.e. the Alpha Anywhere server and folder on that server where the Apps will be published). To define a publishing profile, click the Profiles button on the toolbar when the Web Project Control Panel has focus.

NOTE Each Web Project will typically be published to its own AlphaLaunch server address. For example, you may have 3 UX components in 'Web Project1' that you want to publish to AlphaLaunch and (say) 2 UX components in 'Web Project2' that you want to publish to AlphaLaunch. In both cases you may want to use the same physical Alpha Anywhere server. The Publishing Profile that you define for 'Web Project1' might specify that you want to publish to a folder called 'webProject1', in which case the server address for the 3 Apps in this group of Apps might be something like 'http://www.myAAserver/webProject1'. On the other hand, the Publishing Profile you define for 'Web Project2' might specify that you want to publish to a folder called 'webProject2', in which case the server address for the 2 Apps in this group of Apps might be something like 'http://www.myAAserver/webProject2'.
Once you have defined the publishing profile, click the Publish Apps to AlphaLaunch Server button on the AlphaLaunch dialog.

This will bring up the Publish to AlphaLaunch dialog. You will need to select the Publishing Profile to use and you will also need to specify the Sever URL (i.e. the url of the location where the Apps are being published).
Once you have published your Apps you will need to register the server in AlphaLaunch. AlphaLaunch will contact the server to get a list of the available Apps.
For instructions on how to register a server with AlphaLaunch, see the section above titled How to Register a New AlphaLaunch Server . To make it easy to register a new AlphaLaunch server (i.e. to avoid having to type in a long server URL on a mobile device keyboard), you will probably want to generate a QR code with with server address. Check the 'Show a QR code...' property before you click the OK button.

You can use Advanced mode when you want to republish to AlphaLaunch after having made a change to the App settings (e.g. the App template, description, version number, etc.), but not the App itself. This will speed up the process of publishing the Apps because it will avoid having to recreate the static fileset for each App.

Adding an Exit Button to your App
When an App is run in AlphaLaunch you will typically want to add an 'Exit' button to your App to go back to the AlphaLaunch home screen. If you do not add an Exit button, then after the user launches the App they will not be able to get back to the AlphaLaunch home screen to launch a different App.
You can use Action Javascript to add an Exit button, or you can code the Javascript for the button yourself.
To use Action Javascript, select the 'AlphaLaunch Actions' action for the list of available Action Javascript actions.
To code the Javascript directly, use this code:
if(A5.shell) {A5.shell.exitComponent();};
The code tests if you are running in AlphaLaunch, then if you are then it calls the A5.shell.exitComponent() method.
Troubleshooting
The most common problem with AlphaLaunch is that after you have published Apps to your AlphaLaunch server and you then go to AlphaLaunch to install the Apps you just published, the Apps are not listed on the Apps to Install screen. This cause of this problem is either the Application Server has not been started, or the Server Addrtess (i.e. URL) that was entered in the Publish to AlphaLaunch dialog was incorrect.
You can test if you entered a valid server address by going to a browser and entering the following URL into the browser
<server URL>/availableAppInfo.txt
For example, if your server URL was entered as:
http://192.168.70.157/AlphaLaunchDemo
You would enter this address into the browser address bar:
http://192.168.70.157/AlphaLaunchDemo/availableAppInfo.txt
If you do not receive a response, then it is likely that the server URL that you specified is incorrect.
App Install Errors
If you are installing an App from a folder on an Alpha Anywhere standard server (as opposed to the Alpha Anywhere Server for IIS), you might get an install error if the App has a large number of files. This is because the Alpha Anywhere server limits the number of files that can be simultaneously served. The error will not occur if you are using the Alpha Anywhere server for IIS. You can work around this problem by copying the folder that contains your App files to a bucket on Amazon S3 and then setting the Download location for the App to the URL of this S3 bucket.
AlphaLaunch Methods
A5.shell.exitComponent() -- Exit the App that is running an return to the AlphaLaunch home screen
A5.shell.getAppDir() - Returns the file URL of the local directory with the App's files
A5.shell.getAppFileStorageDir() - Returns the file URL of the local directory where the Apps data files are stored (this is separate from other Apps).
UX and Grid Component - Language Definitions - High Order Characters - When you tag strings in a Grid or a UX with language tags (<a5:r> ...</a5:r> you must then define how the tags are resolved in each of the different supported languages. Previously when entering high order characters, it was necessary to HTML encode the character. Now you can just type in the characters directly into the Language Definition dialog box.

UX Components - Pre-render - Working Preview - Internet Explorer - jQuery - When you do a Working Preview of a UX component and all of the following conditions are met:
then jQuery will not be loaded.
If you need to have jQuery loaded while you are in Working Preview then you can either switch to Chrome for Working Preview, or change where jQuery is loaded from.
If you cannot switch to Chrome for Working Preview, and you cannot change the location from which jQuery is loaded, then you will have to make an Ajax callback to load jQuery. For example, you could use the following Xbasic function to handle the Ajax callback that loads the internal version of jQuery.
function loadJQuery as c (e as p)
loadJQuery = __hidden__javascript__a5_jquery_core() +
crlf() + __hidden__javascript__a5_jquery_ui()
end function
Xbasic Function Libraries, Modules and Classes - Encrypt - Password Protect - When you create Xbasic Function Libraries, Modules or Classes in your Web Project you can now specify that the files should be encrypted, or both encrypted and password protected.
In order to encrypt a file the first line of the file must be an Xbasic comment (with no leading spaces):
'ENCRYPT
In order to both encrypt and password protect a file the first line of the file must be an Xbasic comment (with no leading spaces) of this form:
'PASSWORD:your_password
For example:
'PASSWORD:mysecretpassword
At run-time encrypted files are automatically decrypted.
If a file is password protected, then when you try to edit the file from the Web Control Panel, you will be prompted to enter the password. Once you have successfully supplied the file password you will no longer be challenged for the password when you next edit the file (until you exit from the Alpha Anywhere IDE).
.Net v4.6.2 - The Alpha Anywhere Installers now install .Net V4.6.2 if it has not previously been installed. Previously, the installers were installing v4.6.1
UX Component - List Control - onSelect Event - Detail View - If a List had a Detail View and the List was configured to Allow Null Selection, when the List was rendered, the onSelect event would fire, even though no row in the List was selected.
UX and Grid Component - Action Javascript - File Download - International Characters - If the filename of the file to download contained international characters, the download would fail.
UX Component - Action Javascript - SQLite Actions - Create Table From Data Action - If the Create Table From Table action was configured to get the data by making an Ajax callback, if the data returned by the callback contained null values or values with double quotes, the action would fail.
UX Component - Google Maps - The API for scaling bitmaps uses as markers on a map was changed by Google. Support for the new API has been added.
UX Component - List with Detail View - Sync Log - The sync log feature was not working.
UX Component - List Controls - .dbf Tables - Mapped Table - If a List control was based on .dbf tables and if any of the .dbf tables in the databasource definition was a mapped table that included date fields, an error was generated.
UX Components - jQuery - Pre-rendered - If a UX component was set to pre-render and jQuery was specified to be loaded then in Live mode, jQuery was not being loaded. In Working Preview, jQuery was loaded (as long as you were using Chrome for Working Preview).
NOTE: For pre-rendered UX components that are set to load the internal version of jQuery that are rendered in Working Preview using Internet Explorer, jQuery is not loaded.
UX Component - PhoneGap - Action Javascript - Image Capture for List Detail View Action - onImageCapture Event - The onImageCapture event was not firing if the image was captured using using PhoneGap
UX Component - PhoneGap - App Icons - The utility to create app icons in the PhoneGap builder was failing. if you have not installed your own copy of ImageMagick. This is now fixed.
Desktop Applications - Forms - MS Word Mailmerge - Was failing if the merge data contained a double quote.
SQL Server Reporting Services - Fixed an issue with multi-value input parameters.
UX Builder Crash - If all of the following conditions were met, then when doing a Working Preview of a component, Alpha Anywhere would crash
Web Applications - Multi-file Upload - If you created your own .a5w page to do file uploads, the multiple attribute in the <input> element was not handled properly.
Consider the following .a5w page. Notice that the <input> element uses the multiple attribute. Therefore, the control name must end in [] to indicate that multiple instances of this variable must be created (i.e. the variable must become an Xbasic array when the form is processed).
<form action="fileupload.a5w" method="post"
enctype="multipart/form-data">
Select images:
<input type="file" id="files"
name="selectedfile[]" multiple>
<input type="submit">
</form>
When the files are uploaded, the above example specifies that an .a5w page called fileupload.a5w page will be called. Here is an example of how the fileupload.a5w page might be defined:
<%a5
dim files as p
files = request.variables.selectedFile
'files will be an array. the number of items in the array will match the number of files that were selected
'save each uploaded file to a folder
'ensure that the folder exists
dim folder as c
folder = "c:\uploads"
dir_create_recurse(folder)
dim count as n
'get a count of the number of files that were uploaded
count = files.size()
dim i as n
'loop over each item in the files[] array
dim fn_i
for i = 1 to count
'construct the local filename
fn_i = folder + chr(92) + files[i].filename
'each file in the array has a SaveToFile() method
'call this method to persist the uploaded file to a local file
files[i].saveToFile(fn_i)
next i
'Note: Each item in the files[] array will have these properties and methods:
'Properties:
'Name
'FileName
'ContentType
'CharacterSet
'Encoding
'Data - the data that was uploaded.
'NOTE: It is recommended that you do NOT reference the 'data' property (especially for large files)
'as it causes the data to be read into memory.
'Size
'Methods
'SaveToFile - save the
uploaded data to a local file
'SaveToStorage - save the uploaded data to storage (e.g. S3,
Azure, Disk, etc.)
%>
Grid Component - Detail View - Disable Input Controls when Update Not Allowed - In a Grid component if you have the Security Framework enabled and the user does not have permission to update data, the input controls are still enabled even though the user will not be able to save any edits.
It might be desirable to disable input controls when the user does not have update permission.
Here is how this can be done:
First, define the following Javascript function in the component's Javascript Functions property:
function enableControl(alias) {
var obj = window[alias + '_GridObj'];
var val = obj._editPermissions.allowUpdate;
return val;
}
Next, add the following expression for the client-side Enable expression for each of the Detail View input controls:
enableControl('{grid.componentName}')
NOTE The enableControl()
function takes the Grid alias as an input parameter. This
allows the Grid object to be dynamically computed. If the
enableControl() function had used:
{grid.object}._editPermissions
Then you would run into trouble if you had multiple Grids that
defined the function because the last Grid that was displayed would
overwrite the previously defined global function and the {grid.object}
placeholder would resolve to the last Grid displayed.
Web2Cal Calendar Control - Adding Server Side Event Handlers To Respond to Event Changes -
When using the Web2Cal calendar control you might want to execute server-side code for the following events:
There are no built-in hooks for these events, but you can easily define you own.
For the event added, edited, or deleted cases, you can add event handlers as follows:
function onEventDelete as v (e as p) end function function onEventUpdate as v (e as p) end function function onEventAdd as v (e as p) end function
How to Update the afterDialogValidate Event Handler Function
Make the changes shown in red to the
afterDialogValidate event.
To handle the event is moved case, edit the Web2Cal component and add this code to the onComponentExecute server-side event:
if eval_valid("request.variables._XbasicFunction") then
if request.variables._XbasicFunction = "updateEvents" then
'event was moved -- event data is in request.variables._calEvent_eventId, etc.
end if
end if
Xbasic - a5_json_to_excel() Function - Export JSON Data to Excel - Exports data in a JSON document to an Excel file. If the JSON document is an object with multiple arrays, each array is exported as a separate sheet in the Excel file.
If the JSON document is an array, the Excel file will have a single sheet called 'Table1'
Syntax:
L flag = a5_json_to_excel(c Json, c filename)
Where
For example, if the JSON document shown below was exported to Excel, the Excel file would have two sheets ('customers' and 'phoneNumbers'). Each sheet would have the data in the corresponding array in the JSON data.
{
"customers" : [
{"id": "1", "firstname" : "Fred", "lastname": "Jones"},
{"id": "2", "firstname" : "Mary", "lastname": "Nickerson"}
],
"phoneNumbers" : [
{"id": "1", "type" : "Home", "number" : "555-555-1234"},
{"id": "1", "type" : "Office", "number" : "555-555-1235"},
{"id": "2", "type" : "Home", "number" : "555-555-1236"},
{"id": "2", "type" : "Office", "number" : "555-555-1237"},
{"id": "2", "type" : "Vacation", "number" : "555-555-1238"}
]
}
TabbedUI - onLogin Server-side Event - This event can now set data values that will be available when the client-side afterLogin event fires.
For example, you could add this code in the server-side onLogin event:
e.eventDataObject = "{userName: '"+e.userName+"',
var2: 'some other value', timeOfLogin: '"+js_escape("" + now())+"'}"
In the client-side afterLogin event you can refer to any value in the eventDataObject.
For example:
alert('Welcome: ' +
e.eventDataObject.userName );
Reports - Free-form Reports - Vertical Lines - Growable - You can now set the Growable property on vertical lines in a report. When this property is set, the vertical line will grow to the full height of the report section it is in.

For example, in the report shown below, the vertical line extends the full height of each record in the Detail Section without any gaps between the lines.

Application Server for IIS - Password Expiration - When
publishing an application to IIS, if the application has a password
expiration set, the expiration time will not be set correctly and can
lead to users getting password has expired messages.
UX Component - List Control - Detail View - Parent-Child Lists - New Records - If you entered a new record in a child List and then synchronized the data, if focus was on the new child record at the time the sync command was executed, focus did not remain on this record when the sync completed.
Reports - SQL Data Sources - Null Values - Fixed an issue with character fields that had null values.
Reports - SQL Data Sources - Long Text - Fixed an issue with long text fields not printing all of the data in the field under some circumstances.
| UX Component - List Control | Showing Content in Row When Row Is Selected |
A common use case with the List is to only show
certain content in each List row when the row is
selected. This is easily done using CSS. In this video we show how this is achieved. Watch Video Download Component Date added: 2017-03-26 |
Alpha Anywhere Application Server - TLS Protocol - The
Alpha Anywhere Application Server now allows the server
administrator to specify the minimum TLS protocol version supported.
While SSL v2 and SSL v3 had been fully removed from the Alpha
Anywhere Application Server some time ago, it has not been possible
to fully disable older TLS versions until now. This setting allows
TLS 1.0 and TLS 1.1 to easily be completely turned off, if desired.
TLS 1.2 is the most recent protocol and generally considered to be
the most secure. Setting the minimum TLS version to 1.2 will disable
TLS 1.0 and TLS 1.1 and provide what is currently considered the
highest level of security. Note however that not all older web
browsers or operating systems support TLS 1.2. Site administrators
should evaluate the needs of their users before modifying this
setting.
This setting defaults to TLS 1.0, in order to prevent unexpected
client connectivity issues.

Reports - SQL Reports - Null Numeric Values - Null numeric values were being displayed as 0 and not blanks in reports. This bug was introduced in v4.4.0.
Xbasic - AlphaDAO - SQL Server - In certain cases, when listing tables in a SQL Server database, the 'dbo' schema prefix was added to all of the tables that were listed. This was not necessary and now when tables are listed, the 'dbo' schema prefix is not shown in the list of tables.
UX Builder - Duplicate Control - A bug was introduced in the Duplicate Control command in V4.4.0.
Application Server - Server Settings Dialog - Dialog Height - The OK and Cancel buttons were not visible on machines with less than 800 pixels vertical resolution. This issue was caused because the new Administrative Alerts feature (introduced in V4.4.0) caused the dialog height to increase in size. The Alerts properties have now been moved to their own tab in the dialog.
| UX Component | Alignment Container |
The Alignment Container makes it easy to Left,
Center or Right align a series of control on a
UX. Watch Video Date added: 2017-02-02 |
| Xbasic | Using Xbasic Classes in Server-side code |
You can define Xbasic classes in your project
and then use those classes in any server-side
Xbasic code. In this video we show how an Xbasic class definition can be added to a web project and then used in the server-side code that executes when an Ajax callback is made. Watch Video Download Components Date added: 2017-02-11 |
| UX Component - Map Control | Adding Multiple Markers to a Map Control using Client-side Data |
Action Javascript has an action to add multiple
markers to a map. The data that defines the
latitude/longitude for each marker on the map
(and also for the marker titles, details etc).
can either come from server-side data, or from
client-side data. In the case of server-side data you specify the name of a Data Series that specifies the properties for each marker. In this video we show how to configure the Action Javascript 'Add multiple markers to a map' action to use client-side data. This client-side data can come from a Javascript function, a List control, the client-side Data Cache, or, in the case of a PhoneGap application, by querying a SQLite database on a device. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Download Component Date added: 2017-02-12 |
| UX Component - FormView Control | Lookup Fields |
When you create a FormView control, you might
want to display 'friendly' values for some of
the fields in the form. For example, you might
want to display the Product Name, rather than
the Product Id. In this video we show how you specify a lookup for any field in the Form View control. Watch Video Download Components Date added: 2017-02-14 |
| UX Component - PhoneGap | Using the CLI (Command Line Interface) to Build PhoneGap Applications instead of PhoneGap Build |
When you build a PhoneGap application from a UX
component that you have built, the easiest
approach is to use the Adobe PhoneGap Build
service. Direct integration with PhoneGap Build
is built into the Alpha Anywhere IDE. While the
advantages of using PhoneGap Build are clear -
no software to install on your PC, and ability
to build apps for iOS on your Windows machine -
there are also disadvantages. These include
having to wait an uncertain amount of time
before PhoneGap Build finishes the build (wait
time depends on how busy the service is) and
inability to use certain plugins not supported
by PhoneGap Build. Another way in which PhoneGap applications can be built is by using the PhoneGap CLI (Command Line Interface). When you use the CLI, you are not restricted to only the plugins supported by PhoneGap build. The disadvantage of the CLI approach is that you will first have to install the CLI tools and platform SDKs on your machine. You will also need a Mac to build for iOS. In this video we give an overview of using the CLI. Watch Video See documentation Date added: 2017-02-18 |
| UX Component | Using 3rd Party jQuery Libraries in Control Javascript |
The UX Builder allows you to define 'Control
Javascript' which allows you to easily configure
a UX control to use a jQuery controls (such as a
date or time picker). However, in the case where
the jQuery control is defined in a linked file,
you can run into timing issues that result
because the control javascript is executed
before the linked jQuery file has loaded. This video describes how you can resolve these timing issues. Addendum: In the video we show that the control javascript function is created using the syntax: var clockpicker = function() This should be changed to window.clockpicker = function() Watch Video Date added: 2017-02-19 |
| TabbedUI | Adding a Search Feature to the TabbedUI |
It is not uncommon for developers to create
TabbedUI components with a very large number of
items. Users may then struggle to find a
particular item in the list of available menu
items. Adding a search feature to the TabbedUI
component makes it very easy for users to find
the menu item they want. In this video we show how the search feature is added to the TabbedUI component. Watch Video Date added: 2017-02-24 |
| Reports | Using SQL Server Reporting Services Reports in an Alpha Anywhere Project |
Many organizations who use SQL Server also use
SQL Server Reporting Services (SSRS). Using
reports created in SSRS in an Alpha Anywhere
project is possible. In this video we show how reports defined in SSRS can be used in Alpha Anywhere applications. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2017-02-25 |
| Node | Calling a Node Service that Returns Binary Data |
When you call a Node service from Xbasic, the
service can return both text and binary data. In this video we show how a Node Service can return binary data. Watch Video Date added: 2017-02-28 |
| UX Component | Running Asynchronous Functions Synchronously |
Many Javascript functions in an application are
asynchronous. For example, functions that make
Ajax callbacks are asynchronous and many
PhoneGap functions are also asynchronous. Often
you will want to call several asynchronous
functions, but you want to execute the functions
synchronously. For example, you do not want to
call the second function until the first
function has completed. Javascript Promises are typically used to run asynchronous code synchronously. But Promises can be hard to understand and it can be tricky to restructure your code to use Promises. The Alpha Anywhere Javascript library has a function called A5.runChain() that provide an easy way to run asynchronous functions synchronously. Also, minimal changes need be made to your function definitions to make them suitable for use with the A5.runChain() function. In this video we show how the A5.runChain() function is used. Watch Video - Part 1 Watch Video - Part 2 Date added: 2017-03-04 |
| UX Component | Semi-circular Number Display Control |
The semi-circular number display control
displays the value of a number on a
semi-circular chart. It is ideal for dashboard
type applications. This video shows how you can add a semi-circular number display control to a UX component and how you can configure the component. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2017-03-04 |
| UX and Grid Component | Code Glossary |
The code glossary is a great timesaver when
editing Xbasic and Javascript code. In this video we show how to use the code glossary in the editors. Watch Video Date added: 2017-03-17 |
| UX Component - Javascript Charts | Introduction |
Javascript Charts allow you to create a variety
of different chart types using Javascript.
Because the charts are created client-side,
using Javascript, these types of charts are
ideal for disconnected applications where the
Chart control cannot be used (as this control
type produces charts server-side). In this video we show how to set up a basic Javascript Charts. Watch Video Date added: 2017-03-26 |
| UX Component - Javascript Charts | Binding Chart Data to a Javascript Function |
The data shown in a Javascript Chart can be
obtained by calling a Javascript function. in this video show show how to bind the Chart data to a Javascript function. Watch Video Download Component Date added: 2017-03-26 |
| UX Component - Javascript Charts | Binding Chart Data to Data From a SQL Database - Using a Data Series for Chart Data |
The data shown in a Javascript Chart can be
obtained by querying a SQL database. In this video show show how to bind the Chart data to data from a SQL database table by binding the Chart data to the data in a Data Series. The Data Series is populated with data from a SQL database table. Watch Video Date added: 2017-03-26 |
| UX Component - Javascript Charts | Binding Chart Properties to a Javascript Function |
Any property of a chart can be made dynamic by
binding the property to the result of a
Javascript function. In this video we show how properties of the Chart (in addition to the Chart data) can be made dynamic. Watch Video Download Component Date added: 2017-03-26 |
| UX Component - Javascript Charts | Action Scripting Methods for Working With Javascript Charts |
Action Scripting exposes several methods for
working with Javascript Charts. In this video we show how you can use Action Scripting to resize a Javascript Chart. Watch Video Download Component Date added: 2017-03-26 |
| UX Component - Javascript Charts | Action Scripting - Setting a Chart Property Using Action Scripting vs. Binding a Chart Property to a Javascript Function |
Action Scripting allows you to dynamically
change properties (such as the Chart colors, or
title) after the Chart has been rendered.
However, you can also achieve the same result by
binding the Chart properties to Javascript
functions. In this video we contrast the two methods for setting Chart properties. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2017-03-26 |
| UX Component - Javascript Charts | Using Action Scripting to Refresh Chart Data |
Action Scripting allows you to refresh the data
shown in a Chart. If the Chart data is based on
a Data Series, an Ajax callback to the server
will be made to refresh the data in the Data
Series on which the Chart depends and then the
Chart will be redrawn, showing the new data. In this video we show how Action Scripting is used to refresh the Chart data. Watch Video Date added: 2017-03-26 |
| UX Component - Javascript Charts | In Depth Example - Chart Based on SQL Data |
This example shows a pie chart whose data is
obtained from a multi-table SQL query against
the sample Northwind database. The Chart is
based on a custom Data Series to generate the
Chart data. The user can select the country for
which the Chart should be shown from a
dropdownbox control. In this video we show how this Chart is set up. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2017-03-26 |
| UX Component - Javascript Charts | Understanding the Structure of the Javascript that Defines a Javascript Chart |
The Javascript used to define a Javascript Chart
has a well defined structure, described in this
video. Watch Video Date added: 2017-03-26 |
| UX Component - Javascript Charts | Javascript Chart Events |
In this example we show a Chart with a Tooltip
event. After the Chart is resized, the Tooltip
events must be re-registered. Watch Video Download Component Date added: 2017-03-26 |
UX Component - Copy/Paste Controls - The UI for copying and pasting controls has been simplified.
Grid, UX and TabbedUI Builder - Collapse/Expand Property Grid Categories - You can now quickly collapse or expand all categories in the Property Sheets. This can make it easier to find a property without having to open the Properties search dialog.

PhoneGap App Builder - Icons and Splash Screens - The way in which icons and splash screens (iOS calls them launch images) has been completely rebuilt and a new option
has been added to the Application Master Image Resources category that allows
you to generate a series of 9-patch splash screen images
for Android devices (iOS does not support 9-patch images without additional libraries).

VERY IMPORTANT: It is very important that you create a new PhoneGap Project when generating custom icons and splash screens for your app because the PhoneGap app config.xml file has been changed to support new functionality.
When you supply a single image that needs to be resized for the numerous aspect ratios required by all of the
different types of mobile devices, the aspect ratio will typically change and the resulting image will be out of proportion. The new resizing code uses a center weighting technique to clip the image
without any change to the image aspect ratio. This technique is used for the generation of all of the splash screens and you need to be aware of that when you supply the images for the portrait or landscape
orientations.
Recommended Image Sizes
For portrait splash screens, the recommended size is 1536px x 2048px.
For landscape splash screens, tre recommended size is 2048px x 1536px.
You can also specify a square image (suggested size is 2732px x 2732px) for both orientations and the resulting images will not be
distorted.
Android 9-patch images
A 9-patch image is a standard png file that has been divided into a
matrix of 3 x 3 rectangles (like a tic-tac-toe board). Each region in the matrix has specific stretch properties that allow the image to
be resized without altering the aspect ratio of the center weighted rectangles. As such, 9-patch images can be stretched to fit the different screen sizes without clipping or distortion.
You need to supply a square image that will be used for both portrait and landscape modes and the graphics need to be center weighted. The recommended size is 2732px x 2732px.
For more info on 9-patch splash screen images see:
Cordova Splashscreen Plugin Documentation
NOTE: iOS Storyboard Launch Images - If you open and inspect the new
config.xml file you will see support for iOS storyboard launch images (which act much like Android's 9-patch images). While the
support is included in the image builder module, it hasn't been exposed because the current version of PhoneGap Build does not support it. As soon as PhoneGap Build supports the inclusion of iOS
storyboard images, we will expose iOS storyboard support within the PhoneGap App Builder.
PhoneGap App Builder - Use ImageMagick Option - This option has been removed as all icons and splash screens are now generated using ImageMagick.
UX Component - List Control - deselectAll() Method - A new method has been added to the List control to un-select all selected rows in a List.
Contrast this method with the low level ._deselectAll() method which also un-selects any selected rows in a List, but does not perform any action on child Lists or the associated Detail View that the List may have..
The .deselectAll() method wraps the ._deselectAll() method, but in addition to un-selecting rows in the List, if the List has child Lists with pre-fetched data, the selected rows in all child Lists are also un-selected, and the Detail View for the List (and the Detail View for any child Lists with pre-fetched data) is disabled (if the 'No record in List selected' property for the top-most parent List is set to 'Disable Detail View').
For example:
var lObj = {dialog.object}.getControl('CUSTOMERLIST');
lObj.deselectAll();
UX Component - Data Series - Publish to Client-side - You can now specify that the data in Data Series should be published to the client-side so that it can be used in your Javascript code.
You define Date Series either by clicking on the smart field for the Data Series property (on the UX Builder Properties pane) , or by click on the Menu button.


Your Javascript code can reference the data in a Data Series using the following syntax:
{dialog.object}._dataSeriesData.SeriesName.SubSeriesName
If the Data Series has no sub-series, then syntax for referencing the Data Series is:
{dialog.object}._dataSeriesData.SeriesName
Understanding Data Series
A Data Series is a series of values. Say you have a SQL query that returns the data shown in the table below.
Each column in the table is a series of data. For example, the data series in the pink Firstname column is
Fred, John and Sally.
| Firstname | Lastname | Age |
| Fred | Smith | 23 |
| John | Jones | 35 |
| Sally | Harrison | 29 |
The name of the Data Series represented by the pink column in the above table is:
Names.Firstname
(where 'Names' is the arbitrary name given to the data table)
A common use case for Data Series is in charting applications. Both the Chart and Javascript Chart control in the UX component consume data series for the data shown in the charts.
Action Javascript
There is a new action in Action Javascript to perform actions on Data Series. The Data Series Actions action allows you to:
UX Component - Javascript Charts - A new option for
generating charts in the UX component is now available. Javascript
Charts generate charts using client-side data. Because Javascript
Charts are generated using Javascript with client-side data, they
are ideal for disconnected mobile applications.
NOTE: Javascript charts are based on the open source RGraph charting library. Only the SVG charts in this library are built into Alpha Anywhere. If you want to use any of the Canvas charts in this library, you can, but you will need to write the Javascript yourself. For more information go to http://www.rgraph.net.
Contrasting Javascript Charts with the Chart Control
The Chart controls is a server-side control. The chart is rendered as a bitmap on the server and then the client-displays the bitmap image. Because the Chart control is a server-side control, it is not suited for disconnected applications. Also, since the Chart control is a server-side control, it will be slower than Javascript Charts.
To add a Javascript Chart to a UX component, select the [Javascript Chart] control in the Other controls section of the UX toolbox.

NOTE: Tthe
Chart control (i.e. the
server-side charting control) is available in the
Data Controls
section of the UX toolbox.

After you add a Javascript Chart to your UX, you can then edit the Javascript Chart properties by clicking the smart field for the Chart properties property.

This will open the Javascript Chart builder, as shown below.
The top half of the screen is where you enter the Javascript code that generates the chart and the bottom half of the screen allows you to get a quick preview of the Chart.
In most cases you will get a quick start by selecting one of the Sample Charts. This will enter the Javascript for the selected chart and you can then tweak the Javascript to get the chart appearance that you want. You will likely also want to base the chart on real data, not the sample data shown in the sample chart.

To select a sample chart, click the Select Sample Chart button. This will open up a dialog showing the available sample charts:

Select the sample chart that you want. It will then fill in the Javascript for that chart into the builder. For example:

The Javascript shown in the window is the Javascript used by the RGraph charting library to render the Javascript chart.
Understanding the Pattern Used for the Chart Javascript
All of the sample charts insert Javascript that follows the same pattern.
var _settings = function() {
//function that returns an RGraph settings object
}
var _chart = new RGraph.SVG.Bar(_settings()).draw()
{dialog.object}._jsCharts['{chartName}'] = {};
{dialog.object}._jsCharts['{chartName}'].settings = [_settings];
{dialog.object}._jsCharts['{chartName}'].object = [_chart];
Depending the RGraph chart type (e.g. Pie, Line, Bar, etc.), the appropriate RGraph function is called to render the chart.
A settings object is passed to the RGraph function. This settings object is created by calling the _settings() function.
NOTE: You do not need to include the RGraph charting Javascript libraries yourself in your UX component. The libraries are automatically loaded by Alpha Anywhere.
The Chart settings are stored in the _jsCharts object in the UX component object. These settings are stored to enable the chart to be refreshed with new data, to be changed on the fly by changing any of the chart properties, or to be dynamically resized. Notice that the settings object and the object object are arrays. This is because a chart can actually be composed of multiple charts each drawn on the same DIV.
The Javascript for the chart uses two special placeholders:
Using Real Data in a Chart
When you select a Sample Chart, the Javascript that is inserted into the Javascript window in the Javascript Chart builder uses static data. This is fine initially when you are designing a chart, but at some point you will want to replace the static sample data with 'real' data.
The source of this 'real' data must be client-side data. For example, it might be data from a column in a List control. You will need to create a Javascript function that gets the data from the List and then set the data property in the Chart settings to the this function.
In many cases the 'real' data will be data that you want to get by querying a database, calling a service (REST, SOAP, etc.), or running some custom server-side code. In the case where the data you want to use in your chart originates on the server, you will need to define a Data Series that retrieves the necessary data. (When you define the Data Series you will need to specify that the Data Series data should be 'published' to the client-side.)
For example, here are the settings for a simple bar chart that uses static sample data:
var _settings = function() {
var settings = {
id: '{chartDiv}',
data: [8,5,9,3,5,2,4],
options: {
gutterTop: 50,
hmargin: 20,
xaxisLabels: ['Monday','Tuesday','Wednesday','Thursday','Friday','Saturday','Sunday'],
tooltips: ['Monday','Tuesday','Wednesday','Thursday','Friday','Saturday','Sunday'],
title: 'A basic Bar chart',
titleSubtitle: 'A chart showing daily values for a week',
titleSubtitleItalic: true,
colors: ['#7e9cf6'],
shadow: true,
shadowOpacity: 0.2,
attribution: false
}
};
return settings;
}
var _chart = new RGraph.SVG.Bar(_settings()).draw();
Notice that the chart data is defined by the data property in the settings object.
Say we have a Javascript function that returns an array of values and we want to use the data returned by this function in the Chart. For example, the function that return an array of values could be defined as follows:
function getData() {
return [1,2,3,4,5,6,7];
}
To base the Javascript Chart on the data returned by this function, we simply change the data property in the Chart settings to:
....
id: '{chartDiv}',
data: getData(),
options: {....
In the case where the data comes from a column in a List control, the Javascript function that gets the data would be something like this (assuming that the column in the List that contains the data is called 'Sales'):
function getData() {
var lObj = {dialog.object}.getControl('myList');
var _d = lObj._data //get list data
var _a = []; //make empty array
for(var i = 0; i < _d.length; i++) {
_a.push(_d[i].Sales); //push data from the 'Sales' column onto the array
};
return _a;
}
If the data you want to use in your chart originates server-side, then you will need to create a Data Series. Assume you have created a Data Series called Sales, with two sub-series, Amount and Month.
The data in the Sales Data Series might look something like this:
| Month | Amount |
| Jan | 200 |
| Feb | 220 |
| Mar | 190 |
| Apr | 250 |
| May | 270 |
| Jun | 210 |
| Jul | 300 |
| Aug | 320 |
| Sep | 290 |
| Oct | 330 |
| Nov | 300 |
| Dec | 350 |
You can reference data from Amount column in the above Data Series using this syntax:
{dialog.object}._dataSeriesData.Sales.Amount
Using this syntax, you could change the settings object for the example bar chart to:
var _settings = function() {
var settings = {
id: '{chartDiv}',
data: {dialog.object}._dataSeriesData.Sales.Amount,
options: {
gutterTop: 50,
hmargin: 20,
xaxisLabels: {dialog.object}._dataSeriesData.Sales.Month,
tooltips: {dialog.object}._dataSeriesData.Sales.Month,
title: 'A basic Bar chart',
titleSubtitle: 'A chart showing sales by month',
titleSubtitleItalic: true,
colors: ['#7e9cf6'],
shadow: true,
shadowOpacity: 0.2,
attribution: false
}
};
return settings;
}
var _chart = new RGraph.SVG.Bar(_settings()).draw();
Notice that the chart data, X axis labels and tooltips are all based on Data Series data.
Any Property in the Chart Can Be Dynamic
In the above examples we have set the Chart's data property to the result of a Javascript function call (first example), or to the value in a Data Series (second example). However, it is not just the Chart's data property that can be dynamic. Any property in the Chart settings can be set to a Javascript function, or Data Series value.
For example, in the above example, the Chart Title is defined using this settings:
titleSubtitle: 'A chart showing sales by month'
This could be changed to:
titleSubtitle: getChartTitle()
Working in the Javascript Chart Builder
When you are working in the Javascript Chart builder, the dialog has these buttons and hyperlinks.


The purpose of each of these buttons or hyperlinks is:
Setting a Chart's Background Color or Border
In some cases, you will want to set the background color or border of a chart. For example, the Chart shown below has a black background.

You can set the Chart background color and border using the Javascript Chart's Style property.

Setting Javascript Chart Size to 100%
You can set the Javascript Chart width to 100% (useful when the Chart is shown in a Panel Card). However, setting the Chart's height to 100% is not supported. You must specify an explicit height for the Chart. Also, unlike many other UX controls, Javascript Charts do not have a Fill Container property.
NOTE: If you set the Javascript Chart width to 100% and the Javascript Chart is contained inside a Panel Card, the Javascript Chart will automatically be resized when the device orientation is changed.
Action Javascript Javascript Chart Actions
The Javascript Chart Action in Action Javascript allows you to:
Methods
The following methods are available for working with Javascript charts:
{dialog.Object}.jsChartResize(UXJavascriptChart,width,height[,redrawMethod[,methodParameter]])
Resizes a Javascript chart. You can optionally pass in a draw method to redraw the chart without animation, or with a specified animation option.
Where:
{dialog.Object}.jsChartSetProperties(UXJavascriptChart,
properties [,drawMethod [,methodParameters]])
Resizes a Javascript chart. You can optionally pass in a draw method to redraw the chart without animation, or with a specified animation option.
Where:
{dialog.Object}.jsChartRefreshData(UXJavascriptChart)
Refreshes the data in Data Series that the Chart uses and then redraws the Chart. An Ajax callback is made to the server to refresh the Data Series and then the Chart is redrawn using the new data. If the Chart is not based on any Data Series, then no Ajax callback is necessary and the Chart is redrawn.
Where:
{dialog.Object}.jsChartRedraw(UXJavascriptChart [,drawMethod [,drawMethodParameters [,properties]]])
Redraws a Javascript chart. You can optionally pass in a draw
method to redraw the chart without animation, or with a specified
animation option. You can also
optionally change chart property values when it is redrawn.
Where:
Building Dashboard Applications
Javascript Charts are ideal for 'dashboard' applications. You can design a UX component with multiple Javascript Charts each of which displays data on one of the metrics your dashboard is designed to monitor.
In situations where a large number of users are connected to the
dashboard, and where you want to update the dashboards frequently,
you can use Alpha Anywhere's Web-sockets feature to create an
efficient application. Instead of having the UX component make
periodic callbacks to the server to refresh the data shown in the
dashboard charts, a scheduled CRON job on the server can update data
for the dashboard, then when broadcast the data to all of the
connected UX components.
Speed Typing Glossary - Javascript and Xbasic Editors - You can now define abbreviations that get automatically expanded in the Javascript and Xbasic editors. This can significantly improve your productivity when you are writing Xbasic and Javascript code.
For example, say that in the Javascript editor you frequently type the following code:
var lObj = {dialog.object}.getControl(
You can now define an abbreviation for this code snippet. Every time you type the abbreviation, it is automatically expanded. For example, you might specify that the abbreviation for the above code snippet is .gc.
Every time you type .gc in the code editor, .gc will be replaced with var lObj = {dialog.object}.getControl(.
The replacement text for the abbreviation can be arbitrarily long. It does not have to be a single line of text as in the above example. You can also specify where the insertion point should be placed after the abbreviation has been expanded.
You can also set rules that control when an abbreviation is expanded. For example, you can specify:
You can also specify if the abbreviations should be shown in auto-complete (just like auto-complete for functions and variables), as shown in the image below. If you specify that an abbreviation should be shown in auto-complete, you can define an optional description that will also be shown in auto-complete.

To define a glossary while editing either Xbasic or Javascript, right click, and select the Edit glossary command from the menu. The glossary editor is shown below:
Each line shows the abbreviation, expansion for the abbreviation, and expansion options ( S - show in auto-complete, F - expand if first word on a line, W - expand if preceded by a word boundary)

To edit an individual glossary entry, double click on the item, or click the Edit button. The editor is displayed where you can define both the abbreviation and the replacement text. You can also set the options for the glossary item.

email_send_noprofile() Function - Now allows for a blank username or password. The third parameter for email_send_noprofile() is the security mode. The valid options are blank (""), SSL, and TLS. This parameter is now optional.
Flying Start Genie - Row Expanders - The Flying Start Genie allows you to quickly build Grid components for all (or selected) tables in a database. Now, the Genie will automatically detect if there is a relationship between the Grids that are created and it will add a Row Expander to each Grid if that Grid has related Grids.
For example, in the image below which shows the Grid that was created for the Customers table in the sample Northwind database you can see that each row in the Grid has a row expander that shows the Orders for the selected customer. Similarly, the Orders grid has a row expander to show the Order Details for the selected Order.

UX Component - SemiCircularNumberDisplay Control - A new control type is available in the UX component. This control allows you to display a numeric value on a semi-circular chart. It is ideal for using in 'dashboard' type applications. You can configure the color of the control so that it changes depending on the value. For example if a numeric value is in the 'safe' zone, you might set the color to green, and if the value was in the 'danger' zone, you might set the control color to red.
Watch Video - Part 1
Watch Video - Part
2

To add a SemiCircularNumberDisplay control to your UX component, select the [More...] control in the Data Controls section of the UX Toolbox. Like other controls in the Data Controls section of the UX toolbox, the SemiCircularNumberDisplay control has both a .SetValue() and .GetValue() method that allows you to set its value and read its values.

This will display the list of additional control types:

After you add the control to the UX you can configure the properties of the control by clicking on the smart field for Control Properties. This will open a dialog where you can set the properties of the controls.

Properties of note in the builder include:
Defining Dynamic Colors
When you set the Color type to Dynamic you can define a series of ranges and the corresponding color for each range. Click the smart field for the Values ranges property (shown when the Color type is Dynamic) to open the builder (as shown in the image below).
The builder allows you to define multiple ranges and for each range, you can specify a color.

UX Component - RadioButton - CheckBox Controls - Render as ButtonList - Align - When you set either a Radio Button, or CheckBox control to render as a ButtonList, you can not control the alignment (left or right) of the button labels.
Components - Styles - Customize Colors - Pre-defined Palettes - When you select the 'Alpha' style for a component, you can customize the colors used in the style by simply setting the values of SASS variables.

When you click the smart field for the Customize style colors and fonts property, a dialog is opened, as shown in the image below, where you can set values for each of the SASS variables used in the style.
Now, when you open the Edit Style SASS Variables dialog, a new button appears at the bottom of the dialog that allows you to select a pre-defined palette.

When you click the Use a Pre-Defined Color Palette button, the Palette Selector window is opened, as shown below.
When you select a palette from the list, the colors are applied to the items in the Edit Style SASS Variables dialog. If you want to use the colors, click OK. If you click Cancel, the colors are not applied.
If you have selected a palette, and you want to go back to the base theme with no palette, select <none> from the list.

Setting Min and Max Values at Run-time
The following Javascript snippet shows how you can dynamically set the control's min and max value at run-time.
var max = {dialog.object}.getValue('max');
max = Number(max)
//get a pointer to the control
var obj = {dialog.object}.getControl('semicircularNumber_1');
//set the min and max
obj.rgraphSettings.max = 200;
obj.rgraphSettings.min = 40;
//redraw the control
obj.redraw();
Application Server - Alerts - The Alpha Anywhere Application Server Classic server now has the ability to send administrative alerts by email and SMS. This can be configured on the Logging tab of the settings UI. There is also a Test Alerts button. This will send both a test email and a test SMS, if each are enabled, in order to confirm that the settings entered are working as expected.
NOTE: These comments do not apply to the Alpha Anywhere Application Server for IIS.
For email notifications, all that is required is a recipient
email address. There is no email server configuration necessary, as
emails will be sent using a special account, AppServerAlerts@alphasoftware.com.
Multiple recipients may be specified by separating them with a
comma.
For SMS notifications, the customer must have their own Twilio
account and provide the appropriate account information in the
server's settings, along with the recipient SMS number. This
functionality will work with a free Twilio account, but Twilio may
impose limits on free accounts. Multiple recipients may be specified
by separating them with a comma.
Currently there are 4 different notification levels, detailed below.
Each level includes all alerts from levels under it (higher number).
Level 1 - Emergency
(Indicates something that requires immediate attention, as the server is no longer operating normally)
Level 2 - Alert
(Indicates something that needs attention very soon, as server functionality will be impacted)
Level 3 - Warning
(Indicates a potential problem)
Level 4 - Notice
(Indicates an informational notice)
Xbasic - a5_ink_to_png() Function - Convert Ink to a PNG Image - The Ink control (in the UX component) uses a special syntax for the Ink data. The a5_ink_to_png() function converts the ink data to a PNG image.
Syntax
a5_ink_to_png(C ink,N heightInPoints,N widthInPoints,C filename)
Where:
Javascript Library - A5.runChain() Function - Run Asynchronous Functions Synchronously - A new function has been added to the Alpha Anywhere Javascript library to run asynchronous functions synchronously.
Many Javascript functions run asynchronously. For example,
functions that make Ajax callbacks are asynchronous. In PhoneGap
applications, most of the functions are asynchronous.
This helper function allows you to run a series of functions (some of which may be asynchronous) synchronously (i.e. the second function does not start executing until the first function has completed, and so on).
Watch Video - Part 1
Watch Video - Part
2
Syntax:
A5.runChain(actions,onAllDone,onStop [, context]);
Where:
Each function in the actions array must take a single object as its input parameter. Each function must call the .next() method of the input object to begin execution of the next function in the actions array. If the function is an asynchronous function, the call to the .next() method would be in the onSuccess callback of the asynchronous function.
The execution chain can be stopped if any function calls the input object's .stop() method.
Example
//define 3 functions you want to run asynchronously
//this is an asynchronous function
function action1(obj) {
setTimeout(function() {
console.log('wait 1 second');
obj.next() // call the next function to be executed
},1000 );
}
function action2(obj) {
console.log('this is a synchronous function');
obj.next()
}
function action3(obj) {
setTimeout(function() {
console.log('wait .5 seconds');
obj.next()
},500 );
}
//create an array with the functions to executed
var actions = [action1,action2,action3];
//run the actions synchronously
A5.runChain(actions,
function() { alert('alldone'); },
function(err) { alert('error: ' + err); }
);
//if we want to pass in values to the chain we can do as follows
var context = {var1: 'value of var1'};
A5.runChain(actions,
function() { alert('alldone'); },
function(err) { alert('error: ' + err); },
context
);
//inside any of the functions we can reference 'this.var1'
//we can also set properties on the 'this' object.
When you run this code, the messages in the console will appear in the following order:
wait 1 second
this is a synchronous function
wait .5 seconds
If you had simply called the functions one after the other, then the messages would have appeared in the following order:
this is a synchronous function
wait .5 seconds
wait 1 second
Installing the Alpha Anywhere IDE on Multiple Machines - Deactivating a License - The Alpha Anywhere IDE license allows you to install the Alpha Anywhere IDE on as many machines as you want, but you can only use it on one machine at a time.
If you have installed the AA IDE on two machines, for example, and you started the AA IDE on one machine and then exited the AA IDE on that machine and tried to start it on the second machine immediately after exiting the AA IDE on the first machine, this would not be possible because the activation 'lease' would not yet have expired. By default, the activation 'lease' for the AA IDE is 24 hours. (This can be changed in the View, Settings, Preferences menu command)
However, if you select the File, Deactivate License and Exit menu command, on the first machine, you would be able to go to the second machine and start the AA IDE immediately. You would not have to wait until the lease on that machine expired.
UX Component - List Control - Import Data - If a List control in a UX component is based on data from a SQL database you can now upload an Excel or Ascii file (containing CSV data - comma separated values) and then import the data in that file into the table in the SQL database that the List is based on. After the data are imported, the List is automatically refreshed.
NOTE: If a List is based on a stored procedure, you cannot import data.
The data in the uploaded file must use field names that match the column names in the target SQL table.
In the case of a CSV file, the field names are in the first row of data in the file. In the case of an Excel file, the field names are the column heading in the first row of data.
NOTE: In the case of an Excel file, if the file has multiple tabs, the data on the first tab is imported.
Field names in uploaded file cannot contain spaces, or special characters.
To create an Import Action, use Action Javascript and select the Import Data into a List Control from Excel or Ascii file action.

This will open the builder where you can define the define the target List control into which you want to import data.

The properties of note in the builder include:
Target List control name - The name of the List control into which you want to import data. The data are actually imported into the table in the SQL database that the List is based on. Only Lists that are based on SQL databases (and do not use stored procedures for the List query) are eligible targets.
Pre-process uploaded file Xbasic function - After the file has been uploaded you can call an Xbasic function to validate the data before it is imported into the target table. Your Xbasic function gets passed an array with all of the data to be imported. Your code can modify the data in the array or delete array entries that do not meet validation criteria
Maximum records to process - If the uploaded file contains more records that the specified maximum, no data are imported.
Xbasic - Context.Security.AdministrativeCreateUser() Method - Adds a new user with a password.
Normally Context.Security.CreateUser() is used to create users. When the security setting for Reset Password is set require a question and answer, a security question and answer are required to create a user.
This requirement is not practical when an administrative task creates a user.
The AdministrativeCreateUser() method can be used in this case. It does not require a security question and answer even if the security settings require one. Because of this, its use should be limited to pages/code that require administrative access and the application should require the user to set a security question and answer on first login.
Web Control Panel - Node Services Category - The Web Control Panel now has a new category - Node Services. This makes it easier to create Node services that can be called from your Xbasic code.
When the Node Services item has focus, the New button will create a new stub Node service that serves as a helpful starting point for defining a new service.
Once you have defined your Node service, you can call it from your Xbasic code using the node_request_result() function.
For example, say you have define a service called multiply and that this service takes as input x and y. Here is how you could call the service from Xbasic:
dim pIn as p
pIn.x = 4
pIn.y = 3
dim pOut as p
pOut = node_request_result("multiply",pIn)
?pOut.error
= "" 'empty string indicates no errors.
?pOut.result
= 12
Web Control Panel - Node Services Category - The Web Control Panel now has a new category - Node Services - that shows all of the Node services defined in the project.
Node_request() Function - Automatic Node Restart - If you are in WorkingPreview or LivePreview and you have edited the code in a Node Services definition, when you call node_request() to run the service, the optional flagRestartNode parameter will automatically be set to .T.. This makes iteratively testing edits to a Node service easier to test. Without a Node restart, edits to the Node service definition would not be picked up by Node.
Node_request_result() Function - A wrapper around the node_request() function, except that instead of returning a JSON string, the JSON is already parsed and the function returns a .result and .error property. If there was no error, the .error property is blank.
Session Folders - The Alpha Anywhere Application Server
now uses A5Storage for session files. A5Storage allows for much
greater flexibility in storing session data on local disk, network
attached storage, Amazon S3, and Azure. This means that the physical
folders previously located in a directory named
session_folders
within the webroot are no longer used in any way and will not be
created by the server.
Direct access to these folders has never been supported by Alpha
Software, and the
Session.Session_Folder and
Session.Session_URL
properties were deprecated in version 11 and removed in version 12
(Alpha Anywhere). With this update,
ServerSetting.SessionFolders has also been removed.
However, some developers may have written custom code to directly
access these folders. Any existing code of this type will no longer
function as expected and will need to be updated or replaced
accordingly.
See
https://www.alphasoftware.com/documentation/pages/Server/Guide/Design/Sessions/Storing%20Files%20in%20Sessions.xml
for more information on working with files in Sessions.
Xbasic - create_table_sql() Function - Excel - You can now pass the name of an Excel file to the create_table_sql() function. This will create a SQL table based on the list of columns in the Excel data and also import the data into the SQL table.
The name of the Excel file is passed in as the fieldList parameter.
Xbasic - sql_import() Function - Excel - You can now pass the name of an Excel file to the sql_import() function. This will import the data in the Excel file into the SQL table.
The name of the Excel file is passed in as the data parameter.
SQL Server Reporting Services - Using Reports Created in SQL Server Reporting Services in an Alpha Anywhere Project - Many organizations use SQL Server Reporting Services (SSRS) and have a number of reports that were developed in SSRS. Using these reports in an Alpha Anywhere application is now possible using the SSRS integration features in Alpha Anywhere.
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
In order to use SSRS reports in an Alpha Anywhere project you must:
These steps are discussed in more detail below.
Once you have created a link to a SSRS report, the report link can be used just like any other Alpha Anywhere report. You can add the report to the TabbedUI, or you can create actions using Action Javascript to display the report.
Creating a SSRS Connection String
To create SSRS connection string, select the Tools menu when the Web Control Panel has focus and then select the SQL Server Reporting Services Connection strings menu item.

You can then define a new connection string, or edit an existing connection string:

Linking SSRS Reports
To link SSRS reports in your Web Project, go to the Web Projects Control Panel and select the Reports category.

Then click the New button. The dropdown menu shows these choices:

This will bring up a dialog where you can select the SSRS reports you want to link in your Alpha Anywhere project.
Select your SSRS connection string in the Connection String dropdown box. A list of reports defined in the selected SSRS server will be displayed.
NOTE: The first time you connect to a SSRS server, it can take quite a long time before SSRS responds with the list of reports.
Select as many of the listed reports as you want.
Notice that at the bottom of the dialog there is a Preview Reports hyperlink that will allow you to preview any report before you select it. If the selected report uses parameters, you will be prompted for the parameter values.

Links will be created for each of the selected reports. A link is a file in the Web Projects control panel with information about the SSRS report. The filename includes the .ssrs. string in the name just before the .a5rpt extension.
For example:

Once a report has been linked, you can set security on the report as if it were a native Alpha Anywhere report. You can add the report to a TabbedUI, or show the report when a button is clicked by using Open a Report action in Action Javascript.
Publishing Profiles
When you define a publishing profile to publish your application you can specify values for your SSRS connection strings, just as you can for all other types of connection strings (e.g. AlphaDAO, storage, etc.). This means that you can connect to a different SSRS server when you publish your application than you do when you are developing your application.
TabbedUI Component - Search - If a TabbedUI component has a large number of items, it can be difficult for a user to find the item that they want. You can now add a search feature to the TabbedUI to allow users to quickly find the items they are looking form. As the user types into the search box a filtered list of the matching items is displayed (see second image).
In the image below the search feature has been turned on, but the user has not yet typed into the search box.

In this image the user has typed a string into the search box and all of the matching items are displayed.

To turn the search feature on, go to the TabbedUI Properties pane in the TabbedUI builder and check the Enable search property.
Once you have turned on the search feature, there are a number of other properties you can set.

UX Component - Action Javascript - Get Server-side Data - A new action has been added to Action Javascript. The purpose of the action is to get server-side data and return the data to the client where you can then further process the data with Javascript code. For example, you might use the data returned to populate a List control, a dropdown box, a SpinList etc.

The builder for the action is shown below:

The server-side data can be obtained by performing a query against a SQL database, or by executing a Xbasic function (which can, in turn, call web services - REST or SOAP) to get the data that should be returned to the client.
The options for the Query type parameter are:
The onSuccess property allows you to define Javascript to execute once the data is received by the client. The data that is received by the client will be stored in a variable called:
{dialog.object}._serverSideData
UX Component - List Control - Dynamic Images - Image Sequences - Client-side - You can now specify dynamic images when you define a dynamic image field to a List and specify that the dynamic image computation is server side.
Xbasic - SQL_Import() Function - Import data into a SQL Table - The sql_import() function is a helper function that imports CSV or JSON data into a SQL table.
NOTE: The function is called a 'helper' function because it simply wraps the low level AlphaDAO methods for doing a bulk insert into a SQL table.
Syntax
p result = sql_import(c connectionString, c tableName, c tableOwner, c data [, L replicateIdentity [, c fieldMap]])
Where
Example fieldMap
Assume that the input data is as follows
fname,lname
fred,smith
john,jones
Assume that the target table has column names of firstName and lastName.
You would need to specify the following fieldMap:
fname=firstName
lname=lastName
Example:
dim cs as c
cs = "mydata"
tablename = "table1"
data = <<%str%
id,name,notes,dob,number
1,"Jones, Amy","Here are some notes",1992-12-18,34.56
%str%
'replicateIdentity = .f.
map = "name=fullname"
dim p as p
p = sql_import(cs,tablename,"", data,replicateIdentity,map)
?p.error
= .f.
UX Component - Map Control - Action Javascript - Google Map Methods - Two new actions have been added to the Google Map Methods action
Xbasic - what3words() Function - Add support for the what3words service. Allows you to translate an address or location to a what3words address, or a what3words address to a location. For more information on what3words go to www.what3words.com.
Syntax
p result = what3words(c key, c mode, c input)
Where
Examples
key = "Your api key"
mode = "wordstolocation"
input = "traps.plan.code"
dim p as p
p = what3words(key,mode,input)
?p.lat
= 42.423661
?p.lng
= -71.213213
mode = "addresstowords"
input = "70 blanchard road, burlington ma usa"
dim p as p
p = what3words(key,mode,input)
?p.words
= "newly.slams.roses"
Xbasic - create_table_sql() Function - Create a table in a SQL database.
Syntax
P result = create_table_sql(c fieldList,c connectionString,c tableName [, c mode])
Where
The fieldList parameter can be either a JSON array of objects defining each field, or a crlf delimited list of pipe delimited properties.
Example of a CRLF delimited fieldList:
id|N|6|0|AutoIncrement
name|c|20
dob|d
notes|m
In this example a primary key (that is not an AutoIncrement fields) is defined
id|c|6||PrimaryKey
name|c|20
dob|d
notes|m
When defining a primary key you can designate multiple columns:
firstname|c|20||PrimaryKey
lastname|c|20||PrimaryKey
dob|d
notes|m
Example of a JSON fieldList:
[
{"name": "id", "type": "numeric", "size": 6, "decimals" : 0, "autoIncrement": true},
{"name": "name", "type": "character", "size": 20},
{"name": "dob", "type": "date"},
{"name": "notes", "type": "memo"}
]
In this next example a primary key (that is not an Auto Increment field) is defined:
NOTE: Multiple fields can have the 'primaryKey' attribute set to true.
[
{"name": "id", "type": "character", "size": 6, "primaryKey": true},
{"name": "name", "type": "character", "size": 20},
{"name": "dob", "type": "date"},
{"name": "notes", "type": "memo"}
]
Xbasic - JSON_shred() Function - Converts a complex JSON string representing an array of objects with nested arrays) into individual arrays that do not have any nested arrays.
Syntax:
c result = JSON_shred( c JSON, c schema [, c ParentArrayName])
where
Consider the following JSON string:
[
{"Firstname": "John", "Lastname" : "Smith", "City" : "Boston", "State" : "MA", "Children": [
{"Name" : "Callie", "Age" : 5},
{"Name" : "Griffin", "Age" :3},
{"Name" : "Luke", "Age" : 1}
]
},
{"Firstname": "Henry", "Lastname" : "Rhodes", "City" : "New York", "State" : "NY", "Children": [
{"Name" : "Howard", "Age" : 15},
{"Name" : "Robert", "Age" : 11}
]
}
]
The JSON is an array in which each object in the array has a nested array of 'children'.
This JSON can be 'shredded' to produce this result:
{
"__top": [
{
"Firstname": "John",
"Lastname": "Smith",
"City": "Boston",
"State": "MA"
},
{
"Firstname": "Henry",
"Lastname": "Rhodes",
"City": "New York",
"State": "NY"
}
],
"Children": [
{
"Name": "Callie",
"Age": 5
},
{
"Name": "Griffin",
"Age": 3
},
{
"Name": "Luke",
"Age": 1
},
{
"Name": "Howard",
"Age": 15
},
{
"Name": "Robert",
"Age": 11
}
]
}
The result is an object with two arrays: __top and Children. Notice however, that since the 'Children' array is no longer nested inside each object in the top level array, the linkage between the entries in the 'Children' array and their parent has been lost.
In the above example, the JSON_shred() function was called using a schema that did not specify that any key fields should be added to the Children array.
The schema used to produce the above result was:
[
{
"Children" : [
{
}
]
}
]
Notice how the schema defines the 'shape' of the input JSON but does not specify that any additional 'key' fields should be added to the Children array.
In order not to loose the relationship between each object in the Children array to its parent, a key field must be added to each object in the Children array that points to its parent record. The desired output from the shredding operation is shown below:
{
"__top": [
{
"Firstname": "John",
"Lastname": "Smith",
"City": "Boston",
"State": "MA"
},
{
"Firstname": "Henry",
"Lastname": "Rhodes",
"City": "New York",
"State": "NY"
}
],
"Children": [
{
"key": "John Smith",
"Name": "Callie",
"Age": 5
},
{
"key": "John Smith",
"Name": "Griffin",
"Age": 3
},
{
"key": "John Smith",
"Name": "Luke",
"Age": 1
},
{
"key": "Henry Rhodes",
"Name": "Howard",
"Age": 15
},
{
"key": "Henry Rhodes",
"Name": "Robert",
"Age": 11
}
]
}
Notice that each record in the 'Children' array now has a property called 'key' that points to its parent record. To obtain the above result, the following schema is used:
[
{
"Children" : [
{
"key": "{../Firstname} {../LastName}"
}
]
}
]
The schema specifies that each object in the 'Children' array should have a property called 'key' whose value is the "Firstname' and "Lastname" property in the immediate parent object. The syntax used to specify a value from a parent object is ../. You can reference properties at the grand parent level using ../../, and so on.
Here is a more complex example that shows multiple levels of nested arrays in the input JSON. Notice that the "Hobbies" array is an array of strings, not an array of objects. This array is converted into an array of objects in the result.
[
{"Firstname": "John", "Lastname" : "Smith", "City" : "Boston", "State" : "MA", "Children": [
{"Name" : "Callie", "Age" : 5},
{"Name" : "Griffin", "Age" :3, "Hobbies" : ["Leggo","Star Wars"]},
{"Name" : "Luke", "Age" : 1}
]
},
{"Firstname": "Henry", "Lastname" : "Rhodes", "City" : "New York", "State" : "NY", "Children": [
{"Name" : "Howard", "Age" : 15},
{"Name" : "Robert", "Age" : 11, "Hobbies" : ["Soccer"]}
]
}
]
Here is the schema that could be used to shred the above JSON:
[
{
"Children" : [
{
"Hobbies" : [
{
"hobbyKey" : "{../../Firstname} {../../Lastname}|{../Name}"
}
],
"key": "{../Firstname} {../LastName}"
}
]
}
]
And here is the resulting output from the shredding operation:
{
"__top": [
{
"Firstname": "John",
"Lastname": "Smith",
"City": "Boston",
"State": "MA"
},
{
"Firstname": "Henry",
"Lastname": "Rhodes",
"City": "New York",
"State": "NY"
}
],
"Children": [
{
"key": "John Smith",
"Name": "Callie",
"Age": 5
},
{
"key": "John Smith",
"Name": "Griffin",
"Age": 3
},
{
"key": "John Smith",
"Name": "Luke",
"Age": 1
},
{
"key": "Henry Rhodes",
"Name": "Howard",
"Age": 15
},
{
"key": "Henry Rhodes",
"Name": "Robert",
"Age": 11
}
],
"Hobbies": [
{
"hobbyKey": "John Smith|Griffin",
"__value": "Leggo"
},
{
"hobbyKey": "John Smith|Griffin",
"__value": "Star Wars"
},
{
"hobbyKey": "Henry Rhodes|Robert",
"__value": "Soccer"
}
]
}
PhoneGap App Builder - PhoneGap CLI Build Option - A new option has been added to the PhoneGap App Builder that allows the developer to select and use either PhoneGap Build or a local install of the Cordova CLI
(Command Line Interface) to build a PhoneGap App.
Android builds are supported on PC's running Windows and iOS builds are supported on a Mac with Xcode. Using the CLI allows the developer to use the platform's native development tools to build and debug Cordova apps. This also allows the use of plugins that PhoneGap Build does not support because PhoneGap Build does not support the use of plugin hooks.
For the full documentation on the PhoneGap/Cordova CLI Builder,
see PhoneGap/Cordova CLI Builder
For a video overview on using the PhoneGap/Cordova CLI Builder,
see PhoneGap/Cordova CLI Builder Video Overview
Xbasic - CURL Object - Auto-complete - When you define a CURL object in Xbasic, you now have auto-complete for all of the options available to the .SetOpt() method.
For example:
dim c as extension::curl
c.setOpt(
As soon as you type the opening (, the bubble help instructs you to right click on the argument value (as shown in the image below) to get a list of the options for the .setOpt() method.

UX Component - FormView Control - Lookup Fields - You can now define lookup fields in the FormView. This allows you to display 'friendly' values in the Form (e.g. product name, rather than product id).
To define a Lookup field, go to the Fields tab in the FormView builder and check the Has Lookup value property.
You can then define the Lookup. The lookup data source can be a List control or a Javascript function.

TIP: You may want to use the client-side data cache or a query against a SQLite database (in a PhoneGap application) as the data source for your Lookup. This requires a two-step process because reading data from the client-side data cache, or from a SQLite database can only be done asynchronously. Therefore you must first execute some code that reads the client-side data cache or executes a SQLite query and puts the data in a variable in memory. You can then define the Lookup in the FormView builder to use the Javascript Function option, performing the lookup against the data you have loaded into memory.
Web Project Control Panel - Automatic Refresh - By default every time the list of files in your Web Project changes, or a file is edited, the Web Project Control Panel will refresh. However, if your project contains a very large number of files (several thousand), then refreshing the Control Panel can be slow and you might want to turn off the automatic refresh of the Control Panel and only refresh it when needed.
You can turn off automatic refresh by clicking on the More... button in the Web Control Panel and selecting the Set Control Panel refresh options... menu entry.

If you turn off automatic refresh, a Refresh button will be shown in the Web Control Panel. Click this button to refresh the Control Panel.

UX Component - List Controls - Dynamic Images - Image Sequence - When you add a server-side dynamic image to a List control, you can now specify that you want to use an image sequence for the image.


UX Component - Map Control - Adding Multiple Markers to a Map
Control Using Client-side Data -
Action Javascript has an action to add multiple
markers to a map. The data that defines the
latitude/longitude for each marker on the map
(and also for the marker titles, details etc).
has previously been server-side data. Now, you can
specify that the data should be
client-side data.
In the case of server-side data you specify the
name of a Data Series that specifies the
properties for each marker. In the case of
client-side data, the data can come from a Javascript
function, a List control, the client-side Data
Cache, or, in the case of a PhoneGap
application, by querying a SQLite database on a
device.
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
Watch Video - Part
4
Watch Video - Part
5
Download Component
To specify that the Google Map Method (UX Component) / Add multiple markers to the map action should use client-side data, set the Data type property to ClientSideData. You can then specify whether the client-side data comes from a Javascript function, or from data in a List control.
In the case where you specify the name of a Javascript function, you specify the name of a Javascript function (which must return an array of objects - each object has properties that must include the marker latitude and longitude values). You must also specify the names of the properties in the data returned by the Javascript function.

For example, assume that you specify the name of a Javascript function that returns data like this:
[
{
"name": "COYOTE FLATS",
"city": "BISHOP",
"state": "CA",
"latitude": "37.20203",
"longitude": "-118.47629"
},
{
"name": "LOST HILLS SHERIFF\\'S STATION",
"city": "CALABASAS",
"state": "CA",
"latitude": "34.14167",
"longitude": "-118.5262"
},
{
"name": "GOLDSTONE /GTS/",
"city": "BARSTOW",
"state": "CA",
"latitude": "35.35053",
"longitude": "-116.88837"
}
]
In this case the property names that you specify in the Javascript properties property would be:
name,city,state,latitude,longitude
NOTE: If you want to use data from the client-side Data Cache, or (in the case of a PhoneGap application) data from a query against a SQLite database, you need to use a two-step process because reading data from a Data Cache (or a SQLite database) is an asynchronous action. Therefore your Javascript must read the Data Cache, or execute the SQLite query (you can use Action Javascript for this) and in the on success function for the action, you must put the data you have just read into a variable in the UX object (for example {dialog.object}._mapData) and then call the Action Javascript action to add the markers to a map using the Javascript function option. The Javascript function will read the data from the variable that contains the data.
Xbasic - Classes - The Web Control Panel now exposes a new category - Xbasic Class - that allows you to defined Xbasic classes that can then be used in any server-side Xbasic code.

To use an Xbasic class in your Xbasic code you use the loadClass() function to load the definition and then you can DIM and instance of the class.
For example:
dim flag as l
flag = loadClass("helloclass")
dim h as helloclass
NOTE: It is not strictly necessary to use the loadClass() function to load the class before DIMming and instance of the class. If the DIM statement fails, Xbasic will then try to load the class itself by searching for the class definition. But this will add a short delay to your code while Xbasic tries to resolve the class. Therefore it is recommended that you explicitly load the class before using it. Also, if you make an edit to the class definition, the edit will be seen immediately if you explicitly load the class.
Xbasic - loadClass() Function - Loads a class definition.
Syntax
L flag = loadClass(c className)
Where
UX Component - Integrated Login - Server-side onLogin Event - Enhancements have been made to the server-side onLogin event so the following actions in the onLogin event handler are now supported
For example:
e.arguments[e.arguments.ArgumentNumber("Arg1")].data = "Portugal"
e._set.field1.value = "foo"
e.control.field2 = "bar"
Web Components - Manifest Files - Using Source Control -
Most web components use a special support file with a
_a5wcmp_manifest
file extension. When a component is published, the process checks
for a manifest file built at the same time as the requested
component. The publish process uses this manifest file to determine
what other files need to be published to run the component.
Previously, the file name for each 'manifest' file contained a
timestamp string to synchronize the file with its parent component.
This caused a problem if the component files were stored in a source
control system. (See release notes for 'Grid Component - Compiled
Files - Using Source Control' for a complete explanation).
The new process stores the linking timestamp internally in the two
files, and the manifest filename never changes. It can now be stored
in a source control system with its parent component.
This new naming convention is only applied when a component is
edited and resaved, or when the manifest files are updated by a bulk
process. Existing components with the legacy file naming will still
function normally. Some components such as login and navigation
components do not use the new process as they do not build a
manifest when saved.
UX Component - Alignment Container - The Alignment container makes it easy to left, center, or right align a series of controls.
When you select an Alignment container you can set standard set of properties for container. If you set the alignment to left or right, then you can also set an offset property to control distance of the controls from the left or right edge.
All of the controls in an Alignment Container render on their own line, regardless of whether or not a break follows the control.
If you want multiple controls to be on the same line, you must wrap the controls in a container and then the Alignment container will align the enclosing container.

The image below shows how the above definition renders (but with the alignment set to Center, not Left as shown in the image).
The width of the Alignment container has been set to 100% and the width of the first three textbox controls have been set to 50%, 75% and 33% respectively. As you can see the controls are all horizontally centered within the container.
The txt4 and txt5 controls both appear on the same line because they are wrapped in standard container whose width has been set to 2.5inches. The container itself, which has a red border, is horizontally centered.

UX Component - PhoneGap - New Sample Template - PhoneGap - Sound Effects using Native Sounds - A new sample template component has been added that shows how you can add sound effects to your application using the PhoneGap Low Latency Audio plugin. When you create a new UX component you will see the template listed in the list of available samples.
UX Component - FormView Control - List DataSource - {dialog.object}.formViewCommit() Method - Commit Dirty Fields Only - You can now specify that only fields that were edited should be committed to Form's data source. Only applies if the Form's data source is a List control.
Syntax
var flagOnlyCommitDirtyFields = true;
{dialog.object}.formViewCommit('{form.id}',flagOnlyCommitDirtyFields);
Xbasic - csv_to_json() - Convert a CSV string to JSON. Fields must be comma delimited. First row must be fields names. If a field contains a comma, enclose field in quotes. If a field contains quotes, escape quotes using two consecutive quotes
Example
dim txt as c
txt = <<%txt%
ticker,name,price:N,change:N,mktcap,chgPct
"AAPL","Apple Inc.",402.215,"-24.025",377.7B,"-24.025 - -5.64%"
"GOOG","Google Inc.",780.37,"-13.00",257.3B,"-13.00 - -1.64%"
%txt%
? csv_to_json(txt)
= [
{ "ticker" : "AAPL" , "name" : "Apple Inc." , "price:N" : "402.215"
, "change:N" : "-24.025" , "mktcap" : "377.7B" , "chgPct" : "-24.025
- -5.64%"} ,
{ "ticker" : "GOOG" , "name" : "Google Inc." , "price:N" : "780.37"
, "change:N" : "-13.00" , "mktcap" : "257.3B" , "chgPct"
: "-13.00 - -1.64%"}
]
UX Component - onLogin and onLogout Server-side Event - Setting state variables. You can now use the
e._state.varname = varvalue
syntax to set the value of state variables in the server-side onLogin and onLogout event. Keep in mind that if the UX is set to do a full refresh on logout, setting state variables in the onLogut event is meaningless.
Action JavaScript - Stripe Checkout -
A5.stripe.getEmbeddedStripeResults Function A new function has
been added to Stripe Checkout to handle a unique situation that
occurs when the Stripe Checkout control is used within an embedded
UX component that is reloaded after its was initially loaded The new
function may be called in the
onStripeCheckoutComplete
event.
Example: onStripeCheckoutComplete event handler
var e = {};
if ({dialog.object}.getStripeResults) {
e = {dialog.object}.getStripeResults();
} else {
e = A5.stripe.getEmbeddedStripeResults();
}
UX and Grid Component - onChange Event - Fixed a bug introduced in V4.3.2.
PhoneGap App Builder - ImageMagick - UNC Paths - A problem with UNC paths when using ImageMagick to generate icons has been resolved.
UX Component - Stripe - Fixed an issue when setting the currency type to a non US dollar value.
UX Component - Dynamic Images - Fixed a bug introduced in build 4152 when support for image sequences was introduced.
Xbasic - .Net Integration - Fixed an issue when using Xbasic to work with a .Net assembly
SQL Server Performance Optimization - Indexes - Performance of
queries against SQL Server can be affected by string arguments due to an
issue with the SQL Server optimizer.
It appears that when a query has a string value argument, the SQL Server
optimizer does not always see the type as matching some types of columns
(for example CHAR columns with a fixed size). As a result, the optimizer
will ignore indexes and hints to use them and resort to a table scan.
For example:
SELECT AmountDue, AmountPaid, AccountNumber FROM Invoices WHERE
AmountDue > 0 and CustomerId = :CustomerId
If CustomerId is defined
in the database as Char(5),
the optimizer may not recognize the :CustomerId argument
contains a matching value because the type of the argument is VARCHAR.
In such cases, adding a CAST
to the argument value causes the optimizer to choose the appropriate
index because the types match:
SELECT AmountDue, AmountPaid, AccountNumber FROM Invoices WHERE
AmountDue > 0 and CustomerId = CAST(:CustomerId AS CHAR(5))
Xbasic - SQL_Update() Function - Updates a record in a SQL table. This function is just a wrapper around the Xbasic AlphaDAO commands to execute a SQL update statement, but it convenient to use for simple cases.
NOTE: The record to update is specified by primary key, not by a generalized WHERE clause. This limitation is intentional so a to eliminate the possibility of unintentionally updating multiple records in the database. If you need to update multiple records you will need to write your own Xbasic code.
Syntax
p result = sql_update(A connection,c tablename,c fieldValuePairs,c primaryKey, a primaryKeyValue [, L execute [, P e ]])
Where
Example:
dim cn as sql::Connection
cn.open("::Name::myconnstring")
tablename = "mytable"
fieldsValuePairs = <<%str%
name=fred smith
date of birth=1952/12/18
salary=78000
%str%
'You can also specify field values using JSON
fieldsValuePairs = <<%str%
{
"name" : "fred smith",
"date of birth" : "1954/11/25",
"salary" : "78000"
}
%str%
primaryKey = "id"
primarykeyValue = "1"
p = sql_update(cn,tablename,fieldsValuePairs,primaryKey,primaryKeyvalue)
Xbasic - SQL_Insert() Function - Inserts a record in a SQL table. This function is just a wrapper around the Xbasic AlphaDAO commands to execute a SQL insert statement, but it convenient to use for simple cases.
Syntax
p result = sql_insert(A connection,c tablename,c fieldValuePairs [, L execute[, P e ]]])
Where
Example:
dim cn as sql::Connection
cn.open("::Name::myconnstring")
tablename = "mytable"
fieldsValuePairs = <<%str%
name=fred smith
date of birth=1952/12/18
salary=78000
%str%
'You can also specify field values using JSON
fieldsValuePairs = <<%str%
{
"name" : "fred smith",
"date of birth" : "1954/11/25",
"salary" : "78000"
}
%str%
p = sql_insert(cn,tablename,fieldsValuePairs)
?p.lastInsertedIdentity
= 5
Application Server - OpenSSL - A new version of OpenSSL is now used. The build is OpenSSL 1.0.2k. For details of the fixes in OpenSSL, see:
UX Component - {dialog.object}.debugInfoToFile() Method - This method is useful when debugging an application and you want to examine some client-side data. While you can typically use Alerts in client side code to examine data, or in some case use console.log() commands (not always possible when the app is running on a mobile device), this method allows you to write client side data to a file on the server.
In cases where you do not have permission to write to server files (e.g. when running under IIS or on the Alpha Cloud), the companion {dialog.object}.debugInfoToS3() method can be used to write to a file on an S3 bucket.
Syntax
{dialog.object}.debugInfoToFile(data,filename[, append [,silent]])
Where
UX Component - {dialog.object}.debugInfoToS3() Method - This method is useful when debugging an application. It allows you to write data to a S3 bucket. See {dialog.object}.debugInfoToFile() Method for more information.
Syntax:
{dialog.object}.debugInfoToS3(data,connectionString,objectName [,append [,silent]])
Where
UX and Grid Component - DevArts Zoho CRM ODBC Driver - The DevArts ODBC driver for Zoho CRM is now supported.
Xbasic - json_from_xml() Function - Ignore Attributes - In some cases, when you convert XML to JSON, the XML either does not contain attribute tags, or you want to ignore attribute tags when converting the XML to JSON. This will result in cleaner looking JSON. The json_from_xml() function now takes an optional '-A' attribute to ignore attributes.
For example, consider the following input XML:
dim xml as c = <<%str%
<qdbapi>
<ticket>auth_ticket</ticket>
<apptoken>app_token</apptoken>
<query>{'11'.CT.'Bob'}AND{'19'.GTE.'5'}</query>
<clist>6.7.9.11.16</clist>
<slist>11.6</slist>
<fmt>structured</fmt>
<options>num-4.sortorder-D</options>
</qdbapi>
%str%
showvar(json_reformat(json_from_xml(xml,"qdbapi","-A")))
The following JSON in produced:
{
"qdbapi": {
"ticket": "auth_ticket",
"apptoken": "app_token",
"query": "{'11'.CT.'Bob'}AND{'19'.GTE.'5'}",
"clist": "6.7.9.11.16",
"slist": "11.6",
"fmt": "structured",
"options": "num-4.sortorder-D"
}
}
Grid Component - Compiled Files - Using Source Control - Grid
components use a special support file with a
_a5wcmp_compiled
file extension.
When a Grid component is published, the process checks for a compiled
file built at the same time as the requested Grid.
The publish process uses this compiled file to construct the published
version of the Grid Component used at run time. If the compiled file is
missing or out of date, it is reconstructed, which slows the publish
process. In a large project this could add a significant amount of time
to the publish operation.
Previously, the file name for each 'compiled' file contained a timestamp
string to synchronize the file with its parent Grid. This filename
changed every time the Grid was resaved. This caused a problem if the
Grid component files were stored in a source control system, as
explained below.
At publish time, the timestamp in the filename of the
_a5wcmp_compiled file
was compared with the last edited time of the Grid component file to
determine if the
_a5wcmp_compiled was up to date. However, if the Grid files in
the project had been restored from a source control system, the last
edited time on the Grid component filename would be different from their
original value and would no longer match the timestamp stored in the
local project _a5wcmp_compiled
filename. Because the file name for each 'compiled' file changed at
every save, it could not be stored in a source control system. As a
result, when publishing the application, it would appear that the
_a5wcmp_compiled files
were out of date and the
_a5wcmp_compiled would have to be re-created, thus slowing down
the publishing operation.
Now, the _a5wcmp_compiled
filename no longer contains a timestamp. Instead, the timestamp is
stored as a property in the Grid and it's
_a5wcmp_compiled file.
The _a5wcmp_compiled
filename never changes when the Grid component is edited and the Grid
and its linked compiled file can both be stored in a source control
system. If both are updated at the same time, they will still match when
retrieved from the source control. You do not need to store the
_a5wcmp_compiled files
in source control if the Grid will not be edited in source control.
This new naming convention is only applied when a grid is edited and
resaved, or when the compiled files are updated by a bulk process.
Existing grids with the legacy file naming will still function normally.
UX Component - Static HTML Page Head Section - When you turn on the Application Cache for a UX component you can now inject custom markup into the head section of the static HTML page using the new Page head section property.
The common use case for customizing the head section is to include markup that specifies the icons to use should the user choose to make a home screen shortcut for the page.

When you click the smart field to edit the HEAD section, the editor has a hyperlink that will insert sample markup showing how the home screen icons are defined.
In the example below it is assumed that your project has icons called 'apple-icon-57x57.png', etc.

UX Component - List Control - Detail View - afterSynchronize and afterSynchronizeRecord Server-Side Events - Two new server-side events have been added to the List control.
NOTE: Both of these events must be defined for the top-most parent List in the List hierarchy. For example if your UX has a List showing Customers and a child List showing Orders (and if the child List is set to pre-fetch data), then these events must be defined for the Customer List. Defining these events for the Orders List is meaningless.

Xbasic - CURL to Xbasic Genie - The CURL to Xbasic genie has been substantially enhanced. You can now automatically generate sample CURL commands by clicking the Example commands... hyperlink in the genie.

When you click on the hyperlink a menu of available example commands is shown. You can use this genie to get a template for how the CURL command should be constructed. Then when you convert the generated CURL command to Xbasic, you will have an excellent starting point for fashioning your Xbasic CURL code to perform the task you want.

The list of examples in the menu is extensive, but if you need a specialized CURL command (for example, you need custom headers), select the More... option.
This will open up a generic CURL command builder, as shown in the image below.

UX Component - Google Address Suggest - If you had a Google Address Suggest control on a UX and that control was opened in a TabUI, if the tab containing the UX was closed and then the tab was opened a second time, the Address Suggest control did not work.
REGEX Validation - A recent change in the Regex validator in Grid and UX control validation rules (to support international characters in Regex expressions) broke some regex validations that were previously working
UX Component - PhoneGap - Fixed an issue introduced in build 4015 when creating a PhoneGap appllcation.
SQL Trace - Working Preview - If you checked the SQL Trace checkbox in the AlphaDAO Connection String Builder dialog and then executed SQL in Working Preview, the SQL was not shown in the Trace Window.
Video Library - Refresh - The Refresh command on the Video Library did not always update the list of videos shown in the Video Library.
UX and Grid Component Components - onChange Events - Fixed a bug introduced in build 4095 for Grid and UX controls with onChange event handlers, if the Javascript code had any single quote characters.
Report Preview - E-mail Report - PDF - If you clicked the 'Email Report' button on the Report Preview window to send a report as a PDF, an error was generated.
UX Component - PhoneGap - Fixed an issue introduced in build 4015 when creating a PhoneGap appllcation.
UX Component - Static HTML Page Head Section - When you turn on the Application Cache for a UX component you can now inject custom markup into the head section of the static HTML page using the new Page head section property.
The common use case for customizing the head section is to include markup that specifies the icons to use should the user choose to make a home screen shortcut for the page.

When you click the smart field to edit the HEAD section, the editor has a hyperlink that will insert sample markup showing how the home screen icons are defined.
In the example below it is assumed that your project has icons called 'apple-icon-57x57.png', etc.

UX Component - List Control - Detail View - afterSynchronize and afterSynchronizeRecord Server-Side Events - Two new server-side events have been added to the List control.
NOTE: Both of these events must be defined for the top-most parent List in the List hierarchy. For example if your UX has a List showing Customers and a child List showing Orders (and if the child List is set to pre-fetch data), then these events must be defined for the Customer List. Defining these events for the Orders List is meaningless.

Xbasic - CURL to Xbasic Genie - The CURL to Xbasic genie has been substantially enhanced. You can now automatically generate sample CURL commands by clicking the Example commands... hyperlink in the genie.

When you click on the hyperlink a menu of available example commands is shown. You can use this genie to get a template for how the CURL command should be constructed. Then when you convert the generated CURL command to Xbasic, you will have an excellent starting point for fashioning your Xbasic CURL code to perform the task you want.

The list of examples in the menu is extensive, but if you need a specialized CURL command (for example, you need custom headers), select the More... option.
This will open up a generic CURL command builder, as shown in the image below.

SQL Trace - Working Preview - If you checked the SQL Trace checkbox in the AlphaDAO Connection String Builder dialog and then executed SQL in Working Preview, the SQL was not shown in the Trace Window.
Video Library - Refresh - The Refresh command on the Video Library did not always update the list of videos shown in the Video Library.
UX and Grid Component Components - onChange Events - Fixed a bug introduced in build 4095 for Grid and UX controls with onChange event handlers, if the Javascript code had any single quote characters.
Report Preview - E-mail Report - PDF - If you clicked the 'Email Report' button on the Report Preview window to send a report as a PDF, an error was generated.
UX and Grid Component Components - onChange Events - Fixed a bug introduced in build 4095 for Grid and UX controls with onChange event handlers, if the Javascript code had any single quote characters.
Report Preview - E-mail Report - PDF - If you clicked the 'Email Report' button on the Report Preview window to send a report as a PDF, an error was generated.
Grid Component - Query By Example - If you added two or more filter conditions, ran the query, then removed one of the two filter conditions and then added a third condition, you would get an error.
UX Component - onChange Event - Pre-render - If a UX component had an event handler for the onChange event for a control then if the component was set to pre-render and if the component was shown though an Ajax callback and if the event handler used single quotes in the Javascript, you would get an error.
UX Component - List Control - Detail View - Multi-Column Primary Key - Fixed an issue when adding a new record to a List that was based on a SQL table with a multi-column primary key. This issue was introduced in Version 4.3.2
UX Component - DropDownBox, RadioButton and CheckBox Controls - Choices - Connection String - The connection string builder did not open because of a recent bug that had been introduced.
Reports - Conditional Objects - Fixes to the Conditional Object in reports that resulted from a recent change to this control.
Xbasic - AlphaDAO - Date and Number Formats - The SQL::Connection object now supports three new properties that allow you to control the format for date and number fields when the .toJSON() or .toJSONObjectSyntax() methods are called.
By default, if these properties are not set, the the date format and the decimal separator are inherited from the machine's regional settings
Note: The properties must be set on the connection BEFORE the result set is created.
Example Usage
dim cn as sql::connection
?cn.open("::Name::Access_Northwind")
= .T.
cn.PortableSQLEnabled = .t.
cn.JSONDateFormat = "yyyy-MM-dd"
cn.JSONDateTimeFormat = "yyyy-MM-dd hh:mm::ss 3"
cn.JSONDecimalSeparator = ","
?cn.tojson("select first 5 orderdate, freight from orders")
= [
{"orderdate" : "1996-07-04 00:00::00 000", "freight" : "32,38"},
{"orderdate" : "1996-07-05 00:00::00 000", "freight" : "11,61"},
{"orderdate" : "1996-07-08 00:00::00 000", "freight" : "65,83"},
{"orderdate" : "1996-07-08 00:00::00 000", "freight" : "41,34"},
{"orderdate" : "1996-07-10 00:00::00 000", "freight" : "58,17"}
]
Reports - Conditional Objects - A bug was introduced recently that broke reports with conditional objects.
UX Component - List Control - Dates - A bug was introduced in the last update where, if the client-side data format did not match the server-side data format, dates with days less than 13 (e.g. 13 Oct 2017) were not being persisted to the database correctly
| UX Component - Ink Control | Image Annotation using the Ink Control in a Data Bound UX Component |
The ink control allows you to create sketches by
'drawing' with your mouse, any type of pointing
device, or with your finger (on a device that
supports touch). A common use of the ink control
is to annotate images. The image you want to
annotate is shown as the background to the ink
control and then you can draw 'on top of' the
image. When the data are saved the ink is stored
separately from the image in a long text field. In this video we show how a data bound UX component that allows a user to upload images can be configured to allow the user to annotate the images that are uploaded. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Component Download SQL Table Definition Date added: 2016-10-30 |
| UX Component - ControlBar Control | Defining Disclosure Forms using the Disclosure Form Builder |
In the video 'Displaying a Modal Pop-up Form
using a Disclosure' we show how a modal pop-up
form can be displayed using a Disclosure. The
definition of the HTML for the form is fairly
tedious because it is completely hand coded. In this video we show how the Disclosure Form Builder can be used to make it easier to define the form HTML. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-10-30 |
| UX Component ControlBar Control | Display Modal Message Dialogs using Disclosures |
Modal messages (such as confirmations, progress,
feedback) as commonly used when designing the
user interface for an application. ControlBar
disclosures make displaying these messages
particularly easy. In this video we show how the ControlBar can be configured to display three different types of message dialogs: basic information dialogs (one button), confirmation dialogs (two buttons) and wait dialogs (no buttons). Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2016-10-30 |
| UX Component - List Control | Specifying Sort Criteria when Filtering a List |
Action Javascript allows you to easily define
fields on a UX where the user can specify search
criteria for a List control on the UX ( much
like the Search Part in a Grid). Now you can
also define sort criteria. In this video we show how the Filter Records in a List action in Action Javascript can be configured to allow sort criteria to be specified. Watch Video Download Component Date added: 2016-1-03 |
| UX Component - ControlBar Control | Adding List Navigation Buttons to a ControlBar |
When you define a List control, you can specify
that the List should be paginated. If you set
the pagination method to 'Navigation Buttons'
then you must define buttons to move to the next
and previous page of records. In a mobile
application that uses a ControlBar in a Panel
header or footer, it is desirable to place these
navigation buttons in the ControlBar. In this video we show how you can quickly add List navigation buttons to a ControlBar by selecting the 'Pre-defined buttons' option when adding ControlBar items to your ControlBar definition. Watch Video Date added: 2016-11-05 |
| UX Component - FormView Control | Using a FormView Control to Edit Data in a List Control - Master-Detail Forms - Very Large Forms |
By default, when you configure a List with a
Detail View (so that edits can be made to the
List data), the Detail View is composed using
individual controls (e.g. Textbox, Textarea,
Dropdown, etc). If the Detail View has a large
number of fields, then composing the Detail View
using individual controls will be inefficient
and will result is a very large UX component
that may not perform well. An alternative approach is to use the FormView control to implement the List's Detail View. This is extremely efficient and will allow you to build UX components that edit very large forms but still perform very well. In this video we show how a master-detail Form is built using a FormView control to edit the fields in the Master table and a second FormView control to edit the fields in the Detail Table. The master table has 100 fields and the detail table has 100 fields, so in total, the UX component is editing 200 fields. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Component Download Script to Create SQL Tables Date added: 2016-11-08 |
| UX Component - FormView Control | Tutorial - Building a Mobile Master-Detail Form using The List, FormView and ControlBar Controls - |
In this video tutorial we show how a mobile app
can be built to implement a master-detail form
using the FormView control. The app will allow
users to edit data from the Customers and Orders
table in the sample Northwind database. This is
a classic master-detail form: Each customer has
multiple orders. The UX component uses two Lists
joined in a parent-child relationship. The
parent List displays data from the Customer
table and the child List display the related
orders from the Orders table. Each List has a Detail View, but in both cases, the Detail View is implemented using the FormView control. Once the basic functionality of the app has been built, the app is 'mobilized' by wrapping the various sections of the component in PanelCards and a ControlBar is added to implement navigation between the various parts of the application. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Watch Video - Part 8 Watch Video - Part 9 Watch Video - Part 10 Download Components Date added: 2016-11-10 |
| UX Component | Displaying a Custom Wait Message while a Large Mobile App is Loading in the Background |
If you have built a very large mobile App which
takes some time to load, you might want to
display a custom wait message to the user while
the main UX component of your App is loaded in
the background. In this video we show how this can be done using a simple 'startup' UX component. Watch Video Download Components Date added: 2016-12-11 |
| UX Component - PhoneGap | PhoneGap - Using the PhoneGap - Open File with Native Application Action to View PDF Files in a Mobile Application |
The PhoneGap cordova-open plugin allows you to
open various file types using the associated
native app on a mobile device. For example, if
you open a .pdf file, the PDF file is displayed
using the native PDF viewer app on the mobile
device. If you open a .mp4 file, the video is
displayed using the native video viewer on the
device. A common use case for this plugin is to
download several files when a connection is
available so that the files can then be viewer
later on when no connection is available. In this video we show how an application is built that shows a list of PDF files. These files are downloaded from the server and stored in the filesystem on a mobile device. Then we show how each of the downloaded files can be viewed using the PDF viewer on the mobile device. Because the PDF files are stored in the filesystem on the device, they can be viewed even if the device no longer has a connection. The application uses the 'PhoneGap - Open File with Native Application' action to display the .pdf file. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2016-12-27 |
| UX Component - PhoneGap | PhoneGap- Viewing Reports in PDF Format on a Mobile Device |
The PhoneGap cordova-open plugin allows you to
open files (such as .pdf files) using the natvie
application associated with that file type on a
mobile device. This plugin is particularly
useful for viewing PDF files. The Alpha Anywhere
report writer can save reports as PDF files. The
cordova-open plugin therefore fits really well
with the Alpha Anywhere report writer because
you can build applications that generate reports
as PDF files and then display the reports on a
mobile device using the cordova-open plugin. In this video we show how you can use Action Javascript (the 'PhoneGap - Open File with Native Application' action) to generate a PDF file from an Alpha Anywhere report, then download the resulting PDF file to a mobile device and display it using the native PDF viewer. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-12-27 |
Xbasic - Javascript Web Tokens (JWT) - Additional Options - Additional options have been added to the Xbasic classes for generating Javascript Web Tokens. For more details refer to the documentation.
IIS Application Server - PKI Authentication - Support has
been added for PKI authentication. For more details refer to the
documentation.
Watch Video - Part 1
Watch Video - Part 2
Xbasic - Extension::JSON Class - New methods - New methods have been added to the extension::JSON class to make it easier to extract data from a JSON object.
NOTE: You can generally easily extract data from a JSON string by parsing the JSON to an Xbasic dot variable, using the json_parse() method. But if the JSON has property names that are not valid Xbasic variable names, then you cannot parse the JSON. Also, parsing an extremely large JSON string could be slow. The methods described here do not require the JSON to be parsed into an Xbasic dot variable, and work for all types of JSON property names.
Methods 1
extension::JSON::OffsetToPath(json,offset[,base])
where:
Returns a 'path' to the JSON element that contains the text at the specified offset.
Example:
Assume that json is a variable that contains the sample JSON shown below
?extension::JSON::OffsetToPath(json,540,1)
= "[1].orders[1].orderItems[1]"
This means that the path in the JSON to the element that contains the text at position 540 is:
[1].orders[1].orderItems[1]
Method 2
extension::JSON::PathToOffset(json,path[,base])
where:
Returns the offset in the JSON string for the element specified by the path.
Example:
Assume that json is a variable that contains the sample JSON shown below
?extension::JSON::PathToOffset(json,"[1].orders[1].orderItems[1]",1)
= 355
Method 3
extension::JSON::PathExtract(json,path[,base])
where:
Extracts a JSON element for a specified path
Example:
?extension::JSON::PathExtract(json,"[1].orders[1].orderItems[1]",1)
= {
"OrderID": "10643",
"ProductID": "28",
"Quantity": "15",
"UnitPrice": "45.6"
}
Sample JSON string for above examples:
[
{
"CustomerID": "ALFKI",
"CompanyName": "Alfreds Futterkiste",
"orders": [
{
"OrderID": "10643",
"CustomerID": "ALFKI",
"OrderDate": "09/25/1995 12:00:00 00 am",
"orderItems": [
{
"OrderID": "10643",
"ProductID": "28",
"Quantity": "15",
"UnitPrice": "45.6"
},
{
"OrderID": "10643",
"ProductID": "39",
"Quantity": "21",
"UnitPrice": "18"
},
{
"OrderID": "10643",
"ProductID": "46",
"Quantity": "2",
"UnitPrice": "12"
}
]
},
{
"OrderID": "10692",
"CustomerID": "ALFKI",
"OrderDate": "11/03/1995 12:00:00 00 am",
"orderItems": [
{
"OrderID": "10692",
"ProductID": "63",
"Quantity": "20",
"UnitPrice": "43.9"
}
]
},
{
"OrderID": "10702",
"CustomerID": "ALFKI",
"OrderDate": "11/13/1995 12:00:00 00 am",
"orderItems": [
{
"OrderID": "10702",
"ProductID": "3",
"Quantity": "6",
"UnitPrice": "10"
},
{
"OrderID": "10702",
"ProductID": "76",
"Quantity": "15",
"UnitPrice": "18"
}
]
},
{
"OrderID": "10835",
"CustomerID": "ALFKI",
"OrderDate": "02/15/1996 12:00:00 00 am",
"orderItems": [
{
"OrderID": "10835",
"ProductID": "59",
"Quantity": "15",
"UnitPrice": "55"
},
{
"OrderID": "10835",
"ProductID": "77",
"Quantity": "2",
"UnitPrice": "13"
}
]
},
{
"OrderID": "10952",
"CustomerID": "ALFKI",
"OrderDate": "04/15/1996 12:00:00 00 am",
"orderItems": [
{
"OrderID": "10952",
"ProductID": "6",
"Quantity": "16",
"UnitPrice": "25"
},
{
"OrderID": "10952",
"ProductID": "28",
"Quantity": "2",
"UnitPrice": "45.6"
}
]
},
{
"OrderID": "11011",
"CustomerID": "ALFKI",
"OrderDate": "05/09/1996 12:00:00 00 am",
"orderItems": [
{
"OrderID": "11011",
"ProductID": "58",
"Quantity": "40",
"UnitPrice": "13.25"
},
{
"OrderID": "11011",
"ProductID": "71",
"Quantity": "20",
"UnitPrice": "21.5"
}
]
}
]
}
]
Sample Xbasic script that shows an Xdialog to show how these methods can be used:
'sample.json contains some sample json data
dim json as c = file.to_string("C:\data\sample.json")
dim def.text as c = json
dim def.object as p
dim selection as c
dim subselect as c
ui_dlg_box("JSON",<<%dlg%
{watch=def.object.get_selection_start(.t.)!cursor}
[%M;K%.100,20def];
Path;
[.100path] <copy<;
[.100selection] <select>;
[%M;K%.100,5subselect];
%dlg%,<<%code%
if a_dlg_button = "cursor" then
a_dlg_button = ""
dim pos as n = def.object.get_selection_start(.t.)
path = extension::JSON::OffsetToPath(strtran(def.text,crlf()," "),pos)
else if a_dlg_button = "copy" then
a_dlg_button = ""
selection = path
else if a_dlg_button = "select" then
a_dlg_button = ""
dim pos as n = extension::JSON::PathToOffset(strtran(def.text,crlf()," "),selection)
if pos < 1 then
dim subselect as c = extension::JSON::PathExtract( strtran(def.text,crlf()," "),selection)
def.object.select(pos,len(subselect) )
def.object.show_caret()
else
ui_msg_box("","Not found")
end if
end if
%code%)
UX Component - Client-Side Properties - On Get Value and On Set Value - Two new client-side properties have been added for Data Controls in a UX component.

In both cases, your Javascript can reference a variable called value and must return a value. For example, in the following example, the .getValue() method will return the upper case version of the control's value
return value.toUpperCase()
These methods can be used to translate a stored value into a display value and vice versa. For example, you might want to display a part description, but store the part number. The data used to to the translation might be stored in a client-side data cache.
UX Component - PhoneGap - Cordova-Open Plugin - The PhoneGap genie now exposes the Cordova-Open plugin. This plugin allows you to open files using their associated native application. For example, if you open a file with a .pdf extension the plugin will open the file using the native PDF application on the device. If you open a file with a .mov extension, the plugin will open the file using the native video player on the device.
The Cordova Open plugin is selected in the PhoneGap genie as shown in the image below.

There are many use cases for the Cordova-Open plugin, but PDF files is perhaps the most compelling use case. Displaying PDF files in a mobile application can be tricky because the browsers on mobile devices do not have built-in PDF viewers as is typical with desktop browsers.
Another great use case for this plugin is a mobile app that downloads multiple files (pdf, video, audio, excel, word, etc.) and then stores these files in the filesystem on the device so that they can be viewer later when the device is no longer connected to the internet. For more information on techniques for downloading files to a mobile device, see this topic in the Tips section: Downloading Files to a Mobile Device.
A new action in Action Javascript (PhoneGap - Open File with Native Application) makes it easy to use the Cordova-Open plugin in mobile applications.
The image below shows how a PDF file appears in the Native PDF viewer on an iPhone (in this case the PDF file was created by generating a report and saving the report output to a PDF file). Notice the Done button that will return you to the app when you close the Native Viewer.

UX Component - Action Javascript - PhoneGap - Open File with Native Application Action - This action allows you to open a file on a mobile device using the associated native application.
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
NOTE: You can only use this action in a PhoneGap application. The PhoneGap application must load the Cordova Open plugin.
The action allows you to:
When you select the PhoneGap - Open File with Native Application action in Action Javascript, the following dialog is shown:

If you specify that the file is remote, you must specify the File URL.

If you specify that you want to make an Ajax callback to get the file to open, you must specify the Ajax callback type

If you set the Ajax callback type to Report, you must specify which report you want to run.

NOTE: Alpha Anywhere will automatically send
the following Javascript to the client once the report has been
created:
{dialog.object}.hideWaitMessage();
This is useful because if you displayed a wait message when invoking
the action to save a report as a PDF file, the wait message will
automatically be closed once the report has been generated. You do
not have to specify an
onComplete Javascript property solely for the purpose of
hiding a wait message.
Report Definition Genie
When you click the smart field for the Report definition property, the following dialog is shown where you can specify the name of the report to run and other properties of the report, such as the filter, and order, PDF options (such as whether the PDF file should have a watermark, etc.) and argument bindings.

The filter you define for the report in this dialog is in addition to any filter defined in the report definition itself.
When defining a filter, it is common to use arguments in the filter rather than literal values. For example:
Country = :whatcoutry
rather than
Country = '{country}'
where {country} is the value in a control called Country on the UX component.
To create an argument to use in a report filter click on the Define Arguments button shown in the above image and then bind the argument to a value (either a static value, or a value in a UX control) in the Set Argument Values section of the dialog.
Understanding the onComplete Javascript Property
When you set the Ajax Callback type to Report, the onComplete Javascript property allows you to define the name of a Javascript function that will be called after the report has been generated on the server.
Your function will take a single parameter as its input. This parameter is an object with these properties:
A common use case for this function is to store the name of the report and its associated properties (such as filesystem part, filename, etc), in a List control so that the user can quickly view a previously viewed report by simply viewing the file for that report (which is stored on the device after it is viewed for the first time). This allows the user to view reports even when there is no connection.
For example, the following function would store the report information in a List control called previouslyViewedReports:
(Assume that the List control has columns named filename, reportname, fspart and folder).
function afterReportGenerated(obj) {
var l = {dialog.object}.getControl('previouslyViewedReports');
var _d = [
{
filename: obj.localFilename,
reportname: obj.reportName,
fspart: obj.fileSystem,
folder: obj.folder
}
];
l.appendRows(_d);
}
Alpha Anywhere Application Server - Building Connection Strings - If you have a remote server that does not have the Alpha Anywhere development version installed, building an ad-hoc connection string that you can paste into the a5_appllication.a5i file can be difficult.
There is now a hyperlink on the
Web Server Settings
dialog on the Other
tab to Open the Connection
String Builder Genie. This opens the regular connection
string builder where a new connection can be built and tested. It
will also verify if the correct client driver is installed, as the
test connection option will fail if the driver is not correct. The
generated string is shown in a simple dialog with an option to
Copy to clipboard
when the genie is closed. This allows creating and testing a
connection in the same environment where it will be used.
Xdialog - {Condition_else} Directive - The
{condition_else}
directive makes it much easier to display Xdialogs that have
conditional sections that render in the same place. Previously it
was necessary to use the {start_pos}
directive to get the second and subsequent condition to render in
the same space as the first condition.
For example:
ui_dlg_box("Conditional Sections",<<%dlg%
{removeleadingspaces}
{removecomments}
{region}
Condition: [condition^=conditions];
{condition_begin=condition="condition1"}
{region}
This is
condition 1;
{endregion}
{condition_else=condition="condition2"}
{region}
This is
condition 2;
{endregion}
{condition_else=condition="condition3"}
{region}
This is
condition 3;
{endregion}
{condition_else}
{region}
This is any
other condition;
{endregion};
{condition_end};
{endregion};
{line=1,0};
{justify=right}<Close>
%dlg%)
The images below show how the Xidialog renders for various
conditions. Note that when 'condition4' is selected, the
{condition_else}
text is show because there is no handler for this condition.



Xbasic - Sys_shell_wait() Function - SYS_SHELL_WAIT() now has two additional parameters (in addition to the command and the ShowWindow flag):
Note: SYS_SHELL_WAIT() does not throw any errors if something fails.
There is a new function called
Run() that accepts
all of the same parameters (in fact is now called by
sys_shell_wait() )
but will return an error if something doesn't work.
Example Interactive Window Session
Run("CMD.EXE /C \"DIR C:\*.* /s\"", .t.,1000,.t.)
ERROR: Application timed out.
SYS_SHELL_WAIT("CMD.EXE /C \"DIR C:\*.* /s\"", .t.,1000,.t.)
UX Components - List and ViewBox Controls - SQL Data Sources - Security and Server-side Show Hide Expressions - You can now apply security settings and server-side show/hide expressions to individual columns in the SQL queries that are used to populate List and ViewBox controls.
To define security and/or server-side show/hide expressions for individual columns in a SQL query, click on the smart field for the Security and Show/hide Expressions property (as shown in the image below)

This will open a builder where you can define settings for each column in the SQL query.

At run-time, before the SQL is executed, if any of the columns in the SQL SELECT statement have security or show/hide expressions, the columns that should not be shown are removed from the SQL SELECT statement. This means that if a user is not authorized to see a particular column in a SQL query, the data that are sent to the client does not include the excluded columns.
Contrast this with applying security or show/hide expressions to individual fields in the List (in the 'Fields' pane of the List builder). When you apply security to List fields that merely removes a hidden column from the List display. But the data for the hidden column is still set to the client and would be visible if the user viewed the source of the page.
NOTE: You can only apply security and show/hide settings to the SQL if Alpha Anywhere can parse the SQL statement. For example, if the data source for a List is a stored procedure, then, since this is not a parse-able statement, you cannot apply security and show/hide settings.
UX Component - Step Indicator Control - The Step Indicator control is used to show what step a user is on in a multi-step action.
The image below shows a Step Indicator control configured to show four steps, labeled One, Two, Three and Four

When you add a Step Indicator control you can specify as many steps as you want and you can define the labels for each step. You can also control the color of the completed steps (blue in the above example) and the un-completed steps (gray in the above example).
The Step Indicator control is a Data Control. This means that you can set its value using the {dialog.object}.setValue() method and you can read its value using the {dialog.object}.getValue() method.
For example, to set the above control so that it shows you are at the beginning of the sequence (on the first step) you would use:
{dialog.object}.setValue('name of control',0)
To set the control's value so that it shows you are on step Three (i.e. as shown in the above image) you would use:
{dialog.object}.setValue('name of control',2)
To add a new Step Indicator control to a UX, select the [More...] entry in the UX toolbox in the Data Controls section.

This display a list of additional control types.

To configure a Step Indicator control, click the smart field for the control's Control Properties property.

In the image below, the 'Dot' size has been increased, the 'Show step indicators as circles' property has been turned off and the 'Dot size' has been set to '40px'. A small border radius of 2px has been set so that the 'dot' (squares in this case) have slightly rounded edges.

Xbasic - a5Helper_SQL_ApplySecurity() Function - The a5Helper_SQL_ApplySecurity() function applies security and server-side show/hide expressions to a SQL SELECT Statement. Any column that is not authorized by the security group or server-side show/hide expression is removed from the SQL Select statement.
The SQL statement you pass to this function must be parseable. If Alpha Anywhere cannot parse the statement (e.g. the SQL is a call to a stored procedure), the function returns the original SQL statement.
If a column does not have a security setting or server-side show/hide expression is will be included in the SQL statement.
If a column has a defined security setting that the column will only be included in the SQL statement if the logged in user is a member of one of the security groups specified by the column's security setting.
If a column as a show/hide expression the column will only be included in the SQL statement if the expression evaluates to a true result.
Syntax
c SQLStatement = a5Helper_SQL_ApplySecurity(sql as c , securityDef as c , loggedInGroups as c)
Where:
securityDef is a JSON array of objects. Each object in the array has these properties
The column specify in the securityDef must match exactly how the SQL parser represents the column. For example, consider the following column expression
concatenate(customers.name , ', ', customers.contacttitle)
The meaning of this expression is unchanged if the expression is written as:
concatenate( customers.name , ', ', customers.contacttitle )
However, this is not how the expression is represented in the SQL parser. To get the correct representation of the expression, you can use the code below:
dim si as sql::Query::SelectItem
sql2 = "concatenate( customers.name , ', ',
customers.contacttitle)"
?si.Parse(sql2)
= .T.
?si.SQLStatement
= "concatenate(customers.name, ', ', customers.contacttitle)"
Example
sql = <<%str%
SELECT customers.CustomerID as cid, customers.CompanyName as
compName, customers.ContactName, customers.ContactTitle,
concatenate(customers.name,', ',customers.contacttitle) as exp1,
orders.OrderID, orders.CustomerID AS CustomerID1, orders.EmployeeID,
orders.OrderDate, orders.RequiredDate
FROM customers customers
INNER JOIN orders orders
ON customers.CustomerID = orders.CustomerID
%str%
'define the security settings
dim ss[0] as p
ss[].column = "customers.ContactTitle"
ss[..].security = ""
ss[..].showHide = "session.var1 = \"alpha\""
ss[].column = "concatenate(customers.name, ',
', customers.contacttitle)"
ss[..].security = "Sales,Marketing"
ss[..].showhide = ""
ss[].column = "customers.CompanyName"
ss[..].security = "Administrator"
ss[..].showhide = ""
dim security as c
'Generate a JSON string
security = json_generate(ss)
dim loggedInGroups as c
loggedInGroups = Context.Security.GetUserRoles()
sql2 = a5Helper_SQL_ApplySecurity(sql,security,loggedInGroups)
UX Component - PhoneGap Applications - Delay Function Calls Until PhoneGap is Ready - Typically, when a need to execute a method that can only be run after PhoneGap has loaded, you add code to the onPhoneGap ready client-side event. But in some cases this is not practical and you might already have some code that runs in the onRenderComplete, or onPrepareComplete event and some of the methods in these events need to wait till PhoneGap is ready.
The new {dialog.object}._delayTillPhoneGapReady() method allows you to register function calls that will only be made once PhoneGap is ready.
The syntax is:
{dialog.object}._delayTillPhoneGapReady(functionToExecute, scope, arguments)
For example, say you wanted to call the List Object's ._fetchMediaFiles() method.
Normally your code would be
var lObj = {dialog.object}.getControl('LISTNAME');
lObj._fetchMediaFiles()
This could be rewritten as
var lObj = {dialog.object}.getControl('LISTNAME');
{dialog.object}._delayTillPhoneGapReady(_fetchMediaFiles,lObj)
UX Component - Building Component Programmatically Using Xbasic - Absolute Layout Containers - You can now use the a5wcb_createDialogUsingXbasic() Xbasic function to create a UX component that define a component that contains an Absolute Layout container. This is made possible because the Absolute Layout's absolutePositions property now allows you to specify the variablename of the control in the absolute layout, rather than its idInternal property, which cannot be used because it is dynamically assigned when a5wcb_createDialogUsingXbasic() executes.
dim wp as p
DIM wp.page_fields[0] as P
with wp.page_fields[]
.controltype = "layout_directive_ContainerBegin"
.v.container.subType = "AbsoluteLayout"
.v.container.id = "ABS1"
.v.container.absolutePositions = <<%str%
[
{
variablename:
'c',
top: '7px',
left: '16px',
height: '28px',
width: '139px',
style: 'position: absolute; top: 7px;
left: 16px; width: 139px; height: 28px; '
},
{
variablename:
'd',
top: '156px',
left: '141px',
height: '27px',
width: '132px',
style: 'position: absolute; top:
156px; left: 141px; width: 132px; height: 27px; '
}
]
%str%
end with
with wp.page_fields[]
.v.variableName = "c"
.v.breakType = "None"
end with
with wp.page_fields[]
.v.variableName = "d"
.v.label = "Field D"
.v.hasWaterMark = .t.
.v.waterMark.text = "Enter name"
end with
with wp.page_fields[]
.controltype = "layout_directive_Containerend"
end with
a5wcb_createDialogUsingXbasic(wp,"genByXbasic",.t.)
PDF Reports - Embed Fonts - In certain cases, PDF reports generated will not render correctly on iOS devices. This is because, by default, the PDFs are generated with the 'Embed fonts' option set to false. The PDFs do not render on the iOS devices because they use fonts they are not native to the iOS device. The solution is to turn the 'Embed fonts' option on (this is done by opening the Project Properties dialog and going to the PDF Options section).
Now, the Embed fonts option is turned on by default. Since this will result in slightly larger PDF files, some developers might want to not embed fonts in generated PDF files. This can be done by setting the property in the Project Properties.
UX Component - Pre-render Option - Bulk Update - If you have a large number of UX components and you want to turn on the 'Pre-render at design-time' option for each UX component, opening each component, setting the property and then saving the component would be tedious. A new bulk operation allows you to automatically set this property in multiple UX components at once.

Xbasic - Regular Expressions - regex_valid() Function - The regex_valid() function can be used to test if a regular expression is valid.
Examples:
? regex_valid("[.+")
= .F.
The issue with the above failing regular
expression is lack of a closing ']'.
? regex_valid("[.+]")
= .T.
? regex_match(".","[.+")
ERROR: Unmatched [ or [^ in character class declaration. The error
occurred while parsing the regular expression: '[.+>>>HERE>>>'.
UX and Grid Components - <ProjectStyle> - Compact Styles - Certain of the built-in styles (e.g. 'Alpha') have a 'compact' option. If you set <ProjectStyle> to 'Alpha' you can now specify that you want to use the 'compact' option by setting the <ProjectStyle> to Alpha:compact . In an individual component that is set to use <ProjectStyle> as its style, you can override the global settings of 'compact' or 'non-compact' by specifying:
<ProjectStyle>:compact
or
<ProjectStyle>:notcompact
UX Component - List Control - Show/Hide List Column - A new method has been added to the List control that allows you to show or hide a List column.
Syntax:
<listObject>.showHideColumn(columnNumber,flagShow)
UX Component - Pre-render at Design-time Option - Warning Message - When you save a UX component that does not have the Pre-render Component at Design-time option turned on, a warning message now comes up telling you that it is recommended to turn this option on because of the significant speed improvement this options will give at run-time.
If you choose not to turn the Pre-render option on, you can specify that the message should not be shown again for this component, or for all components
If you choose to turn the option on you can specify that the option should automatically be set to 'on' for all future UX components that you create.
TIP: If you choose the option to turn on pre-render for all UX components, you can un-set the option by going to View, Settings, Preferences, UX Component.
Xbasic Functions - JSON_to_YAML() - YAML is a markup language that is sometimes used in place of JSON. This function converts JSON to YAML. YAML (yet another markup language) uses nesting to represent hierarchy.
Example
json = <<%str%
{
"fname": "john",
"lname": "public",
"children" : [
{"name": "callie","hobbies": ["minecraft","leggo"]},
{"name": "griffin","hobbies":
["ballet"]}
],
"address": {
"street": "12 and main",
"city": "Squares Ville",
"State": "KY"
}
}
%str%
?json_to_yaml(json)
fname: john
lname: public
children:
- name: callie
hobbies:
- minecraft
- leggo
- name: griffin
hobbies:
- ballet
address:
street: 12 and main
city: Squares Ville
State: KY
Note: This function is just a wrapper around the extension::JSON class.
Xbasic Functions - JSON_from_YAML() - YAML is a markup language that is sometimes used in place of JSON. This function converts YAML to JSON.
yaml = <<%str%
fname: john
lname: public
children:
- name: callie
hobbies:
- minecraft
- leggo
- name: griffin
hobbies:
- ballet
address:
street: 12 and main
city: Squares Ville
State: KY
%str%
json_from_yaml(yaml)
= {
"fname": "john",
"lname": "public",
"children" : [
{"name": "callie","hobbies": ["minecraft","leggo"]},
{"name": "griffin","hobbies":
["ballet"]}
],
"address": {
"street": "12 and main",
"city": "Squares Ville",
"State": "KY"
}
}
Note: This function is just a wrapper around the extension::JSON class.
UX and Grid Component - Live Preview - Edge - When you do a Live preview from the UX or Grid, you can now select Microsoft Edge as the target. (For Windows 10 and above)
UX Component - Google Visualization Libraries- Gantt - Because of a recent change Google made to how their visualization libraries are loaded, if you select the 'gantt' library, you would get a Javascript error. This is now fixed.

Alsp, the sample templates that are available when you create a new UX includes an update example for Google charts. This new component includes as Gantt chart, as shown in the second image.


Xbasic Arrays - DIMMing Arrays with Default Values - When you DIM a new array, you can now specify a default value for each array item. This is especially useful when DIMming arrays for use with .Net code.
Examples:
dim sb[6] as system::Text::StringBuilder = new
system::Text::StringBuilder(1024)
? sb[1].capacity
= 1024
? sb[2].capacity
= 1024
...
dim nums[6] as n = rand()
? nums
= [1] = 0.680694580078125
[2] = 0.709716796875
[3] = 0.17425537109375
[4] = 0.60302734375
[5] = 0.752105712890625
[6] = 0.02587890625
dim strs[6] as c = Rand_String(6+int(rand()*10))
? strs
= [1] = "eimpzcugesd"
[2] = "chjhlwuzu"
[3] = "nioseq"
[4] = "gsrslnflqravo"
[5] = "rvaqfaqqu"
[6] = "joexbk"
Xbasic - AlphaDAO SQL::Resultset.toJSON() - The .toJSON() method has been changed so now it create a parseable JSON array of objects. Previously the .toJSON() method was used for an internal function and it generated a special format that was of no general use.
Contrast the AlphaDAO SQL::Resultset.toJSON() with the AlphaDAO SQL::Resultset.toJSONObjectSyntax() method. The later generates a CR-LF delimited string of JSON objects. To turn the output from this method into a parseable string, it is necessary to add the opening and closing square brackets and to terminate each line, except the last, with a comma.
Examples:
dim cn as sql::Connection
cn.Open("::Name::northwind")
cn.PortableSQLEnabled = .t.
cn.Execute("select customerid, contactname, city, country from
customers where country = 'canada'")
rs = cn.ResultSet
? rs.tojson()
= [
{"customerid" : "BOTTM", "contactname" : "Elizabeth Lincoln", "city"
: "Tsawassenn", "country" : "Canada"},
{"customerid" : "LAUGB", "contactname" : "Yoshi Tannamuri", "city" :
"Vancouverr", "country" : "Canada"},
{"customerid" : "MEREP", "contactname" : "Jean Fresnière", "city" :
"Montréal", "country" : "Canada"}
]
cn.Execute("select customerid, contactname, city, country from
customers where country = 'canada'")
rs = cn.ResultSet
? rs.ToJSONObjectSyntax()
= {"customerid" : "BOTTM", "contactname" : "Elizabeth Lincoln",
"city" : "Tsawassenn", "country" : "Canada"}
{"customerid" : "LAUGB", "contactname" : "Yoshi Tannamuri", "city" :
"Vancouverr", "country" : "Canada"}
{"customerid" : "MEREP", "contactname" : "Jean Fresnière", "city" :
"Montréal", "country" : "Canada"}
UX Component - Pre-render - Security and Server-side Show/Hide Expressions - The pre-render option for UX component can make a dramatic difference in the speed with which UX components are rendered. This is especially true of large UX components. Pre-rendering can result in 5 to 10x performance improvements in certain cases. However, if your UX component used security or server-side show/hide expressions to control the visibility of certain controls on the UX you were not able to turn the pre-render feature on.
Now, even if your UX uses security or server-side show/hide expressions, you can still use the pre-render option as long as you also turn on the Apply security and server-side show/hide expressions property.
When this property is turned on, the UX is not recomputed at run-time (as is normally the case when a UX which uses security and/or server-side show/hide expressions). Instead, at run-time, data are sent to the UX with information about what security groups the user is in, and which controls need to be hidden or shown as a result of evaluating server-side show/hide expressions. A client-side function will then hide the controls that should not be visible.

It is important to understand that when you turn on the option to apply security and server-side show/hide expressions client-side, the result is not as secure as applying security and server-side show/hide expressions on the server. That's because when security and server-side show/hide expressions are applied server-side, the HTML and data that are sent to the client does not physically include anything that should not be visible to the user.
But when apply these settings client-side, the HTML may contain sensitive information that the user could see by viewing the page source (even though this information is hidden on the page itself).
A side benefit of turning this option on is that any controls whose visibility is controlled by a server-side show/hide expression will be shown or hidden if any ajax callback sets the value of a session variable that is used in a server/side show expression.
UX Component - Action Javascript - SQLite Actions - Several new actions have been added to the SQLite Actions actions in Action Javascript.
The new actions are:
Get Fields in a Table - This action will get the fields in a table as well as some additional information. The onSuccess event handler gets an array of objects. The array has an entry for each field in the table. Each object in the array has these properties:
Delete a Database - Deletes the physical file for the SQlite database from the device.
Create a Table - Allows you to create a new table in a SQLite database. You can define the table structure and also the indices for the table. The image below shows the builder where you specify the table structure. The action will automatically drop any existing table with the same name.

Create a Table from Data - This action will create a new table from data (i.e. it will import data into a new table). The data from which the table is created is a JSON array of objects where each object represents a record. For example, if you specify the following data:
[
{"id" : 1, "FirstName": "Bob", "LastName": "Smith", "Department" : "Sales"},
{"id" : 2, "FirstName": "Terry", "LastName": "Jones", "Department" : "R&D"},
]
A new table with 2 records would be created. The fields in the table would be id, FirstName, LastName and Department and the type of each field (except the id field) would be TEXT. The type of the id field would be INTEGER.
NOTE: SQLite does not have Date or DateTime fields. Date and time values should be stored in TEXT fields and should appear in the data to be imported as string values.
When you specify the data from which the new table is to be created you have the following options:
When you specify that the data are to be computed by an Ajax callback you have two options
You can specify if a table already exists with the table name you specify that the existing table should be dropped. If you do not drop the existing table, the operation will fail.
You can also specify a batch size property. After the new table has been created (with no records in it initially), INSERT statements are executed to insert the data into the table. You can specify how many records should be inserted with each INSERT statement. The default batch size is 100, which means that each INSERT statement will insert up to 100 records into the table. If you set the batch size to -1, Alpha Anywhere will try to add the data to the table with a single INSERT statement. However, this may result in an INSERT statement that exceeds the maximum statement length supported by SQLite and the action will fail. If you set the batch size to 1, Alpha Anywhere will perform one INSERT statement for each row of data to be added to the table. If you have a large amount of data, this could be slow. Therefore, if you want to optimize performance of this action, you will want to choose the largest batch size possible before the action fails.
If the action fails at any point while adding the records to the newly created table, the table is not created.
Import Data into a Table - This action is very similar to the Create a Table from Data action except that a new table is not created from the data. Instead, the data are imported into an existing table. All of the options for specifying the data that the Create a Table from Data action supports are supported by this action.
Delete All Records from a Table - This action deletes all of the records in a table.
UX Component - List Control and ViewBox Control - Text Select - A new property 'Allow text select' allows you to enable/disable the ability to select text in a List or ViewBox control. Previously this always defaulted to true. Now, this property defaults to false.
UX Component - List Control and ViewBox Control - Multi-select - Shift+Click - When doing a multi-select in a List or ViewBox that is configured to allow multiple selections, shift+click will now select multiple values, following the standard Windows conventions.
UX Component - FormView Control - Default Template and Named Templates - Formatting Directives - You can now use formatting directives in templates. For example:

Web Publishing - HTTP publish and Optimized Publish - These publish methods will now force a reload of the security data and will clear the UX component cache, so any changes should be reflected in the first request after publish.
UX Component - Action Javascript - PhoneGap File Download Action - This action has been enhanced. You can now specify that the list of files to be downloaded should be generated by making an Ajax callback. Of course, this same Ajax callback can also create the files to download (which is the most likely reason for choosing this option).
You can also specify where the file(s) that are downloaded should be stored in the device's filesystem.
You can set the Filesystem property to one of the defined locations. You can also set this property to the name of a Javascript function that will return the name of the Filesystem part, using this syntax:
javascript:myfunctionname
Your function must return the filesystem part (e.g. saved, private, public, persistent). Alternatively, you can return an explicit folder where you want to store files by prefixing the return value with 'explicit:' . For example:
function myfunctionname() {
//return full path to folder with trailing /
return 'explicit:file:///dir1/dir2/dir3/';
}

UX Component - Action Javascript - SQLite - Delete a Database - A new SQLite action has been added. The 'Delete a Database' action will delete a SQLite database file that had previously been downloaded to the device.
UX Component - List Control - Refresh List Data Action - Keep Focus - Child Records - If you refresh List data and you select the option to keep focus on the current selection, child records (if any) will also keep their focus. Previously only the record in the parent List kept its focus.

UX Component - Captcha Controls - You can now define the style for the captcha control error message and you can control where the message is displayed.
UX Component - Application Cache - Spaces in Filenames - If a file in the manifest had spaces in the name, the application cache was not created. This is now fixed as all filenames in the manifest are now URL encoded.
UX Component - List Control - iOS Devices - List Freeze - Fixed an issue where the List control could freeze if it was being scrolled at the same time that the List was being repopulated. This issue could also have affected scrolling on PanelCards.
UX Component - Video Player Control - Action Javascript - SSL - YouTube - The action to set the YouTube video id was not honoring the SSL flag set in in the VideoPlayer properties.
UX Component - DetailView - Media Files - Incremental Refresh - After performing an incremental refresh on a List control, remote media files referenced in new data displayed in the List were not being fetched.
Xbasic - a5storage_listitems() Function - The a5storage_listitems() was limited to 1,000 items. Now, all of the items in the bucket are listed
UX Component - ControlBar Control - Disclosure Button - Placeholders in Button Text - If a disclosure button had a placeholder in the button text, the placeholder was not resolved when the Disclosure was in its open state.
UX Component - List with Detail View - PhoneGap - Fetch Media Files - If a List with a Detail View was configured to fetch the media files referenced in the List from a remote server and store them in the file system on the device, when the PhoneGap app was loaded you would occasionally get a 'PhoneGap not ready' error message. This is now fixed. The reason for the error was that the method that downloads media files was firing before the PhoneGap ready event.
UX Components - Repeating Sections - Date Fields - If the client side date format for date fields in a Repeating Section did not match the server-side date format, when submitting data to the server, the client-side date fields in the Repeating Section were not being translated to the server-side date format.
UX Component - Client-side Calculated Fields - International Formats - If the client side decimal separator was set to a comma, then client-side calculated fields that involved decimal numeric fields were not being computed correctly. This bug was introduced in version 4.3.
UX Component - Ink Control - If a UX component was a child of a parent UX component, and the child UX component contained an Ink control, the Ink control would, in certain cases, not operate the second or subsequent time the child UX was opened.
Downloading Files to a Mobile Device - This topic discusses two different techniques for downloading files (such as PDF, Video, Audio, Excel, Image files) to a mobile device so that the files are stored in the filesytem on the device and can be viewer later on (presumably when the device no longer has an internet connection) using the Native app associated with the particular file type.
NOTE: The comments in this topic apply only to PhoneGap applications. Your PhoneGap application will need to load the following plugins: Cordova Open, Device, File, File Transfer.
The first technique uses the PhoneGap - File download action in Action Javascript. Using this action you can define an action that will download a list of files and store them in the filesystem on a mobile device. The action downloads a list of files returned by a Javascript function.
The second technique uses features of the List control to automatically download files when the List is populated. The data with which the List is populated should contain a field that has the URL for file you want to download. For example:
| Filename | URL |
| pdffile1 | http://alphafiles.s3.amazonaws.com/pdffile1.pdf |
| pdffile2 | http://alphafiles.s3.amazonaws.com/pdffile2.pdf |
| pdffile3 | http://alphafiles.s3.amazonaws.com/pdffile3.pdf |
| pdffile4 | http://alphafiles.s3.amazonaws.com/pdffile4.pdf |
| etc.... |
To use this technique:

The advantage of this second technique over using the PhoneGap - File download action in Action Javascript is that the downloading of files is automatically handled for you.
| UX Component - Ink Control | Image Annotation using the Ink Control in a Data Bound UX Component |
The ink control allows you to create sketches by
'drawing' with your mouse, any type of pointing
device, or with your finger (on a device that
supports touch). A common use of the ink control
is to annotate images. The image you want to
annotate is shown as the background to the ink
control and then you can draw 'on top of' the
image. When the data are saved the ink is stored
separately from the image in a long text field. In this video we show how a data bound UX component that allows a user to upload images can be configured to allow the user to annotate the images that are uploaded. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Component Download SQL Table Definition Date added: 2016-10-30 |
| UX Component - ControlBar Control | Defining Disclosure Forms using the Disclosure Form Builder |
In the video 'Displaying a Modal Pop-up Form
using a Disclosure' we show how a modal pop-up
form can be displayed using a Disclosure. The
definition of the HTML for the form is fairly
tedious because it is completely hand coded. In this video we show how the Disclosure Form Builder can be used to make it easier to define the form HTML. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-10-30 |
| UX Component ControlBar Control | Display Modal Message Dialogs using Disclosures |
Modal messages (such as confirmations, progress,
feedback) as commonly used when designing the
user interface for an application. ControlBar
disclosures make displaying these messages
particularly easy. In this video we show how the ControlBar can be configured to display three different types of message dialogs: basic information dialogs (one button), confirmation dialogs (two buttons) and wait dialogs (no buttons). Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2016-10-30 |
| UX Component - List Control | Specifying Sort Criteria when Filtering a List |
Action Javascript allows you to easily define
fields on a UX where the user can specify search
criteria for a List control on the UX ( much
like the Search Part in a Grid). Now you can
also define sort criteria. In this video we show how the Filter Records in a List action in Action Javascript can be configured to allow sort criteria to be specified. Watch Video Download Component Date added: 2016-1-03 |
| UX Component - ControlBar Control | Adding List Navigation Buttons to a ControlBar |
When you define a List control, you can specify
that the List should be paginated. If you set
the pagination method to 'Navigation Buttons'
then you must define buttons to move to the next
and previous page of records. In a mobile
application that uses a ControlBar in a Panel
header or footer, it is desirable to place these
navigation buttons in the ControlBar. In this video we show how you can quickly add List navigation buttons to a ControlBar by selecting the 'Pre-defined buttons' option when adding ControlBar items to your ControlBar definition. Watch Video Date added: 2016-11-05 |
| UX Component - FormView Control | Using a FormView Control to Edit Data in a List Control - Master-Detail Forms - Very Large Forms |
By default, when you configure a List with a
Detail View (so that edits can be made to the
List data), the Detail View is composed using
individual controls (e.g. Textbox, Textarea,
Dropdown, etc). If the Detail View has a large
number of fields, then composing the Detail View
using individual controls will be inefficient
and will result is a very large UX component
that may not perform well. An alternative approach is to use the FormView control to implement the List's Detail View. This is extremely efficient and will allow you to build UX components that edit very large forms but still perform very well. In this video we show how a master-detail Form is built using a FormView control to edit the fields in the Master table and a second FormView control to edit the fields in the Detail Table. The master table has 100 fields and the detail table has 100 fields, so in total, the UX component is editing 200 fields. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Component Download Script to Create SQL Tables Date added: 2016-11-08 |
| UX Component - FormView Control | Tutorial - Building a Mobile Master-Detail Form using The List, FormView and ControlBar Controls - |
In this video tutorial we show how a mobile app
can be built to implement a master-detail form
using the FormView control. The app will allow
users to edit data from the Customers and Orders
table in the sample Northwind database. This is
a classic master-detail form: Each customer has
multiple orders. The UX component uses two Lists
joined in a parent-child relationship. The
parent List displays data from the Customer
table and the child List display the related
orders from the Orders table. Each List has a Detail View, but in both cases, the Detail View is implemented using the FormView control. Once the basic functionality of the app has been built, the app is 'mobilized' by wrapping the various sections of the component in PanelCards and a ControlBar is added to implement navigation between the various parts of the application. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Watch Video - Part 8 Watch Video - Part 9 Watch Video - Part 10 Download Components Date added: 2016-11-10 |
UX Component - ControlBar Control - Buttons - Bubble Help - You can now define bubble help for all button types (button, button-list, button-toggle, disclosure-button) in the ControlBar control.
PhoneGap App Builder - Passcode Check Plugin - A new
plugin for iOS has been added that allows the developer to verify
that a passcode has been set on an iOS device. This an important
security consideration if you are planning to store data on the
device. If a passcode has been set on an iOS device, then the
contents of the device are encrypted when the device is locked.
When the plugin is installed, a JavaScript
PasscodeCheck object
is automatically created after the PhoneGap ready event fires. You
do not need to create this object. To use the plugin, call the
isDevicePasscodeSet
function.
PasscodeCheck.isDevicePasscodeSet(successCallback, failureCallback);
The successCallback
and the failureCallback
functions are required.
Success callback (called if device passcode is set with value of
true)
Failure callback (called if the passcode is not set, with a value of
false or on error or if the device does not support the
LocalAuthentication
framework)
Example:
PasscodeCheck.isDevicePasscodeSet(function() {
alert('Passcode is set);
},
function() {
alert('Passcode not set);
}
);
PhoneGap App Builder - File Transfer Plugin - In early
September, we detected a problem on Android devices with the latest
version (as of 11/7/2016 : v1.6.0) of the File Transfer Plugin. A
change was made to the PhoneGap Builder to load version 1.5.1 of the
File Transfer Plugin, which is working reliably. If you have any
Android apps that fail to upload media files, make sure version =
"1.5.1" has been included in the project's config.xml file. If you
do not feel comfortable editing the project's config.xml file, you
can remove the file-transfer plugin, save the changes and then add
the file transfer plugin once again and save. This will load the new
plugin definition string that includes the version 1.5.1
specification.
Action JavaScript - Stripe Checkout - Locale Property -
Stripe has added support for a new locale property. The locale
property is used to display the Stripe Checkout dialog in the native
language of the user. The default value is auto and that will
display Checkout in the users preferred language, if available.
English is used by default. Supported languages include Simplified
Chinese (zh), Danish (da), Dutch (nl), English (en), Finnish (fi),
French (fr), German (de), Italian (it), Japanese (ja), Norwegian
(no), Spanish (es) and Swedish (sv). Checkout also uses the locale
to format numbers and currencies.
PhoneGap Shell V2 - Overlay Button Position - You can now
adjust the position of the overlay icon that shown when you are
running a UX component in the PhoneGap shell. By default, the
overlay button is shown bottom right. However, in some cases the
overlay button will obscure an important part of the component you
are testing and you will want to move it. To do so, click on the
overlay button to show the bottom toolbar and then click the menu
icon (left hand button).

This will show a dialog where you can adjust the overlay position.

UX Component - ControlBar - Pre-Defined Buttons - List Control Pagination Buttons - When you define a List control, you can specify that the List should be paginated. If you set the pagination method to 'Navigation Buttons' then you must define buttons to move to the next and previous page of records. In a mobile application that uses a ControlBar in a Panel header or footer, it is desirable to place these navigation buttons in the ControlBar.
When you add 'button' Items to a ControlBar, the Pre-Defined Buttons hyperlink opens a genie that makes it easy to add List control navigation buttons to the ControlBar.
UX Component - List Control - Action Javascript - Filter Records in a List Action - You can now specify sort criteria when using the Filter Records in a List action in Action Javascript.
UX Component - List Control - afterSelect Client-side Event - A new event has been added to the List control. The afterSelect event fires after a row in the List has been selected.
The afterSelect event is essentially the same as the onSelect event except in the case where the List has a Detail View and is the parent of a child List and the child List has been set to pre-fetch data. In this case the onSelect in the parent List will fire after the row in the parent List has been selected and the List's detail View has been populated, but before the child Lists have been populated. The afterSelect will fire after the child Lists have been populated.
UX Component - Client-side Events - onAjaxCallbackNotAllowed - The onAjaxCallbackNotAllowed client-side event fires if the server-side canAjaxCallback event does not allow the Ajax callback. I.e. the canAjaxCallback event sets:
e.authorized = .f.
UX Component - Client-side Data Cache - Deleting Items From Cache - You can now delete items from client-side data cache using the {dialog.object}.deleteFromDataCache() method.
Syntax:
{dialog.object}.deleteFromDataCache(itemName, onSuccessIn,onError)
Where
UX Component - Client-side Data Cache - Listing Files from the Cache that have been saved to disk - A new method allows you to list the files in the client-side data cache. These are the cache-items that are defined to persist to the filesystem and that have been retrieved. The syntax is:
{dialog.object}.listFileInDataCache([onSuccess [, onError]);
Where
UX Component - Client-side Data Cache - File Location - You can now specify where the client-side data cache files should be persisted in the file system (when running in PhoneGap).
To specify the location open the Client-side Data Cache editor and set properties on the Other Settings tab.

For backward compatibility select <default> for both the Filesystem and the Directory. This will store the files in the persistent filesystem (as specified by the PhoneGap constant LocalFileSystem.PERSISTENT). The files will be stored in a folder called __AADataCache/A5SessionFile.
If you specify an explicit Directory name or a Filesystem other than <default>, the A5SessionFile sub-folder in the target folder is not used.
The Filesystem and Directory can be dynamically set at run-time by calling a Javascript function.
For example, you could set the Directory to:
javascript:getDirectory
This would call a Javascript function called getDirectory. This function must return the name of the directory (with a trailing slash).
To specify an explicit location for storing the files in the client-side data cache, set the Filesystem property to the name of a Javascript function (for example javascript:getFilesystem). Your Javascript function should return the fully qualified URI of the folder where the cache files should be stored, prefixed with the string explicit: . For example:
function getFilesystem() {
//return full path to folder with trailing /
return 'explicit:file:///dir1/dir2/dir3/';
}
UX Component - ControlBar Control - Disclosure Form Builder - A new genie has been added to make building the HTML for simple Disclosure forms easier.
Watch Video - Part 1
Watch Video - Part 2
Xbasic - JWT - JSON Web Tokens - New methods have been added to create and decode JSON Web Tokens (JWT)
Example:
dim secret as c = "thisismykey"
dim token as c =
extension::JSON::JWTSign(json_sanitize("{ fname : 'john' , lname :
'smith'}"),secret)
?token
=
"eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJmbmFtZSI6ImpvaG4iLCJsbmFtZSI6InNtaXRoIiwiaWF0IjoxNDc3ODMzMDgwfQ.RJ7vNIYtUaC5DNXiJtiQpxKYUO2TRW2U9bpFZMPypw4"
? extension::JSON::JWTVerify(token,secret)
= {"fname":"john","lname":"smith","iat":1477833068}
UX Component - List Controls - Events - The way in which events are handled for buttons, hyperlinks and dynamic images in a List control has been changed to use 'items' (i.e. the 'a5-item' attribute), rather than binding events to the buttons, hyperlinks and dynamic images in each row. This new method is substantially more efficient than the previous method and will result in less memory utilization and better performance. The performance differences in large lists with several buttons, hyperlinks etc. in each List row should be especially noticeable.
UX Component - Image Annotation using Ink Control in a Data Bound UX Component - A great use case for the Ink control is to annotate images. This is done by displaying the image you want to annotate as the background to the Ink control and then the user can 'draw' on top of the image.
New properties have been added to the UX to allow you to easily configure the Ink control to use an image as its background. The image is and the ink annotation are stored in separate fields in a database.
The image below shows an Ink control with an image as its background.

When you configure the UX you specify that it is data bound to the table that contains the images and the ink annotation. You bind the image field in the table to an image control on the UX and you bind the annotation field in the database to the Ink control on the UX. The in the Ink control's Data Binding section you specify the name of the image control to use as the ink background.

Application Server - a5w_info() Function - Changes have been made to the a5w_info() function to give additional information under IIS and the AlphaCloud. The changes are summarized below:
1. The System section at the bottom now includes values that tell
you the operating system and version of the server.
For example:
Server Product
ApplicationServerIIS
Platform
Windows
Operating System Name
Microsoft Windows Server 2008 R2
Operating System Version
6.1
Operating System Is Server Edition True
The XBasic required to generate those values is below.
? Context.ApplicationConfiguration.ServerProduct
= “ApplicationServerClassic”
?OSPlatform()
= "Windows"
?OSName()
= "Microsoft Windows Server 2008 R2"
?OSVersion()
= "6.1"
?OSIsServerEdition()
.t.
2. The ServerSetting section is specific to the Classic edition of
Alpha Anywhere Application Server. This section is no longer
generated unless the value of
Context.ApplicationConfiguration.ServerProduct is
ApplicationServerClassic;
which apples to Live Preview as well.
The full set of values available is currently:
3. There is an Alpha Cloud section that is displayed only when the
server product is
AlphaCloud.
This section shows the application constants generated by Alpha
Cloud on deployment, including the subscription, account,
application, deployment, published version and publication creation
date/time and the deployment date/time..
4. On the Request section, many of the values on a5w_info() showed
the names of object properties and functions rather than the values
of interest.
For all servers
Session.Keys was not working. It now displays the keys for
session values.
For IIS (and Alpha Cloud), the following were not showing values,
but object function and property names instead. These now display
the keys and values in nested tables:
Request.Params
Request.ServerVariables
Request.QueryString
Request.Form
Request.Headers
Request.Cookies
UX Component - Javascript Error in _numberStringSanitize Function - In certain cases a UX would give Javascript error when loading. The reported error was in the _numberStringSanitize method of the UX component.
UX Component - Caching - A bug in the way the UX component was being cached was fixed. This bug could, in certain cases, lead to a server crash.
Desktop Forms - Supercontrols - Google Maps - Because of a change Google made to their Maps API, the Google Maps supercontrol will no longer work. However, the Bing or Mapquest supercontrols can be used as alternatives.
Reports - Layout Table Reports - Fixed an issue with high order characters.
Web Applications - Web References - Fixed an issue with the proxy generator.
Grid Component - Alpha Theme - Icons - When you use the new 'Alpha' theme in a Grid, the toolbar icons for the Detail View can be a little hard to see in their default state (see first image).
However, you can make the icons much clearer by applying some CSS to the SVG icons used in the toolbar (see second image)
![]()

To define the necessary CSS select the Local CSS definitions property.

Specify the following CSS:
.grid .link .icon {
fill: #333;
stroke: #333;
}
VERY IMPORTANT: As of build 3898 if the regional settings on your server do not use a period as the decimal character and if the client-side number format that users will use when entering numbers does not use default settings (period for decimals and comma for thousands separator) then you must set the new Number format - decimal character and Number format - thousands separator properties in each UX component. See the UX Component - Number Formats topic below for more information.
Summary: V4.3 is packed with new features. Perhaps the single most important new feature is the ControlBar control in the UX component. If you are building Mobile apps, the ControlBar will give you a huge productivity boost and allow for much more professional looking applications. It is an essential tool for Mobile app developers! Other new features of note include the new 'Alpha' stylesheet, new PhoneGap shell for quickly testing PhoneGap applications, Built-in SVG icons for all themes, Google address auto-complete
| UX Component - FormView Control | Capturing Signatures using the SignatureInk Editor |
A common requirement when using the FormView
control is capturing a signature. Alpha Anywhere
has a Signature control, but this control
captures signatures as bitmaps and is not ideal
for use in a FormView control. The Ink control
is better suited for this use case. In this video we show how a FormView control is configured to use the built-in SignatureInk editor. Watch Video Download Component Date added: 2016-06-30 |
| Node | Installing a Node Module from NPM and then Creating a Node Service to Call Methods in the Node Module |
The Xbasic code you write in your Web
applications can call methods in Node.js modules
that are installed from NPM (the Node Package
Manager). In this video we show how a Node module is installed into the Web Project folder and then how a Node Service is created so that methods in the Node module can be called. The particular Node module that we install in this video is called Tinify and we show how a Node Service is defined so that we can call into this module from Xbasic using the Node_request() function. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2016-07-06 |
| UX Component - Ink Control | Customizing the Ink Control Overlay |
The Ink control 'overlay' displays a number of
tools that are used by the Ink editor (such as
the Pen selector, Eraser, etc.). You can
customize the appearance of the 'overlay' and
add your own tools (i.e buttons). In this video we show how you can add a new button to the Ink editor overlay. Watch Video Date added: 2016-07-08 |
| UX Component - Ink Control | Setting the Ink Control Background Image |
Setting the background image in the Ink Control
is a common practice. In this video we discuss
various aspects of how you can set the Ink
control image background and control whether the
UX goes dirty when the Ink background is set. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-07-06 |
| UX Component - Ink Control | Using the Ink Control to Capture Signatures |
The UX Component has always had a built in
Signature Capture control. However, it is also
possible to use the Ink control to capture
signatures. The primary benefit of using the Ink
control to capture signatures is that the
signature is captured using the Ink format,
which is an ascii format, rather than as a PNG
image, which the Signature Capture control uses. In this video we show how to configure the Ink control to capture signatures. Watch Video Date added: 2016-07-08 |
| UX Component - ViewBox | Using a ViewBox as the List's Detail View |
A common pattern when building mobile
applications is to use a List control with a
Detail View. When the user taps on a row in the
List, the Detail View shows the details for the
selected row. This pattern is used extensively,
especially for offline applications where the
data in the List is intended to be updateable. However, there are many cases where the List is not intended to be updateable and a much 'lighter weight' solution can be achieved but not turning on the List's 'Has Detail View property' and instead, using a ViewBox to display details for the selected row in the List. An even lighter weight solution can be achieved by using a ViewBox to replace the List. So you end up with a ViewBox to display a list of records and another ViewBox to display details for the selected record. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-07-09 |
| UX Control | Building a Custom Image Gallery using the List and Ink Control |
The List and Ink Control can be used to build a
custom Image Gallery in which the List is used
to display thumbnails of the available images
and when the user taps on a particular image,
the full size image is shown in the Ink control.
The advantage of using the Ink control to
display the image is so that you can take
advantage of the Ink controls pinch-zoom
features and pan features to scale the image and
to pan around to see details of different parts
of the image. The ability to actually draw ink
(which of course is the primary purpose of the
Ink control) is not used in this case. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2016-07-16 |
| UX Component - List Control | Options for Handling Write Conflicts when Syncing Data |
When you build a disconnected mobile
application, there is always a chance that the
user will get a write conflict when they sync
data that was edited while they were offline.
This could happen because some other user
has committed a change to a record before
another user could commit their change. By default, when a write conflict occurs, the information about the conflict is sent to the user and the user can resolve the conflict by selecting 'Their value' or 'My value'. However, there are other powerful programmatic options for handling write conflicts. In this video we discuss the various techniques for handling write conflicts. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-07-21 |
| Grid Component | Preventing User from Closing Pop-up Window if Grid or a Linked Child Grid is Dirty |
It is common in web applications to have buttons
that open a Grid component in a pop-up window.
The Action Javascript builder when you build
this action has a built-in property that allows
you to prevent the user from closing the window
if the Grid shown in the window is dirty. But
what if the Grid shown in the window has Linked
child Grid components? You might want to also
check that the child Grids are not dirty before
the window can be closed. In this video we show how this can be done. Watch Video Date added: 2016-08-04 |
| UX Component - FormView Control | Creating Complex Form Layouts using the Flow and Column Layout Containers |
When you lay out a Form using the FormView
control, by default, the controls on the form
are rendered with one control per line and each
control taking up the full width of the FormView
control. If you want to create a more complex
Layout you can either switch from Genie mode to
the Freeform mode, or you can use Flow and
Column Layout Containers to control the layout
of your Form. In this video we show how a complex Form layout is achieved using Column and Flow layout containers. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-08-27 |
| UX Component | Adjusting Colors and Fonts in a Stylesheet |
Alpha Anywhere has always allowed you to edit a
stylesheet used by a component to change any of
the CSS defined in the stylesheet. But when you
simply want to change some colors in a
stylesheet, using the style editor may be more
than you need. In this video we show how you can easily adjust colors and fonts in a style. NOTE: This option is only available for 'new' styles (AndroidLight, AndroidDark, iOS7, Alpha) as these styles are based on SASS. Watch Video Date added: 2016-09-14 |
| UX Component - ControlBar Control | Introduction to Basic Concepts |
This video demonstrates basic concepts of the
ControlBar control. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-09-14 |
| UX Component - ControlBar Control | Updating ControlBar Data - Dynamic Text |
This video demonstrates how you can update the
data in the ControlBar's data. This allows you
to put dynamic text in the Controlbar. We also
show how the ControlBar can be animated when it
is refreshed. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-09-14 |
| UX Component - ControlBar Control | Using Watch Events to Update ControlBar Data |
The ControlBar data can be updated automatically
in response to certain events in the UX (such as
the UX going dirty, a List going dirty, etc.) or
by a change in the value of one or more
controls. In this video we show how you can configure watch events to automatically update ControlBar data. Watch Video Date added: 2016-09-14 |
| UX Component - ControlBarControl | Adding a Button to a ControlBar |
In this video we show how you can add a button
to a ControlBar and then associate an action
(i.e. some Javascript code) to run when the
button is tapped. Watch Video Download Component Date added: 2016-09-14 |
| UX Component - ControlBarControl | Adding a Button-Toggle to a ControlBar |
In this video we show how you can add a
Button-Toggle to a ControlBar. Toggle buttons
can either be two-state (switching between a
true and a false state), or multi-state (each
click advances to the next button state). The video shows how the state of a Button-Toggle is used to control what action a button performs when clicked. Watch Video Download Component Date added: 2016-09-14 |
| UX Component - ControlBarControl | Adding a Button-List to a ControlBar |
A common pattern in mobile apps is to have a
button bar at the bottom of the screen with a
series of buttons that allow you to select the
active Panel that is shown on the device.
Typically, these buttons are spread out so that
they fill the width of the screen. The button-list control is ideal for implementing this pattern. In this video we show how a Button-List can be configured to fill the width of the screen and to select a Panel Card in a Panel Layout when one of the buttons in the Button-List is tapped. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2016-09-14 |
| UX Component - ControlBar Control | Selecting the Active ControlBar Layout |
A ControlBar can have multiple Layouts. In this
video we show how you can dynamically select the
Layout to show. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-09-14 |
| UX Component - ControlBar Control | Showing a Disclosure |
A disclosure can be some explicitly defined
HTML, or it can be another Layout. In this video
we show how a disclosure, defined as a
ControlBar layout, is shown. Watch Video Download Component Addendum: One of the more unusual disclosure types is Outside-After (and Outside-Before) which display the disclosure perpendicular to the parent Layout. In this video we show how the disclosure is rendered when the Outside-After type is selected. Watch Video - Part 2 Date added: 2016-09-14 |
| UX Component - ControlBar Control | Showing a List in a Disclosure |
You can display standard UX controls (such as
Lists, Buttons, Input controls, etc.) in a
disclosure. In this video we show how a list is
displayed in a disclosure. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-09-16 |
| UX Component - ControlBar Control | Setting the Selected Button in a Button List using Javascript |
The selected button(s) in a ControlBar Button
List can be set programmatically using
Javascript. It is also possible to completely
change the buttons shown in a Button List
programmatically. In this video we show how this is done. Watch Video Download Component Date added: 2016-09-21 |
| UX Component | Google Address Auto-complete |
A commonly seen feature in many web and mobile
applications is address auto-complete. As the
user starts typing an address into a textbox, a
list of suggested address is shown and the user
can select from the list. This feature is
powered by Google Maps. In this video we show how you can turn on the Address Suggest feature for any textbox control on a UX. NOTE: Textbox controls in Repeating Sections are not supported. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-09-16 |
| UX Component - ControlBar Control | Defining Javascript in a ControlBar - Understanding the 'This Object' Option. Using Javascript function in a template. |
When you define Javascript functions in a
ControlBar (and also a ViewBox and FormView
control), you can specify where the Javascript
should be stored. The options are: At the
control level, at the UX level and 'This
object'. This video explains the options and discusses why the 'This object' option is best. It also describes how functions defined at the 'This object' level can be referenced in templates. Watch Video Download Component Date added: 2016-09-28 |
| UX Component - ControlBar Control | Dynamically Showing and Hiding Lines in a ControlBar Layout |
A ControlBar layout can have multiple Lines.
Each Line in a Layout can be dynamically shown
or hidden. This video shows how a show expression can be defined for a Line in a ControlBar Layout Watch Video Download Component Date added: 2016-09-28 |
| UX and Grid Component | Sending SMS Messages using the Twilio Service |
You can send SMS messages from the Grid and the
UX. The messages are sent using the Twilio
service, so you will need a Twilio account. You
can use Action Javascript to define the action
which sends the message. There are a large number of options for customizing the message, such as sending messages in different languages, depending on the user preference. In this video we show how a button was defined in the UX to send a message. The phone number and message body are read from controls on the UX. Watch Video Date added: 2016-09-29 |
| UX Component | Creating Offline HTML5 Applications using the Application Cache |
The Application Cache (an HTML5 feature widely
supported by various browsers) allows you to
build 'offline' applications - i.e. applications
that can be loaded into the browser even if
there is no internet connection.
In order to load
the application initially an internet connection
is obviously needed. But once the application
has been loaded initially, all of the files
(e.g. CSS.Javascript, images, etc.) referenced
by the application are cached in the browser and
an internet connection is not needed to load the
application subsequently. If the application is updated, then if an internet connection is available when the app is loaded, the new version of the app is downloaded and cached in the browser. In this video we show how offline HTML5 applications can be created using the Application Cache feature. NOTE: These 'offline' HTML5 applications do not require PhoneGap! Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-09-29 |
| UX Component - List Control | Saving and Restoring List Settings to Quickly Define New Lists |
The List control is one of the most commonly
used controls in a UX component. But because of
the richness of the List, there can be many
properties that need to be set to configure a
List. After you have configured a List, you can
save all of the settings for the List in a named
file. Then when you define your next List, you
can restore the settings from the named file -
saving a lot of time. This video demonstrates how List settings can be saved and restored. Watch Video Date added: 2016-109-02 |
| UX and Grid Component | Using the Javascript Code Library |
The Javascript Code Library is available in all
contexts where Javascript can be edited. The
Code Library is ideal for storing snippets of
code that can then be pasted into the Javascript
you are editing. In this video we walk through the various features of the Javascript Code Library. Watch Video Date added: 2016-109-05 |
| UX Component - ControlBar Control | Adding an Edit ControlBar Item to a ControlBar |
A ControlBar typically contains text and
buttons, but a common use case is to build a
Search ControlBar that uses an edit control in
the ControlBar. In this video we show how the edit ControlBar item type can be used to build a Search feature. Watch Video Download Component Date added: 2016-10-08 |
| UX Component - ControlBar Control | Displaying a Modal Pop-up Form using a Disclosure |
A common pattern in many applications (both
Mobile and Desktop web) is to display pop-up
modal forms to collect some information from the
user. Displaying pop-up modal forms using the
ControlBar is very easy and extremely powerful.
This video shows how a ControlBar 'disclosure' is used to display a pop-up modal form. The 'a5-action' attribute in the Disclosure HTML is used to invoke actions defined in the ControlBar's Action pane. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-10-08 |
| UX Component - FormView Control | Displaying Calculated Values on a FormView Control |
When you design a FormView control you may want
the form to display calculated values (typically
computed from other fields in the form). Since
the Form is really just an HTML template that is
rendered using Alpha Anywhere's client-side
templating features, this is easily done. In this video we show how a calculated field is added to the FormView control. Watch Video Download Component Date added: 2016-10-10 |
UX Component - ControlBar Control - A new control type is available in the UX component. The ControlBar is primarily intended for creating the content that appears in Panel headers and footers and it is a much easier and vastly more flexible way for populating a Panel header or footer compared with the previous technique of adding standard UX controls (such as buttons and static text controls) to the header or footer.
For more information on ControlBars, please see the User Guide documentation here.
You can also refer to the API documentation here.
To see videos on the ControlBar refer to the Videos section of this document.
UX Component - ControlBar Control - Modal Dialogs - A new property (Auto-hide disclosure) for disclosure-buttons allows the disclosure opened by the disclosure-button to be modal. This means that the user will not be able to tap anywhere off the disclosure to close the disclosure, but must tap a button on the disclosure itself in order to close the disclosure. To make a modal disclosure:
For example, in the image shown below when the user taps the Settings button, the disclosure (a modal dialog) prompting for two input fields is shown. The user cannot close the disclosure by clicking off the disclosure. The only way to close the disclosure is by tapping the OK or Close buttons.

UX Component - ControlBar Control - Miscellaneous Improvements
When you define HTML for a Disclosure you can now use the a5-actions attribute in your HTML to bind to ControlBar Actions. For example:
<div a5-action="action1">
Tap here to do some task
</div>
A new type of ControlBar Item is available. The Edit item allows you to display an input control in the ControlBar.
The button-disclosure ControlBar item now supports user defined events such as click, downhold, etc.
UX Component - ControlBar Control - Samples - When you open the ControlBar builder you can now get a quick start by loading a sample ControlBar. On the 'Home' tab in the ControlBar builder, click the Load Sample ControlBar hyperlink.

UX Component - ControlBar, ViewBox and FormView Controls - Defining Javascript - In the builder for the ControlBar, ViewBox and FormView, you can define Javascript functions.
When you define you Javascript functions, you can specify where the Javascript should be stored. The options are:
Now, a new option is available:
When you select the 'With the control' option, the Javascript is stored in the control definition, (which means that if you copy the control to another UX component, the Javascript you define comes along - this would not be the case if you use the 'With the UX' option). However, at render-time for both the 'With the control' and 'With the UX' options, the Javascript functions you define are global functions. That means that if you have a UX with multiple ControlBar, ViewBox or FormView controls, and they each define a different function called (say) 'func1' at the 'With the control' option, the definition of the global func1 function will be whatever definition exists in the last control that was rendered.
However, if you define the Javascript at the 'This object' level, then your Javascript functions become method of the ControlBar, FormView or ViewBox object and a definition in one control cannot overwrite a definition in another control.
To invoke a function defined at the 'This object' level, you must use a pointer to the object as a prefix.
For example
this.func1()
(assuming that the this object is a reference to the ControlBar, FormView or ViewBox object).
In cases where the this object does not reference the ControlBar, FormView or ViewBox object, you can still call the function by first getting a pointer to the ControlBar, FormView or ViewBox object. For example
var obj = {dialog.object}.getControl('myViewBox1');
obj.func1()
The ControlBar, FormView and ViewBox controls allow you to use client side templates. If you templates you can reference a Javascript function defined at the 'This object' level as follows:
{@[scope].func1}
The [scope] keyword is a reference to the object.
UX Component - ControlBar Control - Show/Hide Lines in a ControlBar Layout - You can now dynamically show or hide lines in a ControlBar layout.
To define a Show expression for a Line, click the Line Properties button on the ControlBar layout editor.

UX Component - PhoneGap Shell V2 - A new PhoneGap shell template is now available. When developing a PhoneGap application, a shell is a huge productivity boost because you can test new versions of the app you are developing by quickly loading the app into the shell that is running on your device. You do not have to submit your app to PhoneGap build every time you want to test a new version of your app.
The V2 shell improves on the previous PhoneGap shell that shipped with Alpha Anywhere in several key areas.
To create a new PhoneGap shell, open the UX builder and create a new UX component. Select PhoneGap-Shell-V2 from the list of templates.
Once you have created the UX component using the template, save it and submit it to PhoneGap build using the PhonGap build genie (accessed from the PhoneGap button on the Web Control Panel). Then load the shell onto your device.

Key benefits of the V2 shell include
The various screen shots shown below illustrate various of the new V2 features of the PhoneGap shell.

1. PhoneGap Shell V2 - Main Screen

2. PhoneGap Shell V2 - Main Screen Menu

3. PhoneGap Shell V2 - Adding a new component to the list

4. PhoneGap Shell V2 - Generating a QR code for the component name from the dropdown menu in the UX builder

5. PhoneGap Shell V2 - QR code type

6. PhoneGap Shell V2 - Showing a running component - Back and Refresh buttons are hidden

7. PhoneGap Shell V2 - Showing a running component - Back and Refresh as hidden shown after tapping on the menu icon

8. PhoneGap Shell V2 - Settings screen menu

9. PhoneGap Shell V2 - Adding a new server address

10. PhoneGap Shell V2 - Generating a QR code for the server address and description to avoid having to type into the dialog prompting for server address

11. PhoneGap Shell V2 - Testing a server address
UX and Grid Component - Javascript Library - Date Arithmetic - A new method has been added to the date object prototype. The .addTime() method is now a built-in method of the date object. This method takes two arguments:
The possible values for interval are:
Units is a number.
Examples:
//add 1 year to a date object
var d1 = new Date();
d2 = d1.addTime('year',1);
//add 1 year, 3 months, 10 days to a date value
var d1 = new Date();
d2 = d1.addTime('year',1).addTime('month',3).addTime('day',10);
UX Component - .getDateValue() Method - When you use the .getValue() method to retrieve the value of any control, a string is returned, regardless of the control's defined data type. In the case of numeric and logical types, casting the value to the required Javascript type is easy (using the $u.s.toNum() or $u.s.toBool() ) functions, but casting to a date value is harder because the data value has to be parsed. Therefore a new method has been added to get the value in a control as a date object.
For example:
var d = {dialog.Object}.getDateValue('dateofbirth')
The date string in the control is parsed into a date object using the client-side date and time format defined in the UX component.
UX Component - List Control - Server-side beforeQuery Event - This event fires before the query to retrieve the List data is executed.
The Xbasic function that handles this event gets passed the SQL statement that will be executed and the SQL arguments that will be used in he query.
Now, your Xbasic code can modify the SQL statement that the query will execute.
Previously your Xbasic could only change argument values.

UX Component - Action Javascript - PhoneGap - Scan Barcode - A new action in Action Javascript allows you to scan barcodes in a PhoneGap application.
The action is called PhoneGap - Scan Barcode. The builder for the action is shown in the image below.
You can define an onSuccess Javascript event handler that gets called if the scan was successful. You Javascript code can reference:

IMPORTANT: When you build the PhoneGap application be sure to select the Bar Code Scanner plugin in the Third Party PhoneGap Plugins section.

UX Component - PhoneGap - Android - onAndroidBackButton - When running in a PhoneGap shell the client-side onAndroidBackButton event will fire when the user taps on the system back button. If you do not define an event handler for this event, then when your app is running and user taps on the Android Back button, your app will exit.
If you define a handler for this event, then when the user taps on the Android Back button, the app will not exit and the code in your event handler will execute. You can typically use this event to move to the previous 'state' of your app. For example, if the user had just opened a window, you would close the window.
An approach that you might take is to add a new item to a 'stack' every time the user executes an action in your app that should be undone by pressing the back button.
Then when the user presses the Back button you can execute the top action on the stack and then pop that action off the stack. When there is nothing left on the stack and the user presses the Back button you can exit the app. To do this your event handler would execute this code.
e.event.preventDefault();
navigator.app.exitApp();
UX Component - List Control - AfterRefreshData Event - A new event has been added to the List control After the List control's data has been refreshed (using the {dialog.object}.refreshListData() method) the AfterRefreshListData event will fire. This event is defined in the Events section in the List Builder.
UX Component - Action Javascript - Image Capture - Camera/Photo Library Action - Videos - This Action Javascript action can now let the user select a Video from the Photo Library. This only works in a PhoneGap application.
The Type property in the image shown below is visible if the Image capture method is set to PhoneGap and the Picture source property is set to Photo Library.

Once the user has selected a video from the Photo Library, the Javascript defined in the Javascript to execute when image has been captured property is executed.
Your code can reference e.fileSystemURL, the filename of the video file. You could use this value to set the value of the VideoPlayer control so that the video can be played back, or you might want to upload the video to your server, or to Amazon S3.
For example
{dialog.object}.setValue('myvideoplayer',e.fileSystemURL)
UX Component - Google Address Suggest - Address Filtering - You can now specify a filter to filter the addresses shown. For example, you might want to restrict address to a certain country.
For example, in the image below, addresses in New Zealand are shown.

You can also use a Javascript function to specify the filter. For example:
javascript:myfunction
In the above example, the Javascript function myfunction should return the Filter as an object. For example:
function myfunction() {
return {country: 'NZ'};
}
Note: The Javascript function is called when the auto-complete field is initialized. It is not called every time the user types an address into the field.
UX Component - Number Formats - Two new properties in the UX allow you to specify the format that users will use when entering numbers.
The Number format - decimal character allow you to specify what character the user will use when entering decimal places.
The Number format - thousands separator allow you to specify what character the user will use when entering formatted numbers above 999.
You can enter the explicit character to use or 'period' (which is simply a symbol for a period) or 'comma' (which is simply a symbol for a comma).
These properties can also be set automatically, and dynamically, using session variables. The values in these session variables could be set when a user logs in by referring to some user preference setting stored in a table on the server.
The session variables are:
IMPORTANT: If the regional settings on your server do not use a period as the decimal character then it will be important to update existing UX components and set the value in these two properties if the defaults (period for decimals and comma for thousands separator) are not correct.
Build 3892
Technical Note
This change is made necessary by an internal change to the {dialog.object}.getValue() method. Previously, if a user in (say) Spain (where the decimal character is a comma) entered a value (say 234,34) into a numeric textbox, and then used the .getValue() method to read the value in the control, the .getValue() method returned:
234,34
Now, if the user has specified that the Number format - decimal character property is a comma, .getValue() will now return this (a string value)
234.34
This is an important change because if you wanted to perform a numeric calculation using this number you can simply use the Javascript Number() function to convert the string to a number and then do the calculation. For example
var newVal = Number({dialog.object}.getValue('NUMBER1')) * 12
UX Component - Internationalization Helper - The
Internalization Helper (accessed from the
button in the UX
builder), now has a new option to perform all actions at once,
rather than requiring actions to be executed individually.

UX and Grid Component - Javascript Editors - Code Library - A code library is available in all contexts where Javascript can be edited.
To open the Code Library, click the Code Library icon (shown highlighted in yellow below) on the toolbar.
To add a code snippet to the library, highlight the code in the editor and then click the 'Add' button (left most button on the button bar at bottom of the Code Library window)
To insert a code snippet into the code you are editing either double click on the item or click the 'Insert' button (3rd from left on button bar).
Features of the Code Library include:

UX Component - System SVG Icons - Alpha Anywhere now comes with a set of pre-defined SVG icons that can be used with any style. These SVG icons are the same icons that the new Alpha stylesheet uses.
When you are using a stylesheet other than the the Alpha stylesheet, when you open the SVG Icon picker you will see that the system SVG icons are shown in a category called System SVG Icons. In addition, the Class dropdown will have three special auto-generated classes that can be applied to the SVG icons. These are
The definition of these classes are shown below.
If you do not select any class, some of the images will not render properly because the stroke color of the SVG icon is not defined.
You must select either icon or iconSizeable for the icons to render correctly.
You will notice that the icon class defines a explicit size for the icon (26 x 26 px). Therefore changing the size using the slider on the dialog will have no effect.
If you would like to be able to size the icon, you should select the iconSizeable class.
You can also define your own classes in the component's Local CSS, or Linked CSS to apply to the SVG icon.
![]()
.icon {
vertical-align: middle;
width: 26px;
height: 26px;
fill: #333;
stroke: #333;
}
.iconSizeable {
vertical-align: middle;
width: auto;
height: auto;
fill: #333;
stroke: #333;
}
.iconDisabled {
opacity: .25;
}
UX Component - Text Area - Mobile Devices - If you have a Text Area control on a mobile device, it can be difficult to scroll the text in the text area without scrolling the Panel that the Text Area is in,
On iOS devices you can scroll the text in the Text Area using a two finger drag. However, this is a cumbersome and not obvious gesture.
A new pre-defined control is available to create a Text Area that is optimized for mobile devices.

The image below shows the Text control with a special slider on the right hand side that will allow you to easily scroll the text in the Text Area control.

SQL Server LocalDB - Alpha Anywhere now automatically installs SQL Server LocalDB when you install Alpha Anyhwere. SQL Server Local DB is installed. This means that as soon as Alpha Anywhere has been installed, developers will be able to start building applications that use a SQL database, even if they don't access to a SQL database of their own.
According to the Microsoft documentation:
LocalDB installation copies a minimal set of files necessary to start the SQL Server Database Engine. Once LocalDB is installed, you can initiate a connection using a special connection string. When connecting, the necessary SQL Server infrastructure is automatically created and started, enabling the application to use the database without complex configuration tasks. Developer Tools can provide developers with a SQL Server Database Engine that lets them write and test Transact-SQL code without having to manage a full server instance of SQL Server.
When AlphaAnwhere is started it automatically creates a named instance of LocalDB called AlphaAnywhere
To build a connection string to the LocalDB databse, use the SQL Server driver and specify the Version as 2016 and the Server Name as (localDB)\AlphaAnywhere.
When you select a connection string in the various genies and builders, a hyperlink appears at the bottom of the dialog that allows you to automatically create a LocalDB version of the sample Northwind database that is uses in many of the Alpha Anywhere tutorials and videos. When you click the hyperlink a named connection string called AADemo-Northwind is created.

UX Component - Starter Templates - Two of the starter templates listed when you create a new UX component have been recreated using ControlBars in the Panel headers and footers rather than individual UX controls. The versions created using ControlBars are smaller than the corresponding versions that do not use ControlBars.

Grid Component - HTML Editor - Customize Toolbar Icons and Layout - You can not choose your own icons for the HTML toolbar editor and you can customize the layout of the editor, rearranging the buttons, and leaving off buttons for features you don't want to expose.

UX Component - List Control - Save/load Settings - After you have defined the settings for a List control, you can now save the settings to a file on disk. Then when you begin defining a new List, you can restore previously saved settings. This can save a lot of time when setting up a List that is similar to a previous List you have created.
To save, load or manage your settings file, click on the Save/load Settings... button at the bottom of the List builder.

Select an option from the sub-menu that appears.

If you select the Manage saved settings option, Windows Explorer will show the folder where the settings files are stored and you can delete, or rename any of the files.
NOTE Saved settings are common to all web projects and all Workspaces. That means that it is possible to load a saved setting that will not work in your current context. For example, if you restore a saved setting for a SQL list that specifies a particular connection string, and that connection string is not present in the current Workspace, your List will not work until you fix the problems.
UX Component - Application Cache - Building Offline HTML5 Applications - You can now create a static HTML page for a UX component. This static HTML file can include a cache manifest. This will enable the static HTML page to work 'offline'.
Watch Video
- Part 1
Watch Video
- Part 2
Offline enabled HTML pages can be loaded into a browser even if no internet connection is available.
To turn on this feature, click the smart field for the Create a static HTML page with an application cache property, as shown in the image below.
When this property is checked, when you save the UX component, a special sub-directory in the Web Project folder is created. This directory is called StaticHTMLFileset and it contains the static HTML page with the rendered UX component and all of the files referenced by this page (e.g. Javascript, CSS and image files). The directly also contains an application manifest file which lists all of the files reference by the static HTML page. The application manifest file is linked in the head of the static HTML page by specifying a value for the manifest attribute in the <html> tag. For example:
<html manifest="cache_myuxcomponent.appmanifest">

When a static HTML page that includes a manifest is loaded, all of the files listed in the manifest are stored in the browser's ApplicationData storage area.
When a static HTML page is loaded, the browser checks to see if a cached version of the page and all of the files it references exists in the browser's ApplicationData storage area. If so, the page is loaded from the ApplicationData storage area. To determine if the cached version is stale or not, but browser will attempt to contact the server (if an internet connection is available) to check if a newer version of the manifest is available.
If a newer manifest is available, the browser will download and cache the new version of the static HTML page and its referenced files.
While the browser is downloading files listed in the manifest, a series of events will fire. You can specify event handlers for these events in your UX component.
When you click the smart field for the Create a static HTML page with an application cache property, you can automatically generate default code for the error, updateready and progress Application Cache events:
UX and Grid Component - Action Javascript - Send SMS Message using Twilio - A new action has been added to Action Javascript to allow you to send an SMS message. You will need an account with Twilio to use this feature.
The action allows you to:
To specify the message text you can:
You can also specify Javascript code to execute after the message has been sent.
You can either explicitly specify your Twilio credential, or you can reference a NamedResource which contains your credentials. You will need your Twilio SID, Token, and Phone Number (the phone number from which the SMS message is sent).
If you use the NamedResouce option, you can change specify different values for the SID, Token and Phone Number in your publishing profile.
To create a NamedResource, open the Web Project Properties dialog.
The screen below show the Action Javascript builder for the action.

reversearray() Function - You can reverse the order of items in an array with the reversearray() function.
Examples:
dim p[3] as n
p[1] = 1
p[2] = 2
p[3] = 3
reversearray(p)
?p.dump()
= 3
2
1
dim p[2] as p
p[1].name = "alpha"
p[2].name = "beta"
reversearray(p)
?p.dump_properties("name")
= "beta"
"alpha"
UX Component - List Control - Layout - Copy Property Value - In the Layout tab of the List Builder, when you are editing a column layout, you can now copy a property value from one column and paste it to multiple columns.

UX Component - List Control - Render Columns in Reverse Order - If you are using a right-to-left language (such as Hebrew), then you might want the columns in a Column layout to be rendered in reverse order. A new property in the List Properties allows you to reverse the column order.

Xdialog - Caption Fields - You can now define a caption (i.e. a watermark) for an input control on an Xdialog. When there is no text in the input control the caption shows. As soon as the user begins to type in the field, the caption is replaced by the user entered text.

To define a caption for an input control, use the caption directive within the %...% delimiters.
For example:
ui_dlg_box("Captions",<<%dlg%
[%caption=Enter Name%.60name];
[%caption=Enter City%.60city];
%dlg%)
UX Component - Google Address auto-complete - afterGoogleAddressSelect Client-side Event - A new client-side event is defined. This event is called after the user makes a selection from the Google address auto-complete list. The event gets the Google 'place' object with a wealth of information about the address the user selected. You can use this event to define a custom mapping of data from the 'place' object to controls on your component.
UX Ccomponent - ViewBox Control - Sample iOS Settings Screen - A new sample ViewBox can be loaded into the ViewBox builder.

The iOS Settings screen example is loaded by clicking the Load Sample ViewBox link on the Home tab of the ViewBox Builder.

The entire contents of the settings screen (i.e. each of the properties prompted for and the type of editor used for the property) is driven by the ViewBox data. For example, the settings screen in the above image is created using this data:
[
{text: 'Name', type: 'edit', editor: ['EDITORSET_1','EDITOR_1'],
name: 'name', value: 'John Smith'},
{group: 'Group 1', icon: 'svgIcon=#alpha-icon-home:icon', text:
'Item 1', type: 'switch', name: 'item1', value: true},
{group: 'Group 1', icon: 'svgIcon=#alpha-icon-shield:icon', text:
'Item 2', type: 'switch', name: 'item2', value: false},
{group: 'Group 1', icon: 'svgIcon=#alpha-icon-envelopeSolid:icon',
text: 'Item 3', type: 'switch', name: 'item3', value: true},
{group: 'Group 2', text: 'Notifications', type: 'disclosure', name:
'disclosure1'},
{group: 'Group 2', name: 'passFail', value: 'Pass', values: ['Pass','Retry','Fail'],
type: 'radio'},
{group: 'Group 2', name: 'colors', value: ['Red','Green'], values:
['Red','Blue','Green'], type: 'checkbox'},
{text: 'Phone', type: 'edit', editor: ['EDITORSET_1','EDITOR_1'],
name: 'phone',value: '123 456-7890'}
]
The ViewBox 'value' is a JSON string of the setting values. The settings can be initialized by using the .setValue() method and setting the ViewBox value to a JSON string of setting values.
NOTE: This control is must be used with the Alpha style as the icons in the data are SVG icons, used in the Alpha style.
NOTE2: The edit the text properties in the dialog you will need to add an editor set called EDITORSET_1 with a text box editor called EDITOR_1.
This sample ViewVox is a good example of how very rich user interfaces can be built very easily and efficiently using a ViewBox. For example to add a new setting to the ViewBox, simply add the definition to the ViewBox data.
UX Component - Google Visualization Libraries - When using the Google Visualization library in a UX component, it is no longer necessary to go to the Web Project Properties dialog to specify that the Google JSAPI library should be loaded. The Visualization libraries are now loaded automatically by the UX as needed.
UX Component - Goggle Address Auto-complete - In many applications (both web and mobile) it is common when typing in an address to get auto-complete suggestions, as shown in the image below. In the image shown, the user has begun typing an address into the Address control ('70 blanc') and a drop-down list of possible addresses is shown.
This is achieved using a feature of the Google Maps API.
You can now add this functionality to your any textbox in a UX
component.
Watch Video
- Part 1
Watch Video
- Part 2
NOTE: In order to use this feature you will need an API key from Google. You can get an API key for Google Maps Javascript from the Google site. This API key is the same key needed for Google Maps.

When the user makes a selection from the drop-down list, you can also specify that the individual parts of the address should populate other controls on the UX. For example, if the user were to select the first entry in the drop-down list shown above, you might want to insert '70' into a 'StreetNumber' control on your UX, 'Blanchard Road' into a 'Street' control, 'Burlington' into a 'City' control, and so on.
The genie that allows you to configure this feature makes it easy to set up these mappings.
To turn on GoogleAddressSuggest for any textbox control, set the Special type property to GoogleAddressSuggest.

Next click the smart field for the Special type settings property. This will open a builder appropriate for the special type you selected.
The builder allows you to specify how the address parts from the selected address should be mapped to individual controls on the UX component. You do not have to define any mapping if you don't want to map address parts to individual controls.
For each address part that you choose to map, you can specify if you want the 'long' or 'short' form of the string. For example, the long form of a state field might be 'Massachusetts', while the short form might be 'MA'.

You can also specify your API key.
NOTE: If you leave the API key blank then Alpha Anywhere will read it from the setting in Web Project Properties. If there is no setting in Web Project Properties then it will look for a file called GoogleMapsAPIKey.txt. This file should have the API key in it.
The Bias address suggestions to the user's current location prompt allows you to bias the address suggestions to the user's current location. So, for example, if the user is in Paris, the suggestions displayed by Google will show Paris addresses at the top of the list.
NOTE: Address auto-complete for textbox controls in Repeating Sections are not supported.
UX and Grid Component - Customize Style Colors and Fonts -
Editing the colors and fonts used in a style has always been
possible by editing the style sheet. For example, if you are using
the iOS7 style, you could edit this style and customize all colors
and fonts.
However, if you edit the style, you create your own copy of the style. That means that if Alpha subsequently modifies this style (for example, by adding new CSS classes for some new control type that is added to the UX), your style will not see these new classes unless you manually add them to your copy of the style.
Also, bringing up the style builder just to change one of the colors in the style seems like overkill.
A new option is now available for 'version 3' (e.g. iOS7,
AndroidDark, AndroidLight) and 'version 4' (e.g. Alpha) styles.
These styles use SASS variables to define the colors and fonts used
in the stylesheet.
Watch Video
To edit colors and fonts, click the smart field for the Customize style colors and fonts property.
The dialog in the image shown below will be displayed.

When you edit the colors and fonts using this builder, you are not editing the base style sheet. Instead you are storing your adjustments to the style in a separate file. This means that if the style sheet is changed by Alpha, you will get all of the edits applied to the style by Alpha, and you will still get your color and font changes.
To see the file in which your edits are stored click the Manage files hyperlink at the bottom of the dialog.
NOTE: When you customize the colors and fonts for a style, the edits apply to all components in your project that use the style. So, even though you might be in UXComponent1 when you edit the colors, UXComponent2 (for example), if it uses the same style as UXComponent1, will get the same edits to the colors and fonts.
If you want to delete the custom colors you have defined, open the editor, and click the Manage files hyperlink and then delete the styleTweaks.json file that contains the settings.
Xbasic Functions - sha512() function - Creates a hash using the SHA512 algorithm.
Syntax
result = sha512(c text [, L flagBinary])
If flagBinary is .t. the result is a blob.
Web Applications - Style Sheets - Alpha style - A new style sheet called Alpha has been released.
The Alpha style (which is a 'version 4' style) uses SVG icons (as opposed to CSS Icons which 'version 3' styles - such as iOS7, AndroidLight and AndroidDark used).
The Alpha style is primarily intended for use with UX components.
When you select the Alpha style (or any 'version 4' style), the builder displays a prompt allows you to select the 'compact' version of the style. For mobile applications the standard version of the style is appropriate. For desktop web applications, you might find the standard version of the style to be too large. Selecting the compact version of the style will render the component using smaller text, buttons, icons, etc.

The images below show a grid using the Alpha style. The first image is using the compact version of the style.


A notable feature of the new 'version 4' styles is the change in the naming convention for the CSS selectors. In 'version 3' and older style sheets, the CSS selectors include the style name in the selector. For example, in the iOS7 style sheet there is a selector called:
iOS7Button
In 'version 4' style sheets, the CSS selectors do not include the style name. So, the CSS selector for a button is now simply
button
As a result of this change, when using a 'version 4' style, it will not be possible to have a page with two different components, each of which uses a different 'version 4' style. On the other hand it will now be possible to dynamically change the style of a component from one 'version 4' style to another 'version 4' style without having to re-render the component.
UX Component - ViewBox Control - Capture Focus property - The ViewBox has a new property that allows you to specify if the ViewBox can capture focus. Be default, this property is set to true. However, in cases where you ViewBox contains standard HTML controls (such as INPUT or TEXTAREA controls) and you want the user to be able to type into these controls you should set the Capture Focus property to false.
PhoneGap App Builder - User Defined PhoneGap Plugin Library Manager - When you use the PhoneGap Builder to build a PhoneGap project, the Builder gives you a list of PhoneGap plugins to choose from. However, there are many more PhoneGap plugins than those that are listed in the Builder. The plugins that are listed in the Builder are those specially chosen by Alpha Software and they are a small subset of the available plugins.
You may have a need for a plugin that is not listed in the Builder.
The User Defined PhoneGap 3rd Party Plugins Library Manager has been added to the PhoneGap App Builder. This allows users to easily include any publicly available PhoneGap plugin within a PhoneGap Project. The Plugin Manager allows you to easily add, edit and delete the PhoneGap plugin resource definitions.
To open the User Defined PhoneGap 3rd Party Plugins Library Manager click the Manage My PhoneGap Plugins button at the bottom left of the Builder screen.

This will open the Library manager where you can add the plugins that you want.
For more information on this feature, please refer to the
documentation. See
User Defined PhoneGap Plugin Library Manager
UX Component - Client-side Templating - New Directives - Several new directives have been added to the client-side templating syntax.
The new directives are listed below:
Comments - You can now add comment to your templates.
Syntax:
{/* comment */}
Note: Comments must have white space after the first "*" and before the last "*".
When the template is expanded, any space taken by comments is ignored. Comments are useful for the obvious use case of adding explanations to your templates.
But another less obvious use case for comments is to make templates
more readable. For example, in certain cases your templates should
not include any line breaks because the space taken by the line
break will affect how the expanded template appears. However, this
makes the template difficult to read. In the example below, an empty
comment that spans two lines is used to insert a line break into the
template for readability. This line break is ignored, however, when
the template is expanded.
Example
{/* this is the firstname field */}
<div class="item">{/*
*/}<div class="label">Firstname</div>{/*
*/}<div class="field">{firstname}</div>{/*
*/}</div>
Arbitrary iterator - Allows you to iterate over dynamically created data.
Syntax:
{*@functionName}
...
{/*}
The iterator is useful for inserting external data into the template
when it is expanded.
Example:
{orders}
{id} {total} {date}<br />
{*if !delivered}
{*@tracking}
{location} at {date}
{/*}
{*endif}
{/orders}
Where tracking is a Javascript function that might be defined as follows:
function tracking(data,temp,root,parent,path){
/*
data is the current parent data context - in this case the current order
assume code here that goes to a separately stored tracking array and
returns an array of locations and dates
return [
{location: 'Boston MA', date: '9/4/2016'},
{location: 'Albany NY', date: '9/5/2016'}
];
}
Escape - Allows you to escape a long string of template characters.
Syntax:
<escape<{some template code'}>>
In some cases you need to include special functions in a template
(such as A5.map.staticMap() - a function that generates a static
HTML map). The function call may include characters such as a colon
and curly braces,
which must be escaped because they have special meaning in a
template.
Example:
{A5.map.staticMap(<escape<{
width: 400,
height: 300,
center: 'Boston MA'
}>>)}
Before the escape directive was available, this above template would have had to be written as (escaping the : { and } characters in the function arguments):
{A5.map.staticMap(\{width\: 400,height\: 300,center\: 'Boston
MA'\})}
Ensure - Allows you to ensure that certain properties exist
in the Data.
Syntax:
{*ensure a,b,c}
Where a, b and c are data variables that you want to define so that if they are referenced in an {*if} block, the {*if} block will evaluate correctly.
Example:
Assume the data passed to the template is:
{bar: 'world'}
Template
{*if foo == 'hello'}
...
{*elseif bar == 'world'}
...
{*else}
...
{*endif}
Without {*ensure foo}, the {*if} block will not execute correctly, as foo doesn't exist.
Here is how the template could be rewritten to ensure that it works as expected:
(*ensure foo}
{*if foo == 'hello'}
...
{*elseif bar == 'world'}
...
{*else}
...
{*endif}
Defined / Undefined - Provides a shorthand syntax for
checking if a list of variables are either defined, or undefined.
It is common in the logical expressions in a {*if} block to check that certain variables are defined or undefined. The code to do this can be cumbersome and the <defined<variableList>> and <undefined<variableList>> directives make your template more readable.
For example, imagine you had the following template:
{*if typeof variableName1 == 'undefined' || typeof variableName2 == 'undefined'}
...
{*endif}
The syntax in the template is cumbersome and can be simplified as:
{*if <undefined<variableName1,variableName1>>}
...
{*endif}
Similarly, an expression that tests if variables are all defined might previously have been written as:
{*if typeof variableName1 != 'undefined' && typeof variableName2 != 'undefined'}
...
{*endif}
can now be written as
{*if <defined<variableName1,variableName2>>}
...
{*endif}
Expression escapement - The ":" and "|" characters have
special meaning in a template and therefore, if they are used in an
expression, they must be escaped.
If a logical expression in an immediate if expression is enclosed in ( ... ), the special : and | characters do not need to be escaped.
NOTE: The : character in a template is how a formatter is defined and the || character sequence is now text for null values are defined.
For example consider the following template code:
{a ? b \: c:uppercase}
If a is true, then the expression will return b. However, if a is false, the expression will return c. The returned value (either b or c) will then be uppercased because the formatting directive (:uppercase) is applied to the result of the expression.
The above template can now be rewritten as:
{(a ? b : c):uppercase}
Expression escapement is not limited to logical expressions. For example, the following template expression concatenate strings, one of which is a string containing a : character.
{(a + ':' + b):uppercase}
UX Component - AudioPlayer and AudioRecorderPlayer Control - onError event - The onError event fires when an audio file does not load.
UX Component - AudioPlayer and AudioRecorderPlayer Control - onChange event - These controls now support an onChange event. This event can be used to create a custom progress display while an audio is playing back.
UX Component - FormView Control - Form Layout - Flow and Column Containers - When you are laying out a Form in a FormView control using the Genie mode, there are two new Layout Container types that allow you to create complex form layouts without forcing you to switch from Genie mode to Freeform mode.
The two new Layout Containers are
Watch Video
- Part 1
Watch Video
- Part 2
The flow container allows you to lay out controls that flow from left to right and then start a new line when an explicit break is inserted, or the sum of the widths of the control on a line equals 100%.
The column container allows you to lay out the controls in multiple columns in which the controls flow from top to bottom and then start a new column.
Flow and Column containers can be nested, allowing you to create extremely complex layouts, all from within the Genie.
In the image below, the form has been laid out using a column container. The container has been divided into two equal width columns and a vertical line spacer has been inserted between the columns.

In the next image, the controls have been laid out using a flow container. Notice that explicit breaks to start a new line have been inserted after some of the controls and the width of each control has been explicitly set (using a percentage, although explicit widths are also supported).
For example, the Customerid control width was set to 25% and a break was inserted after the field to start a new row.
The City Region and Postalcode fields all have a width of 33.33%. The Phone and Fax field are each 50% and the Thumb and Thumb2 fields are also 50% each.

In the next image a more complex layout is created by nesting Flow and Column layout containers.
At the top level a Column container is defined with column widths of 50%, 25% and 25%.
Within the first column a nested Column container is defined. This container has two columns showing Companyname and Contactname in the first column and Contacttitle in the second column.
Also within the first column a nested Flow container is defined. This flow container has Address (with a width of 100%) and City, Region ad Postalcode, each with a width of 33.33%.
In the third column a nested Flow container is used to put Thumb and Thumb2 on the same line (each with a width of 50%).

Here is how this layout is defined in the FormView Builder:

Using the Column Container
To insert a Column Container into the Form Layout click the Add Item button and select a Layout Container and set the Layout type to 'Column'. All of the controls that should be laid out in columns should be placed inside this container.
You can start a new column at any time by inserting a break after a control. In the above example, the nested Column layout container has two columns because only one control in the container (LAYOUTCONTAINER_5) has a break (i.e. ContactName).
The outer Column container has three columns because there is a break on [LayoutContainer End: LAYOUTCONTAINER_3], and Phone.
You can control whether there is a line between columns, how much space to leave to the left of the first column and the right of the last column and how much space to insert above the the columns and below the columns.
You can also control the spacing between columns.
The columns can either be equal sizes. or you can specify explicit widths for each column (using either percentages or absolute sizes). To specify explicit sizes for each column, enter a comma delimited list of sizes. The first size in the list applies to column 1, the second size in the list applies to column 2 and so on.
Using the Flow Column Container
To insert a Flow container into the Form Layout click the Add Item button and select a Layout Container and set the Layout type to 'Flow'. All of the controls that should be flowed should be placed inside this container.
You can assign an explicit width to each control and you can add breaks after certain controls to force a new line.
NOTE: If you are using percentage widths and the sum of the widths of the controls on a line equals 100% a new line is implicitly started for the next control. It is not necessary to put a break after the last control on the line. However, if you do not put an explicit break on the last control in the line, the control spacing setting (defaults to 4px) will still get added to the end of the line even if you have unchecked the 'Add spacing after last control on each line' property.
You can control the horizontal spacing between each control on a line. You can also specify if the spacing should be added before the first control on a line or after the last control on a line.

Grid and UX Component - Google Maps - Icon Sequences - Icon sequences previously used URLs that pointed to remote images for each image in the sequence. Some of these remote URLs are now broken and as a result certain icon sequences were no longer working. All icon sequences have now been converted to use internal images and therefore all icon sequences will now render correctly.
Development Server - Default Port - The default TCP port
for HTTP communications is 80. As such, the Alpha Anywhere
Application Server and Development Server have both used port 80 as
their default server setting. However, this port is not always
available on non-server systems because of other software using it
(e.g. Skype) and conflicts sometimes arise. To address this, the
Development Server no longer defaults to port 80. The Application
Server is unchanged and still defaults to port 80/
When the Development Server does not already have a server
configuration file available (e.g. a new install), Alpha Anywhere
will find an available TCP port for the server to run on instead of
simply defaulting to port 80. The search for an available port
begins at 1580. If no available port is found (ports go up to 65535
so this is extremely unlikely), the configuration will fall back to
80.
Because this port search is only done when there is no existing
configuration file, a developer may specify a port at any time and
that setting will be maintained. Similarly, this change does not
impact existing installations of Alpha Anywhere where the
Development Server has been configured or run at least once.
Application Server - HTTP Strict Transport Security - The
Alpha Anywhere Application Server now supports HTTP Strict Transport
Security (HSTS). HSTS is a security mechanism that allows a server
to indicate that clients should only communicate with it using using
HTTPS connections. For more information on HSTS, see
https://wikipedia.org/wiki/HTTP_Strict_Transport_Security
HSTS can be enabled on your server by simply checking the box on the
SSL tab of the Application Server Settings. The HSTS maximum age may
also be specified here.
With the default SSL Cipher List, HTTP Strict Transport Security
enabled, and a valid SSL certificate, the Alpha Anywhere Application
Server can achieve an A+ rating on the Qualys SSL Labs SSL Server
Test at
https://www.ssllabs.com/ssltest/index.html (as of August 3,
2016).

UX Component - List Control - Detail View - onSQLExecute Error Event - A new server side event has been added to the List to allow you to translate database error messages into friendlier error messages.
To define the Xbasic function to process database error messages, go the Detail View tab in the List builder, and edit the Table Properties.

XBasic - Twilio - Sending SMS Messages - twilio_send_sms() Function - You can now send SMS messages from XBasic to a mobile phone.
NOTE: In order to use this function you must first set up an account with Twilio an purchase a phone number that is authorized to send SMS messages. Go to www.twilio.com for more information.
When you create your twilio account you will get the following items, which you will need in order to use the twilio_send_sms() function:
When you use the twilio_send_sms() function you can either pass in the values for the AccountSID, the AuthorizationToken and the 'From' phone number directly, or you can create an entry in the Named Providers property in Project Properties to store these values and then just pass in the name of the stored settings to the function.
NOTE: Using Named Resources is the preferred method because you can redefine any of the parameter values in the stored setting when you define a publishing profile.
Syntax:
L result = twilio_send_sms(pResult as
p, to as c, message as c, namedResource as c , from = "", accountSID
= "", authCode = "" )
If you want to explicitly set the accoundSID, authCode and from arguments, set the namedResource argument to an empty string.
pResult is an object that contains return information provided by Twilio. For example, if the SMS fails ( result = .f.) the pResult object will have a property explaining why the SMS failed.
To define a Named Resource, click the Project Properties button on the Web Control Panel. The click the smart field for Named Providers.

Example:
dim to as c
to = "+15551111"
dim message as c = "Sent from Xbasic at: " + now()
dim namedResource as c = "MyTwilioSettings"
dim pResult as p
dim flag as l
flag = twilio_send_sms(pResult,to,message,namedResource)
'to see what's in the pResult object
showvarscript(pResult, "" + flag)
UX Component - ButtonList Control - Fill Width - If a ButtonList control is set to render horizontally, a new property allows you to force the ButtonList control to fill with width of the ButtonList's defined width. So, if the ButtonList's defined width is set to 100% and the Fill width property is checked, the ButtonList will fill the width of the screen.

The Fill width property is also available for RadioButton and CheckBox controls that are set to render as ButtonLists.

ButtonList, RadioButton and CheckBox controls set to fill the width of the screen.
IIS Application Server - Application Pre-load - The first
time a page in an IIS application is loaded, it can be slow because
the application needs to be initialized. A new option allows you to
pre-initialize the application. This options is accessed in the IIS
Publish Profile. The option is called
Enable application preload
and is checked by default. This setting uses the IIS "Application
Initialization" feature to automatically load and initialize an
application so that it is more likely that the first request to an
application is serviced much quicker.
Note that this option will default to enabled for existing publish
profiles and that the "Application Initialization" feature must be
installed on IIS. The installation guide recommends that application
initialization is installed, but stops short of requiring it.
Because of this, publish will check if application initialization is
installed or not and will prompt the user if it is not installed and
preload is enabled.

UX Component - List Control - Detail View - Write Conflicts - When you sync data that was edited in a List with a Detail View, there is always a chance that an update will fail because of a write conflict. When a write conflict does occur, the error is bubbled back to the user to allow the user to resolve the conflict. However, the developer can also define a server-side onWriteConflict event that fires when a write conflict occurs. The code in the event can programmatically resolve the conflict and no write conflict error will be bubbled back to the user.
If your event handler programmatically resolves a write conflict you can now specify Javascript code that will execute on the client after the sync is complete. The typical use case for this new property would be to inform the user that there was a write conflict, but that the write conflict was resolved programmatically on the server.
For example, your Xbasic code in the onWriteConflict event might set e.javascript as follows:
e.javascript = "alert('Write conflict in row [rowNumber] was automatically handled on the server.')"
The [rowNumber] placeholder in the message will be replaced with the
zero based row number in which the conflict occurred. If you are
working with hierarchical data (i.e. there is a parent-child
relationship between Lists), then [rowNumber] will be replaced with
the full path to the List where the conflict occurred. For example,
0,'__LIST__ORDERS',3
This would indicate that the row in which the conflict was handled programmatically is the first row in the parent List, then the 4th row in the 'Orders' list.
PhoneGap App Builder - Icon and Splash Screens (Android) - Added support for Android xxxhdpi icons and splash screens. When building an Android app, the PhoneGap App Builder now includes default
images for a xxxhdpi icon and xxxhdpi splash screens in portrait and landscape mode. When generating the icon or splash screens for an Android app, the xxxhdpi icon and splash screens will be generated.
PhoneGap App Builder - Configuration Options - Launch PhoneGap App Manager After App Submission to PhoneGap Build
- By default, the PhoneGap App Manager is launched after
an app is submitted to PhoneGap Build. Uncheck this option to disable this
behavior.
PhoneGap App Builder - Third Party Plugins (Android, iOS) -
Media Capture With MP4 Video - Added support for the Alpha Media
Capture With MP4 Video plugin. This plugin requests a MPEG/MP4 video
file when run on an Android device (not all Android versions/devices
support MP4 video) and converts the recorded mov file to an MPEG/MP4
file on an iOS device. This provides file uniformity across all
devices. The videos that are recorded with this plugin can be played
back on iOS, Android, Windows and OSX devices.
For the full Media Capture With Mp4 Video plugin documentation, see
cordova-plugin-media-capture-mp4video.
UX Component - Form View Builder - Enhancements to the FormView builder now allow for a new container type - HTML Element. This allows you to use the Layout genie to construct HTML tables.
Connecting to MySQL using AlphaDAO - A new MySQL driver is used in build 3732 and above. There are some things to be aware of when using build 3732 or above.
Google Maps - Map overview and Pan control properties removed from the builder as Google has deprecated these features. For more information, click here.
Image Gallery Component - Google MAPS APIKey - Now allows you to specify your Google Maps API key.
Grid Component - JSON Format - The Grid component file (i.e. the .a5wcmp file) can now be saved in a JSON format. Previously the Grid was always saved as a binary file. The ability to save the UX in JSON format was introduced some time ago.
Web Components - Default File Save Format - The default
component save format for all new components that support multiple
file formats can now be set in the Web Project Properties. This is
set in the Design-time Properties under 'Component File Save
Format'. Most components can be saved in 'Binary' or 'Formatted JSON'
formats. Formatted JSON saves the properties in clear text. This is
useful if you are using some type of source or version control
system and the system has a method to show differences between
versions. The 'Binary' format creates smaller files and can be used
if source control is not used. The option can be left blank to use
the default file format set for each component type in the component
builder.
AlphaDAO - Oracle - Oracle TLS/SSL Support - Alpha Anywhere now supports Oracle TLS/SSL connection definitions without the requirement of a tnsnames.ora file (containing a TNS name definition). This can make deploying to an application server easier in cases where a secure connection is required and you do not want to maintain individual TNS names.
Oracle Connection String Changes
In the Oracle connection string dialog, there is now an additional tab labeled TLS/SSL that includes a checkbox for enabling SSL.
There is also a text box for optionally entering the distinguished name of the server certificate. Providing this entry results in the clause (SECURITY=SSL_SERVER_CERT_DN=...) being added to the connection description. The distinguished name you provide is used to verify the server certificate.
The connection string dialog sets the following connection string attributes:
Note: If you are connecting to an Amazon RDS server, leave the Distinguished Name entry blank. Alpha Anywhere will provide it automatically.
Be sure to import the Amazon RDS certificate on your application server (the client for Amazon RDS). You can download the certificate bundle from Amazon at rds-ca-2015-root.pem For more information on Amazon RDS SSL support for Oracle see Options for Oracle DB Instances
For help on importing a certificate on Microsoft Windows Servers see Import a Certificate
sqlnet.ora
Important: Oracle requires the configuration file sqlnet.ora for the most common SSL settings. The example entries below show the most common values. Consult Oracle documentation for details.
Notes:
Alpha Anywhere connection strings may support only encryption, or
both client and server certificates. Connection string properties for TLS/SSL support
include:
a) SSL
- If A5SSL is set to 'Y', and
the connection cannot be established securely, an error is returned.
b)
A5TLSCertificateAuthorityFile - Contains name of a file that
contains one or more certificates PEM format with which to verify
the server certificate.
c)
A5TLSTrustedCertificatePath - Contains a path name to be used
for walking the certificate chain. If this property is used,
Individual certificates are stored in individual PEM files.
d)
A5TLSClientKeyFile,
A5TLSClientCertificateFile - These properties are used to
identify the file containing the Client private key and the client
certificate for verification of the client. They are used together.
As explained above, they are less commonly used.
e) A5TLSCipherList
- An optional list of ciphers to be passed to the server. This list
establishes a limit on the ciphers that can be negotiated.
3. A new property
IsSecurelyConnected will return true (.t.) if a connection
for one of the drivers below confirms a secure connection. Note that
ODBC drivers or Oracle TNS connections may in fact connect securely,
but if Alpha Anywhere does not know this has happened, the value of
IsSecurelyConnected
may still return false (.f.).
UX Component - Ink Control - Capturing Signatures - The
Ink control can now be easily configured to capture signatures. When
you open the Ink Control builder to edit the settings for the Ink
Control, the genie now has a new option for Signature Capture.
Watch Video

Json_sanitize() Function - Converts a JSON string to 'strict' JSON syntax - Javascript objects can be created from literal definitions that do not follow the strict JSON syntax.
For example:
var obj = {name: 'Fred'}
However the JSON.parse() function can only parse strict JSON strings.
Similarly, on the server-side, the Xbasic json_parse() function can parse JSON strings that do not follow the strict syntax. However, many of the other Xbasic JSON functions (e.g. Json_extract() ) require strict syntax.
The Json_sanitize() function will convert a JSON string to strict syntax. For example:
dim json as c = "{name: 'Fred'}"
?json_sanitize(json)
= {"name": "Fred"}
json_delete() Function - Deletes attributes from a JSON string that match a certain pattern -
For example, consider the following JSON string:
dim json as c = <<%json%
{
one : 1 ,
two : 2 ,
arr : [
{ __deleted : true , fname : "joe" },
{ __deleted : false , fname : "jim" }
],
arr2 : [
{ __deleted : false , fname : "joe"
},
{ __deleted : true , fname : "jim" }
],
}
%json%
Assume that you want to remove all 'rows' in the JSON that contain the attribute:
__deleted: true
Using json_delete() we can do this:
json = json_sanitize(json) 'convert to strict syntax
dim json2 as c
json2 = json_delete(txt , "{ \"__deleted\" : true }")
json2 = json_reformat(json2)
?json2
{
"one": 1,
"two": 2,
"arr": [
{ "__deleted": false, "fname": "jim"}
],
"arr2": [
{"__deleted": false,"fname": "joe"}
]
}
AlphaDAO - Database Drivers - New and Updated Alpha Anywhere Database Drivers - Alpha Anywhere now include two new SQL database drivers.
The existing MySQL driver has been renamed MySQLV4 and will be available as a fallback for those running older databases. The MySQL library was last updated around 2005 and still uses version 5.0.18 of MySQL Connector/C, so it has no support for SSL, prepared statements and other mainstream features. MySQL version 5.0 was in beta at that time. The current release of MySQL is 5.7 and was released in October of 2015.
Note: Alpha Anywhere now ships with
libmysql.dll version
6.1.6.
There are a couple of potential configuration issues on some
instances of MySQL that may require attention:
Because MySQL Connector 6.1.6 supports IPV6 as well as IPV4, you may
experience slow connect times if one of the following is not set in
your MySQL configuration file:
Instead of
CREATE USER 'root'@'localhost' IDENTIFIED BY 'root-password';
use
CREATE USER 'root'@'127.0.0.1' IDENTIFIED BY 'root-password';
CREATE USER 'root'@'::1' IDENTIFIED BY 'root-password';
Note: For Windows servers the configuration file is currently
found in the folder "C:\ProgramData\MySQL\MySQL Server 5.7", but
your other versions may store it in a different location.
For more information, see the MySQL documentation:
Alpha Anywhere support for SSL:
1) Each database client has a different implementation of TLS/SSL.
The most common features are:
a) Secure/encrypted communication. Here TLS/SSL is used as a
vehicle to guarantee a secure communication link with the server.
Data is considered to be 'encrypted in transit'.
b) Verification of the server.
i) X509 certificates are issued by a
certificate authority who vouches for a certificate by signing it
with their private key. Using the public key of the certificate
authority, a client can verify that they have 'signed' the server
certificate.
ii) A certificate authority can
delegate to another authority. As a result, a certificate from a
server may actually have a 'chain' of authorizations that go back to
a well-known certificate authority. One that our system trusts. When
a server returns a certificate to the client, it will generally
include the chain of authorities - one of which should match a
certificate you trust.
iii) You can, and in some cases need
to, install any certificate as a trusted certificate to verify that
a server certificate matches the host name you requested.
c) Verification of the client.
i) The same process of verification
can also be used to authenticate an SSL client. A certificate is
installed on the client (along with a private key) that is then sent
to the server to verify that the client is who they say they are.
This is less common, but is used in some applications - especially
those with a greater need for security and for which there is a
manageable number of clients..
2) Alpha Anywhere connection strings may support only encryption, or
both client and server certificates (see the driver by driver
explanation below). Connection string properties for TLS/SSL support
include:
a) A5SSL -
can be Y or N. If A5SSL is set to 'Y', and
the connection cannot be established securely, an error is returned.
b)
A5TLSCertificateAuthorityFile - Contains name of a file that
contains one or more certificates PEM format with which to verify
the server certificate.
c)
A5TLSTrustedCertificatePath - Contains a path name to be used
for walking the certificate chain. If this property is used,
Individual certificates are stored in individual PEM files.
d)
A5TLSClientKeyFile,
A5TLSClientCertificateFile - These properties are used to
identify the file containing the Client private key and the client
certificate for verification of the client. They are used together.
As explained above, they are less commonly used.
e) A5TLSCipherList
- An optional list of ciphers to be passed to the server. This list
establishes a limit on the ciphers that can be negotiated.
3. A new property
IsSecurelyConnected will return true (.t.) if a connection
for one of the drivers below confirms a secure connection. Note that
ODBC drivers or Oracle TNS connections may in fact connect securely,
but if Alpha Anywhere does not know this has happened, the value of
IsSecurelyConnected
may still return false (.f.).
TLS/SSL Support by Database Driver
MySQL
MariaDB
Oracle
PostgreSQL
SQL Server
Note: Install any certificate authority files as trusted
certificates in the Windows store. The Microsoft SQL Server native
client will find them there.
Connecting Securely to Amazon RDS Database Instances from Alpha
Anywhere
Amazon RDS (Relational Database Service) currently includes the
following databases: Aurora, MariaDB, MySQL, Oracle, PostgreSQL and
SQL Server. In order to secure communication to these databases,
Amazon generates a certificate for the database and instance that is
presented by the server when a secure link is requested.
Alpha Anywhere ships a copy of the certificate authority files for
Amazon and it is installed under the installation directory for
Alpha Anywhere (and application servers) in a folder with the path
<installation directory>\SQLDatabases\Certificates\Amazon RDS.
We recommend the following when attempting to communicate securely
with an Amazon RDS instance:
UX Component - Caching - When a UX component makes an Ajax callback, the UX Component file (the .a5wcmp file) must first be de-serialized before the callback is handled. If the UX component is very large, de-serializing the file can be relatively slow and it imposes a significant 'tax' on every callback. Now, the first time the UX component file is de-serialized, it is cached. As a result, Ajax callbacks (in the case of large components) can be significantly faster.
This caching technique was first introduced in version 4.0, but was subsequently pulled in version 4.2 when it was found that under some circumstances, the caching logic was introducing errors.
Now, a much more robust caching technique has been developed and UX caching is again turned on by default.
If you notice any odd behavior in a UX that was previously working, you can turn caching off by creating this file (does not matter what's in the file):
c:\debug\nocaching2.txt
REDIS - Alpha Anywhere now has built-in support for REDIS. Redis is a very popular database for storing name/value pairs, working with queues and many other use cases. Alpha Anywhere ships with a local Redis database. Xbasic now has a Redis client object that allows you to interact with Redis databases. For more information on this feature, see the documentation.
http://www.alphasoftware.com/
PDF Printing - Amyuni Printer Driver - Multilingual Support - The default setting for the MultilingualSupport flag in the PDF Options dialog has been changed to true (checked). This was done because many users were reporting 'bugs' when then high order characters in their reports were not rendering correctly. The issue was they did not have the MultilingualSupport flag turned on.
If you are certain that your reports do no contain any high order characters and you are concerned about the size of the PDF files generated by the Amyuni printer driver, you can turn this flag off.
Xbasic Arrays - .Net data types - You can now dim Xbasic arrays using .Net types. This makes working with .Net assemblies from Xbasic easier to do.
For example:
dim myarr[10] as system::int32
For more information, see:
http://www.alphasoftware.com/documentation/pages/Guides/Dotnet
Integration/Arrays/index.xml
Application Server - Performance - AEX Files - An option has
been added to preload AEX files into memory on the first request for
any code in the AEX file. The maximum size of the AEX file to load
into memory can be set. The default behavior is to create a copy of
the AEX in the user's temporary folder and load code from the
temporary file. However, if any utility is run to clean up temporary
files, it is possible this copy could be deleted causing a problem.
This option does not impact performance and is only needed when
cleanup programs are removing the temporary AEX file after the
application server has started.

Grid Component - File Save Format - JSON - Grid Components
can now be saved as formatted JSON instead of binary (the default).
This option was added to UX components some time ago. Formatted JSON
saves the properties in clear text. This is useful if you are using
some type of source or version control system and the system has a
method to show differences between versions. The save format can be
selected in the Grid Properties under 'Advanced-> Save component
format'.
The compiled file used to publish the Grid is still saved as binary
as a binary file size is smaller.
You can do a bulk conversion of the storage format by selecting the
'Edit, Bulk Operation, Change Component storage type' menu option
when the Web Control Panel has focus.
UX Component - FormView Control - Signature Editor - A new predefined Editor for use in an Editor Set has been added for capturing signatures.
Watch Video
Download Component
UX and Grid Components - Google Maps - API Key - Google has made a change to Google Maps and they now require you to specify an API key when using the Google Maps Javascript API. This release allows you to specify your API key. There are three different ways in which you can specify the API key - described below.
NOTE: To obtain your Google Maps you will need to visit the Google site. Do a Google search for 'Google Maps API key'. You will need an API key for Google Maps Javascript API.
You can specify the Google Maps API key as follows:
NOTE: If your Developer version of Alpha Anywhere is installed in the "Program Files (x86)" folder you will need Administrator privileges in order to create the GoogleMapsAPIkey.txt file.
UX Component - Client-side Events - onServerSideEventHandlerError - This event is fired when there is an error in some user defined Xbasic function that handles an AJAX callback.
UX Component - AudioPlayer, AudioRecorderPlayer, VideoPlayer, and VideoPlayerRecorder Controls - New methods - These controls all have these new methods:
In addition, the Audio controls also have .stop() method.
Example
var Obj = {dialog.object}.getControl('MYVIDEOPLAYER');
Obj.pause();
AlphaDAO - MariaDB - Timestamp Fields - When retrieving
timestamps with microseconds from MariaDB, the milliseconds part was
not retrieved.
Notes:
UX Component - Local Storage - Version Number - In the Local Storage section of the UX builder you can specify the version number of the Local Storage settings. If the version number is increased and the application is republished, then any existing data in Local Storage should not have been restored (because it was stored with a version number less than the current version number). The version number was not being honored and the data in Local Storage was being restored. Now, if the version number is increased, the existing data in Local Storage will NOT be restored.
UX Component - Numeric Fields - Client-side Formatting - Submitting Data - If you have a numeric control that is formatted using client-side formatting rules (for example 123456.78 gets formatted as $123,456.78 ) when the data in this control was submitted, it was previously submitted in its formatted form. Now, the data are converted to an unformatted number. So in the case of this example, the data submitted to the sever would be 123456.78 and NOT $123,456.78.
The same comments here also apply to the {dialog.object}.getValue() method.
UX Component - List Control - Export to Excel - Fixed an issue where data was not exported correctly if the list had group breaks.
UX Component - Video Recorder Player Control - A bug was fixed. If you have an existing UX with this control you must edit the control properties and resave to regenerate the control with the fixed code.
Reporting - SQL Reports against tables with fieldnames longer than 32 characters caused a problem.
Temporary Folder
- The system stores temporary files in special folders under the
users folder such as in "C:\Users\<userName>\AppData\Local\Temp\AlphaAnywhere\p_1234".
Under certain conditions, a cleanup utility could remove these
folders and saving a temporary file would fail. Now saving any file
to the temporary folder using an xbasic method will recreate the
folder if it has been deleted.
UX Component - List Control - Auto-fetch more Mode - When
pagination was turned on for a List, and the pagination method was set
to 'AutoFetchMore' - the Ajax callbacks that were firing to fetch
additional records were firing too early.
UX Component - List Control - Right to Left - When creating a List control for a right-to-left language (e.g. Hebrew, Arabic), you typically want:
To achieve this:
UX Component - Text Area - Scrolling - iOS - If you have a text area control in a Panel Card and you have more text in the control than can be seen, drag scrolling on the text in the text area control will not allow you to scroll the text.
You can however enable two-finger drag scrolling on the text by defining a local CSS class as shown below and then setting the text area class to this class.
.scrollTextBox {
overflow-y: scroll;
-webkit-overflow-scrolling: touch;
}
UX Component - Changing the Background Image of a Panel at Run-time - When you add a Panel Card to a UX component, you can specify a background image for the Panel Card. In some situations you might want to dynamically change the background image for the Panel Card. For example, you might want to use one image when the device is in portrait mode and another when in landscape mode. The following Javascript code shows how you can do this
//get the id of the 'body' part of the Panel Card
var id = {dialog.ob ject}.panelGetId('PANELCARD_1','body');
//set the background image to 'image2'
$(id).style.backgroundImage = 'url("image2.png")'
| UX Component - List Control | Tutorial - Building a PhoneGap Application to Capture Images and Audios while Disconnected from the Network |
A common requirement when building mobile
applications is to capture data that includes
photos and audio recordings. The application
must work while offline and then be able to
synchronize the data and the media files
(photos, audios, videos) when a connection is
available. In order to implement this
application it is necessary to use PhoneGap. Note: Because PhoneGap is used the, data that are captured includes the filenames of pictures, rather than the base64 data for each picture. As a result many more images can be captured while the device is offline than would be possible if images were captured as base64 encoded data. In this video we show how a UX component with a List/Detail View is configured to capture data and media files and then sync with a server. Watch Video - Part 1 - Configuring the Data Source Watch Video - Part 2 - Configuring the List control and its associated Detail View Watch Video - Part 3 - Configuring the List control and its associated Detail View Watch Video - Part 4 - Configuring the List control and its associated Detail View Watch Video - Part 5 - Configuring the List control and its associated Detail View Watch Video - Part 6 - Running the app on a Device (Note: This is a large video file. It will take some time to download) Download Component (Note: See the component's 'PhoneGapDefaultSettings' property for a list of plugins that the PhoneGap app should use) Date added: 2016-06-05 |
| Reports | HTML-Paged Output Option |
When you render reports in a Web application you
can choose whether the report should be rendered
as PDF or HTML. The HTML option is only
available for Layout Table reports - not
Freeform reports. The HTML-Paged option will work with all report types -- Freeform and Layout Table and can be rendered in any browser (including mobile device browsers that do not have the ability to render PDF files. This video contrasts the different report output options. Watch Video Date added: 2016-06-10 |
| UX Component - ViewBox Control | Dynamically Setting Data Displayed in the ViewBox |
The ViewBox control is often used as a very
light weight alternative to the List control
when all you need is a scrollable list of data
and not the full functionality of a List. When used as an alternative to the List, a common pattern is to populate the data shown in the ViewBox dynamically, based on some search criteria entered by the user. In this video we show two different techniques for doing this. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-06-10 |
UX Component - Video Recording - PhoneGap Applications - It is now possible to add video recording to your PhoneGap applications. Video recording will work in disconnected application. You can record as many videos as you want, and then when you sync you data with the server, the video files can be uploaded to the server. In this respect, syncing video files is identical to the way pictures and audio recordings are synced when the user has an internet connection.
When you sync data on your mobile device you can specify that media files (pictures, audio recordings and videos) should be uploaded to Amazon S3, rather than the Alpha server. Since media files can be quite large, uploading media files to S3 is often preferable to uploading these files to an Alpha server.
To support video recording a playback, two new UX controls are available:
The Video Player control is used when you only want to allow users to play back previously created video files. The Video Recorder/Player control will allow playback of previously created videos and recording of new videos.
To add a Video Player or Video Recorder/Player control to your UX component select the [More...] option in the list of Data Controls.

Both the Video Player and Video Recorder/Player controls are standard 'data controls'. This means that they have .setValue() and .getValue() methods, like all other data controls.
The .setValue() method is used to set the control to the URL of a video file.
The .getValue() method is used to read the current value of the control.
For example, in a PhoneGap application, after you end a video recording, if you called the .getValue() method for the control, the filename of the video that had just been recorded would be returned.
You can also convert the type of an existing control to a Video Player or Video Recorder/Player control by clicking on the smart field in the Control type prompt.

In the image below, the Video Player control is shown. Since the Player does not support recording, the control is not limited to applications that are running under PhoneGap.
The VCR buttons allow you to start, pause and resume playback. The fast forward and back buttons behave as follows:
The double sided arrow icon at the right edge will allow you to switch into full screen mode.

The control also shows a progress indicator and how long the video has been playing

The appearance and behavior of the Video Recorder/Player control is essentially the same as the Video Player control, except that the Recorder/Player control include a button to switch from Playback mode to record mode:

Configuring the Video Recorder/Player and Video Player Controls
To configure the Video controls, click the smart field for the Control Properties property.

The Properties dialog for the Video Recorder/Player controls is shown below.
You can set the maximum allowed length (in seconds) of the video and you can specify code for the various events that the control fires.

How to Configure a PhoneGap Application To Support Video Recording/Playback
Let's assume you want to build a PhoneGap application that will allow users to enter/edit data and record videos. The application must work offline and when a connection is available the data must be synced to a SQL database on the server and the videos must be uploaded to S3.
This tutorial will highlight the key configuration settings you will need to make as you build the UX component.
Let's assume that the underlying schema of the table in which data must be stored is as follows
If the videos are being uploaded to Amazon S3 when data are synced, the videofilename field will contain values like:
http://alphamediacapture.s3.amazonaws.com/video1.MOV
On the other hand, if the video are being uploaded to the Alpha server, the videofilename field will contain values like:
videofiles/video1.MOV
(assuming that the video files are uploaded to a folder called 'videofiles' in the Webroot).
Step1 - Create a UX control with a List/Detail view showing data from the SQL table. You can use the List Control Quick Setup genie to quickly create the List/Detail view.

Step 2 - Configure the fields in the List. After you have created the List you must edit the List and on the Fields tab, set the control type of the videoFilename field to Video.
In addition, if the video files are going to be uploaded to the Alpha server (as opposed to Amazon S3) you will also need to specify the folder on the Alpha server where the video files should be stored. To do this, click the smart field for the Video capture and storage properties.

The Video Capture Properties dialog is shown below. The Upload folder is where you specify the folder name.
For example, if you specify:
myVideos
The videos will be stored in a folder called myVideos that is relative to the Webroot. It is recommended that you specify a folder that is relative to the webroot. This will allow you to upload videos from the server to the device for storage in the device's file system so that videos are available for playback on your device even when you have no internet connection.

In addition to specifying the Upload folder you should also specify the Stored filename transformation expression. This property defines what gets stored in the videofilename field in the database. The builder for this property allows you to use 2 special placeholders: <Filename> - the fully qualified video filename, and <ShortFileName> - the name of the video file with no drive and path information.
You will typically want to store a filename that is relative to the Webroot. For example, if the Upload folder was set to myVideos then you should set this property to:
"myVideos/<shortFileName>"
With this setting, the actual data stored in the vidoefilename field in the database will look something like this
myVideos/video1.MOV
NOTE: If your videos are being uploaded to Amazon S3, it is not necessary to specify Video Capture Properties.
Step 3 - Specify if media files (pictures, audios and videos) should be uploaded to the Alpha server or Amazon S3 when data are synced.
To do this, edit the List properties and go to the Detail View tab. Then click the smart field for the Media files (photos, videos, audio recordings, other) settings property.

This dialog will allow you to specify if media files are uploaded to the Alpha server or to Amazon S3.
The dialog will also allow you to specify if media files should be downloaded to the device when data are loaded into the List control. If you download media files to the device the media files are stored in the file system on the device and will be available even when there is no connection.
Step 4 - Set the control type for the videoFilename control in the List's Detail View to a Video Recorder/Player control. When the List Quick Setup Genie created the List's Detail View, it set the control type of the videoFilename field to a textbox. To change the control type to a Video Recorder/Player, click the Control type smart field and select the Video Recorder/Player control.

Having configured the List control and its Detail View, you are now ready to build your PhoneGap application.
TIP: To see a list of PhoneGap plugins that you
should enable when you build your PhoneGap application, download the
sample component using the link shown below and then examine the setting
in the component's PhoneGap
default settings property.
Download Component
Grid, UX and Tabbed UI Component - Reports - HTML-Paged Output Option - A new option (HTML-Paged) is available for how reports should be rendered in web applications.
When you use Action Javascript to display a report, or you add a Report to a Tabbed UI, or you embed a report into a UX component, the output options are now:
The PDF Option
The PDF option will render the report as a PDF file using the bundled Amyuni PDF printer driver. The PDF file will then be displayed in your browser (in a window in the component, a tab pane in the Tabbed UI or in a div on the current page). The manner in which the PDF will be displayed depends on the browser you are using. For example, if you are using IE, the Adobe Acrobat PDF viewer is used as IE does not have a built-in ability to render PDF files. Chrome and Firefox, on the other hand, have a built in ability to render PDF files, so the Acrobat reader is not used.
Unfortunately, the situation on mobile devices is more complicated because on many mobile devices there is no option to render PDF files in a browser.
When you choose the PDF option, the resulting report is properly paginated and is ready for printing, should the user want to print the displayed report.
The PDF option works with both type of Alpha Anywhere reports: Freeform and Layout Table.
The HTML Option
The HTML option will render the report as HTML. This option does not use the Amyuni PDF printer driver. However, this option is only available for Layout Table reports. The advantage of Layout Table reports over Freeform reports is that they render much more quickly than Freeform reports, and they can be exported to Excel with very high fidelity (because the cells in the Layout Table report can be directly mapped to cells in the Excel spreadsheet). The HTML produced by this option is not paginated. The report does not render any Page Headers, Page Footers, or page breaks defined in the report. When the HTML is printed, the page breaks are controlled by the printer -- i.e. a new page is started when the current page is full.
The HTML-Paged Option
The new HTML-Paged output option can be used for both Freeform and Layout Table reports. This output option does not use the Amyuni printer driver, but unlike the HTML option, the report is properly paginated and all Page Header, Footers and breaks defined in the report are honored. When the output from the HTML-Paged report is printed, the printout is properly paginated -- just like the output from the PDF option.
Since the output from HTML-Paged option is pure HTML (technically it is HTML with embedded SVG), no special plugins or viewers are needed by the browser. This means that the reports will render in all mobile browsers (unlike the PDF output option).
When you display a report in your web application the uses the HTML-Paged output option, the display window has buttons that allow you to create a PDF version of the report, to print the HTML, to export to Word, or to export to text.
Another benefit of the HTML-Paged output option is the way image with an Alpha channel (images with transparent backgrounds) are rendered. The HTML-Paged option will render these images correctly, while the PDF option (which uses the Amyuni printer driver) will not render these images correctly.
A5ws_SaveValidateUser() Function - A bug was introduced in build 3633 that broke the A5ws_SaveValidateUser() function.
Grid Component - Export to Excel - Computed Fields - If a computed field in the SQL SELECT statement for the grid contained a colon in the field expression, the field was not exported to Excel.
UX Component - Panel Navigator - A bug was introduced in build 3629 that resulted in a child Panel not displaying correctly after a command that set focus to the child Panel without animation.
UX Component - Slider Control - Show/Hide - If a slider control had the message area turned on, when the control was hidden using a client-side show/hide expression, the message area was not hidden.
UX Component - Slider Control - Set Value - If a slider control had the message area turned on, when the value in the control was set using the .setValue() method, the slider message was not updated. The message was only updated when you dragged on the slider.
Application Server - Performance - Made a change to the algorithm used to reduce priority on busy threads.
| UX Component - PhoneGap | Sending Push Notifications using the Pushwoosh Service |
A common feature in mobile applications is push
notifications. In a PhoneGap application, this
can be be done, utilizing the Pushwoosh plugin,
which integrates the Pushwoosh service. This video shows an example application that uses push notifications. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Documentation - PhoneGap Push Notifications Date added: 2016-04-28 |
| UX Component - FormView Control | Specifying Display Formats for Numbers and Dates |
You can specify display formats for numbers and
date values that are displayed in the FormView
control. Watch Video Date added: 2016-05-22 |
Font-Awesome - Version 4.6.3 - Updated to a new version of Font-Awesome. In order to see new icons in Working Preview when using Internet Explorer you will need to install the new font. To do this, open Windows Explorer and navigate to the cssIcons\font-awesome\fonts folder and double click on the the .ttf file.
PhoneGap App Builder - PhoneGap Version - Added support for PhoneGap 6.1.0 which is now supported by PhoneGap Build.
PhoneGap App Builder - Third Party Plugins (Android, iOS) - Secure Local Storage For Cordova. Added support for the nl-afas-cordova-plugin-
For the full nl-afas-cordova-plugin-
UX Component - FormView Control - Display Format
for Numeric and Date Values - You can now specify a display
format property for fields displayed in the FormView. This allows
you to apply formatting directives to number and date values.
Watch Video

PhoneGap - Android - Build Tool - A new option has been added to the PhoneGap Builder that allows you to specify the Android build tool to be used by PhoneGap Build when creating Android apps. The default setting is gradle, which is required by many of the newer plugins. If you run into any issues when building Android apps using older plugins, you can set the Android build tool to ant, which was used in older versions of PhoneGap.

Web Security - Action Scripting -
You can now completely customize the messages used by security
action scripting in a UX component. The Action scripting genie
shows a list of messages used by the action and information about
the conditions that will show the message. You can also use
language tags (<a5:r>..</a5:r> ) to translate the messages into
different languages.
UX Component - List Control - Export - Select Columns to Export - A new option has been added to the 'Export List data to Excel/Ascii' action to allow selection of the List columns to export.
To export only selected List columns you must first specify settings for the 'Customize field sizes and column headings in export file' property and then ton the 'Only export columns for which customize options are defined' property.

PhoneGap App Builder - Generate App Zip File - A new option has been added to the PhoneGap Builder to create a zip file that contains all of the files and assets required to build an iOS, Android or Windows Phone app on PhoneGap Build.
The use case for this option is that in some organizations, access to the API that Alpha Anywhere uses to communicate with the PhoneGap build service is blocked and therefore, in order to build a PhoneGap project it is necessary to visit the PhoneGap site in a browser and then upload a .zip file from the user interface presented by the browser.
When you select this option, you can specify the folder location
to allow easy access to the file. The zip file is named with the app
name specified in the PhoneGap Builder.
The zip file can be uploaded directly to https://build.phonegap.com to update an existing project or to create a new project on PhoneGap Build. The ability to easily upload the app zip file is helpful when the development machine is located behind a secure firewall that does not allow access through to PhoneGap Build through the PhoneGap Build API which is used by the Alpha Anywhere PhoneGap App Builder.
UX and Grid Component - Javascript Functions - Hang when Saving Component - if you had done a fresh install of Build 3603 (rather than install the Build 3603 update over an existing build), the node.exe program file was not installed in the executable folder as it should have been. (If you ran the update, to update an existing build, node.exe was already installed in the executable folder and so you would not have been affected by this issue).
When a component that contains Javascript is saved, Alpha Anywhere automatically validates the Javascript syntax. To do this is uses a node.js module. However, if node.exe was not present in the executable folder, Alpha Anywhere would hang. This is now fixed and the installers (both full and update) will install the required 32 bit version of node.exe in the executable folder.
Printing - Windows 10 - Under some circumstances, only on Windows 10, requesting 2 copies of a report would print 4 copies.
UX/List Control - Grid Component - Dynamic Images - SVG Icons - Fixed several issues when the Dynamic Image control referenced SVG Icons.
UX Component Crash - An error was introduced in the previous build that, under certain circumstances, would cause a UX to crash. The pattern for the error message shown when the crash occurs was:
wfNew.<some variable name> = wfOrig.<some variable name>
UX Component - List Control - Export - Select Columns to Export - A new option has been added to the 'Export List data to Excel/Ascii' action to allow selection of the List columns to export.
To export only selected List columns you must first specify settings for the 'Customize field sizes and column headings in export file' property and then ton the 'Only export columns for which customize options are defined' property.

PhoneGap App Builder - Generate App Zip File - A new option has been added to the PhoneGap Builder to create a zip file that contains all of the files and assets required to build an iOS, Android or Windows Phone app on PhoneGap Build.
The use case for this option is that in some organizations, access to the API that Alpha Anywhere uses to communicate with the PhoneGap build service is blocked and therefore, in order to build a PhoneGap project it is necessary to visit the PhoneGap site in a browser and then upload a .zip file from the user interface presented by the browser.
When you select this option, you can specify the folder location
to allow easy access to the file. The zip file is named with the app
name specified in the PhoneGap Builder.
The zip file can be uploaded directly to https://build.phonegap.com to update an existing project or to create a new project on PhoneGap Build. The ability to easily upload the app zip file is helpful when the development machine is located behind a secure firewall that does not allow access through to PhoneGap Build through the PhoneGap Build API which is used by the Alpha Anywhere PhoneGap App Builder.
UX Component Crash - An error was introduced in the previous build that, under certain circumstances, would cause a UX to crash. The pattern for the error message shown when the crash occurs was:
wfNew.<some variable name> = wfOrig.<some variable name>
SVG Icons - Slow Loading - If you defined a large number of SVG icons in a component, the component was slow to load.
Security Framework -
A recent change in a security function broke the security show /hide on
legacy components built in early versions of Alpha Anywhere and previous
Alpha versions. A workaround was to use the bulk update process to
Update component security settings and republishing. It is now not
necessary to use the workaround.
| UX Component - List Control | Search Highlighting |
When you perform a server-side search to filter
records in a List you can highlight the matching
characters in each record. This makes it easy to
see why the record was included in the search
result. Watch Video Date added: 2016-04-24 |
| SVG Icons | Introduction to SVG Icons |
SVG Icons have many benefits over bitmap images
and font icons. In this video we introduce you
to SVG icons and show how they can be used in
your components. Watch Video Date added: 2016-05-01 |
| SVG Icons | Search the Web for SVG Icons and Importing into Components |
There are a large number of free SVG icons
available for download on the web. In this video
we show how you can download SVG files from a
site that specializes in SVG images and then
import the SVG files for use in your components. Watch Video Date added: 2016-05-01 |
| SVG Icons | Converting Locally Defined SVG Icons to Linked SVG Files |
SVG icons can either be defined within a
component, or they can be stored in physical
files that are linked by your components. The
advantage of using linked files is that
many components can share the same SVG icon
definitions. In this video we show how you can
easily convert locally defined SVG into a file
of SVG icons that can then by linked by many
components. Watch Video Date added: 2016-05-01 |
| SVG Icons | Using SVG Icons in a List Control on a UX Component |
A common pattern in mobile applications is to
use a List control as the menu for the
application. It is common to use icons in the
menu List. In this video we show how SVG icons
can be used in these menu Lists. Watch Video Date added: 2016-05-01 |
| UX Component - PhoneGap | Sending Push Notifications using the Pushwoosh Service |
A common feature in mobile applications is push
notifications. In a PhoneGap application, this
can be be done, utilizing the Pushwoosh plugin,
which integrates the Pushwoosh service. This video shows an example application that uses push notifications. Watch Video - Part 1 Watch Video - Part 2 Documentation - PhoneGap Push Notifications Date added: 2016-04-28 |
SVG Icons - The Grid, UX and TabbedUI components now support SVG icons.
Introduction to SVG Icons - Video
SVG icons have several very important advantages over traditional bitmap icons. Namely:
While the same advantages are also true of font icons, which Alpha Anywhere has supported for some time now, SVG icons are easier to work with than font icons.
An additional benefit of SVG icons over font icons is the ability to support colored icons. With a font icon you can specify a color for the entire icon - but not for different aspects of the icon. In other words, a font icon is always green, red, yellow, or whatever color you specify. Whereas an SVG icon can be mostly green, red, yellow, or whatever color you specify for the 'fill' and 'stroke' color, but certain parts of the icon can be hard-coded as a particular color.
There are a large number of freely available SVG icons on the web. A particularly good source of free SVG icons is http://www.flaticon.com/
In the screen shot below, two different icon sets are shown in the SVG Image picker. These icons were imported from icon sets on www.flaticon.com. As the image shows, the second icon set is richly colored.
![]()
In this next screenshot the icons are shown at a much larger size. As you can see, the icons scale smoothly.

There are two ways to use SVG icons in a component:
To use locally defined SVG, you set the Local SVG definitions property in the CSS/SVG section in the component builder. To use linked SVG files you set the SVG Linked files property in the CSS/SVG section in the component builder.

Locally Defined SVG
When you open the builder for Local SCG definitions you get a screen where you can enter the SVG definitions. For example:

As you can see, the SVG definition looks quite formidable, but this is largely irrelevant because the SVG will, in almost all cases, be generated by importing SVG files that you have downloaded, or will have been created by an SVG authoring tool that you use.
How to Import SVG Files
Once you have found a source of SVG icons on the web that you want to use in your components, you will need to import the SVG. To import SVG files:
After you import the SVG into the builder, you might want to manually edit the SVG. The most common type of edit you might want to perform on the imported SVG is to change the fill and stroke color on the SVG icons. Click the Understanding SVG Icon colors hyperlink for more information on this subject.
Converting Locally Defined SVG to Linked SVG
After you have imported SVG files into Local SVG definitions, you might want to convert the SVG that is locally defined, into a SVG file that is linked. The main reason for doing this is so that other components can use the same SVG icon definitions.
To do this, click the Convert to Linked SVG hyperlink on the dialog while you are editing the local SVG definitions..
Syntax for Specifying an SVG Icon
When you use a SVG icon in a component (for example as the image on a button, or in a List control, or as the image to display in a Dynamic Image control), you use a special syntax (generated automatically by the image picker). For example:
svgIcon=#svg3_safebox:52 {fill: red}
This syntax is very similar to the syntax used for CSS font icons. For example:
cssIcon=fa fa-heart fa-2x
In the case of the SVG icon, the prefix is 'svgIcon' and in the case of the CSS font icon, the prefix is 'cssIcon'
In the above example, the SVG icon is being displayed with a size of 52px and a fill color of red. The icon name being displayed is 'svg3_safebox'. Notice that the icon name is prefixed with a hash character.
Printing Ink Annotation over a Picture in a Report - a5_composite_picture_and_ink() Function -
If your database has picture fields and ink fields that were used to annotate pictures you might want to print a picture field with the ink annotation shown directly over the picture.
This is done by creating a calculated field that uses the special a5_composite_picture_and_ink() function.
This function takes the name of the field that contains the picture, the name of the field that contains the ink and (optionally) a base path. The base path is only needed if the picture field contains relative a relative filename. The base path is used to convert the relative image filename into an absolute filename.
a5_composite_picture_and_ink(c pictureFieldName, c inkFieldName [, c basePath])
For example, assume that your database has fields called picture1 and annotation1 and you want to print the ink in annotation1 over the picture in picture1. You could create a calculated field called compositeImage, defined as shown below, and then add this calculated field to your report.
compositeImage = a5_composite_picture_and_ink("picture1","annotation1")
PhoneGap - UX Component Template - Secure Login With Location Tracking And Pushwoosh Notifications
- This new UX component template is a mini-app that
is designed to introduce developers to the power of using native push notifications with Alpha Anywhere and
the Pushwoosh service.
The app offers user login and location check in and check out
for a mobile worker. When the user logs in or out, an admin user is sent a push notification that includes the user name and the date and time the user logged in or
out of the app. When the user checks in or out of a location, a marker is placed on a map, the lat/lon is reverse geocoded with the Google Geo-location API to determine
the exact address and a push notification is sent to the admin user. The admin user is identified in a Pushwoosh filter called Admin. This allows the admin user to
receive push notifications to track all activity within the app.
For a video overview of this component template, click the link below.
Video overview of the Secure Login With Location Tracking And Pushwoosh Notifications
To view the help documentation click the link below.
PhoneGap Push Notifications
UX Component - List Control - Search Highlighting
- When you perform a server-side search on the records in a List
control (using the 'Filter records in a List' action in Action
Javascript), or you apply a filter from a List's Search Part (either
server-side or client-side) you can now highlight the characters in each record that
were matched by the search. This makes it easy to see why a
particular record was included in the search result.
Watch Video
For example, in the image shown below, the table were searched for all records that contain the string 'manager' in the 'Contacttitle' field.

To turn on search highlighting, edit the List and check the Search highlight property, as shown in the image below. You will then be able to set the class name and in-line style to apply to the highlight characters.

UX Component - AudioPlayer and AudioRecordAndPlayer Controls - Events - Added event hooks to these controls.

Action Javascript - PhoneGap - File System Actions - A new action is now available in Action Javascript. The PhoneGap - File System Actions (Fire URI Based) is similar to the PhoneGap - File System Actions action in that they both allow actions such as read file, write file, create directory, delete directory, read directory, etc.. The key difference is the the File URI Based actions give you explicit control over which part of the device's file system the operations are performed in.
The PhoneGap - File System Actions actions operate on files in a default location, whereas the PhoneGap - File System Actions (Fire URI Based) actions allow to specify an explicit file location.

SQLite Database - Indexes - PhoneGap - When you use Action Javascript to construct a SQLite database you can now specify that indexes should be build for each table in your SQLite database. You can add as many indexes as you want. For each index you can define the columns used in the index.
Sending E-mail Using the SparkPost Service - email_send_SparkPost() Function - You can now use an Xbasic helper function to send e-mail using the SparkPost service. This service is similar to the Mandrill service. You must first go to sparkpost.com to get an API key. You will also be required to verify your ownership of you sending domain.
Once you have your API key and you have verified your domain ownership you can send e-mail in much the same way that you may have used the email_send_mandrill() function.
NOTE: Currently the email_send_sparkPost() function does not expose the ability to use merge variables in the HTML message. If you need this functionality, you must compose the message JSON manually. Refer to the SparkPost documentation.
Syntax
p Result = email_send_sparkpost( c key, A message)
Where
Example:
dim ms as p
ms.send_to = "john@acme.com:Optional friendly name for John
Smith,sally@acme.com"
ms.from_email = "sendername@acme.com"
ms.from_name = "Sales at Acme" 'friendly name - optional
ms.subject = "Information You Requested"
ms.message_html = "Here is the <b>information</b> you requested."
ms.message_text = "Plain text version of the message"
ms.attachments = "c:\alphasports\invoice.pdf,c:\alphasports\vendorlist.pdf"
dim key as c = "your sparkpostkey"
pp = email_send_SparkPost(key,ms)
You can optionally define attachments using an array syntax. Instead of defining a property called ms.attachments which has a comma delimited list of files to attach, you can define an array as shown in the example below::
dim ms.attachmentsArray[1] as p
ms.attachmentsArray[1].name="report.pdf"
ms.attachmentsArray[1].type=resolve_mime_type("pdf")
ms.attachmentsArray[1].content=base64encode(file.to_blob("c:\myfiles\invoice.pdf"))
In the body of your HTML message you can optionally include in-line images. To define in-line images you can either use a property that specifies a comma-delimited list of image filenames, or you can use an array syntax:
Array syntax:
dim ms.inlineImagesArray[1] as p
ms.inlineImagesArray[1].name = "myimage1.jpeg"
ms.inlineImagesArray[1].type = resolve_mime_type("jpg")
ms.inlineImagesArray[1].content = base64encode(file.to_blob("C:\Images\4296.JPG"))
Comma delimited filenames syntax:
ms.inlineImages = "c:\movieImages\4296.jpg|myimage1.jpeg"
Notice that the comma delimited names syntax specifies the image name (the name by which you will refer to the image in the HTML body) with a | delimiter. In the above example, the image name is 'myimage1.jpeg'
To use the in-line images in the HTML message body, you use this syntax:
Here is your inline image!<br><img src="cid:myimage1.jpeg">
Signature Control - Reports - PDF - If you print a report that contains a signature control bitmap image using the Amyuni PDF printer driver, the bitmap previously showed up with a black background. This is due to a bug in the Amyuni Printer Driver which does not properly render transparent image backgrounds.
Now, Alpha Anywhere will automatically convert the transparent
background on the image to white. If you want an explicit background
color, then set the image fill style to 'solid' and pick the
background color you want to use. The transparent background on the
image will be converted to the specified color.
PhoneGap - Custom Window onerror Event Handlers - By default, the Alpha Anywhere Javascript libraries add window.onerror handlers to certain functions in the Alpha Anywhere libraries. This can interfere with any window.onerror event handlers that you might want to add to your code.
You can now prevent Alpha Anywhere from adding system window.onerror event handlers by adding the following code to the client-side onRenderComplete event.
{dialog.object}.customWindowErrorEvents = true;
Grid Component - Search - 'Is blank' and 'Is not blank' - Were generating SQL statements that used the Length() function rather than the StringLength() function (which is the portable SQL function for string length).
Application Server - Xbasic Error Log - A change was made in how thread usage is calculated in the Application Server to reduce false thread error messages which could occur under rare conditions.
| UX Component - Map Control | Adding Multiple Markers to a Map - Customizing the Marker Icon for Each Marker |
Using Action Javascript, it is easy to add
multiple marker to a map control on the UX.
However, in some cases you might want to use a
different icon for each marker. In many cases
the decision as to what icon to use for a
particular marker should be based on some data
about the marker. In this video we show how the marker icons used for markers on a map can be dynamically specified. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2016-04-15 |
UX Component - Map Control - Action Javascript - Adding multiple markers to a map - Customizing the marker icons - When you add multiple markers to a map you can now dynamically set the icon used for each marker based on data in the Data Series for each marker. You can also use image sequences.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
To customize the marker icons, click the smart field for the Marker icon property, shown below.
![]()
This will bring up a dialog that offers three different methods for specifying the marker icons:
![]()
UX Component - Calendar Control and Date Picker - Disabled Days - When configuring the Calendar control or the Date Picker you can now explicitly disable certain dates.

You can either explicitly specify certain dates to disable (or call a Javascript function that returns an array of explicit date values), or you can specify more general Javascript code that gets called before each date value is drawn to determine if the date is disabled or not. For example to disable every December 25th date (regardless of year), you could specify the following Javascript:
Note: The Javascript is referencing a variable called 'd' -- the date value of the entry being rendered.
if(d.getMonth() == 11 && d.getDate() == 25) return true; //month is 0 based
return false;
You can also set the disabled dates programmatically (using Javascript) after the calendar has been rendered. For example:
//create an array of disabled dates
var disabledDates = [];
disabledDates.push('12/25/2016');
disabledDates.push('12/26/2016');
//get a pointer to the calendar control
var obj = {dialog.object}.getControl('MYCALENDAR1');
//set the calendar's disabledDates.dates property
obj.datePicker.disabledDates.dates = disabledDates;
//refresh the control
obj.refresh();
AlphaDAO - MySQL - Commands out of sync Error
- If you executed code that returned a resultset from MySQL, but did
not read all of the rows in the resultset before executing a new SQL
command you would get a 'Commands out of sync' error from MySQL.
This is now fixed.
AlphaDAO - SQL::Resultset - .NextResult() Method -- Under some circumstances, when there was no next result set, would return an Xbasic error, rather than .f..
AlphaDAO - Oracle - CLOB Fields - Fixed an issue with Oracle CLOB fields if the data in the field contained high order characters.
UX Component - List Control - Search Part - Keyword Searches - Keyword searches now honor the search type setting for individual character fields. This means that if you had set the search type for a field to (say) '12' -- a case in-sensitive 'contains' search -- and you preformed a keyword search that included this field, the field search would be performed using search type of '12'.
Grid Component - Row Expander and Linked Content Section - Fixed an issue if the child component was a UX or Custom Component.
Grid Component - Excel Import - Under some circumstances empty data in the Excel file did not import correctly.
Forms - Desktop Applications - Button Labels - A bug was introduced in the previous build the caused button labels on forms to not display correctly if the button text included the & character.
Application Server - Session Variables - Null Values -- A bug was introduced in the previous build that prevented a session variable from being set to a null value if it had previously been set to a non-null value.
UX Component - Default Value - Page Variables - If you set the default value of a variable to an expression that used the PageVariable prefix, the expression did not evaluate. For example:
=PageVariable.var1
This bug was introduced in build 3522-4647. However, an easy work around is to change the default value expression to:
=request.variables.var1
| UX Component | PhoneGap - Storing Large Amounts of Data for Off-line Use in Files on a Device |
When you build an application for disconnected
usage, the data you want to have available while
you are disconnected is stored in List controls
in the UX which are persisted to Local Storage
on the device. Local Storage is, however,
limited in size. In some cases your application
will need to have a large amount of read-only
data available (such as price lists, etc.) and
instead of storing this information in Local
Storage you would like to store the data in
files in the file system of the device. If your application is a PhoneGap application, then you can store large amounts of data in files on the device as shown in this video tutorial. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Watch Video - Part 8 Watch Video - Part 9 Download Component Date added: 2015-08-01 |
| UX Component | PhoneGap Shell |
Building and testing PhoneGap applications can
be tedious because every time you want to test a
change to your application you have to submit
the application to the PhoneGap build service
and then load the app onto your device for
testing. This process can be dramatically shortened by building a PhoneGap shell application and then testing your application inside the shell. Every time you make a change to the component you are working on, you no longer have to submit it to PhoneGap build - you simply click the refresh button inside the shell, where the component is running. In this video we show how you can easily build a PhoneGap shell component. Watch Video - Part 1 Watch Video - Part 2 Date added: 2015-08-01 |
| UX Component | PhoneGap - Using the Image Picker Plugin To Select Multiple Images from the Photo Library |
The List control allows you to use the camera on
a mobile device to take a picture and then when
the List data are synchronized, upload the
picture to a server (such as Amazon S3 or the
AlphaAnywhere server) and store the picture
filename in the database. However, there are
situations where you want to capture multiple
pictures and adding one record at a time to a
List and then using the camera to get the image
for each record would be tedious. It would be
preferable to be able to open the Image Library
(i.e. the Photo Roll) on the device and select
as many images as you want. Each selected image
would add a new row to a List control. This video shows how the PhoneGap Image Picker plugin can be used to do this. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2015-08-09 |
| UX Component | Setting the Height of an Object to 100% |
Setting the height of to 100% might seem like a
natural thing to want to do, but in reality it
is complicated because while it is clear what
you MEAN by this, the HTML layout engine may not
know what the height of the containing element
is. or put more accurately, when the the element
you want to size at 100% height is initially
rendered, its container may not have been
properly sized yet. This is especially true with Panels which need to be resized after initial render so that they fit the device. Fortunately, Panels have an onSize event that exposes a height property, which you can use to set the absolute height of an element so that it fills a Panel, as shown in this video. Watch Video Download Component Date added: 2015-08-25 |
| UX Component | Building 'Real-time' Applications Using Web-Sockets |
In a typical web-application the client makes a
request to the server and the server responds.
The server cannot send information to any client
unless the client first requests it. However, in
'real-time' applications the server maintains a
connection to the client and there is a two way
channel for sending and receiving messages. When
the server, or any of the connected clients,
sends a message, the message is broadcast to all
of the connected clients and an event will be
triggered on each client when a message is
received. The event handler can choose to handle
the message, or to ignore it. A common pattern (which is discouraged because it does not scale) is to user timer events on a Grid or UX to make periodic callbacks to the server to see if there is any 'new information' that is of interest to the client. Real-time applications built on web-sockets are much more efficient than the pattern of executing Ajax callbacks on a timer. This video demonstrates how a real-time application can be built. The video demonstrates a chat application where any client can post a message that is instantly seen by all of the other clients. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2015-09-03 (Requires build 4540 or above) |
| UX Component | Client-side Data Cache |
The client-side data cache allows you to
retrieve data from the server. Once the data has
been loaded into the data cache, you can use the
data in your UX component. The data in the
client-side data cache can be persisted (either
to Local Storage or to the file system in a
PhoneGap application) so that the data is
available even when you no longer have a
connection. The client-side data cache is particularly useful in PhoneGap applications that are designed for disconnected usage because you can store a large amount of data on the device and have this data available to your application. In this video we show how the client-side data cache is set up and we demonstrate how it persists data to Local Storage and to the file system in a PhoneGap application. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Download Component Date added: 2015-09-05 (Requires build 4541 or above) |
| UX Component | Map Control - Adding Multiple Markers to a Map using Client-side Data |
Action Javascript has a method (in Map Control
Actions) to add multiple markers to a map.
However, this action assumes that you will be
making an Ajax callback to the server to do a
query to get the list of latitude/longitude
values for each marker you want to add to the
map. But what if you already have a list of data
on the client-side with latitude/longitude
values? Making an Ajax callback to the server
under these circumstances is unnecessary. In this video we show how a List control, which has latitude/longitude values for each row, can be used as the data source for the markers and how a marker for each row in the List can be added to the map without having to make an Ajax callback. Watch Video Download Component Date added: 2015-09-10 |
| Xbasic | Calling into Node.JS from Xbasic - Node Services Defined at the Project Level |
You can define global Node services (i.e.
services that can be called from any application
on your server), or you can define Node services
at the individual project level. Node services
defined at the project level get 'published'
like any other components, or pages in your
application when you publish your applications.
In this video we show how you can define and consume Node services in a web project. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2015-09-12 |
| UX and Grid Component | Using OData Data Sources |
OData is a standard method of access data using
a REST api. Alpha Anyhwere allows you to easily
consume data from OData services. In this video we show how a connection string is defined to connect to an OData service and then how a Grid component is built to go against the OData service. Watch Video - Part 1 Watch Video - Part 2 In the next video we show how a UX component with a List can be built using the OData data source: Watch Video - Part 3 Date added: 2015-09-12 |
| UX Component | Finding Controls in a Large UX Component |
When editing a UX component with a large number
of controls, finding the control that you want
to edit can be difficult. The Quick Find genie
makes it very easy to locate the control that
you want to edit. Watch Video Date added: 2015-10-07 |
| Xbasic | Validating and Reformatting JSON Data |
Xbasic has many functions that make working with
JSON data easy. Two particularly useful
functions are json_validate() and json_reformat().
These functions are described in this video. Watch Video Date added: 2015-10-22 |
| UX Component - List Control | Converting a List that uses a Static Data Source to a SQL Data Source and Vice-Versa |
It is common when building a UX component that
uses List controls to start off with Lists that
are based on static data (because setting up a
List to use static data is so easy). Once you
have your UX working, you might then want to
convert the List to be based on a SQL database.
A genie allows you to easily export the data
from your static data source to a new table in a
SQL database, or to link your List to an
existing table in a SQL database. You can also easily convert a List that uses a SQL data source to a static data source by importing the data from the SQL table. Watch Video Date added: 2015-11-04 |
| UX Component - List Control | Opening a Pop-up Window with a Button in a List Row - Positioning the Window Relative to the Button |
When you create pop-up windows in a UX control,
a common pattern is to open the window
positioned relatively to the button that
displays the window. If the button is in a row
of a List control, then it is a little trickier
to position the window relative to the the
button that was clicked. This video shows how you can position a dropdown window relative to a button in a List row. Watch Video - Part 1 Watch Video - Part 2 Date added: 2015-11-09 |
| UX Component - List Control | Dynamically Changing Page Size of a Paginated List at Run-time |
In this video we show how you can dynamically
change the page size of a paginated List that is
based on SQL data. Watch Video Download Component Date added: 2015-12-29 |
| UX Component | Executing Client-side Validation Rules Programmatically |
When you define validation rules for controls on
a UX, the rules are evaluated when the UX is
submitted. However, there may be cases where you
want to explicitly (programmatically) evaluate
the validation rules for a set of controls. For example, you might not want to allow the user to go to a different Panel Card if there are validation errors on the current Panel Card. In this video we show how you can programmatically execute the client-side validation rules for a series of controls. Watch Video Download Component Date added: 2015-12-30 |
| UX Component - List Control | Displaying Hierarchical Data in a List |
A common requirement in many mobile applications
is to display cascading data in a List control
(such as a list of menu choices). Some of the
items in the List will have sub-choices. When an
item in the List that has sub-choices is
selected, the List is repopulated with the
sub-choices and a 'back' button is enabled to go
back to the previous level. There is no limit as to how deep this hierarchy of nested Lists can be. Typically, when an item in the List that has no sub-choices is selected, an action associated with that List item is executed. In this video we show how you can build a UX component that uses a List to display an hierarchical menu system. We show how a genie can help you generate the JSON data for the hierarchical menu system and how the List's 'Quick Setup Genie' can be used to configure the List to display the nested Lists defined by the List's JSON data. TIP: In some cases, instead of populating the List with static data, you might want to generate the List data by querying a SQL database. See the video 'Displaying Hierarchical Data From a SQL Table in a List' for a demonstration of how this can be done. Watch Video - Introduction Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Showing Animation for List Transitions Date added: 2016-01-04 |
| UX Component - List Control | Displaying Hierarchical Data From a SQL Table in a List |
In the 'Displaying Hierarchical Data in a List'
video we show how hierarchical data can be
displayed in a List. In that example the data
shown in the List is defined statically. In this
video we show how the data hierarchical data for
the List can be retrieved from a SQL table. The video shows a List with Country names. When the user selects a Country, the List is repopulated showing the Cities in the selected Country and a 'back' button is enabled. When the user selects a City, the Contacts in that City are shown. Watch Video Download Component Addendum: In this next sample component the Xbasic commands that are executed to get the JSON data are replaced with a built-in helper function (a5_sqlToJSONTree() ). When the user clicks on a List 'endpoint', the selected record is shown and can be edited. Download Component Date added: 2016-01-05 |
| UX Component | Structure Explorer |
When you are working with a complex UX component
that has many different Panel Layouts,
Navigators and Cards as well as many Window
containers and Panel Overlays, it can be
difficult to get a sense of the component's
underlying 'structure'. In this video we show how the Structure Explorer can help in getting an overview of how a UX component is structured. Watch Video Date added: 2016-01-05 |
| UX Component | Client-side Data Cache - Populating Dropdown Boxes From the Client-side Data Cache - PhoneGap |
In a PhoneGap application, if your UX contains
Dropdownbox controls, the choices shown in the
Dropdownbox controls will be defined at
design time (when the PhoneGap application
is built). However, in your application you might want the choices in the Dropdownbox controls to be defined at run-time. Your app should make a callback to the server to get current data for the Dropdownbox controls and then persist that data locally so that the next time the app is loaded it already has the data for the Dropdownbox controls. The client-side data cache is ideal for this scenario. In this video we show how you can define client-side data cache items for the data to populate Dropdownbox controls. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2016-01-12 |
| UX Component - PanelOverlay | PanelOverlay Windows |
The UX component allows you to display
PanelOverlays that 'float' on top of a Panel. By
showing and hiding the PanelOverlay you can make
the PanelOverlay behave much like a 'window'.
In this video we show how the 'PanelOverlay is window' property is used to turn a PanelOverlay into a window that is initially hidden and shown on demand by executing the 'PanelOverlay window show' action in Action Javascript. Watch Video Download Component Date added: 2016-01-13 |
| UX Component - Custom Controls | Understanding CustomControls |
The UX Component allows you to define two types
of CustomControls - data bound and non-data
bound. In both cases the HTML and Javascript for
the custom control can either be specified at
design-time, or (much more powerfully) generated
by Xbasic at run-time. In this video we introduce the CustomControl found in the 'Other Controls' category of the UX Builder (as opposed to the 'CustomControl' found in the 'Data Controls' category). After introducing the basic concepts of the CustomControl, the video shows how a UX form can be dynamically generated at runtime from a definition that could be read from a database. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Download Component Date added: 2016-01-19 |
| TabbedUI Component | Keyboard Shortcuts |
The TabbedUI component is a great way for
navigating to the different components that make
up an application. You can assign keyboard
shortcuts to the different buttons in the
TabbedUI that launch components. Launching a component using a keyboard shortcut can be more efficient than having to visually locate the button in the TabbedUI and then click on it. In this video we show how to assign a keyboard shortcut to a button in the TabbedUI. Watch Video Date added: 2016-01-21 |
| Xbasic | Calling SOAP Web Services from Xbasic |
You can register SOAP web services at the Web
Projects Control Panel and then call methods of
these services from your Xbasic code. In this video we show how to register a SOAP service and then call methods of the service. Watch Video Date added: 2016-01-21 |
| Grid Component | Using IN clause in SQL Statement and Argument Arrays |
Argument arrays, in combination with the SQL IN
clause are a powerful way to define what records
the Grid should show. In this video we show how you can use argument arrays to define a button on a UX that opens a Grid showing a selected list of records. Watch Video Download Component Date added: 2016-02-10 |
| Xbasic | Working with MongoDB using AlphaDAO |
Alpha Anywhere allows you to connect to a vast
array of SQL databases and then build Grid and
UX components against the SQL data. You can also
use Xbasic (specifically the AlphaDAO object) to
write code that executes SQL commands. You can work with a Mongo database in the same way. In this video we show how you can create an AlphaDAO connection string that points to a Mongo instance - how you can export data from a SQL database to a Mongo database - and how you can build a Grid component against a Mongo database. NOTE: These videos show how the Mongo database is accesses using standard AlphaDAO objects. Alpha Anywhere also provides an API to access Mongo directly. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Required build: 4612 Date added: 2016-02-10 |
| UX Component | Understanding Custom Settings |
The UX allows you to define Custom Settings - a
list of named setting values. These custom
settings can be referenced in Javascript code
and also when the component is initially
rendered. Custom Settings are a powerful tool for dynamically configuring certain aspects of a UX component. In this video we introduce the concept of Custom Settings and show some of they ways they can be used. Watch Video - Part 1 Watch Video - Part 2 Download Component Required build: 4614 Date added: 2016-02-14 |
| UX Component - List Control | Pull-past-end to Refresh List Data |
A common pattern in mobile applications is to
allow a user to refresh the data in a List by
pulling down on the List past the top of the
List and if the user pulls down past some
threshold value, to trigger a List refresh once
the user releases the List, and it bounces back
to its initial position. In this video we show how you can implement the 'pull-past-end-to-refresh' pattern in a List control. Watch Video Required build: 4620 Date added: 2016-02-20 |
| PhoneGap | Including Pre-populated SQLite Database Files in a PhoneGap Project |
The UX component has extensive support for
working with SQLite databases in PhoneGap
applications. A common requirement when building
PhoneGap applications is to include
pre-populated SQLite database files as part of
your PhoneGap project. These pre-populated
database files can contain large amounts of
data. Since they are part of the PhoneGap
project, the data in these database files will
be immediately available to your application
when it is loaded, even if there is no
connection. In this video we show how the PhoneGap Builder allows you to define the pre-populated SQLite database files to include in your PhoneGap project. Watch Video 1 Watch Video 2 Required build: 4625 Date added: 2016-02-27 |
| UX Component | Using SQLite in a UX Component in a PhoneGap Project |
Action Javascript has actions that make it easy
to work with a SQLite database on a mobile
device. In this video we demonstrate various actions that can be performed with the Action Javascript SQLite action. Watch Video 1 Watch Video 2 Watch Video 3 Watch Video 4 Required build: 4626 Date added: 2016-02-28 |
| Publishing Web Applications | Using the HTTP Method for Publishing Web Applications |
When you publish a web application to a remote
server, you can choose whether to use FTP or
HTTP to do the actually work of transferring the
files. The HTTP option has more options than the
FTP option, but has some additional setup that
is required. In this video we show how to configure a server to allow HTTP publishing and how to create a Publishing Profile in the Alpha Anywhere IDE that uses HTTP Publishing. Watch Video - Configuring the Server Watch Video - Defining a Publishing Profile Date added: 2016-03-02 |
| UX Component | Vertically Centering Content in a Panel Card |
A common pattern in mobile applications built
using Panels it to vertically center some
content in a Panel Card. The content should be
vertically centered regardless of the device
orientation or size. In this video we show how this is easily done with some Javascript in the Panel Card's onSize event. Watch Video Download Component Date added: 2016-03-04 |
| UX Component | Using SQLite to Store a Large Database of Records with Images for Use in an Off-line Application |
In a PhoneGap application, being able to use
SQLite on the device allows you to store a large
amount of information on the device that will be
available when the device is offline. A common
requirement is for the data that is stored in
the SQLite database to contain images. In this video we should how you can build a UX component that makes a callback to the Alpha Anywhere server to create a SQLite database of 500 records, with each record having an associated image. The SQLite database is then download to the device and stored on the device. The a SQL query is executed against the on-device SQLite database and a List control is populated showing all of the records and their associated image. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2016-03-08 |
| UX Component | PhoneGap - iOS Background Geolocation |
This video shows how to use the 3rd party iOS
Background Geolocation PhoneGap plugin. Watch Video Date added: 2016-03-11 |
| UX Component | PhoneGap - Local Authentication for iOS with the Fingerprint Scanner |
This video shows how to use the 3rd party
Local Authentication for iOS with the Fingerprint Scanner PhoneGap plugin. Watch Video Date added: 2016-03-11 |
| UX Component - ViewBox Control | Introduction to Basic Concepts |
This video demonstrates basic concepts of the
ViewBox control such as the a5-item attribute
and the a5-value attribute and shows how events
are attached to the ViewBox and how parts of the
ViewBox can be made 'selectable'. Watch Video Download Component Date added: 2016-03-13 |
| UX Component - ViewBox Control | ViewBox HTML Rendered by Merging Data into a Template |
The HTML that the ViewBox displays can be
generated dynamically by merging data into an
HTML template. Watch Video Download Component Date added: 2016-03-13 |
| UX Component - ViewBox Control | ViewBox HTML Rendered by Merging Data Array into a Template |
The data that is merged into the ViewBox
Template can be an array of objects. In this
video we show how the template is expanded by
iterating over all of the objects in the data
array and how the resulting HTML can be
formatted to look and behave like a simple List
control. Watch Video Download Component Date added: 2016-03-15 |
| UX Component - ViewBox Control | Making a ViewBox Behave Like a Simple List Control |
A common use case for a ViewBox control is to
implement a simple List control. In cases where
you don't need the full richness of a List
control, but you only want to create a
scrollable list of items, the ViewBox represents
a simpler option. In this video we show how the special ListRowContainer control can be used to make a simple List using the ViewBox. Watch Video Download Component Date added: 2016-03-15 |
| UX Component - ViewBox Control | Sample ViewBox Walkthrough - Star Rating Example |
In this video we do a behind-the-scenes
walkthrough on the sample 'star rating' ViewBox
Control. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-03-15 |
| UX Component - ViewBox Control | Sample ViewBox Walkthrough - iOS Login Example |
In this video we do a behind-the-scenes
walkthrough on the sample 'iOS Login' ViewBox
Control. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-03-15 |
| UX Component - ViewBox Control | Understanding the Concept of 'Selectable' Elements in a ViewBox |
One of the key concepts of the ViewBox control
is that elements in the HTML rendered by the
ViewBox control can be 'selectable'. In this video we explain this concept by taking a complex ViewBox layout that does not have any selectable elements and making portions of the ViewBox HTML selectable. Watch Video Download Component Date added: 2016-03-15 |
| UX Component - ViewBox Control | Understanding the ViewBox State Object |
The ViewBox has a 'state' object and the values
in the state object can be used in the ViewBox
template. In this video we show how the template can reference values in the ViewBox state and how the ViewBox's .setState() method allows you to set properties in the ViewBox state object. Watch Video Download Component Date added: 2016-03-16 |
| UX Component | Add-in Controls |
The UX Builder allows you to define add-in data
bound controls. These are control that are
defined externally and are available in the uX
Builder just like any of the built-in controls. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-03-15 |
| UX Component - List Control | Dynamically Populating a List Columns and Data - Generic SQL Table Viewer |
The List control on a UX is one of the most
versatile controls in Alpha Anywhere. To
demonstrate its versatility this video shows a
sample UX component that can be used to view the
data in any table in a SQL database. The UX has
a dropdownbox where the user can select the
table in a SQL database and then a callback is
made to the server to dynamically populate the
List with the data from the table. In addition the UX contains a search part where the user can specify filter criteria to filter the data in the table. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component Date added: 2016-03-18 |
| Xbasic | Using Output Arguments when Calling a Stored Procedure |
When you call a stored procedure from Xbasic,
the stored procedure might return values (in
addition to resultsets). The calling Xbasic code
can read these return values by using 'output'
arguments. In this video we show how input/output and output arguments are defined and used when calling a stored procedure. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-03-18 |
| UX Component - List Control | Audio Recording/Playback in a UX Component |
It is quite common to build mobile applications
that work in disconnected mode and allow the
user to capture images using the phone's camera.
You can also build mobile applications that
allow users to record and playback audio files. NOTE: To record audio, you must be using PhoneGap. In this video we show how a List with a Detail View can be used in a UX component that is running as a PhoneGap application to capture audio files for each new record that is added to the List. The application that we show can work in disconnected mode and allows the user to record many audio files while disconnected. When a connection is obtained and the data that was captured while disconnected is synchronized, the audio files can first be uploaded to a server (such as Amazon S3). The component relies on the AudioRecorderAndPlayer control in the UX component. Watch Video - Part 1 Watch Video - Part 2 Date added: 2016-03-26 |
| Style Builder | Style Builder |
In Alpha Anywhere V4 the Style Builder has been
rewritten. You can now easily adjust the entire
appearance of a style by simply adjusting the
SASS variables that control the style colors and
you can also easily add new sub-themes for
different control types. In this video we show how you create a new style for buttons and we also show how the entire style can be c hanged from a 'blue' color to a 'green' color. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2016-03-26 |
| UX Component - Ink Control | Introduction to the Ink Control |
The Ink control allows you to create and edit
'ink' data. In this video we give a very brief introduction to the Ink control. Watch Video - Part 1 Watch Video - Part 2 Date added: 2015-08-13 |
| UX Component - Ink Control | Setting the Background Image for the Ink Control |
You can set the background image shown in the
ink control to anything you want - either by
specifying the URL of an image, or the base 64
encoded data for an image. In this video we show how you can set the background to an image and also to a map this is generated by Google Maps. Watch Video Date added: 2016-01-21 |
| UX Component - ViewBox Control | ViewBox Control - In Depth Tutorial |
This video is an in-depth tutorial on how the
ViewBox control can be used to build a 'star
rating' control. A common pattern in many applications is to allow a user to rate something by clicking on the number of stars. For example, the control might display 5 stars, all of which are grey. The user will then click on the 4th star to rate something as '4 stars'. The first four stars will then change color and the 5th star will remain greyed out. This type of control can easily be built using the ViewBox control, as shown in this video. NOTE: A 'star rating' control is actually a built-in control type (select the [More...] tool in the UX toolbox) so it is not necessary to go through the steps shown in this tutorial every time you want to add a star rating control to a component. The video is mean simply as in introduction to key concepts of the ViewBox control. Watch Video - Part 1 Watch Video - Part 2 In depth discussion of how the control is built. Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Watch Video - Part 8 Download Component Date added: 2015-09-04 |
| UX Component - FormView Control | Using the MobileForms_StarterExample Quick Start Template |
When you create a new UX component that will use
the FormView control to create a mobile
optimized form, the sample 'MobileForms_StarterExample'
template is a convenient starting point. In this video we give a quick overview of the features of this sample template. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2016-04-02 |
FormView Control - Starter Example - When you
create a new UX component you can use the
MobileForms_StarterExample as a quick start to create a basic UX
component with a List control (the form's data source), a FormView
control and a set of Editors (for editing values in the form).
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
To use the template select 'MobileForms_StarterExample' from the dialog shown below.

FormView Control - The FormView control (together with Editor Sets and Editors and the List View control) are the fundamental building blocks for building touch optimized mobile forms.
For more information on the FornView control click here.
Ink Control - A new type of data bound control can be added to a UX Component. The ink control allows users to 'draw' (using a finger or stylus on a device that supports touch events) or with a mouse (on a desktop browser). The ink is captures using a special text format.
Watch Video
- Part 1
Watch Video
- Part 2
Overview
The ink control, shown in the image below, is made up of two main parts, the editor and the view.

The editor (bottom part -- this is where the user draws) allows the user to edit the ink while the view
(top part) provides the ability to navigate to the part of the page
where the ink is being drawn. For example, the 'page' that contains
the ink might be a standard 8.5 x 11 inch page. In ink editor
(bottom part) only shows a small part of the page. The view (top
part) contains a
dragable zoom-box (see the dotted red rectangle) showing the portion of the ink visible in the
editor. The editor and view can be laid out in three ways.
The first is a split layout. In this layout the editor and the view
share the ink controls layout area in either a horizontal or
vertical layout. It should be noted that a split layout can still
optionally show only the view or editor. This is useful if you are
targeting multiple screen sizes, as you can use responsive layout
Javascript to change the split layout on smaller screens to toggle
between the editor and view if there isn't space for both. You can
also use this to allow the user to toggle the editor to take up the
entire ink control on larger screens as well.
The second layout is a detached view layout. In this layout the
editor takes up the entire ink control area, while the view part is
injected into an element specified by an ID. This allows
for extremely customized layouts.
The last layout is an editor layout. This will display only the
editor. This is useful for ink editing that doesn't need navigation,
such as signature capture.
Ink data is stored in a string format, with the strokes stored as
vectors. Below is an example of some ink data.
#A5Ink
version 1.0
settings %json%
{"page":{"width":5,"height":3,"unit":"in","dpu":300,"lines":false,"background":{"image":false,"color":""}},"meta":{"bounds":{"l":57,"t":35,"r":1393,"b":571},"created":"2015-09-12
05:12:15 pm","modified":"2015-09-12 05:29:42 pm"}}
%json%
A pen 3 #000
S
120,228,CAC+D+E+F+G+I+J+M+M+TaTaR+UaQcRdQcTeOePcMfJcGcFcEdDcEdAdBcAcAdBd+e+c+e+caebcbebedddekhfcfbgbgbfahahajal+m+-29+p+lBiBkAhBfAfBdAdCcAcC+CCAFCHCKCMBUDQBOBPBN+NAJ+MAI+J+H+H+IaIcHbIbGbEcDbCbCc+d+cAc+cAdDdCdCcBcBcBcBcE+D+D+DADCEAEBDBCBBCCEACDEAECFAF+FAFAG+E+F+EbHbDaDbEaC.........
This keeps the file size down and allows for the ink to be rendered at any resolution. The boundaries of the ink page are defined by the ink page settings. The page settings include width and height in a specified unit (in, px, etc.). This data is combined with the dots-per-unit (dpu) to create the ink page. The width and height are multiplied by the dpu to get the base page size in "ink units". The dpu can be thought of like "dpi" in printing. The higher the dpu, the higher the ink resolution.
The goal is to get the dpu relative to the units so that when the editor is at a scale of '1 ink unit equals 1px', the user is encouraged to enter ink at a larger scale than if they where writing on a sheet of paper. This works around the inherent lack of accuracy in capacitive touch screens (ink can only be captured at screen pixel accuracy), and allows for readable written input.
If the ink page unit is 'inches' then the dpu should be at least be 300. All measurements inside of the ink (pen width, margins, etc.) are in 'ink units' derived from the dpu.
The
page can also store background (color and image) settings, and have
automatically generated lines to create graph and ruled paper look.
The editor and view parts of the ink control can each have an
overlay. The overlay is arbitrary HTML that will be laid out over
each part. Elements in the HTML can make use of the "a5-item"
attribute in order to easily add buttons to the ink control. There
are a number of predefined "items" that allow the user to access the
eraser tool, pan tool, undo and redo actions, and navigate the ink.
Custom "items" allow you to add unique behaviors to elements in the
overlay. The events on the "items" have direct access to the ink
control.
The ink editor uses tools to edit the ink. The default tool in the
pen tool. Other tools can be selected using the ink control's .setTool()
method. This method can specify whether the tool is "sticky" or not.
If a tool is not "sticky" then after a single user interaction with
the tool, the tool will be deselected, and the ink editor will go
back to the pen tool. Each tool has an optional "active class name"
that will be applied to the ink control when that tool is active.
This allows you, though CSS, to automatically highlight the elements
in the overlay, and possibly change visibility of elements as well.
AudioPlayer Control - The AudioPlayer control allows you to add a control to the UX to play audio files.
To add a new AudioPlayer control to the UX component, select the [More...] entry in the controls toolbox (in the 'Data Controls' section) and then select the 'AudioPlayer' control.
NOTE: A separate Audio Recorder/Player control is also available. This control can only record in a PhoneGap application.

This will insert a control into the UX that looks like this:

To customize the AudioPlayer control, click the smart field for the Control properties.

Since the AudioPlayer is a data bound control, it has a {dialog.object}.setValue() and a {dialog.object}.getValue() method.
To set the audio file that you want to play back you use the {dialog.object}.setValue() method
For example:
{dialog.object}.setValue('MYAUDIOCONTROL','stream:http://audio.wgbh.org:8004');
In this case the AudioPlayer value is being set to a 'stream' - (a continuous audio stream) rather than a file.
After the stream is ready to play, the AudioPlayer appearance will change to this;

While the stream is loading (i.e. before it is ready to play), the text 'Stream', shown in the above image, will say 'Loading...'.
All of the text messages shown in the control are customizable in the AudioPlayer Control properties.
In this next example, the AudioPlayer value is set to a file URL:
{dialog.object}.setValue('MYAUDIOCONTROL','http://s3.amazonaws.com/alphaVideos/theway.mp3');
In the case where the AudioPlayer value is set to an audio file (not a stream), its appearance will change as follows once the audio file is ready to play:

When the user taps the Play button, the audio starts to play back. The number on the right side indicates the duration of the audio file. Before playback starts, or when playback is paused, the fast forward and fast reverse buttons (on either side of the Play button) will skip to the beginning or end of the audio clip (if you tap on them). However, if you press and hold, they will rewind or fast forward in 2 second steps.
The top bar shows the progress as the audio file is being played. The number on the right hand side shows the duration of the audio file. The number on the left hand side shows how much of the audio file has been played. The buttons on each side of the Play button allows you to skip forward and back in the file.
NOTE: The AudioPlayer control cannot play audio files that are hosted on the Alpha Anywhere server. It can play files that are hosted on Amazon S3, or, in the case of a PhoneGap application, files that are stored in the file system on the device.
AudioRecorderAndPlayer Control - The AudioRecorderAndPlayer control allows you to add a control to the UX component to play audio files and to record audio files.
NOTE: A separate AudioPlayer control is also available. This control is for playback only and is not limited to PhoneGap applications.
To add a new AudioRecorderAndPlayer control to the UX, select the [More...] entry in the controls toolbox (in the 'Data Controls' section) and then select the 'AudioRecorderAndPlayer' control.

The AudioRecorderAndPlayer controls is a dual purpose control. It can be used to play audio files (or streams) and it can also be used to record audio files.
You can only record audio files if you are using PhoneGap.
When you build your PhoneGap application you must must ensure that the Media plugin has not been selected:

and that the Media With Compression plugin has been selected.

In addition, you are likely to need to upload the captured audio files to a server so the following PhoneGap plugins should also be loaded: Device, File, File transfer.
When you add an AudioRecorderAndPlayer control to your UX you customize the control properties by clickin the smart field for the Control properties.
The customization genie allows you to set customize text and also set the maximum recording duration (in seconds).
When the component is run, the AudioRecorderAndPlayer control will look like this (if not audio file has been loaded for playback):

The red circle button will put the control into record mode. When the control is in record mode, it will appear as follows:

The Done button (text on this button is customizable -- you can use language, or text dictionary tags for International applications- <a5:r> or <a5:t>) becomes enabled. This button indicates that you want to end the recording. The record button changes to a Pause button. You can use this button to pause the recording.
The horizontal line at the top of the control indicates the recording level. The color of the line will be orange, green or red to indicate if the recording level is too low, ok or too high.
The number on the right indicates the duration of the recording.
If you set the value of the control to an audio stream or an audio file ( using the {dialog.object}.setValue() method ), the control's appearance will change as shown below.
The control is now in 'Player' mode. The play button in the center of the control will start playback. The small record button at the left of the control will allow you to switch the control from 'Player' mode to 'Record' mode.

Audio Files - List Control - Detail View - The List control now supports the 'Audio' control type in the 'Fields' pane of the List Builder, as shown in the image below. The purpose of setting a field type to 'Audio' is to designate the field as a 'media' field for synchronization purposes (as explained below).
Watch Video
- Part 1
Watch Video
- Part 2

The 'Audio' control type is intended to address a very specific use case. Consider the following scenario:
When you sync the List, Alpha Anywhere looks in all of the 'media' fields in the List looking for local filenames. These files are then uploaded to the target server and the data in the List are then changed to reflect the filename of the file on the remote server before the data are submitted to the server to update the SQL database. The following example will help make this point clearer.
Assume that you have a List with these fields:
name, audioFile
The user adds a new row to the List and records an audio. The data in the List will look something like this:
name: John Smith
audioFile: file://folderNameOnTheMobileDevice/filenameOfAudiofile.m4a
When the user hits the sync button to push the edits made to the List back to server so that the data can be added to the SQL database that backs the List, Alpha Anywhere first scans the data in all 'media' files to find any references to local file system filenames.
If the control type of the audioFile fieldname was set to Audio in the List builder, the audioFile field is considered a 'media' field. Alpha Anywhere will detect that the data in the audioFile field is a local file and it will first upload this file to the target server. Assuming that the target server is Amazon S3, the URL of the file once it has been uploaded to S3 might be something like: https://your_bucket_name.s3.amazonaws.com/audiofile1.m4a
Next, before sending the data in the List back to the Alpha Anywhere server (where the data will be written to the SQL database), the data in the List is changed so that the media fields are set to the URL of the files on the remote server. So, in our example, the data in the List is changed to this:
name: John Smith
audioFile: https://your_bucket_name.s3.amazonaws.com/audiofile1.m4a
The data are then sent to the Alpha Anywhere server and the value that is stored in the SQL database for the audioFile field is https://your_bucket_name.s3.amazonaws.com/audiofile1.m4a and not file://folderNameOnTheMobileDevice/filenameOfAudiofile.m4a (which of course would be a meaningless value to store in the database!)
NOTE: It is recommended that you set Amazon S3 as the target for media file uploads as the AudioPlayer cannot play audio files that are hosted on an Alpha Anywhere server. To set the upload target go to the 'Media and Other Linked Files (PhoneGap Applications Only) property on the 'Detail View' tab in the List Builder.
PhoneGap - FileTransfer - Upload and Download - SSL Server - If you are testing a PhoneGap application with a server that is using SSL with a self-signed certificate, all PhoneGap file transfer functions will fail.
You can set a global flag to tell the PhoneGap file transfer function to trust all host. When you set this flag to true, you will be able to test PhoneGap file transfer functions even though your server might be using a self-signed certificate.
To set the flag, you could add this code to the client-side onRenderComplete event:
{dialog.Object}._phoneGapTrustAllHosts = true;
PhoneGap App Builder - Config.xml File Format - Updated - PhoneGap Build has deprecated the 'gap:' prefix previously used within the project's
config.xml file. While the 'gap:" prefix is still officially supported, the recent PhoneGap Build documentation suggests that the prefix should be dropped.
This change affects the splash, icon, platform and qualifier tags. All new PhoneGap project config.xml files will no longer include the 'gap:' tag.
All previously defined config.xml files will be automatically updated and the 'gap:' prefix will be removed once the PhoneGap project is saved.
PhoneGap App Builder - Launch Images / Splash Screens - Android Only
-
PhoneGap Build now requires a default launch image /splash screen called 'splash.png' for Android apps. You must include the core SplashScreen plugin as well.
The SplashScreen plugin is now automatically enabled if you choose to build an Android app. The config.xml file now includes the required splash
tag as well.
PhoneGap App Builder - App Icons / Splash Screens - Windows 8.1
- PhoneGap Build now supports Windows 8.1. The appropriately sized icons and launch images / splash screens have been added to the config.xml file
and will be automatically generated, should you choose to generate the images files for icons and splash screens when building a Windows 8 mobile app.
Please keep in mind that you should always check the sizing on each launch image / splash screen prior to publishing your app to any of the app stores. While
the PhoneGap Builder does its best to size the images in the X axis, the Y axis may be larger than the expected size because of the
numerous varying aspect ratios that the properly sized images require.
UX Component - Control Flow Direction - Right-to-Left Languages - A new property in the UX builder allows you to set the control flow direction.

The default is left-to-right (ltr). You can also select right-to-left, as shown in the image below.

Web-sockets Server - Redis - A new option has been added to the Web-sockets server to use Redis to store the messages that are sent and to handle the distribution of messages to the connected Node.js server(s)
To turn on this option, go to the Web Project Properties dialog (accessible from the Web Control Panel) and select the option as shown in the image below.
A copy of Redis is automatically installed with Alpha Anywhere. You need to ensure that the Redis server has been started before you run a component that uses the web-sockets server.
You can start a local copy of the Redis server, or you can point to a remote copy by specifying the Redis host property in the dialog.
To start a local copy of Redis you can either start Redis manually, or install Redis as a service.
To start Redis manually, navigate to the Alpha Anywhere executable folder from the command window and then type:
Redis-server
For information on how to install Redis as a service, see:
http://stackoverflow.com/questions/26213403/install-redis-as-windows-service
If you are using a load balancer to distribute load to multiple Alpha Anywhere servers, then you should turn on the Redis option.

The benefit of using Reds in your web-sockets configuration is that the solution is more robust. If the Node.js server is restarted for any reason, the message queue is not lost. In addition, Redis enables web-sockets applications if you are running multiple instances of the Alpha Anywhere server that are managed by a load balancer.
registry.sys_get() Method - 64 Bit Registry Entries - A new option has been added to the registry.sys_get() method to specify where you search for a registry value.
The second parameter passed to the method can be '32', '64' or 'Any'. 'Any' is the default option. With the 'Any' option, the method will first search the 32 bit registry and then if no match was found, it will search the 64 bit registry.
Examples:
? registry.sys_get("HKEY_LOCAL_MACHINE\SOFTWARE\MongoDB\Server\3.0\Edition")
= "MongoDB 3.0 2008R2Plus SSL (64 bit)"
? registry.sys_get("HKEY_LOCAL_MACHINE\SOFTWARE\MongoDB\Server\3.0\Edition","32")
= ""
? registry.sys_get("HKEY_LOCAL_MACHINE\SOFTWARE\MongoDB\Server\3.0\Edition","64")
= "MongoDB 3.0 2008R2Plus SSL (64 bit)"
? registry.sys_get("HKEY_LOCAL_MACHINE\SOFTWARE\MongoDB\Server\3.0\Edition","Any")
= "MongoDB 3.0 2008R2Plus SSL (64 bit)"
UX Component - Add-in Controls -- The UX Component now supports 'add-in' controls. Addin controls are defined by entries in the 'uxCustomControls' folder in the executable folder.
To add an add-in control to your UX component, click the [More...] item in the UX toolbox.

This will bring up a dialog showing the existing Add-in controls:

To define a new Add-in control add a new folder to the uxCustomControls folder in the executable folder.
The name of the folder defines the name of the add-in control. Inside the sub-folder there should be three files
For examples of how to define the contents of these three files, please refer to any of the sample controls that are shipped with Alpha Anywhere.
Here is an example of how the IntegerValue control looks:

This control is used for a field that only allow integer values and the value can be set by clicking buttons to increment/decrement the integer value.
UX Component - Data Controls - Custom Control - Data Bound Custom Controls are a powerful new technique for creating custom controls on a UX component.
NOTE: Contrast 'Custom Controls' in the 'Data Controls' section of the UX toolbox (discussed here) with 'Custom Controls' defined in the 'Other Controls' section of the the UX toolbar - search for 'UX Component - CustomControl - 'Other Controls' for more information.
NOTE: 'Data controls' are controls that have the concept of a control 'value'. These controls have a {dialog.object}.setValue() and {dialog.object}.getValue() method and when the UX is 'submitted' the value in these controls are submitted and are available in the e.datasubmitted object in your Xbasic event handlers.
Custom data controls are built using the ViewBox control. An understanding of how the ViewBox control works is essential before you can create a custom data bound control. For more information on the ViewBox control, click here.

To add a data bound Custom Control to a UX cpmponent, select the [CustomControl] item in the UX toolbox.
To define the properties of the Custom Control click the smart field for the control properties. This will bring up the builder as shown below:

When you define a custom control you can specify the properties for the control 'now' (i.e. at design time), or you can generate the property settings at run-time using Xbasic.
The 'Specify Now' option is rarely used because a Custom Control that uses the 'Specify Now' option is really no different than a ViewBox control and so there is little reason to use the Custom Control rather than the ViewBox.
However, the option to generate the custom control definition at run-time using an Xbasic function is extremely powerful. and allows you to generate highly customized controls on your UX component.
Creating a Custom Control - Starting with a ViewBox Control
The easiest way to create a new Custom Control is to start by creating a ViewBox control and then once you are satisfied with the ViewBox control copy the generated Javascript from the ViewBox builder to the Custom control.
From the ViewBox builder, click the Show button at the bottom left corner of the dialog. Then select the 'Javascript code to render ViewBox' menu command.

Copy the code for the 'Settings' object. This is the code you will paste into the Settings JSON property in the Custom Control builder.
UX Component - ViewBox Control - A powerful new control type is now available in the UX Builder.
See this link for details about the ViewBox control.
UX Component - List Control - International
Numbers - If the system regional settings on your server are set
to a country that uses a comma as the decimal point, when you create
a List control numbers are now shown with the comma as the decimal
character. Previously, numbers were displayed using a period as the
decimal character.
As a result of this change client side calculations (e.g. client-side calculated fields), might no longer work correctly. To fix the problem add this code to the client-side onRenderComplete event:
$u.decimal = ',';
This code informs the Javascript functions that convert a string into a number what the decimal character is.
UX Component - File Save Format - JSON - In a previous pre-release build (4582) an option was introduced to allow the UX component to be saved as a text file (using a JSON format) rather than the default binary file format. However, the default format was left unchanged as binary. Now, the default format has been changed to JSON. The reason for this change is to make using source controls systems easier to work with.
UX Component - PhoneGap - Image Capture - File name Option - When you use the PhoneGap camera option to take a picture, the picture filename is stored in the file system in a temporary location. This means that if the application is terminated the file may be removed by the operating system. You now have the option of moving the file to a different part of the file system so that it is not in a temporary location.
This new option is exposed in the Action JavaScript builder as shown below.

UX Component - PhoneGap - File System Methods - Several new methods for working with the file system in a PhoneGap application have been added.
NOTE: The existing PhoneGap file system methods (accessed using the PhoneGap - File System Actions action in Action Javascript) are limited in that they do not allow you explicitly specify what file system you (i.e. 'temp', 'private', 'saved', 'public') you want to use and they assume that all actions are in the 'saved' file system.
These new methods are more generalized as they can work with fully qualified file and directory URLs.
| {dialog.object}.phoneGapFilesAvailable() | Returns true if there is a local file system and PhoneGap is running. |
| {dialog.object}.phoneGapGetLocalDirURL(type) |
Returns URL of base for the requested part of
the file system. 'type' can be: "temp",
"private", "saved", "public" Note: On iOS, "saved" and "public" may be backed up to iCloud |
| {dialog.object}.phoneGapReadFileURL(filepath, onReadSuccess, onError, startAt, endAt) | Read a file. Optionally specify a starting and ending position in the file. |
| {dialog.object}.phoneGapWriteFileURL(filepath, text, onWriteSuccess, onError, append) | Write a file |
| {dialog.object}.phoneGapFileExistsURL(filepath, onResult, onError) | Check if a file exists. onResult(properties) will be called with false if the file does not exist. |
| {dialog.object}.phoneGapDeleteFileURL(filepath, onDeleteSuccess, onError) | Delete a file |
| {dialog.object}.phoneGapCopyFileURL(srcpath, destdirpath, destname, onCopySuccess, onError) | Copy a file. |
| {dialog.object}.phoneGapMoveFileURL(srcpath, destdirpath, destname, onMoveSuccess, onError) | Move a file. |
| {dialog.object}.phoneGapRemoveDirectoryRecurseURL(dirpath, onRemoveSuccess, onError) | Deletes the specified directory and all of its contents, including other directories and their contents. |
| {dialog.object}.phoneGapEnsureDirPathURL(rootpath, subdirpath, onCompletion, onError) | Ensures that a directory structure (specified by subdirpath) exists within the specified rootpath. If the directories do not exist, they are created. |
| {dialog.object}.phoneGapListFilesRecurseURL(rootpath, onCompletion, onError) | List files in a directory (recursively) |
| {dialog.object}.phoneGapListFilesURL(dirpath, matchRegex, onCompletion, onError) | List files in a directory. If matchRegex is specified only matching files are listed. |
| {dialog.object}.phoneGapDeleteFilesNotInListURL(dirpath, matchRegex, keepList, onCompletion, onError) | Delete files. If matchRegex is specified, only matching files are listed. If keepList is specified files in the list are not deleted, even if they matched. |
UX Component - HTML Editor - Toolbar - You can now customize which buttons are shown on the HTML editor toolbar.
To customize the toolbar, click the smart field for the HTML editor toolbar customization property.

This will open the Genie where you can select the buttons that you want and the order in which you want them to appear. Use *break to start a new row of icons and *space to insert a spacer between the icons.

UX Component - Sample Templates - PhoneGap - When you create a new UX component, the available sample templates now include 'PhoneGap - iOS Background Geolocation' and 'PhoneGap - iOS Device User Authentication'.
PhoneGap App Builder - Third Party Plugins (iOS) - Touch ID. Added support for the TouchID plugin.
This plugin, allows a PhoneGap app to locally authenticate the user with the TouchID sensor (fingerprint scanner) on iPhone 5S and greater devices.
For a video overview of using this plugin with the new UX PhoneGap - iOS Device User Authentication template,
see Local Authentication for iOS with the Fingerprint Scanner Plugin
For the full cordova-plugin-touch-id plugin documentation,
see cordova-plugin-touch-id
PhoneGap App Builder - Third Party Plugins (iOS) - Background Geolocation. Added support for the Transistorsoft/cordova-background-geolocation-lt plugin.
This sophisticated plugin, allows a PhoneGap app to continue acquiring device geolocation data when the app is in the background or the device is locked.
For a video overview of using this plugin with the new UX PhoneGap - iOS Background Geolocation template,
see iOS Background Geolocation with PhoneGap
For the full transistorsoft/cordova-background-geolocation-lt plugin documentation,
see cordova-background-geolocation-lt
Style Builder - A new Style Builder is
available for Alpha Anywhere V3 Styles - Alpha Anywhere styles that
were released in older versions of Alpha Five (e.g. MobBlue,
MobGreen, GrBlue, etc) are tagged internally as 'version 2' styles.
Newer styles (e.g. iOS, iOS7, AndroidLight, AndroidDark) are tagged
internally as 'version 3' styles.
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
A new Style Builder is available for 'version 3' styles. Previously it was not possible to edit a 'version 3' style in the 'version 2' style builder.
Now, when you try to edit a style, Alpha Anywhere automatically selects the appropriate style builder.
There are several ways to get to the style builder. The easiest is to open the UX or Grid component and click the smart field button for 'Edit style in Style Builder' property (which is just below the Style Name property).
You can also select the Edit, Open Web Style Builder command from the menu when the Web Control Panel has focus.
Alpha Anywhere web styles can be stored in one of three places:
When you select a style to edit, if you selected a 'system' style, you will get a dialog asking you to make a 'local' or 'global' copy of the style.
When you make a copy of the style you can keep the same name as the source ('system') style, or you can give the style a new name. Since the local or global style is stored in a different folder than the system style, it is perfectly OK to use the same name as the source ('system') style.

If you selected a version 3 style the new style builder will be displayed:

The Style Builder has two distinct modes.
Alpha Anywhere styles sheets are defined using SASS syntax. To learn more about SASS visit http://sass-lang.com/
One huge advantage of SASS syntax is the ability to define variables for many of the setting in the stylesheet, especially colors.
The Adjust mode allows you to easily adjust the SASS variables in your stylesheet. For example if you use the built-in iOS7 stylesheet you will see that the predominant color in the style is blue. By changing a single SASS variable in Adjust mode you can change the entire
The tabs at the bottom on the screen allow you to switch between Adjust mode and Code mode.
Code Mode
In Code mode the left side of the screen has a preview of the style in the top and the actually CSS in the bottom.
The property grid on the right shows all of the "object" types defined in the stylesheet. Examples of "objects" include Textbox, Button, Accordion.
For each object type one or more named sub-types can be defined. The sub-types are called 'sub-themes'. Generally every "object" has at least one 'sub-theme' called 'base'. For some object types only 'base' sub-theme is defined. You can add an arbitrary number of sub-themes for any object type.
A sub-theme defined all of the CSS classnames used to style the object.
At the top of the code window when you are in Code mode you will all of the SASS variables defined in the stylesheet.
You can adjust the variable values directly in the Code window or you can switch to Adjust mode to change the SASS variables.
UX and Grid Component - Open Style Builder - You can now open the Style Builder directly from the UX and Grid component. A new property 'Edit style in Style Builder' appears directly below the 'Style name' property.

Application Server - Open SSL - A new version of OpenSSL is now included with Alpha Anywhere.
OpenSSL 1.0.2g addresses the 'Drown attacks' vulnerability.
UX Component - Sub-theme Picker - Preview - When you pick the sub-theme for any control that supports sub-themes, the picker now shows a preview of all of the available sub-themes.


PhoneGap Builder - SQLite Databases - When you create a PhoneGap project, you can now include pre-populated SQLite database files as part of the PhoneGap project. A new genie allows you to create the SQLite databases that you include with your PhoneGap project.
If your PhoneGap project includes pre-populated SQLite databases, your UX component can work with the data in these SQLite databases using Action Javascript. See 'UX Component - PhoneGap - Using SQLite - Action Javascript' below for more information.
If you are including pre-populated SQLite databases in your project, be sure to specify the following PhoneGap plugins: Device, File, File Transfer, SQLitePluginExt.
To define the SQLite databases that should be part of your PhoneGap project, click the smart field for the SQLite Databases property in the PhoneGap Genie.

This will open a dialog where you can define your SQLite databases.
Your project can include multiple SQLite databases and each database can include multiple tables. Each SQLite database is contained in a single file and this file is automatically added to the Additional Files Required setting in the builder.
You can choose to put all of the tables you want in your SQLite databases in a single SQLite database, or you can use multiple SQLiite databases - the choice is yours.

Once you add a new SQLite database to the above dialog, you can click the Define SQLite Database Contents button to specify the tables that should be in the SQLite database. For each table that you specify you can define how the table should be populated. The options are to perform a SQL query to extract data from any SQL database supported by AlphaDAO, static data, or Xbasic. If you choose the Xbasic option, you can specify Xbasic code that will return data that are used to populate a table.
Once you have defined the SQLite databases, click the Create SQLite Database Files button to actually create the SQLite database files. These files will be created in the www folder in your PhoneGap project.
NOTE: Contrast creating pre-populated SQLite databases with making an Ajax callback to the server and dynamically creating the SQLite database. Dynamically creating SQLite databases is a built-in action in Action Javasascript and it is discussed below. See UX Component - PhoneGap - Using SQLite - Action Javascript.
UX Component - PhoneGap - Using SQLite - Action Javascript - The UX component now has extensive support for working with SQLite databases in a PhoneGap application.
SQLite is a SQL database that is available on your mobile device and is accessible through a PhoneGap plugin. When building disconnected applications, having an on-device SQL database can be extremely useful. It allows you to get rapid access to large amounts of data that are stored on the device (and is therefore available even when there is no connection). You can store significantly more data for offline access than would be possible using Local Storage.
The primary use case for an on-device SQLite database is to make large amounts of 'lookup' information available in a disconnected, mobile application.
Watch Video 1
Watch Video 2
Watch Video 3
Watch Video 4
NOTE: The UX Component Client-side Data Cache is also useful, in PhoneGap applications, for storing large amounts of data on the mobile device for use in offline applications. Your particular application requirements will dictate if the Client-side data cache, or SQLite, is the better solution.
IMPORTANT: To use the SQLite features in a PhoneGap application, your PhoneGap project must load the following plugins: Device, File, File Transfer, SQLitePluginExt. These plugins are all listed in the PhoneGap builder.
NOTE: While it is certainly possible to perform Insert, Update, and Delete actions on the SQLite database that is on a device, there is no built-in mechanism for persisting these changes to the source database on your server. You would be responsible for writing your own code to persist changes to the on-decice SQLite database to your server databases.
A SQLite database is a single file. The SQLite database file can be part of your PhoneGap project, or it can be downloaded to the device by making a callback to a server.
If the SQLite database is part of your PhoneGap project, you will need to list the name of the SQLite database file in the Additional Files Required property in the PhoneGap Builder.

NOTE: For more information on adding SQLite database to a PhoneGap project, see this section : PhoneGap Builder - SQLite Databases.
You can use Action Javascript to download a SQLite database to the mobile device at run-time (see below for more information). When you download the SQLite database to the device at run-time, you can either download an existing SQLite database, or your callback function can dynamically create the SQLite database file.
Action Javascript now has a new action called 'PhoneGap - SQLite Actions' that will allow you to select and configure the type of action you want to perform.

When you select this action, the builder shows the available SQLite actions:

The available action are:
| Command | Description |
| Download SQLite Database from the Server | Downloads a SQLite database file from a server and stores the database file on the mobile device |
| Create SQLite Database on Server then Download to Device | Similar to the 'Download SQLite Database from the Server' action excepting that the SQLite database file is dynamically created on the server before it is downloaded to the device |
| Execute SQL statement(s) | Executes one or more SQL statements. If you execute multiple SQL statements, the statements are automatically wrapped in a transaction so that no changes are made to the database if any of the statements fail. |
| Get Tables in a Database | Lists the tables in a SQLite database. |
Each of these commands in discussed in more detail below.
Download SQLite Database from Server
Use this action to fetch a remote SQLite database file from a server (does not have to be the Alpha Anywhere server) and store the database on the mobile device. Once the database has been downloaded, you can then start executing SQL commands against the tables in the database.
There are two ways in which this action can be used:
If you are using option 1, then you will need to specify Javascript code that returns the URL of the SQLite database file.
Examples:
Assume that the SQLite database files is in a folder in the webroot. The relative filename of the SQLite database file is (for example) sqlite/db1.db. Your Javascript code that returns the URL will therefore be:
return 'sqlite/db1.db';
There is no need to specify a protocol for the URL since the resource is relative to the webroot.
If, on the other hand, the SQLite database file was (for example) in an Amazon S3 bucket, your Javascript code might be:
return 'http://name_of_your_s3_bucket.s3.amazonaws.com/sqlitedbfilename.db';
Id you are using option 2, you must specify an Xbasic function that will handle the Ajax callback. The Xbasic function will return the URL of the SQLite database file (by setting the e.URL property in the Xbasic code).
Create SQLite Database on Server then Download to Device
This action is really just a variant of the Download SQLite Database from Server action. The main difference is that the SQLite database to download to the device is created on the fly by Alpha Anywhere and once the database file has been created, a message is sent to the client (i.e. the mobile device) telling it that the SQLite database file has been created and can now be downloaded to the server.
The SQLite database file is created by populating a SQLite database with data obtained from SQL queries (against your SQL Server, Oracle, MySQL etc. data sources), static data, or from Xbasic code (that returns data to be used to populate the SQLite database).
For example, you might define a SQLite database that contains several tables (called say 'table1', 'table2', 'table3', etc.) where:
When you select this action, the builder shows this screen:

The SQLite Database definition property is where you define how the SQLite database will be created. When you click the smart field for this property you get this dialog.

This dialog allows you to define the tables that will added to the SQLite database.
You can add as many tables as you want. Once you have have added a table (by clicking on the Add table) button, you can then define the data source for that table (by clicking on the Edit table definition) button.
When you click the Edit table definition button you get a dialog as shown below where you can define how the SQLite table will be populated.
The choices are:

Format for Static Data and Data Returned by Xbasic Functions
If your Query Type is set to either Static or Xbasic, the required format for the data is as shown in the following example:
ID=INTEGER (Primary Key),FirstName=TEXT,LastName=TEXT,Salary=NUMERIC
1,Fred,"Smith",87234
2,Tom,Jones,45234
Note that the data is in CSV (comma separated value) value format. Values can be quoted if they contain commas.
The first row in the data is the field names. The format for the fieldnames is:
fieldname=fieldtype
There is no need to specify a field size for a SQLite table. The
SQLite field types are TEXT, NUMERIC, INTEGER, REAL and BLOB. You
can optionally indicate which column in the primary key by including
the (Primary Key)
keyword after the field type.
Execute SQL statement(s)
This action allows you to execute SQL statements against any SQLite database on the device. You can either execute a single SQL statement, or you can execute multiple statements.
If you execute multiple statements, the statements are wrapped in a transaction, which means that the state of the database is not changed if any of the SQL statements fails.
When you select this action you get the following dialog (shown twice - once for the 'Single' statement case and once for the 'Multiple' statement case).
Executing a Single SQL Statement

The properties in the Dialog are defined below:
Your SQL statement can optionally reference arguments (similar to SQL::arguments when using AlphaDAO in Xbasic).
For example, this statement does not use arguments:
select * from customers where id = 'ALFKI'
This statement does use arguments:
select * from customers where id = ?
The ? indicates an argument value.
If your SQL statement uses arguments you must defined the argument values in the Arguments property.
For example, if your SQL statement was select * from customers where id = ?
the Javascript that you define for the Arguments property might be:
return ['Alfki'];
Example:
Assume that your SQLite database has a table called customers and you want to populate a List control with the results of this query:
select * from customers where city = 'Boston'
You might set the onSuccess Javascript to:
if(resultArray.length > 0) {
//populate list 'list1' with
data
{dialog.object}.setListColumnsAndPopulate('list1',resultArray);
} else {
alert('No records in query.');
}
Executing Multiple SQL Statements

In the case where you are executing multiple SQL statements you must set the SQL definition Javascript property.
Your Javascript must return an object with these properties:
Alternatively, your Javascript can return an array of objects. Each object in the array should have these properties:
Example:
(This example uses the array of objects method. Notice that the parameters passed into the onSuccess functions are: tx, result, array and transObj.
where:
Notice how the arguments property for the last object in the array calls a function to set one of the argument values. This function can see the transObj variable.
)
var obj = [];
obj.push( { sql: 'drop table if exists cars', onSuccess:
function(tx,result,array,transObj) { alert('table was dropped'); }}
);
obj.push( { sql: 'CREATE TABLE Cars (Id INTEGER PRIMARY KEY, Name
TEXT, Price INTEGER)'} );
obj.push( { sql: 'insert into cars (name,price) values (?,?)',
arguments: ['Ford',1], onSuccess: function(tx,result,array,transObj)
{ transObj.foobar = 123;} });
obj.push( { sql: 'insert into cars (name,price) values (?,?)',
arguments: ['GM',2] } );
obj.push( { sql: 'insert into cars (name,price) values (?,?)',
arguments: ['Honda',3] } );
obj.push( { sql: 'insert into cars (name,price) values (?,?)',
arguments: ['Toyota',function(transObj) { return transObj.foobar; }
] } )
return obj;
NOTE: When you edit the Javascript for the SQL definition Javascript property, the Javascript editor shows extensive help for how to construct the object for the SQL definition object. For example, the help shows how you can do the following task:
You can also define these properties:
How to Create a New SQLite Database on a Device
When you want to start working with a SQLite database on a mobile device there is no requirement that you either download an exiting SQLite database from the server or include a pre-populated SQLite database in your PhoneGap application. You can simply create a new SQLite database on the fly in your Javascript code.
When you use the 'Execute SQL statement(s)' action in the 'PhoneGap - SQLite Actions' action, you specify the name of the SQLite database name against which the SQL commands should be executed.
If you specify the name of SQLite database that does not exist, then a new SQLite database will automatically be created.

Xdialog - {treatasform} Directive - If a modeless Xdialog is displayed and then all Alpha Anywhere windows (besides the modeless Xdialog) are closed or hidden, then once the last window is hidden, the Workspace itself will be closed.
For example, consider the following sample Xdialog code.
dim dlg_title as c
dlg_title = "test"
dim dlg_body as c
dlg_body = <<%dlg%
<close><hide><show>
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "close" then
ui_modeless_dlg_close(dlg_title)
else if a_dlg_button = "hide" then
controlpanel.hide()
else if a_dlg_button = "show" then
controlpanel.show()
end if
%code%
ui_modeless_dlg_box(dlg_title,dlg_body,dlg_event)
Once you press the 'Hide' button to hide the Control Panel (assuming that there are no other Alpha windows open at the time), the Workspace will closed, and therefore the "Show" button, which is intended to show the Control Panel, will not work.
You can instruct Alpha Anywhere not to enforce this rule by adding the {treatasform} directive to the Xdialog. This will cause Alpha Anywhere to not close the workspace when the last window (not counting the Xdialog) is closed.
dim dlg_title as c
dlg_title = "test"
dim dlg_body as c
dlg_body = <<%dlg%
{treatasform}
<close><hide><show>
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "close" then
ui_modeless_dlg_close(dlg_title)
else if a_dlg_button = "hide" then
controlpanel.hide()
else if a_dlg_button = "show" then
controlpanel.show()
end if
%code%
ui_modeless_dlg_box(dlg_title,dlg_body,dlg_event)
UX Component Builder - Display Line Numbers in the Controls List - You can now turn on the display of line numbers in the control list in the UX builder. In large components, this will make it easier to find a control quickly.

To toggle the display of line numbers, click on the Menu button and select the Toggle line numbers in Controls display menu item.
You can also go to the Properties pane and check the Show line number in Controls list property.

TIP: You can easily navigate to a control by number by pressing the Ctrl-G shortcut key.
UX Component - List Control - Pull-past-End to
Refresh List Data - You can now easily implement the common
'pull-past-end-to-refresh' List data pattern.
Watch Video
To turn on this behavior, open the List builder and check the Has 'pull-to-refresh' behavior property.

You can then configure the settings for the behavior.

The Convert to low level properties checkbox on the builder allows you to see all of the individual properties that get set to implement this behavior. If you want to customize the behavior beyond what this genie allows, check this box.
AlphaDAO - SQL - DateTime Fields - SQL::Resultset.toJSONObjectSyntax() - Datetime fields are now exported using an increased precision. Previously, the default format for date time fields was:
MM/dd/yyyy 0h:0m:0s (or dd/MM/yyyy 0h:0m:0s if set by Windows regional settings).
Now, the default format is:
MM/dd/yyyy 0h:0m:0s 3
Technical Note: This change will solve the
following problem: Assume that you had a SQL table with a field
called (for example) 'ExaminationDate'
and that the value in the field was
2/18/2016 3:24:10 123.
Assume that you then built a UX component with a List control with a
Detail View to allow users to edit this value and that you had write
conflicting checking turned on for the
ExaminationDate
field.
When the user tried to synchronize the data after making a change to
the ExaminationDate
field they would get a write conflict error because the 'old' value
for the ExaminationDate
field was stored as
2/18/2016 3:24:10 and not
2/18/2016 3:24:10 123.
With the above change, the 'old' value for the field stored in the
List will be stored at the field's full precision, and the update
will succeeed.
UX Component - Custom Settings - Custom
settings are named setting values that you can reference in
JavaScript code and in your component definition.
Watch Video
- Part 1
Watch Video
- Part 2
Download Component
To define Custom Settings go to the Properties Pane in the UX builder. The Custom settings property appears in the Advanced section.

Click the smart field and the Custom Settings dialog is shown.

The dialog allows you to create an unlimited number of custom settings. Each custom setting has a name and a value.
If the value is a string, just enter the string value. If the value is a JavaScript object, you must prefix the definition with '{javascript}'. If the value is a function definition, you must also prefix the value with '{javascript}. In the example below, three custom settings are defined showing how the value of the custom setting is set to a string, object and function:
| Custom Setting Name | Value |
| setting1 | Some string value |
| setting2 | {javascript}{name: 'Fred', city: 'Boston'} |
| setting3 | {javascript}function(name) { alert('Hello name.toUpperCase());} |
You can export Custom Setting definitions and import them using the Export and Import hyperlinks at the bottom of the screen.
Using Custom Settings
Custom settings can be used in your Javascript code and also at the time the UX component is rendered.
Using Custom Settings when a Component is Rendered
When you define the properties of a UX component, any place that you define some text you can use a Custom Setting value using this syntax:
[CustomSetting:settingName]
For example, assume you have a Button control in your UX. You could set the Button text to:
[CustomSetting:button1]
If you had defined a Custom Setting called 'button1' with a value of 'Save new record' then when the UX component was rendered, the label on the button would be 'Save new record'.
Using Custom Settings in JavaScript Code
The UX object has a method that allows you to read and set Custom Setting values:
{dialog.object}.customSetting(settingName [, newSettingValue])
If you do not provide the optional second parameter the method is used to read the value of a Custom Setting. If you provide the second parameter, the method is used to update a Custom Setting value.
For example, assume you had defined a Custom Setting called 'string1', with a value of 'this is the value of string1'. You could use this in your JavaScript code:
var txt = {dialog.object}.customSetting('string1');
alert(txt);
If the value of 'string1' had been set to an object (using this for the value: {javascript}{name: 'Fred', city: 'Boston'} ), then your JavaScript might look like this:
var obj = {dialog.object}.customSetting('string1');
alert(obj.name + ' -- ' + obj.city);
If the value of 'string1' had been set to a function (using this for the value: {javascript}function(name) {alert('Hello ' + name);} ), then your JavaScript might look look like this:
var fn = {dialog.object}.customSetting('string1');
//now call the function
fn('Fred');
To set a new value for the 'string1' Custom Setting:
{dialog.object}.customSetting('string1','this is a new value for string1');
Overriding Custom Settings when Opening a UX Component
When you use Action Javascript to define an action that opens a UX component, if the target UX component has defined any Custom Settings, you can override the value of the Custom Settings.
In the image shown below, the Action Javascript action opens a UX called 'uxWithCustomSettings'. Since this UX has defined some Custom Settings, the dialog shows an option to override any of the Custom Setting values.

Note The overrides defined here are applied when the UX is initially rendered. If this action is called from a button and the target UX is opened in a Window and the 'Use cached UX Component' property is checked, the second and subsequent times the button is clicked to open the target UX, the Custom Settings remain at the values they were set to when the target UX was initially opened.
Using Language and Text Dictionary Tags in Custom Settings
You can use language tags (<a5:r>...</a5:r>) and text dictionary tags (<a5:t>...</a5:t>) in the Custom Setting values.
UX Component Builder - Buttons and StaticText Objects - Double-clicking on a Button in the UX Builder will now open the editor to edit the click or onClick event for the button. Similarly, double clicking on a static text control will bring up the text editor.
MongoDB - Using MongoDB in Grid and UX Components and with Xbasic AlphaDAO - Alpha Anwhere has an API for working directly with a Mongo database. This API is useful if you want to write your own server side code to query and update a Mongo database. However, if you want to use a Mongo database as the data source for a Grid, or UX component, you cannot use the API.
In order to use Mongo as the data source for a Grid or UX, it is necessary to impose a schema on the Mongo database, much like any SQL table has a schema.
Alpha Anywhere now allows you to define a connection string to a Mongo database (much like you would define a connection string to any SQL database). Once you have define a connection string, you can build Grid and UX components against the Mongo database in exactly the same way that you would build a Grid or UX against any SQL database. You can also use AlphaDAO in Xbasic to perform CRUD operations against the Mongo database
When you define a connection string to a Mongo database you define a schema for each table (i.e. collection) in the database. This schema defines the fields and data type of each field in each table.
When you define a connection string to a Mongo database you define:
The image below shows the connection string builder for a Mongo database.

NOTE: In the above screenshot the manifest filename stats with '.\'. This syntax is used to indicate the the manifest is stored relative to the Web Project folder. In the above example, the manifest will be stored in a folder called 'schemas' in the Web Project folder, and when the project is published, the schema.json file will be published to a folder called 'schemas' in the web root.
Alpha Anywhere has a number of helper function that help you define the schema for the Mongo database.
Structure of the Schema JSON File
A sample schema JSON file is shown below. The JSON file defines two objects, 'schema' and 'collection' and an optional property, 'sourceconnection'.
The 'collection' object contains a property for each collection in the Mongo database and the name of the corresponding schema in the 'schema' object.
For example, the entry in the 'schema' object shown below specifies two schemas, one called 'Categories' and another called 'Employees'. For each schema, the primary key column is specified and the list of columns and their corresponding data type are identified.
The optional 'sourceconnection' identifies if the schema was obtained from a looking at the schema in some other SQL database. If so, the 'sourceconnection' property is the connection string to that database.
{
"schema": {
"Categories": {
"primary": [
"_id"
],
"columns": {
"_id": "String",
"CategoryID": "Number",
"CategoryName": "String",
"Description": "String",
"Picture": "String"
}
}
"Employees": {
"primary": [
"_id"
],
"columns": {
"_id": "String",
"EmployeeID": "Number",
"LastName": "String",
"FirstName": "String",
}
}
},
"collection": {
"Categories": {
"schema": "Categories"
},
"Employees": {
"schema": "Employees"
}
},
"sourceconnection": "::Name::northwind"
}
Creating the Schema
To define the Mongo database schema, click the More... button on the connection string build.

This will open an intermediate dialog:

Then click the 'Edit/create Schema definition...' hyperlink.
This will open a dialog when you can edit the schema definition.

At the bottom of the dialog you will see several hyperlinks:
More on the 'Guess From Content...' Option
When you click the Guess From Content... button, Alpha Anywhere will examine the data in the Mongo database specified at the 'Database' prompt on the connection string builder. This is the dialog that was displayed before you clicked the 'More...' button to get to the dialogs when you define the schema.

Using a MogoDB Connection String
Once you have built the connection string to the MongoDB database you use it in the same way that you use any other connection string (that connects to SQL databases). You can build Grid and UX components against the Mongo database. You can also use Xbasic and AlphaDAO objects to work with the data in the Mongo database.
When you use a connection string that points to a Mongo database you are essentially using SQL syntax to interact with the Mongo database. Behind the scenes Alpha Anywhere is automatically converting the SQL commands to the appropriate commands that then Mongo API understands.
You can see how Alpha Anywhere makes this translation but turning on the 'Trace SQL' option in the connection string build (shown below). Once you do this, the trace information will be shown in the Trace window (View, Trace window) if you are working in the Alpha Developer Version - i.e. the IDE) or in a folder where your logs are created if you are in the Server.

Here is some sample output from the Trace window showing the SQL statement and how that statement was translated to Mongo commands.
SQL Statement: SELECT FIRST 11 [_id], CustomerID,
CompanyName, ContactName, ContactTitle, City, Country FROM Customers
ORDER BY ContactTitle, [_id]
Time to prepare URL: 0.001
Time to execute REST call: 0.041
Mongo Commands:
{
"verb": "GET",
"collection": "Customers",
"select": "_id , CustomerID , CompanyName , ContactName ,
ContactTitle , City , Country",
"groupby": "",
"where": {},
"orderby": "ContactTitle, _id",
"limit": "TOP 11 "
}
Because Mongo is not a SQL database, there are obviously limitations as to what SQL commands you can send to Mongo. For example, you cannot execute a SQL statement that performs a JOIN since the concept is meaningless to Mongo. You also cannot perform CRUD operations that affect more than a single record. For example, the following SQL statement will update multiple records
UPDATE customers set Status = 'B' where Balance > 100
This will not work if you are connected to a Mongo database if there is more than one record with a Balance that is > 100.
Grid Component - Arguments - Array Arguments - IN Clause in SQL Statements - You can now use the IN clause in a SQL statement in a Grid, where the IN clause is tested against an argument.
For example, you might set the SQL query for a Grid to
Select * from customers where customerId IN (:array_customerIds)
IMPORTANT: The parentheses around the argument in the above SQL statement are required when using an IN clause.
The argument in the above SQL is 'array_customerIds'. The 'array_' prefix in the array name is significant. It informs Alpha Anyhwere that the argument is an 'array argument'
When you define the 'array_customerIds' argument in the Grid you might (for example), bind the array to a session variable. For example, you might bind the argument to session.whatCustomerIds.
The session variable would be set to a comma delimited list of values.
Report Events - BeforePrint and AfterPrint - You can now define two new events for Reports. The beforePrint event fires before any report is printed and the afterPrint event fires after any report is printed.
These events must be defined in an Xbasic Function Library. The name of the functions to call to handle these events are defined in the Web Project Properties dialog, as shown below.

Xbasic - AlphaDAO - SQL::Resulset.ToCSVFile() and .ToStringFile() - Two new methods on the SQL::Resultset object allow you to create a file directly without first having to call .toCSV() or .toString() to create an intermediate variable.
List with Detail View - Synchronizing Data - Synchronization Log Table - The synchronization log table helps prevents a sync command being processed more than once.
If you do offline-data entry in a List, there is a small chance
that the SQL updates to the underlying table will be executed more
than once. This can happen if the mobile device loses connectivity
to the server AFTER the synchronize command has been received by the
server, but BEFORE the mobile device has received the response from
the server. Under this condition, the next time the List is
synchronized, the previously submitted edits will be submitted a
second time. By checking the 'Use server-side synchronization log
table' property, a special server-side log can be used to prevent
the possibility of duplicate SQL updates. When you check this
property an extra Ajax callback fires after the client-receives
acknowledgement from the server that the synchronization was
performed.
By default, after a successful sync, the sync log table is cleared out.
Now, a new property has been added to not clear the sync log table automatically. This provides an extra level of protection against duplicate sync commands being executed by the server.

NOTE: If you turn the 'Clear sync log table after successful sync' off, then may need to periodically clear our the sync log table manually as it will continue to grow as users sync their data.
Application Server - SSL - Alpha Anywhere now
includes the latest stable release of OpenSSL, version 1.0.2f.
Why make the change?
No coding changes were required in Alpha Anywhere to move to
OpenSSL 1.0.2.
For more information on OpenSSL releases please go to:
http://www.openssl.org
a5_sqlToJSONTree() Function - Generates a JSON tree structure from a SQL database table - To display cascading data in a List control (i.e. user selects an item in the List and a sub-list is displayed and a back button is enabled to allow user to navigate to the previous list) a new helper function has been added to Xbasic.
The function will generate the JSON for the hierarchical List.
The function takes the name of a table and a list of fields. For example, if the field list is Country, City, ContactName, the generated JSON data will have a list of Countries. In each Country record there will be a nested array of Cities and in each City record there will be a nested array of ContactNames.
The syntax for the function is:
c JSON = a5_sqlToJSONTree as c (c connectionString, c table,c fieldList [, c endPointFfieldName [ ,c filter [,c order [p arguments]]]])
Where
Example
dim args as sql::Arguments
args.add("c1","USA")
args.add("c2","UK")
json = a5_sqlToJSONTree("::name::northwind","Customers","Country,City,ContactName","CustomerID","Country
= :c1 or Country = :c2","",args)
A partial listing of the JSON returned by the above function call is shown below:
Notice that for each 'endpoint' the display value is the ContactName, but the 'action' property is set to the CustomerID.
[
{
"display": "UK",
"children": [
{
"display": "Cowes",
"children": [
{
"display":"Helen Bennett","action":"ISLAT"
}
]
},
{
"display": "London",
"children": [
{
"display":"Ann Devon","action":"EASTC"
},
{
"display":"Elizabeth Brown","action":"CONSH"
},
........
FormView Control - API Changes - The FormView Control API has been changed to simplify the passing of data to the Editors that are associated with fields in the FormView control. As a result of this change, existing UX components that use the FormView control will not be affected. But you should use new syntax when building new Editors.
For example, this syntax
settings['*a5column'] is replaced with settings.formView.active.path
settings.data is replaced with settings.formView.data
All information dynamically generated by the FormView when an Editor is invoked is now encapsulated in the settings.formView namespace. This reduces the chances of a user's settings conflicting with system settings.
Calling SOAP Services - A new set of genies
makes it easy to register and call SOAP services from Xbasic code.
The Web Projects Control Panel has a new category called 'Web References' where your registered SOAP services are displayed.

To register a new SOAP web service, select the Web References category in the Web Projects Control Panel and then click the New button.
This will open the New Web Reference dialog where you can register your SOAP web service.
At the 'Service address' prompt, enter the URL of the service WSDL. For example:
http://bernera.zapto.org/astronomy/astronomy.asmx?WSDL

Also specify the local name of the service. This can be any name you want.
Once you click the OK button, Alpha Anywhere will create a proxy file in the bin\webreference folder in the web projects folder. The proxy file has the same name as the the Name you entered into the New Web Reference dialog and it has a .dll.
NOTE: When you publish your Web Project the 'bin' folder will automatically be published. Your Xbasic code that calls the SOAP service will need to be able to reference the proxy .dll file at run-time.
Once you have create the Web Reference you can explore it method by double clicking on the entry in the Web Control Panel:

This will open the Explorer. The explorer shows the methods exposed by the service and the arguments for each method and the return values for each method.
Calling a Registered SOAP Service from Xbasic
Once you have registered your SOAP service as described above, you can call it from your Xbasic code. A genie will help you write the Xbasic code.
To get to the genie open the Xbasic editor where you will be writing your Xbasic function to make the SOAP call (this might in the Xbasic Function Declarations section in a component, or while exiting an Xbasic Module file), and right click on white space.
Then select the Genies...., Web Reference Call... menu item.

This will then bring up a dialog where you can select the Web Service you want to call. The list of services that you previously registered are shown here.

Once you select the service, the Explorer is shown where you can choose the method that you want to call.

Finally, when you press the OK button, Alpha Anywhere generates the sample Xbasic code needed to call the service. You can paste this code in the Xbasic function you are writing.

Web Applications - Publishing - HTTP Publishing - When you publish a web application to a remote server you first define the Publishing Profile to use. The publishing is currently accomplished by using FTP to upload the files to the remote server. Now, a new way of publishing files to a remove server is available using the HTTP protocol.
Watch Video - Configuring the Server
Watch Video - Defining a Publishing Profile
The HTTP Publishing method requires that the Alpha Anywhere server on the remote site be running because the Alpha Anywhere server is actually handling the uploading of the data.
The HTTP Publishing method is more reliable and faster than the FTP method.
For more details on HTTP Publish, click this link:
http://downloads.alphasoftware.com/a5v12Download/ReleaseNotes/HTTPPublish/httpPublish.html
PhoneGap App Builder - Third Party Plugins (iOS) -
Keyboard Plugins - Added support for the cordova-keyboard
and the ionic-keyboard plugins. These plugins provide functions to
make interacting with the iOS keyboard a bit easier and include
events to indicate the keyboard will show/hide.
For the full plugin documentation, see the links below.
cordova-plugin-keyboard
cordova-plugin-ionic-keyboard
PhoneGap App Builder - Third Party Plugins (Android,
iOS) - Media With Compression Plugin - The Alpha cordova-media-with-compression
plugin has been updated to include three (3) new methods.
For the full plugin documentation, see the link below.
cordova-plugin-media-wth-compression
UX Component - Data Binding - Server-side Save Submitted Data to Table(s) Action - onSQLError Event - A new event has been added to the action to allow you change the error message shown to the user when a SQL database error occurs.
For example say that the user tries to enter a new record. When the INSERT SQL statement is executed, the database returns some error (perhaps a foreign key violation). The error message returned by the database is displayed to the user. However, this error message is often quite cryptic and is certainly not 'friendly'. The onSQLError event handler allows you to intercept the error before it is displayed to the user and replace it with a friendlier message.

TabbedUI Component - Keyboard Shortcuts - You can now define keyboard shortcuts for the action buttons in a TabbedUI component.
To define a keyboard shortcut for a TabbedUI button, click the smart field and select the key combination. The user will be able to open the component by using the keyboard shortcut in addition to clicking on the button.

UX Component - Server-side Events - canAjaxCallback - afterAjaxCallback - Two new server side events have been added:
In the canAjaxCallback event handler, if your code sets:
e.authorized = .f.
then the Ajax callback action will not be performed. Your code can examine data in request.variables to see what type of callback was being attempted.
In the afterAjaxCallback event, the 'e' object that is passed into the event handler contains:
e.ajaxResponse
Your code can modify this response.
UX Component - List Control - SQL Datasource - beforeQuery - The beforeQuery server side event fires before a query is performed to get data for the List.

The event allows you 'authorize' the query.
In your Xbasic code in the function, you can set:
e.authorized = .f.
This will cause the query for the List data to return no data.
UX Component - CustomControl - 'Other Controls' - A new control type has been added to the 'Other Controls' section in the UX builder:

The CustomControl allows you to specify arbitrary HTML and Javascript for the control. You can specify the HTML and Javascript at design-time, or you can specify an Xbasic function that will generate the HTML and Javascript for the control at run-time.
A very powerful use case for the CustomControl is to dynamically generate a form based on a definition stored in a database.
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
Watch Video
- Part 4
Watch Video
- Part 5
Watch Video
- Part 6
Watch Video
- Part 7
When you add a CustomControl to a UX component, the PropertySheet for the control is displayed as follows

Clicking on the smart field for the Custom Control Properties brings up the builder.
If you select the 'Specify Now' option in the Custom Control builder you can specify the HTML for the control and (optionally) any Javascript you want to execute before the UX is 'prepared' and after the UX has been rendered.

For example, if you wanted your CustomControl to render a standard UX component input control (called, say, 'CUSTOM1') you would add this code to the HTML:
<input id="{dialog.componentname}.V.R1.CUSTOM1"
name="V.R1.CUSTOM1" class="{dialog.style}Edit" ></input>
And you would add this Javascript to the 'Javascript - Before Prepare' property:
{dialog.object}.columnInfo['CUSTOM1'] = { info: {controlType:
'Textbox'}, hiddenVal: false, type: 'input,label', isCalc: false,
hlp: '', isArray: false, dataType: 'C' };
On the other hand, if you wanted your CustomControl to render a standard UX component button control (with an ID of, say, 'B1') you would add this code to the HTML:
<div id="B1" style="width: .5in;">MyButtonGoesHere</div>
And you would add this Javascript to the 'Javascript - After Render' property:
//add an event handler for the button
$e.add('B1',A5.d.evnts.click,function(e) {
alert('this is button b1');
},this,false,'B1');
//define a new button object
{dialog.object}._buttons['B1'] = new A5.Button({
layout: 'text',
style: 'box-sizing: border-box; -moz-box-sizing: border-box;
-ms-box-sizing: border-box; -webkit-box-sizing: border-box; width:
1.5in;',
html: 'Button',
onClick: function() {
},
theme: '{grid.style}'
})
//bind the button object to the html element
{dialog.object}._buttons['B1'].bind('B1');
If you wanted to generate the HTML and Javascript at run-time you can set the Method to 'Xbasic' and then define an Xbasic function that generates the HTML and Javascript.

PhoneGap Shell Template UX Component - Statusbar Plugin - iOS - The template UX component that implements a PhoneGap shell has been modified so that it now uses the PhoneGap Statusbar plugin. When running the Shell UX on an iOS device the status bar will now display above the UX component. Previously, the status bar was overwritten by the UX component. The code that implements this is in the UX components onPhoneGapReady client-side event.
NOTE: Search for PhoneGap - PhoneGap Shell - for more information on the PhoneGap Shell.
UX Component - List Control - Lists with Detail View - Synchronization - onSynchronize Server-side event - The onSynchronize event fires when the user clicks the synchronize button on the UX to submit edited List rows to the server. The primary purpose for this event is to allow the developer to take complete control of the synchronization process and implement a custom handler to synchronize the edited List data.
When the user synchronizes a List with a Detail View, the dirty List records are submitted to the server. If the List is based on SQL queries, the CRUD operations to update the database are automatically computed by Alpha Anywhere. However, you may want to process the dirty List data yourself.
In the case where the List is not based on SQL queries, you have no choices - you have to handle the List synchronization yourself.

NOTE: If the List is not based on SQL queries, the List Builder also has these events:

The onSynchronize server-side event is a higher level event that fires before any of the 'Synchronization Handler' events are fired. For example, the 'Commit data handler function' is called after the server has processed validation rules. The event is called once for each dirty composite record submitted to the server.
Application Server - Self-Signed Certificates
- Self-signed SSL certificates are now signed using the SHA-256
algorithm. Previously they were signed using the md5 algorithm,
which is no longer considered secure for these purposes. It is still
recommended that a public-facing server use a certificate from a
commercially supported Certificate Authority (e.g. Verisign, Comodo,
GoDaddy, etc.) for browser compatibility, but this change increases
security in situations where self-signed certificates are desired.
UX Component - PanelOverlay - Windows - A new property has been added to PanelOverlays to make the PanelOverlay behave like a window. When the 'PanelOverlay is window?' property is checked, the PanelOverlay is initially hidden (when the Panel that contains the PanelOverlay is shown).
Watch Video
Download Component
To show the PanelOverlay you can use Action Javascript. There are two new actions in Action Javascript:
These actions allow you to animate the PanelOverlay as it is shown or hidden.
NOTE: The animation option uses jQuery. Your application must load jQuery. See the Project Properties dialog (accessed from the Web Applications Control Panel).
.Net Framework v4.6 - Alpha Anywhere now uses .Net Framework v4.61. If the machine you are installing to does not include the .Net Framework v4.61, Alpha Anywhere will install it. It can take quite a bit of time to install the .Net Framework. However, this is a one-time event.
Web Applications - Xbasic Error Log - A new warning message is now written to the Xbasic error log if you run a component that was last edited with a build that is greater than the version of the server.
For example, say your server is running using build 4600 and you run a component that was built with build 4610. This is a version mismatch that might cause an error.
For example if the component built using build 4610 calls some function that was added after build 4600, it will definitely lead to a run-time error. On the other hand if the the component does not use any new functionality, then it is unlikely that there will be an error.
Because it cannot be know with certainty if this version mismatch will lead to errors, the message written to the Xbasic error log is termed a 'warning' and not an 'error'.
Xbasic - Web Applications - How to Write to the Xbasic Error Log - Xbasic_Write_to_Error_log() - A new Xbasic function allows you to write messages to the Xbasic error log.
The text is written to the error log exactly as specified in the function. Therefore it is recommended that you format the message so that it appears in the log in a useful manner.
For example
dim message as c
message = "Warning: " + crlf() + chr(9) + "This is a warning message" + crlf()
Xbasic_write_to_error_log(message)
The message will appear in the log as:
Warning:
This is a warning message
UX Component - ButtonList Control - Allow Null Property - The ButtonList now has a new property - 'Allow NULL selection'. The options for this property are:

UX Component - ButtonList - Class name - You can now specify a class name for the items in a ButtonList.

In the above example the class name is set to 'foobar'
Here is how you might want to define this class:
.foobar {color: red;}
.{dialog.style}ButtonPressed.foobar {color: orange;}
Notice that two CSS selectors are defined.
.foobar - defines the appearance when the Button is not selected
.{dialog.style}ButtonPressed.foobar - defined the appearance when the Button is selected.
UX Component - Checkbox and RadioButton Controls - Vertical Alignment - Vertical Spacing - A new property has been added for Radio Button and Checkbox controls that allows you to control the vertical spacing between each item. The 'Vertical spacing' property is shown when the Orientation is set to 'Vertical'.


UX Component - Data Bound Image Control - imageIsEmpty() Method - A new method on the Dialog object allows you to test if an image control is empty.
Example:
var flag = {dialog.object}.imageIsEmpty('PICTURE1');
UX Component - Explore Structure - A new dialog is available to help you understand the structure of complex UX component layouts.
When you build large UX components with many Panels, Windows, PanelOverlays, etc. it can be difficult to get an 'overview' of the underlying structure of the component. The new 'Structure View' can help you quickly explore the structure of a UX.
The 'Structure Explorer' is implemented as another view in the Quick Find dialog.
To open the 'Structure Explorer' click the 'Find' button on the toolbar and then select the 'Explore Structure' radio button.

UX Component - List Control - Configuring a List Control to Display Nested Lists - A new genie is available to configure a List to display a series of cascading Lists.
Watch Video
- Introduction
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
To select the Genie, create a new List, then select the 'Quick Access...' button at the bottom of the List Builder. Then select the 'List Quick Setup Genie'. This genie can be used to quickly configure a List that has a data source that defines hierarchical data to display a series of nested Lists.
UX Component - List Control - Static Data Genie -
Nested List Data - A new genie is available to help you defined
the static JSON data for a List that is intended to display a series
of cascading Lists.
For example in the images shown below the List initially displays the data shown in the image on the left. When the user selects an item in the List that has a sub-list (indicated by the icon at the right edge of the List item), the List is repopulated with the sub-choices defined by the item that was selected and a 'back' button is shown. In order to implement a List that behaves in this manner, the List is populated with JSON data that defines the choices for each item in the List.
![]() |
![]() |
For example, for the List shown in the above two images, the
following JSON data is used to populate the List.
[
{
display: 'Menu1',
children: [
{
display: 'Menu1_A',
action: 'Action_1'
},
{
display: 'Menu1_B',
action: 'Action_2'
},
{
display: 'Menu1_C',
action: 'Action_3'
}
]
},
{
display: 'Menu2',
action: 'Action_4'
},
{
display: 'Menu3',
action: 'Action_5'
}
]
Notice that the 'Menu1' item has a property called 'children' that defined the sub-choices for that item. The actual text displayed in the List is defined by the 'display' property in the JSON. Any item in the List can have a 'children' property.
It can be tedious to define this JSON data manually. The 'Nested
List Genie' can help you define the JSON. Once you have the basic
structure of the JSON defined, you can then make making further
edits to the JSON manually. To get to the 'Nested Lists Genie', open
the List builder, set the List Data Source to 'Static', click the
smart field to open the Static Data dialog. Then click the 'Sample
data' hyperlink at the bottom of the dialog (as shown in the image
below).

UX Component - Sample Template -
MobileAppFramework_with_SplitView_Hierarchical_Menu - When you
create a new UX component, a new sample template is available. This
template is similar to the MobileAppFramework_with_SplitViewMenu
template. The only difference is that, unlike the
MobileAppFramework_with_SplitViewMenu, which implements a 'flat'
list of choices for the menu, the
MobileAppFramework_with_SplitView_Hierarchical_Menu template
implements a hierarchical list of menu choices.
UX Component - List Control - Paginated List - SQL Data - Change Page Size - You can now dynamically change the page size of a paginated List that is based on SQL data.
For example, say you want to change the page size of a paginated List (called, say, 'LIST1') to 20 records per page.
//get pointer to List object
var lObj = {dialog.object}.getControl('list1');
//set the new page size
lObj._state.pageSize = 20;'
//refresh the List
dialog.object}.refreshListData('LIST1');
UX Component - Embedded Report - HTML - Option Buttons - When a report is embedded into a UX component and is rendered as HTML, the report is displayed with a series of buttons that allow the user to print the report as PDF, export the report to Word or Excel, etc. There was no ability to control which of these buttons were shown. Now, when a report is embedded into a UX, the 'HTML report options' property allows you to control which button are shown.

UX Component - Persisting Variables to Local Storage - Variables to Omit - When you build a disconnected application using a UX component, it is typical to persist the variables (i.e. the Data Bound controls in the UX) in your component to Local Storage so that when the application is restarted, the variables (i.e. Data Bound controls) in the UX will have their values restored automatically from Local Storage. However, there may be certain variables that you do not want to persist to Local Storage. For example, your UX may contain a login section that contains a UserId and Password field. You might not want to persist the Password field to Local Storage.
The UX now has a new property that allows you to define an exclusion list. The Variables to NOT persist property in the Local Storage section (on the Properties pane) allows you to select a list of variables.

UX Component - Panels - .resize() Method - A new method has been added to allow you to force Panels (Cards, Layouts and Navigators) to resize themselves. Typically this is not necessary, but if the Panels were initially sized and then the window was resized (and a resize event was not triggered -- for example, the PhoneGap Statusbar plugin), then Panels will have been laid out based on incorrect size information and the .resize() method can be useful.
For example:
var obj = {dialog.object}.getPanelObject()
obj.resize();
UX and Grid Component - Date Picker - 'Today'
Button - A new property in the Date Picker and the Calendar
control (UX component) allows you to turn off the 'Today' button.
Web Security - Alpha Anywhere Server - Publishing
Data - Publishing Roles - Publishing web security to an Alpha
Anywhere server from the Publish genie or the Web Security menu
"Publish Security Files" has new options. These are available only
if using Optimized FTP publishing. You can now publish security
roles without publishing the security tables. The options are:
The option to publish security tables is available in all publish
profiles that publish to an Alpha Anywhere server.
UX Components - File Save Format - UX Components
can now be saved as formatted JSON instead of binary (the default).
Formatted JSON saves the properties in clear text. This is useful if
you are using some type of source or version control system and the
system has a method to show differences between versions. The save
format can be selected in the UX Properties under 'Advanced-> Save
component format'.
You can do a bulk conversion of the storage format by selecting the 'Edit, Bulk Operation, Change UX Component storage type' menu option when the Web Control Panel has focus.
Xbasic - Dot Variables - .set() Method - A new method has been added to dot variables to allow you to set properties on the variable. The .set() method complements the .data() method which is used for reading a property value.
Example
dim p as p
p.name = "Fred"
?p.data("name")
= "Fred"
p.set("name","John")
?p.data("name")
= "John"
p.set("city","Boston")
?p.city
= "Boston"
Reports - Free-Form Reports - UTF8 - SQL Data - Free-form reports that are based on SQL data can now use the full UTF8 character set. This means that reports can now, for example, easily include Chinese, Hebrew, Arabic and other characters on the same report. Previously this was only possible by setting the localization settings on the machine where the Application Server was running. Since you had to pick a particular locale that meant that you could not combine characters from different code pages (e.g. you could not have Chinese and Hebrew on the same report).
This feature can be turned off in web applications in the Project Properties dialog by un-checking the PDF Printing option to "Allow all international character in free-form reports".
For desktop applications, the option can be turned off in "View->
Settings-> Preferences-> Reports-> SQL Support All International
Characters". When the feature is off, the reports will use temporary
dbf tables for report data.
UX Component - Publishing Session Variable Values to Client Side - Ajax Callback - If an Ajax callback made a change to a session variable that had been published to the client-side the value of the session variable on the client-side is now automatically updated.
Application Server - Session Variables - Session.Sequence - A change was made to the way session variables are stored internally by the Alpha Anywhere server. This change should not affect any application.
This change makes the method used by the Alpha Anywhere server and the Alpha Anywhere Server for IIS the same and it opens the possibility for a future enhancement to the Alpha Anywhere server to use the IIS session state provider. This will allow for improved scalability and fail over (sessions shared across instances).
As a result of this change a new property is now available on the session object. Session.Sequence is a character value and is an unformatted string representation of a GUID. It will automatically be updated when a session variable is created, modified, or deleted.
UX Component - List Control - Detail View - Synchronizing in Batches - Client-side Events - The client-side events for batch synchronization - afterSynchronizeListBatch and afterSynchronizeListBatch now both allow your Javascript to reference the e.countInfo object which has information in it about the number of records in each batch, the number of successful updates and the number of errors in the batch.
UX Component - Signature Control - .signatureIsEmpty() method - This method has been improved and it now gives accurate answers regardless of the browser that is being used. Previously, the method would be inaccurate for Chrome.
In addition, this method can now be used when the signature control is in 'signing' mode. Previously it could only be used after the user had clicked the 'accept' button to accept the signature.
You can also now pass in an optional second parameter to specify a length parameter The control is considered to be 'empty' if the base64 encoded value of the signature is less than the specified length. Note that even an 'empty' signature will have a non-null value for its base64 encoded value.
Reports - Calculated Fields - User Defined Functions - When you create reports you can define calculated fields that use user-defined functions in the calculate field expression.
Now, the user-defined functions that the report references can be defined in an Xbasic Function Library. Previously these functions had to be in an .aex file that was published along with the other files in the project.
Placing the Xbasic functions in a Function Library is more convenient than having to create an .aex file.
NOTE: This feature only applies to Project Reports (i.e. reports defined in the Web Projects Control Panel).
To attach an Xbasic Function Library to a report, right click on the report and select the Xbasic Function Library References.. command.

UX Component - Ajax Callbacks - Caching - When an Ajax callback is made to a component, the first thing that the Alpha Anywhere server does when handling the callback is de-serialize the component ( the .a5wcmp file). For very large components, the time taken to de-serialize the .a5wcmp file can be significant (perhaps as much as 200ms). Now, the de-serialized components are cached. As a result, the performance of Ajax callbacks will be improved.
NOTE: Caching is only used on UX component that do not user security or server-side show/hide expressions. For example, if you have a button that is only show to members of the 'Sales' group, caching is not used.
UX Component - List Control - Convert Data Source from Static to SQL or SQL to Static - A new genie in the List Builder allows you to convert the Data Source for a List from Static data to SQL or vice-versa. When you convert the data source from static to SQL, the following options are available:
When you convert the data source from SQL to Static, the following options are available:
PhoneGap Applications - _phoneGapSettings() Function - In PhoneGap applications you can now call a special system function to return information about your PhoneGap application. For example, you might want to know if a particular option was selected, if a particular plugin was loaded or what the application id is.
For example:
To get the application id:
alert( 'app id: ' + _phoneGapSettings().appId );
To find out if the sqlite plugin was loaded:
var flagSQL = _phoneGapSettings().plugins['com.brodysoft.sqliteplugin'];
if(typeof flagSQL == 'undefined') flagSQL = false;
NOTE: When a PhoneGap application is built, a special .js file called _phoneGapSettings.js is created in the 'www' folder.
Below is a sample of the _phoneGapSettings.js file:
function _phoneGapSettings() {
return {
"appId": "com.yourCompany.yourApp",
"preferences": {
"permissions": "none",
"orientation": "default",
"target-device": "universal",
"fullscreen": "true",
"webviewbounce": "true",
"prerendered-icon": "true",
"stay-in-webview": "false",
"ios-statusbarstyle": "black-opaque",
"detect-data-types": "true",
"exit-on-suspend": "false",
"show-splash-screen-spinner": "true",
"auto-hide-splash-screen": "true",
"disable-cursor": "false",
"android-minSdkVersion": "7",
"android-installLocation": "auto",
"phonegap-version": "3.7.0",
"FadeSplashScreen": "true",
"FadeSplashScreenDuration": "2",
"EnableViewportScale": "false",
"MediaPlaybackRequiresUserAction":
"true",
"AllowInlineMediaPlayback": "false",
"TopActivityIndicator": "gray",
"BackupWebStorage": "cloud",
"iosPersistentFileLocation":
"Library",
"KeyboardDisplayRequiresUserAction":
"true",
"SurpressesIncrementalRendering":
"true",
"android-maxSdkVersion": "",
"android-targetSdkVersion": "",
"KeepRunning": "true",
"splash-screen-duration": "5000",
"ErrorUrl": "error.html",
"LoadingDialog": "Please wait, the
app is loading.",
"LoadingPageDialog": "Please wait,
the data is loading.",
"LoadUrlTimeoutValue": "20000",
"AndroidPersistentFileLocation":
"Internal"
},
"plugins": {
"battery-status": "npm",
"console": "npm",
"device": "npm",
"file": "npm",
"file-transfer": "npm",
"geolocation": "npm",
"inappbrowser": "npm",
"media": "npm",
"network-information": "npm",
"com.phonegap.plugins.pushplugin": "pgb",
"com.brodysoft.sqliteplugin": "pgb",
"com.alphasoftware.plugins.camera.withexif":
"pgb",
"statusbar": "npm"
}
};
}
Xbasic - YELP API - You can make requests against the YELP API using Xbasic - The following example shows how to make a request against the YELP API:
Example:
The query syntax for the YELP API is described on the YELP website (see the YELP API dashboard).
Say that the syntax for the query you want to make is as follows:
https://api.yelp.com/v2/search/?location=lexinton
ma&radius_filter=10000
This query will show businesses within 10,000 meters of Lexington, MA.
To perform this API query using Xbasic
1. Extract the URL from the query (everything up to the ?) and set the URL variable (in the code shown below) to this value.
2. DIM an Xbasic dot variable (DIM P as p in the code shown below) and set properties in this dot variable for each parameter in the query string. Note that when setting parameter values, spaces in the parameter values must be converted to + signs.
dim p as p
p.location=stritran("lexington ma"," ","+")
p.radius_filter = "10000"
Here is the complete example:
dim ao as extension::OAuthClient
ao.consumer_key = "consumer key value - get from the YELP website"
ao.consumer_secret = "consumer secret value - get from the YELP website"
ao.oauth_token = "oauth token - get from the YELP website"
ao.user_secret = "user secret - get from the YELP website"
ao.oauth_signature_method = "HMAC-SHA1"
ao.url_encode_flags = "+plusspace"
url = "https://api.yelp.com/v2/search/"
dim p as p
p.location=stritran("lexington ma"," ","+")
p.radius_filter = "10000"
dim result as n
result = ao.Exec("GET",url,p4)
if result = 200 then
dim jsonResponse as c
'reformat the json response to make it readable
jsonResponse = json_reformat(ao.response_content)
showvar(jsonResponse)
else
showvar("Error")
end if
Once you get the response from YELP you can use the json_parse()
function to get an Xbasic variable and then generate code to (for
example) populate a List control on a UX component showing the
results.
UX Component - {dialog.object}.refreshDropdownBoxChoices() Method - Refreshing Multiple Controls in a Single Ajax Callback - You can now refresh multiple Dropdown controls in a single Ajax callback. Previously, if you wanted to refresh the choices in multiple controls you had to make multiple Ajax callbacks.
There are two syntax options.
You can specify a comma delimited list of controls to refresh. For example:
{dialog.object}.refreshDropdownBoxChoices('COUNTRY,CITY')
Or, you can specify a JSON string. Using the JSON string method you
can specify optional parameters for each Dropdown control.
For example:
var arr = [];
arr.push({ controlName: 'country');
arr.push({ controlName: 'city', dynamicFilter: 'country = \'usa\' or
country = \'uk\''});
var json = JSON.stringify(arr);
{dialog.Object}.refreshDropdownBoxChoices(json)
Application Server - Configuration Changes -
Many Application Server configuration changes are now effective
immediately (without requiring a server restart)
Changes made to the Application Server's configuration are now
effective as soon as those changes are saved, including when the
server is currently running. This allows the server configuration to
be modified without having to restart the server and interrupt user
activity.
For example, many server administrators do not enable server logging
in order to conserve disk space and other server resources. However,
since logs are very helpful when an unexpected problem occurs, it is
often times desirable to turn them on temporarily. Previously, this
would require a server restart which meant either interrupting users
of your applications or going without logging until some later time
when the server became idle. Now changes such as this can be made
with no impact on application users.
Some changes cannot be made effective without a server restart
however. These are changes to the listening IP address or port, the
server's license, and the SSL configuration.
IMPORTANT: Changes must be made through the Alpha Anywhere or Alpha Anywhere Application Server user interfaces. If the server's configuration file is directly edited then the changes will not be effective until either the server is restarted or changes are saved through the user interface.
UX and Grid Component - Auto-Suggest Control - Return Value - By default, the return value for an auto-suggest control is the same as the search field. Now you can specify a different return value than the search field.
PhoneGap App Builder - Status Bar Plugin (iOS)
- The Status Bar Plugin default behavior has changed to reflect the
styling recommended by Apple for iOS 7 and greater apps. By default,
the iOS status bar is now overlaid on top of the PhoneGap WebView.
This will require the addition of a 20px spacer to a Panel header to
accommodate the status bar. If you would like to set the behavior to
the previous iOS 6 style, which does not overlay the WebView, you
must set the properties for the status bar from within the
onPhoneGapReady
event in the Client-side events.
Example:
Add this code to the onPhoneGapReady event:
StatusBar.overlaysWebView(false);
StatusBar.styleDefault();
NOTE: While the PhoneGap documentation for the Status Bar plugin indicates that a preference setting within the config.xml file can be used to set the default behavior as required, this is not currently supported by PhoneGap Build.
IMPORTANT: The PhoneGap StatusBar plugin resizes the size of the WebView control asynchronously. That means that if your UX component uses Panels (which is very likely) the Panels will have been laid out using the original size of the WebView control. This will cause layout errors - most likely manifested as Panel Footers being incorrectly sized. Therefore, it is very important that you add this code to the onPhoneGapReady event to resize the Panels in your component. This code must be wrapped in a setTimeout() so that it runs after the Statusbar plugin has completed.
For example:
StatusBar.overlaysWebView(false);
StatusBar.styleDefault();
setTimeout(function() {
var obj = {dialog.object}.getPanelObject()
obj.resize();
},100);
UX Component - Action Javascript - File Upload - Amazon S3 Action - Alpha Anywhere Server - This action previously only allowed upload to S3. Now you can use the same action to upload files to the Alpha Anywhere server. In the case of the Alpha Anywhere server, you specify the name of an Xbasic function to call after each file us uploaded. This action allows you to select multiple files for upload. The files are all uploaded at once and separate progress bars are shown for each file. The Xbasic function will be called once for each file selected.
UX Component - PanelOverlay - zIndex Property - You can now specify an explicit z-index for a PanelOverlay. Previously the zIndex for a PanelOverlay was hard-coded to '4'. The default value has been changed from '4' to '6'. This means that it is possible that you might see a change in behavior when running a UX in that a PanelOverlay that was previously shown when another Panel was brought into view would now be hidden. To restore the prior behavior simply set an explicit value of '4' for the PanelOverlay's zIndex property.
Xbasic - a5_word_merge_dotNet() Function - Merge Data into Word Template - Merges data that results from executing a SQL query into a Microsoft Word template document.
IMPORTANT: You must install the Microsoft
Office 2010: Primary Interop Assemblies Redistributable in order to
use this function.
http://www.microsoft.com/en-
Syntax:
p pResult = a5_word_merge_dotNet(c folder,c templateFile, c connectionstring,c sql,sql::arguments args [,l flagPortableSQL [c outputFilename]])
Where:
Example:
dim folder as c = "c:\data\wordMerge"
dim template as c = "Template.docx"
dim ConnectionString as C = "::Name::Northwind"
dim sql as c = "select customerid, contactname, address, city,
region, country, postalcode, contactname as [salutation] from
customers where country = :whatcountry"
dim args as sql::arguments
args.add("whatcountry","uk")
dim outputfilename as c = "Invoice for {customerid}"
dim pr as p
pr =
a5_word_merge_dotNet(folder,template,connectionstring,sql,args,.t.,outputFilename)
The Xbasic source code for this function can be download here. The reason for including the source code is that it serves as a useful guide to calling .Net code from Xbasic and it allows developers to tweak the function to expose other Word features.
: UX and Grid Component - Building Real-time Applications - Web-sockets Server - Publish/Subscribe - The web-socket server functionality has been enhanced to support a publish/subscribe model. When a client-connects to the web-socket server they can specify the 'message types' that they are interested in receiving.
If the client is not subscribed to a particular 'message type' then when the web-socket server will not send any messages of that type to the client.
In the component properties, you can specify what message types the component should listen for.
You can use the Web-socket server actions in Action Javascript to dynamically change the types of messages that the component has subscribed to.
For example, in the image shown below, the component will be subscribing to messages of type 'messageboard' and 'alpha'

The 'message types' are completely arbitrary. When a message is sent, it is given a specific (arbitrary) message type.
For example, the code below sends a message of type 'myspecialtype':
var obj = {type: 'myspecialtype', messageText:
'this is the message};
{dialog.object}.wsclient.socket.send(JSON.stringify(obj));
Alpha Anywhere comes with certain 'built-in' message types. You can add you own built-in message types by writing a node.js handler for your user-defined message type.
The built-in 'messageboard' message type (for example) is written so that when the user connects to the web-socket server (or re-connects after having lost the connection) any messages of type 'messageboard' that were sent prior to their connecting are automatically sent to the client (assuming, of course, that the user has subscribed to messages of type 'messageboard'). The 'messageboard' special type is written to keep a certain maximum number of messages in is 'history' stack, but you can edit this value.
The custom message types are stored in the <Alpha Anywhere executable folder>\node_services\ws_queue folder. For example, the 'messageboard' special type is in a file callled messageboard.js.
To add your own message type (called say 'type1') create file called type1.js in the ws_queue folder. Use the messageboard.js code as
The web-socket server actions in Action Javascript allow you to specify what message types to subscribe to when you select the following actions:
Using the Web-Sockets Server when Alpha Anywhere is Using a Load Balancer
A load balancer is commonly used to distribute incoming requests
to one of several Alpha Anywhere Application Server instances
running on a single Windows computer. Alpha Anywhere uses a Node.js
server running on a different port in order to provide WebSockets
functionality, so the load balancer will need additional
configuration if you will be using WebSockets with your application.
The URL used for your application points to the load balancer so it
must know about all incoming traffic that is to be expected and
passed along.
Configuring the load balancer to work with the WebSockets server is
simpler than configuring it to work with the Alpha Anywhere
Application Server instances because only one Node.js server is
used. There is no balancing to be done, just allow the incoming
traffic to pass through to the Node.js server. The load balancer
should be configured to accept traffic on the port that has been
specified in the web project properties and send that traffic to the
same machine as the Alpha Anywhere Application Servers, but on the
port specified. The exact configuration steps vary from load
balancer to load balancer, but it is essentially the same as
creating the alpha Anywhere Application Server load balancing that
was already done but with just a single target.
Action Javascript - File Upload - Amazon S3 Storage Action - Base64 Encoded Data - Previously this action assumed that the user would select the files to be uploaded. The action has been enhanced so that you can now specify the file to upload by supplying base64 encoded data (which must be in the form of a data URI).

Tabbed UI - Initial State of Buttons Pane - If you specify that the Buttons Pane on the Tabbed UI can be collapsed, you can now specify its initial state.

The use case for this is typically when you have a Tabbed UI with integrated login. Before the user logs in you do not want the Buttons pane to display, but after login, in the afterLogin client-side event you want to display the Buttons pane. This is done by adding code to the client-side afterLogin event:
tbiObj.showTabbedUIMenuPanel(false);
Note that the .showTabbedUIMenuPanel() event is called with a false parameter to indicate that animation should not be used.
UX Component - Data Bound UX Component Quick Start Genie - You can now create a data bound (SQL Database) UX with full CRUD support using a quick start genie.
To get started, create a new UX component, go to the Controls pane and then click on the [Textbox] item in the toolbox on the left. The following dialog is shown:

Select the 'Create multiple new controls at once' option and then click the 'Populate list from a table' option.
The following dialog will be shown:

The highlighted properties are new. When the controls are added to the UX you can specify that a server-side action to load primary keys should be added to the onDialogIntialize event, that a server-side action to save submitted data to the database to which the UX is bound should be added to the afterDialogValidate event, that buttons to submit/cancel the UX should be added and that buttons to navigate from record to record in the bound table should be added.
This genie makes it much quicker to get started building a data bound UX component.
NOTE: You can also build UX components that perform CRUD operations by creating a List with a Detail View.
UX Component - Quick Find - When a UX component has a large number of controls, finding the control that you want to edit in the Tree View can be difficult. The existing Find feature (accessed by clicking the Find button on the toolbar) was not very helpful. The Find command has been re-implemented as shown in the image below.
To open the Quick Find dialog, click on the highlighted icon in the image below.
The tree view of your UX controls is shown below. You can filter this list by typing into the Filter box, or by clicking on one of the categories in the lists on the left.
You can then double click on an item in the tree view or click the Goto Control button.

PhoneGap App Builder - Added support for the latest CLI versions of PhoneGap - The PhoneGap App Builder has been updated to support the latest CLI versions of PhoneGap. As of early October, 2015 the latest CLI vesrion supported by PhoneGap Build is 5.2.0.
PhoneGap App Builder - Configuration options - Backup config.xml file - A new option has been added to the PhoneGap App Builder that controls the generation of a backup of the
config.xml file when any changes are saved. The backup config.xml option is enabled by default. You may disable or enable this
option as required. The backup config.xml files are stored in the projects resources folder and the files are date and time stamped. A .bak extension is included.
PhoneGap App Builder - Added support for the new NPM Plugin Registry - The PhoneGap App Builder has been updated to load all of the core PhoneGap plugins from
the NPM registry. All prior versions of the PhoneGap App Builder loaded the core and 3rd party plugins from the PhoneGap Build Registry, which is being deprecated by PhoneGap in favor of NPM.
If you are using any of the CLI versions of PhoneGap, the NPM core plugins are required. PhoneGap Build will no longer accept any updates to the plugins listed within the
PhoneGap Build Registry.
Approximately 30% of the 3rd party plugins listed within the PhoneGap App Builder have been listed within the NPM registry by their respective authors and the PhoneGap
App Builder will load those plugins from NPM when appropriate. Some of the plugins must still be loaded from the PhoneGap Build registry in order to work properly within PhoneGap Build.
A new property has been added to all 3rd party plugins that identifies the registry that is being used.
This information is available within the help of each plugin from within the builder.
All previous PhoneGap Build project config.xml files will be automatically updated to use the NPM listed plugins if they are used within a project. This includes the
3rd party plugins that have been updated to the NPM registry.
PhoneGap App Builder - Added support for the Android Crosswalk plugin - The Crosswalk plugin for Android is now supported. You must use one of the CLI versions
of PhoneGap in order for this plugin to be enabled.
Crosswalk replaces the Android WebView with the most recent revision of Chrome. This generally provides enhanced app performance and consistency among different Android devices.
json_filter() Function - Extracts or omits certain properties from a JSON string.
NOTE: Conceptually, this function is similar to the filter_string() function, except that it operates on JSON strings.
Syntax:
c result = json_filter(c json [, c properyNames [, L exclude]] )
Where:
Examples:
'extract object with a single field
dim json as c
json = <<%txt%
{
one" : 1 ,
two" : "TWO" ,
three : [ 1 ,2 ,3 ]
}
%txt%
? json_filter(json,"one")
= { "one" : 1}
? json_filter(json,"two")
= { "two" : "TWO"}
? json_filter(json,"three")
= { "three" : [ 1 ,2 ,3 ]}
'exclude a single field
? json_filter(json,"one",.t.)
= { "two" : "TWO" , "three" : [ 1 ,2 ,3 ]}
? json_filter(json,"two",.t.)
= { "one" : 1 , "three" : [ 1 ,2 ,3 ]}
? json_filter(json,"three",.t.)
= { "one" : 1 , "two" : "TWO"}
'include multiple (comma separated) fields
? json_filter(json,"one,two")
= { "one" : 1 , "two" : "TWO"}
? json_filter(json,"one,three")
= { "one" : 1 , "three" : [ 1 ,2 ,3 ]}
compile_xbasic_function_library() Function - Allows you to use Xbasic Function Libraries in an .a5w page.
Syntax
p nameSpace = compile_xbasic_function_library(c functionLibraryName)
Where:
To call a function you must prefix the function name with the nameSpace. See example below.
Example:
<%a5
dim p as p
p = compile_xbasic_function_library('myFunctionLibrary');
?p.functionInMyLibrary()
%>
Amyuni PDF Printer Driver - Amyuni V5.0 - Windows 10 - Alpha Anywhere uses the Amyuni PDF Printer driver to produce PDF output from reports. Previously Alpha Anyhwere included V4.5 of the Amyuni Printer Driver. Alpha Anywhere now bundles V5.0 of the Amyuni Printer Driver. The V5.0 driver is compatible with Windows 10 whereas the V4.5 driver is not.
Grid Component - Sorting - Add Primary Key to ORDER BY Clause - By default, when you sort a Grid component, the Primary Key of the primary table for the SQL statement that the Grid is based on is now automatically added to the ORDER BY clause. This is done to ensure that even when the user sorts on a field that would not normally generate unique sort keys (e.g. user sorts on the 'City' column), that the sort keys are unique.
If you do not add the primary key to the ORDER BY clause and if the user sorts on a non-unique field, then when the user navigates from page to page in the Grid, it is possible for records that have appeared on a prior page to re-appear on a subsequent page.
You can control whether this feature is enabled or not by setting
the 'Add primary key to all ORDER BY clauses' property on the
Properties pane of the Grid Builder.

a5_copyLayout_to() Function - Can now be used without bringing up any UI.
The a5_copy_layout_to() function is used to copy a Report, Label, or Letter from one data dictionary to another (does not apply to 'Project' reports). This function brings up a user interface for the user to enter the target dictionary. Now, you can use this function programmatically, without bringing up a user interface.
Example:
a5_copy_Layout_to("Report","report1@c:\alphasports\customer.ddd","report2","c:\a5v12\packages\alphasports.ddd")
Where the arguments are:
OData Support - Consume Data from OData Sources
- You can now use standard AlphaDAO methods to access data exposed
by OData data sources.
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
OData is a very popular standard for accessing data using REST calls. Alpha Anywhere now allows you to connect to OData services and then execute standard portable SQL code against the connection. Obviously, the SQL that you execute is limited to functionality supported by the OData service. That means, for example, that while you cannot execute JOIN commands.
To use OData data, you define a named AlphaDAO connection string, and then select OData as the connection type.
The dialog will prompt for the Base URL of the OData service. Once you have the named connection string, you can then continue to build Grid and UX components in the same manner that you would for any SQL database.

node_request() Function - Calling Node.JS Code From Xbasic - Node Code Defined at Project Level - The node_request() function allows you to execute some Node.js code.
The syntax is:
c Result = node_request(c NodeServiceName, p data [L flagRestartNode [, L flagShowNodeConsoleWindow]]);
Where:
Watch Video - Part 1
Watch Video - Part
2
Download Component
NOTE: Contrast this with the technique for running Node code shown in video XB_V12-3 "Calling into Node.JS from Xbasic". The technique shown in this video are for Node services defined at the Alpha Server level (the Node services can be called from any project), whereas the node_request() function discussed here is for Node services defined at the Web Project level.
IMPORTANT: The Node services must be defined in a special location in your Web Project. You must define the Node .js file in the Node\Node_Services folder in the Web Project.
Example:
Assume you have defined a Node service called 'hello' (name is case-sensitive). This service will be defined in a file called hello.js in the 'node\node_services' folder in the Web Project folder.
The contents of the hello.js file is:
exports.handler =
function(packet,response,sendResponse) {
var e;
var attachments = null;
var msg = 'Hello there <b> ' + packet.firstname + ' ' +
packet.lastname + '</b>';
response.result = msg;
console.log(msg);
sendResponse(response,attachments);
};
This is the standard format for a Node module.
Notice the following about the hello.js file:
To run this Node service from the Interactive window:
'define an object (i.e. an Xbasic dot variable) to contain the input parameters
dim p as p
p.firstname = "Fred"
p.lastname = "Smith"
'restart the Node service so that any edits to the hello.js file are picked up and show the console window
?node_request("hello",p,.t.,.t.)
The result, shown in the Interactive window will be:
{"_id":"e38bcc7c-581f-4b6b-9d13-d4da6eb0aa8a","error":"","result":"Hello there <b> Fred Smith</b>"}
This string is a JSON object that can be parsed:
For example:
dim json as c
json = node_request("hello",p)
dim pOut as p
pOut = json_parse(json)
showvar(pOut.result)
TECHNICAL NOTE: The node_request() function is actually a simple wrapper around these low level Xbasic commands:
dim n as helper::node
dim p as p
p._id = "some_unique_id"
p._command = "name of the Node service"
p.param1 = "value of parameter 1"
p.param2 = "value of parameter 2"
dim jsonCmd as c
jsonCmd = json_generate(p)
dim folder as c
folder = "fully qualified path to the 'node\node_services' folder"
n.request(folder,jsonCmd)
NOTE: The files in the 'node\node_services' folder in your Web Project are automatically published when you publish your application. When you do a Live Preview of a component you are working on and you choose the 'Full Preview' option from the menu, the files in the 'node\node_services' will also be published to the LivePreview folder in the server webroot.
Client-side Data Cache - The client-side data cache allows you to define one or more 'data items' that are cached on the client-side so that you can reference this data in a UX component. The data in the data cache is in the form of Javascript arrays.
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
Watch Video - Part
4
Watch Video - Part
5
Watch Video - Part
6
For example, you might define a client-side data cache with these items:
For each item in the data cache you specify the server side query that generates the JSON data for the data item. For example, you might specify that the data for the 'customer' data item is obtained by executing a SQL SELECT command against a SQL Server database.
The data for the 'orders' data item might be obtained by executing some custom Xbasic code that returns a string of JSON data.
The data source for a data item can be:
The data in a data-item can, optionally, be saved on the client-side so that it is available when you are running the application in disconnected mode. When you choose to save the data on the client, you have the option of storing the data in:
The amount of data that can be stored in local storage is limited. If you store data in a file on the device you will be able to store significantly more data than would be possible in local storage.
The UX has methods that allow you to refresh the data in a data item and to read the data from a data item into a Javascript array. When you read data from a data item into an array you can, optionally, specify filter and order conditions so that only 'records' that meet your filter criteria are in the array returned by the read method.
You can specify that the data in a data-item should be 'delayed'. This means that when the UX is initially rendered, the query for the data item is not performed and no data is initially sent to the client. Only when the user executes an explicit command to 'refresh' the data item will an Ajax callback to the server be made and then the data item query is performed and the data are sent to the client.
If you have specified that the data in a data item should be persisted to Local Storage, there is no way of knowing, at the time the query to get the data for the data item is performed, if the data that is returned to the client will actually be able to be stored in Local Storage - because there is not enough available space in Local Storage. Therefore, when you specify that a data item should be stored on the client side you can also specify an event handler that will get fired if the data could not be successfully persisted to Local Storage. This will allow you to display some UI to inform the user to enter more selective search criteria for the query that returns the data for the data item.
IMPORTANT: If you want to use the FileSystem option in a PhoneGap application you must include the Device, File and File Transfer plugins when you build your PhoneGap application.

Defining a Client-side Data Cache
To define a client-side data cache, you open the Client-side Data Cache Editor. There are two ways to open the editor. You can use the dropdown menu by clicking the Menu button, as shown below:

Or, you can click the smart-field for the 'Client-side data cache' property on the Properties pane in the UX builder

Client-side Data Cache Editor
The Client-side Data Cache editor, shown in the image below, shows the names of data items in the Data Cache. The dialog show summary information about each data item.

To edit an item in the Data Cache, click the 'Edit item' button, or double click on the item in the list. This will open the Data Item editor.

For each item you can specify:
Persisting Data
If the Delay query until explicit refresh property has been checked, the dialog shows additional properties that allow you to specify that the data item should be stored on the device.

The options for Store where are:
IMPORTANT: If you are persisting to the file system and you are using Xbasic to generate the data for the data items, be sure to generate properly formed JSON. For example: [ {"name" : "fred"} ] and not [ {name: 'fred'} ]
When Store data on device option is checked you can specify a Maximum payload size property. This is the maximum size (in bytes) that a query is allowed to return. If you specify the default value of -1 there is no maximum. This property is designed to allow you to protect against the user trying to download too much data to the device. When the
Maximum payload size property is set to some value greater than -1, the payloadSizeExceeded Javascript Event property is shown. You can put code in this property to alert the user that their query for the data item returned too much data and they they must enter a more restrictive query.
Other Settings
If any of the data items in your Client-side Data Cache are configured to store data in the file system on the device then you can set additional settings in the Other Settings tab of the Client-side Data Cache editor.
These settings control whether a progress bar is shown while the device is downloading the data from the server to be stored in files on the device.
If you are storing large amounts of data on the device you will generally want to show the user a progress bar so that they know that something is happening.

You can specify the color and width of the progress bar and you can also specify a placeholder or an explicit element id for the position of the progress indicator. Say for example, and element with an ID of 'progress1' and you want to display the progress indicator in this element, you specify the Placheholder for progress indicator as element:progress1
Before file download begins - This event fires after the Ajax callback to get the data for the data items that are being refreshed has completed, but before the device actually starts downloading data.
The use case for this event is as follows:
Say you have defined a Client-side data cache with a large number of data items, (or a few data items, some of which return a large amount of data.) The Ajax callback to refresh all data items will take some time on the server to complete. While the server is busy performing the queries to get the data in the data items, the user has no indication that anything is happening. So, it is likely that you will want to display a wait.. dialog when the user clicks a button to refresh the data in the data items (which triggers the Ajax callback to the server). Once the server has obtained all of the data it sends a response back to the client telling the client to start downloading the data. At this point the progress indicator will start moving, giving feedback to the user. The Before file download begins event will allow you to dismiss the wait... dialog (since it is no longer needed -- the user can now watch the progress indicator).
Action Javascript
Action Javascript allows you to perform several actions on data items in the Data Cache. Select the 'Client-side Data Cache Actions' action from the list of available actions.

Then in the editor, select the action type:

The actions currently currently supported are:
Read Data Action
The builder for the Read Data action is shown below. You specify the name of the data item you want to read and then you define the Javascript code you want to execute once the item has been read. You code can reference data - a Javascript array that contains the data in the data item.

The filter allows you to define an arbitrary filter to filter the data. The filter builder dialog is shown below. The filter is in the form of a Javascript expression that evaluates to true or false. Fields in the data item are referenced with the data. prefix. In the screenshot shown below only records in London or Berlin are included in the data array passed to the onSuccess event handler.

The order allows you to define an arbitrary sort order for the data in the data array. The order builder is shown below:

The order builder allows you to define a multi-level sort. It also allows you to parse numeric, logical and data strings into data of the correct type so that the data are ordered correctly. For example data values in your data cache might be in form of date strings (e.g. 12-31-2015). In order to sort these values correctly, they have to first be parsed into real date objects.
Data Cache Methods
The UX object has several methods for working with data items.
Refreshing Data-cache items:
{dialog.object}.refreshDataCacheItem(listOfItemsToRefresh, onCompleteFunction)
Where:
Reading a data-cache item:
{dialog.object}.getFromDataCache(itemName,onSuccessFunction, onFailFunction, filter, order)
Where:
Here is an example of the filter parameter specified as a string:
var _filter = 'data.Country == "USA" || data.Country =
"France"';
Here is an example of the filter parameter specified as a function:
var _filter = function(data) {
if(data.City == 'Boston') return true;
else return false;
}
Here are examples of the order parameter specified as an object:
//sort by City, then by Lastname (descending)
var _order = {'City' : 1, 'Lastname': -1};
//sort a date string that is in the format MM-dd-yyyy
var _order = {'DateOfBirty:date:MM-dd-yyyy' : 1);
Here is an example of the order parameter specified as a function:
//sorts by Lastname, then by DOB ( a date field with a
format of MM-dd-yyyy) in descending order
var _order = function(a,b) {
if(a.Lastname > b.Lastname) return 1;
else if(a.Lastname < b.Lastname) return -1;
else {
if(new
Date().fromFormat(a.DOB:date:MM-dd-yyyy,'') > new
Date().fromFormat(b.DOB:date:MM-dd-yyyy,'')) return 1;
else return -1;
}
}
UX and Grid Component - Building Real-time Applications - Web-sockets Server - You can now build 'real-time' applications by enabling a 'web-sockets' server to broadcast messages to all 'connected clients'.
Use cases for 'read-time' applications include:
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
In a typical web-application, the server can only respond to a request from a client. The server cannot push information to clients. But in web-socket applications, the server and the client can establish a permanent 'channel' that allows the server to send messages to all of the connected clients.
In addition to the server, all of the other connected clients can send messages and all of the connected clients will receive the messages.
To turn on web-socket server support in your application you must first go to the Project Properties dialog:

Then navigate to the 'Web-socket Applications' section and turn on web-socket applications and specify the port that the web-socket server should run on. This needs to be a different port than your Application Server. Be sure to specify a port that is not in use.

Web-socket support must then be turned on at the individual UX or Grid component level. For a UX component, go to the Properties Pane, Advanced section and check the 'Web-socket server' property.

For a Grid component, go to the Grid, Properties pane and check the 'Web-socket server' property.

Once the 'Web-socket server' property has been checked, when the UX or Grid component is run, it will automatically launch the web-socket server (if it is not already running) and it will start listening for messages. When a message is received, the client-side webSocketOnMessage event will fire and your Javascript code can decide what (if anything) to do with the message.
Web-socket Client-side Events
The UX and Grid components have method for web-socket server applications. These methods are:
Web-socket Server - Action Javascript
Action Javascript has actions for the web-socket server. The Web-sockets Server Actions option allows you to perform the following actions:
web_socket_server_sendMessage() Function
The web_socket_server_sendMessage() Xbasic function can be used to broadcast messages to all connected-clients.
The syntax is
P pResult = web_socket_server_sendMessage(C message)
Where
pResult - object with two properties - error (.t. or .f.) and errorText.
message - message text to send
UX Component - List Control - De-select a Row - If a row in a List has been selected, and the List allows NULL selection, you can now set a property to de-select the row (so that no row is shown as selected) by clicking on the selected row a second time.

UX Component - List Control - Loop Navigation - You can now set a property in a List to turn on 'loop navigation'. With loop navigation, if the last row in the List is selected and the user presses the 'down' key, focus will go to the first row in the list (if Loop navigate null selection is unchecked) or will be set to NULL (if Loop navigate null selection is checked)

UX Component - List Control - Dynamically Set Columns Shown in List - A new helper method has been added that allows you to dynamically set the columns shown in a List and populate the List with some data. The columns are based on the data with which you are populating the List.
For example, assume you have a List and you have a Javascript variable with this data:
[
{
"Firstname": "John",
"Lastname": "Smith",
"City": "Boston",
"State": "MA"
},
{
"Firstname": "Henry",
"Lastname": "Rhodes",
"City": "New York",
"State": "NY"
},
{
"Firstname": "Allison",
"Lastname": "Berman",
"City": "Los Angeles",
"State": "CA"
}
]
The 'columns' in the above data are Firstname, Lastname, City and State.
You might want to populate the List with this data and simultaneously set the display columns in the List to Firstname, Lastname, City and State.
At some later point you might have another Javascript variable with this data:
[
{"Name" : "Fred Smith", "Age" : 30},
{"Name" : "Tim King", "Age" : 23}
]
The 'columns' in the above data are Name and Age. You might want to populate the same List with this data and simultaneously set the display columns in the List to Name and Age.
The {dialog.Object}.setListColumnsAndPopulate(listName,data,options) method can be used to populate the List and set the List columns (based on the columns in the first row of data).
Examples:
var data = [
{
"Firstname": "Kathy",
"Lastname": "Morton",
"City": "New York",
"State": "NY"
}
];
//populate List 'mylist' with the first 3 columns in data
var ops = {columnCount: 3};
{dialog.object}.setListColumnsAndPopulate('mylist',data,ops);
//specify columns
var ops = {columns: ['Firstname','State']};
{dialog.object}.setListColumnsAndPopulate('mylist',data,ops);
AlphaDAO - ToJSONFile() Method - A new method has been added to both the SQL::Connection and SQL::ResultSet object to create a file in JSON format with the data in a query.
Example:
dim cn as sql::Connection
?cn.open("::Name::Access_Northwind")
= .T.
?cn.tojsonfile("c:\temp\cncustomer.json", "select * from customers")
= .T.
PhoneGap Shell - Memory Management - The sample PhoneGap shell component, used for testing UX components that use PhoneGap features, has been improved. Now, when you go back to the menu screen to load a different UX for testing, the UX that you were using is completely removed from memory. This will prevent the PhoneGap shell from becoming sluggish after you have cycled back and forth from the main menu to a test component several times.
PhoneGap Builder - Android APK Version Code
Property - A new property has been added to the PhoneGap Builder
that allows you to define the APK Version Code.

This code is required for Android apps published to the Google Play
store and it must be unique for each version/update that your submit
to Google Play. If you fail to change the APK version code, your app
submission to Google Play will be rejected.
PhoneGap Builder - 3rd Party Plugins - Camera With Exif Plugin - The Camera with Exif plugin has been added to the
PhoneGap 3rd party plugins.

The Camera With Exif PhoneGap plugin, developed by Alpha Software,
is a modified version of the cordova-plugin-camera that provides the
addition of the EXIF and geolocation metadata to all camera and
gallery images and returns this metadata along with the image file
URI to the success callback. This allows the image metadata to be
stored to a database along with the image or the image file
reference. The metadata does not need to be parsed from the image
itself because it is included in the success callback.
See
GitHub: cordova-plugin-camera-with-exif for the full
documentation.
TIP: If you use the Image Capture - Camera/Photo Library action in Action Javascript and you use the Camera with Exit plugin, then when you write the Javascript code for the Javascript to execute when image has been captured property, you will be able to reference this variables in your code:
PhoneGap Builder - 3rd Party Plug- ins - Media With
Compression plugin - The Media With Compression plugin has been
added to the PhoneGap 3rd party plugins.

The Media With Compression plugin, developed by Alpha Software, is a
modified version of cordova-plugin-media that provides the ability
to record and play back audio files on a mobile device. This plugin
adds MPEG4 compression to both iOS and Android audio recording,
making the recordings compatible for playback on either an iOS or
Android device and within most modern browsers. MPEG4 compression
typically results in a significant reduction in the recorded audio
file size when compared to the stock Media plugin. The reduction in
file size is required for efficient online/offline storage and
retrieval of the audio files.
See
GitHub: cordova-plugin-media-with-compression for the full
documentation.
Web security - E-mail - The data recovery options in web security can be configured to send an email to the user with the requested data. Previously, this process could only use an email profile configured on the Application server. Email can now be sent using email settings defined in the Web Security Settings, email settings defined in the Web Project Properties, or using Mandrill in addition to a defined profile.

UX Component - PhoneGap - Image Picker Plugin - A new plugin is now available in the PhoneGap Builder. The Image Picker plugin can be used to select multiple images from the Photo Library. The typical use case for this plugin is in a disconnected application where you want to add an image to a record, but instead of adding one record with an associated image at a time (to a List control with an associated Detail View), you want to select multiple images at once and then automatically add a new record to a List for each selected image and associate each new record with one of the selected images.
You can watch videos demonstrating this use case here:
Watch Video - Part 1
Watch Video - Part
2
Watch Video - Part
3
The Image Picker plugin is invoked with this Javascript function:
window.imagePicker.getPictures(successFunction, failureFunction, options);
To see the options supported by the plugin do a Google Search on the PhoneGap Image Picker.
Here is how the image picker is used to add a new row to a List control for each selected image. In the code example below, the field in the List that contains the image filename is imageChar.
function getImages() {
var success = function(results) {
//add the selected image names to the child List.
for(var i = 0; i < results.length; i++) {
var _d = {};
_d.imageChar = results[i];
var lObj = {dialog.object}.getControl('LIST1');
lObj.addTableRow(_d);
}
}
var fail = function(error) {
}
var settings = {width: 800};
window.imagePicker.getPictures(success,fail,settings);
}
In the above example, the
imageChar field in
LIST1 should be set
to an Image control
type (on the Fields
tab in the List builder). Also, when is
LIST1 synchronized,
you can upload the selected images to either Amazon S3, or to the
Alpha Anywhere server. See the medial files property on the
Detail View tab in
the List builder for LIST1.
PDF Printing - Windows 10 - Microsoft PDF Printer - Windows 10 includes a PDF printer driver. This printer driver can be used instead of the Amyuni PDF printer driver that is bundled with Alpha.
You can set Alpha Anywhere to use the Microsoft PDF printer by going to the View/Settings menu in the Development version and then selecting Preferences/Reports/PDF Driver.

For the Application Server there is no UI currently to set the preferred PDF printer. Instead you can open the Interactive Window by right clicking on the Alpha Anywhere Server icon in the system tray and then entering these commands:
dim p as p
registry.load_settings("preferences",p)
p.reports.pdf_driver = "Name of the driver you want to use"
registry.save_settings("preferences",p)
where 'name of the driver you want to use' one of:
AMYUNI printer driver
Microsoft Print to PDF
Microsoft XPS Document Writer
UX Component - Watermark - Dynamically Setting the Watermark - .setWatermark() Method - A new method has been added to controls that have a watermark property that allows you do dynamically change the watermark text.
For example, say you have a control called 'LASTNAME' and you want to set its watermark property.
var obj = {dialog.object}.getControl('LASTNAME');
obj.setWatermark('Enter your last name');
In the case where the watermark text contains international characters, you must use a unicode encoded value. For example, to set the watermark text to 'Prénom', you would use:
var obj = {dialog.object}.getControl('LASTNAME');
obj.setWatermark('Pr\u00E9nom');
TIP: To get the unicode encoded value of a string you can go to the Tools menu when the Web Control panel has focus and select the Open text encoder window menu command. The encoded string will be of this form: Pr{unicode}00E9nom. Replace {unicode} with \u.
PhoneGap - PhoneGap Shell - Alpha Anywhere Developers enjoy a very rapid design-test cycle. You can test a component you are working on by simply going to the Working Preview or Live Preview tab in the builder. However, when you are working on a PhoneGap application and you want to test any PhoneGap specific functionality in your component (such as accessing the native file system on a device), you cannot test your application in the Working Preview or Live Preview tab. You have to create a PhoneGap application and then install the PhoneGap application on your mobile device. This is a time consuming process.
Using a PhoneGap shell you can dramatically shorten this cycle. The basic idea behind the shell is that you build the PhoneGap shell once and install it on your device. You then dynamically load the UX that you are developing into a Panel in the PhoneGap shell. If you make a change to your component, you can simply click the Refresh button on the PhoneGap shell and the new version of your component is loaded. You don't need to submit the component to PhoneGap build.
Alpha Anywhere now ships with a sample PhoneGap shell that you
can use for testing your UX components on a device.
Watch Video - Part 1
Watch Video - Part
2
When you create a new UX component, you can select the PhoneGap-Shell.

Once you have created a new UX using the PhoneGap shell template, save the component using any name that you want. The next step is to build a PhoneGap project from your shell UX component.
When you build your PhoneGap project it is extremely important that you set the URL For All Ajax Callbacks correctly. If you do not set this property correctly, your shell will not work - it will not be able to dynamically load the UX component that you want to test.

It is also important that you specify the plugins that your components will need when you build the PhoneGap shell. That's because the dynamically loaded components cannot load PhoneGap plugins.
For example, assume that you are building a UX component that uses the SQLite PhoneGap plugin. You will need to ensure that this plugin is selected when you build the PhoneGap shell.
Obviously, you can't know ahead of time what plugins the components you are going to build in the future will need. So, from time to time you will need to rebuild your shell component to specify a different set of plugins to load.
When you open the PhoneGap shell on your device, it will look something like this.
Since you have not previously loaded any UX components, the list is empty.
Click the Add button and enter the name of the UX component you want to test.

Here is what the List will look like after entering the name of a UX component called 'ux1'.
'
Now, to run this component in the shell, simply tap on the row in the List.
The shell will transition to a new Panel and load the component into the Panel as shown below.

If you make any changes to the 'UX1' component that you are testing, simply republish the component then hit the 'Refresh' button. If you want to load a different component into the shell, tap the 'Back' button, and add the component name to the List.
UX Component - PhoneGap File Download Action - Force Download Property - The 'Force download if file found on device' property allows you to force the file(s) to be downloaded even if a file with the specified name is already on the device. If you force download, the existing file(s) on the device will be overwritten. Previously, if a file with the specified name was found on the device, the source file was not downloaded.

AlphaDAO - MySQL - Stored Procedures - Multiple Resutsets - If you create a MySQL stored procedure that returned multiple resultsets, the SQL::Resultset.nextResult() object failed. As a result you could only read the first resultset returned by the stored procedure.
Web Applications - Repository Database - Case Sensitive Databases - If you configured your Web application to use a Repository database (for example, to save searches in a Grid component) and your defined the repository tables in a SQL database that case case-sensitive for table and column names, saving data to the repository did not work.
Script Editors - Windows Server 2008 - The status bar in the Xbasic and Javascript Script editors contain several 'hot' areas that you can click on to navigate to a line in the script or navigate to a particular function in the script. These 'hot' areas did now work on Windows Server 2008.
UX and Grid Component - Live Preview - In some cases if the browser you selected for Live Preview was installed as a 64 bit program, the selected browser was not found. This is now fixed.
UX Component - List with Detail View - Local Storage - Minify - If the minify option was turned on to compress the data stored in Local Storage when a List's data was updated, under some circumstances you could be sync errors when syncing a List's data after restoring the List data from Local Storage.
Xbasic - Stringdictionary Object - Clearing Existing Entries when Initializing - When the stringdictionary object was initialized (using its .initialize() method) , existing entries in the stringdictionary were not being cleared out. Now, they are. An optional flag has been added to the initialize() method to allow you to specify that existing entries should not be cleared out.
Example:
dim map1 as c = "alpha=this is alpha"
dim map2 as c = "beta=this is beta"
dim sd as stringdictionary
sd.Initialize(map1)
?sd.get("alpha")
= "this is alpha"
?sd.get("beta")
= ""
sd.Initialize(map2) 'clear out existing entries
?sd.get("alpha")
= "" 'because existing entries were cleared
?sd.get("beta")
= "this is beta"
sd.Initialize(map1,.f.) 'do not clear out existing entries
?sd.get("alpha")
= "this is alpha"
?sd.get("beta")
= "this is beta" 'because existing entries were NOT
cleared
UX Component - Action Javascript - File Upload Action - Repeating Section - Fixed a problem when using the File Upload action in a Repeating Section.
UX and Grid Component - Action Javascript - Send E-mail Action - If you used the Send-mail action multiple times on a component, the settings for the last instance were used for all instances.
UX Component - Image Capture - Character Fields - PhoneGap - In a PhoneGap application if captured images were uploaded to the Alpha Anywhere server (as opposed to Amazon S3), the images would not render correctly after the component was refreshed.
UX Component - Image Capture - Character Fields - Thumbnails - If you were capturing images in a character field and you had specified that you wanted to create thumbnails for the image and the stored filename expression for the field was <Shortname> (as opposed to <Fieldname>), the thumbnail was not created correctly.
UX Component - Panels - Google Map - Touch Events - When a Google Map is displayed in a PanelCard, certain touch events on the Map that the Google Map should have responded to were not being seen by the Map control.
Report Preview - Two Page Preview - When you switched to Two Page preview mode, a 'Print Progress' dialog was displayed. This dialog could not be dismissed and should not have been displayed.
Runtime - Debug(1) - In a Runtime application, if a debug(1) statement was inadvertently left in some user-defined code, Alpha would hang.
Grid Component - QBE - Hidden Columns - Fixed a problem in the generated HTML for the QBE feature if a Grid contained hidden columns.
Web Applications - Publishing - FTP Publishing -
History - In certain cases the History list was not being
maintained correctly when using FTP publishing. As a result of the
bug, files were published in some cases when they did not have to be
published.
UXComponent - Hierarchical Lists with Detail View - Data Synchronization - Fixed errors that occur under certain circumstances if the initial sync returns sever-side validation errors and then a subsequent sync is performed after the validation errors are corrected.
Oracle CLOB Fields - Limit of 4000 Characters - When reading data from an Oracle CLOB field, only the first 4,000 characters were read. This is now fixed.
Xbasic CURL Genie - Fixed an issue in converting certain CURL statements to Xbasic.
international_days_of_week() Function - This function was returning the days in the incorrect order when with a specific start of week day. For example:
?international_days_of_week("start-monday,short")
= Mon
Tue
Wed
Thu
Fri
Sun
Sat
UX Component - List Control - Detail View - Synchronizing in Batches - If a UX contains List controls that are in a parent-child hierarchy, and the parent List is configured to synchronize data in batches, then there were errors when the data was submitted that prevented all dirty rows from being synchronized. This error was only if the List was set to synchronize in batches.
Grid - Export Data - Security - The export function was not honoring security settings for columns in a Grid.
Web-Sockets Server - Fixed a bug where the web-sockets server was not starting correctly if the user was running the application on the default port (i.e. the URL for the application did not specify an explicit port).
UX Component - Repeating Sections - Xbasic Validation - Immediate Validation - Improvements were made in how immediate Xbasic validations are performed on fields in Repeating Sections.
Grid and UX Component - Searching SQL Databases - 'Is blank' and 'Is not blank' Search Options - The generated SQL for the 'Is blank' and 'Is not blank' search options has been changed to:
Previously, the generated SQL was:
The change was made because in some Oracle databases the previous generated SQL did not return the expected results. The stringLength() function is a portable SQL function.
Alpha Anywhere Server - 500 Error - Fixed an error that would, under some circumstances, cause the server to crash with a 500 Error. Also improved server memory utilization.
UX Component - Data Bound - Repeating Sections - Unbound Controls - Default Values - If you had unbound controls in a Data Bound UX component and you had set default values for the unbound controls, then when UX was initially rendered and the data bound controls were set to their bound values, the unbound controls did not show their default values. If the component did not use Repeating Sections, this bug did not occur.
UX and Grid Component - jQuery - Internal Version - The version of jQuery and jQuery UI that Alpha Anywhere includes when you choose the 'built in' version have been updated to jQuery 1.11.3 and jQuery UI v 1.11.4.
UX and Grid Component - Oracle - Search for Records that End with '_ some character' - A user was trying to search for records in an Oracle table that ended with '_1'. This was failing because SQL treats the _ as a wildcard character. To perform the search the search has to be entered as '\_'. Alpha Anywhere will now automatically add the ESCAPE '\' clause to the generated SQL statement for Oracle.
UX Component - Signature Capture Control - Initially Hidden - If the Signature Capture control was initially hidden when the UX component was rendered, but was then made visible by some Javascript, in some cases, it did not work correctly.
UX Component - List Control - .addTableRow() Method - Fixed issues with the .addTableRow() method when the rows were being added to a child List control.
UX and Grid Components - Google Maps - Google made some
changes to the Google maps API fairly recently, and now recommends a
different URL to access the API. They also changed Google Premier
and now use a "key" value in the URL instead of "clientId". The
existing code added the ClientId property which has been deprecated.
The URLs generated by the UX and Grid to access the Google Maps API
have been updated to reflect the changes Google made.
Another issue occurred if the map was run on a server using SSL, but
was not set to use SSL. Most browsers blocked the request for the
API JavaScript. A change has been added to force the Google URL to
SSL if the server is using SSL in places where the link is built at
run time.
The standard public Google map access will throttle map requests,
and currently that public access limit is listed at 2,500 requests
per day.
The latest Google method to get a higher limit is to sign up for a
Google developer account (previously called Google Premier), create
a project (free), and then activate the Google Maps JavaScript API.
This will create a special API key that can be added to any Alpha
Anywhere Map configuration in the builders as the "Google Premier
ID". If you use an API key, Google tracks the number of requests,
but allows a much higher free limit, currently listed as 25,000 per
day. For large companies, they do start charging if the requests
exceed that limit. If a key is not provided, the standard public map
access will be used.
UX Component - Auto-suggest Control - Fill in Fields - The fill in fields were only filled in if you selected from the auto-suggest list by clicking on a row in the suggestion list. If you typed in a matching value (and did not select by clicking on the suggestion list), the fill-in values did not fill in.
UX Component - List Controls - List with Parent List - Pre-fetched Data - Arguments in Child List WHERE Clause - Fixed a bug where you would get an error after synchronizing data in a List with a Detail View if the SQL for the List used arguments in the WHERE clause.
AlphaDAO - Stored Procedures - Output Arguments - When you use execute SQL statements from Xbasic using AlphaDAO it is very common to use the SQL::Arguments object to pass parameter values to the SQL statement that you execute. For example
dim args as sql::arguments
args.add("customerId","alfki")
dim cn as sql::connection
dim flag as l
flag = cn.open("::Name::Northwind")
dim sql as c
sql = "Select * from customers where customerId = :customerId"
flag = cn.execute(sql,args)
In the above example, the argument (customerId) is termed an 'input' argument - it is passing a value to the database engine.
However, Alpha Anywhere also allows you to create 'output'
arguments and 'inputOutput' arguments. These argument types are used
when you want the database engine to return a value to Xbasic.
Watch Video
- Part 1
Watch Video
- Part 2
For example, consider the following (very simplistic) stored Procedure defined in a SQL server database:
CREATE PROCEDURE [dbo].[output]
-- Add the parameters for the stored procedure here
@Param1
integer output,@Param2
varchar(30) outputAS
BEGIN
-- SET NOCOUNT ON added to prevent extra result sets from -- interfering with SELECT statements. SET NOCOUNT ON; -- Insert statements for procedure here set @Param1 = 100 set @Param2 = 'Hello world' returnEND
In this stored procedure, the parameters (Param1 and Param2) are being set.
Here is how an Xbasic script could call the stored procedure and get the value of the parameters set in the stored procedure:
dim args as sql::arguments
'define to arguments, 'inout' and 'inout2' as
inputOutput arguments
args.add("inout",0,sql::ArgumentUsage::inputoutputargument)
'notice that a dummy value of the correct size
needs to be defined for the argument
args.add("inout2",replicate(" ",40),sql::ArgumentUsage::inputoutputargument)
dim cn as sql::Connection
cn.open("::Name::sqlserver_northwind")
'call the stored procedure and pass in the two
argument values
?cn.Execute("exec output :inout, :inout2",args)
= .T.
?args[1].data
= 100
?args[2].data
= "Hello world"
If the size of the argument is not big enough then when you execute the stored procedure you might get an error like this:
?cn.CallResult.text
= "Internal Error - Data Truncated - The buffer for receiving data
is too short"
In some cases your stored procedure will also return one or more resultsets in addition to setting the value of output arguments.
Depending on the database you are using you might have to read each of the returned resultsets before you can read the values in the output arguments.
For example, consider the following modification to the above stored procedure:
CREATE PROCEDURE [dbo].[output]
-- Add the parameters for the stored procedure here
@Param1
integer output,@Param2
varchar(30) outputAS
BEGIN
-- SET NOCOUNT ON added to prevent extra result sets from -- interfering with SELECT statements. SET NOCOUNT ON; -- Insert statements for procedure here set @Param1 = 100 set @Param2 = 'Hello world'select
* from customers select * from orders returnEND
This stored procedure now returns two result sets.
Below is the Xbasic to execute the stored procedure and get the values from the output arguments:
dim args as sql::arguments
args.add("inout",0,sql::ArgumentUsage::inputoutputargument)
args.add("inout2",replicate(" ",50),sql::ArgumentUsage::inputoutputargument)
dim cn as sql::Connection
cn.open("::Name::sqlserver_northwind")
?cn.Execute("exec output :inout, :inout2",args)
= .T.
'value of the output arguments not yet available because we have
'not read the resultsets
?args[1].data
= 0
?args[2].data
= ""
dim rs as sql::ResultSet
rs = cn.ResultSet
'still not available
?args[1].data
= 0
?args[2].data
= ""
'get the next resultset
?rs.NextResult()
= .T.
'still not available
?args[1].data
= 0
?args[2].data
= ""
'no more resultsets to read
?rs.NextResult()
= .F.
'argument value are now available!!
?args[1].data
= 100
?args[2].data
= "Hello world"
Web Applications - Windows 10 - Acrobat PDF Viewer - Internet Explorer 11 - Unlike Chrome and Firefox, Internet Explorer 11 does not have a built-in PDF viewer and therefore it relies on Adobe Acrobat Reader to display PDF files. On some machines, when you try to view a PDF report in IE, Acrobat will not open. You will need to turn off 'Enhanced Protected Mode' in IE11 to solve this problem. For more information, see this post.
UX Component - Panel Cards - Vertically Centering a Container - A common requirement when building mobile applications is to vertically (and horizontally) center content in a Panel Card.
Watch Video
Download Component
For example, in the image below, the content in the blue frame is always vertically and horizontally centered, regardless of the device orientation.

This is achieved by putting the following code in the onSize event of the Panel Card that contains the container.
Assume that the content to be centered is in a container called CONTAINER_1 and that the in-line style on this container has been set to 'visibility: hidden'. Setting the visibility to hidden will prevent the container from being seen until it is correctly positioned.
if({dialog.object}) {
var p = $(this.contId + '.BODY');
var v = {dialog.object}.getPointer('CONTAINER_1');
var ph = p.offsetHeight;
var vh = v.offsetHeight;
var pw = p.offsetWidth;
var vw = v.offsetWidth;
var offsetH = (ph-vh)/2;
var offsetW = (pw - vw)/2;
v.style.left = offsetW + 'px';
v.style.top = offsetH + 'px';
v.style.visibility = '';
v.style.position = 'absolute';
}
Windows 10 - Default Printer - PDF Printing - When you save a report as a PDF, Alpha Anywhere uses the special 'AlphaFive' printer driver that is automatically installed with Alpha Anywhere. After the report has been saved to PDF the default printer (that was defined before the report was saved) is restored. On Windows 10 this does not work because of a change Microsoft made. After the report has been saved to PDF, the default printer is now set to the AlphaFive printer. To disable this new Microsoft feature, see this document.
AlphaDAO - Microsoft Access - Can't Load ODBCJI32.dll Error - If you have installed Office 365 on your computer you might find that you can no longer connect to a Microsoft Access database.
To fix the error you will have to install the Microsoft Access Database Engine.
Here is a link to the installer on the Microsoft site.
If you already have the Microsoft Access Database Engine installed, then running a 'Repair' on the engine should fix the problem.
Working with XML Data in Xbasic - JSON_from_XML() Function - Xbasic has extensive support for parsing XML data. However in some cases, the Xbasic XML parsing features are too granular and you might want a quick and simple way to convert an XML document into an Xbasic object (i.e. dot variable). The xml_from_json() function provides such a mechanism.
Here is an example of some simple XML that is first parse into a JSON string which is then parsed into an Xbasic object using the json_parse() function.
dim xml as c
xml = <<%html%
<customers>
<customer>
<name>Dion Jones</name>
<city>Boston</name>
<more attribute1="val attr1"
attribute2="val attr 2">More for Dion Jones</more>
</customer>
<customer>
<name>Donald Trumpet</name>
<city>Washington</name>
<more attribute1="val attr1"
attribute2="val attr 2">More for Donald Trumpet</more>
</customer>
</customers>
%html%
dim json as c
json = json_from_xml(xml)
json = json_reformat(json)
showvar(json)
dim p as p
p = json_parse(json)
UX Component - Radio Button and Checkbox Controls - Render as Button List - Right to Left - For languages that use right-to-left text, when you render a radio button or checkbox control as a Button List, you might want the Button List to render as shown below (text right aligned and icon to the right of the text).

In the property sheet for the Radio Button or Checkbox, set a custom class name for the 'Class name - choices' property.

Then, in the CSS for the component, define this custom class as follows:
.myButtonListClassName {
direction:rtl;
text-align:right !important;
}
UX Components - List Control - Nested Lists - Hierarchical JSON Data from SQL Tables - If you want to display a List control with nested Lists (ile. when the user selects an item in the List, the List is repopulated with that item's child data), you typically define JSON data for the List using this format:
Watch Video
Download Component
[
{
display: 'Menu1',
children: [
{
display: 'Menu1_A',
action: 'Action_1'
},
{
display: 'Menu1_B',
action: 'Action_2'
},
{
display: 'Menu1_C',
action: 'Action_3'
}
]
},
{
display: 'Menu2',
action: 'Action_4'
},
{
display: 'Menu3',
action: 'Action_5'
}
]
In some cases you might want to generate this JSON data by querying a SQL database. This is easily done by using the a5_xbasicTreeToJSONTree() function.
For example, consider the following Xbasic string which defines a tree structure in Xbasic syntax:
dim txt as c
txt = <<%str%
MA.Boston.Smith
MA.Boston.Jones
MA.Cambridge.King
CA.Los Angeles
%str%
json = a5_XbasicTreeToJSONTree(txt,".","display")
The syntax for the a5_XbasicTreeToJSONTree() function is:
a5_XbasicTreeToJSONTree(c XbasicTreeDefinition, c delimiter [, c propertyName])
This will generate a JSON string in this format:
[
{
"display": "MA",
"children": [
{
"display": "Boston",
"children": [
{
"display": "Smith"
},
{
"display": "Jones"
}
]
},
{
"display": "Cambridge",
"children": [
{
"display": "King"
}
]
}
]
},
{
"display":
"CA",
"children": [
{
"display": "Los Angeles"
}
]
}
]
With this understanding of how the a5_XbasicTreeToJSONTree() function works, it is easy to see how to generate the JSON from a SQL database. The key is to simply define a query that returns data in the Xbasic tree format and then call the a5_XbasicTreeToJSONTree() function.
For example, to generate data that displays a list of Countries, Cities and Contact Names, you can use this Xbasic:
dim cn as sql::Connection
cn.open("::Name::northwind")
dim sql as c
sql = "SELECT Country, City, ContactName FROM Customers ORDER BY
Country"
dim flag as l
cn.PortableSQLEnabled = .t.
flag = cn.Execute(sql)
dim rs as sql::ResultSet
rs = cn.ResultSet
dim txt as c
'generate the Xbasic tree format data using a
| as the delimiter
txt = rs.ToString(-1,-1,.t.,"|")
dim json as c
'generate the JSON tree specifying the | as
the delimiter and 'display' as the property name
json = a5_XbasicTreeToJSONTree(txt,"|","display")
Reports - Calculated Fields - User Defined Expressions - Slow Performance in Report Design Mode - A common pattern in reports is to define calculated fields that use user defined functions. Sometimes these functions are quite complex and because the functions get evaluated repeatedly when you are design mode, the performance of the report designer is degraded.
You can easily solve this problem by adding code to your user defined functions that cause the functions to exit when you are in report design mode.
For example, say you have a calculated field that references a function defined as follows:
function my_report_calc_field as ()
'some code here that does a database query
my_report_calc_field = "function return value"
end function
You can rewrite this function as follows:
function my_report_calc_field as ()
if
eval_valid("topparent.window_title") then
'in report design mode, so bail out
my_report_calc_field = "some dummy return value"
exit function
end if
'some code here that does a database query
my_report_calc_field = "function return value"
end function
Reports - Calculated Fields - User Defined Expressions - 1024 Character Limit - A common patter in reports is to define calculated fields that use user defined functions. In some cases the function might return a long value. However, calculated fields have a limit of 1024 characters.
You can easily work around this limit by converting the calculated field to an HTML type. For example, suppose you have a function that returns a long string of text. You could define your calculated field in the report as follows:
myCalcField = *mime_object("html",myFunction())
UX Component - Columnar Lists Not Displaying Correctly - If a List control is initially hidden when the UX is rendered, and then it is later shown (for example, using some Javascript that shows the container in which the List is contained), the List will not display correctly (if the List is defined as a columnar List as opposed to a free-form layout List). In order to get the List to display correctly you must refresh it. For example:
var lObj = {dialog.object}.getControl('name of your list');
lObj.refresh();
In many cases when you build your UX, Alpha Anywhere will be able to detect automatically that a List is not displayed when the UX is initially rendered and it will automatically generate the code to refresh the List when it is shown (for example, if you put a List on Pane number 2 of a Tab control, the List is not initially shown, bug when Pane 2 is given focus, the List is automatically refreshed). However, there are cases where it is not possible for Alpha Anywhere to detect this and you will need to add the refresh code yourself.
NOTE: Lists that use a free-form layout do not need to be refreshed when they are shown.
UX Component - PhoneGap - Disconnected Applications - Storing Read-only Data in the Device File System - When you build applications that are designed to be used while you are disconnected, you typically load the data that you want to have while you are disconnected into List controls and then you set these List control to persist the data to Local Storage.
TIP: You can download a working example of
the component described in this topic
here. You can also watch a video tutorial on the steps.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
Watch Video - Part 5
Watch Video - Part 6
Watch Video - Part 7
Watch Video - Part 8
Watch Video - Part 9
However, if your application is designed to be run in a PhoneGap shell, then you can store the 'read-only' data in your application in the file system on a mobile device. Only the editable data needs to be stored in List controls. By storing the 'read-only' data in the file system, you leave more of the available space in Local Storage for your editable data.
NOTE: The technique described here is different from linking in a static Javascript file in the Javascript linked files property in the UX component. You certainly can include read only data in linked Javascript files, but after the PhoneGap application has been built, you will not be able to refresh the data in the Linked files. The technique described here allows the user to click a button at any time to make a callback to the server to refresh the data that is stored in the mobile device's file system.
When the user wants to update the 'read-only' data stored on their device, you might perform the following steps:
Now that the data is in a file, you can use PhoneGap to read the file into memory. Once the file has been read into memory, you can call the JSON.parse() Javascript function to crate a Javascript object with the data and your UX component can then use this data as needed.
The Xbasic Function to Handle the Ajax Callback
The Xbasic function that handles the callback to fetch data from the server will have to create a file with data in JSON format. Here is an example of what the file might look like:
{
"table1" : [
{ "field1" : "alpha", "field2" : "beta"},
{ "field1" : "alpha", "field2" : "beta"},
{ "field1" : "alpha", "field2" : "beta"}
],
"table2" : [
{ "field1" : "a", "field2" : "b", "field3": "c"},
{ "field1" : "d", "field2" : "e", "field3": "f"}
]
}
Notice that the file is in JSON format. In this case, the file defines two objects (you can think of these as 'tables') called 'table1' and 'table2'. 'table1' has 3 records and each record has these fields: field1 and field2. 'table2' has 2 records and these fields: field1, field2, field3
This file must then be stored as a session file so that the client (i.e. the mobile device) can download it from the server.
Assume that you used Action Javascript to define the the Ajax callback and that in the action definition you specified that the name of the Xbasic function to handle the callback was xb_getData. Assume also that you specified Additional data to submit as '_filename=data1.json'.

Here is how xb_getData() might be defined.
Function xb_getData as c (e as p)
'in this example the json data is statically defined.
'in a real-world case you would likely execute database queries here to generate the json
dim json as c
json = <<%txt%
{
"table1" : [
{ "field1" : "alpha", "field2" : "beta"},
{ "field1" : "alpha", "field2" : "beta"},
{ "field1" : "alpha", "field2" : "beta"}
],
"table2" : [
{ "field1" : "a", "field2" : "b", "field3": "c"},
{ "field1" : "d", "field2" : "e", "field3": "f"}
]
}
%txt%
'get a temporary filename
dim tempFn as c
tempFN = request.GetRequestTempFileName(".json")
'save the json data to the temporary file
file.from_string(tempFn,json)
'get the filename to use from the 'additional data' submitted by the ajax callback
dim clientSideFileName as c
if eval_valid("e._filename") then
clientSideFileName = e._filename
else
'user did not specify the client-side filename in the Ajax callback
'so generate a random filename
clientSideFileName = remspecial(api_uuidcreate()) + ".json"
end if
'now put the temporary file into session storage
session.SaveFileToSessionFile(tempFN,clientSideFileName)
'get the URL for this session file
dim url as c
url = Session.FormatFileDataURL(clientSideFileName)
'construct the Javascript response that will be sent to the client
'note that we specify that a function called 'fetchFile()' should be called
'on the client-side with the name of the URL that points to the temporary
'file in session storage. This 'fetchFile()' function is a user-defined
'Javascript function that you will need to add to your UX component
dim js as c
js = js + "fetchFile('" + js_escape(url) + "');"
'return the javascript code
xb_getData = js
End function
At run-time, the user might click a button to trigger the Ajax callback. The Xbasic function will prepare the file and then send a response back to the client (i.e. the browser) and call a function (called 'fetchFile' in this example).
Here is how the fetchFile function could be initially defined (in the Javascript functions section of the UX) to test that the Ajax callback is working:
function fetchFile(url) {
alert('Server has prepared this file: ' + url);
/*
eventually, we will put the Javascript here to make a
callback to the server to fetch the file
however, in the mean time, we are just going to store the URL
in a variable so we can reference it from another function
*/
{dialog.object}._urlToDownload = url;
}
Flushing out the 'FetchFile' Action
In order to fetch the file from the server and store it in the file system on the device we can use Action Javascript to get started.
Add a temporary button to your UX (label it 'Fetch File') and then use Action Javascript to define the button's onClick action. Select the PhoneGap - File Download action.
NOTE: The reason for putting the temporary button on the UX is so that we can use Action Javascript to assign an action to this button and then copy the generated Javascript. This is easier than writing the Javascript by hand.

The genie for this action will open:

The builder allows you to specify the names of the files on a remote server (in this case the Alpha Anywhere server) that you want to download. You do this by specifying the name of a Javascript function that will return an array of filenames.
You can specify the name of the folder on the device where the downloaded file(s) should be stored.
The 'Force download if file found on device' property allows you to force the file(s) to be downloaded even if a file with the specified name is already on the device. If you force download, the existing file(s) on the device will be overwritten.
You can also specify if you want to display a progress bar while the files are being downloaded. Since you might be downloading large files or many files, displaying progress to the user is always a good idea.
Finally, you can specify some Javascript to execute once the file(s) have been downloaded and stored in files on the device.
Set the 'Files to download Javascript Function' property to 'getFiles' and add this function to the Javascript functions in the UX component.
function getFiles() {
/*
recall that in the fetchFile() function we put
the url in a temporary variable (called _urlToDownload)
in the UX object
*/
var url = {dialog.object}._urlToDownload
/*
this function must return an array of filenames, so
put the url into an array
*/
return [url];
}
We can add a [Placeholder] control to the UX and set the 'Placeholder for progress indicator' to the name of our placeholder.
Finally, we can set the 'On Download Complete (all files)' property to some Javascript code. Let's set it temporarily to this:
alert('File was downloaded');
After you have filled in all of the properties that you need to fill in in the PhoneGap File Download genie, click the OK button. Here is the Javascript code that was generated to download a file on the server (specified by a URL) and store that file in local file on the mobile device.
Note: To see this code, click the View
Javascript button in Action Javascript editor.

var _list = window['getFiles']();
var arr = [];
for(var i = 0; i < _list.length; i++) {
arr.push( {filename: _list[i]} );
}
var options = {
targetFolder: '__myAlphaFiles',
showProgress: true,
forceDownloadIfFileExists:
false,
onComplete: function(array) {
alert('file was downloaded');
},
onError: function(array,arrayIndex) {
alert('error');
},
progress: {
color: '#9fa1e8',
width: '300px',
allowCancel: false,
progressElement: '{dialog.componentname}.V.R1.PLACEHOLDER_1'
}
}
{dialog.object}.phoneGapFileDownload(arr,options);
Next, we need to write some Javascript that will read the contents of the file that has been stored on the mobile device. Again, rather than write this Javascript by hand, we will use the same technique we just used - add a temporary button to the UX and then use Action Javascript to set the button's action. We will be using the PhoneGap - File System Actions action to define this action.

Add a temporary button to the UX (label it 'Read file') and select the PhoneGap - File System Actions action. The builder for this action will then open.

The PhoneGap File System Actions genie allows you to select from many different types of actions (such as read file, delete file, read directory, delete directory, etc.). Set the Action name to Read File.
Next, set the Filename to __myAlphaFiles/A5SessionFile/data1.json.
Recall that when you defined the File Download action you specified __myAlphaFiles as the folder where the downloaded file(s) were to be stored. Recall also, that when we made the Ajax callback to create the file of JSON data we specified that the file should be called data1.json. Our Xbasic function that handled the callback created the JSON file and then added it to temporary session storage using the name data1.json as the key. Our Xbasic function then called the Session.FormatFileDataURL() method to get a URL for this session file. The format of the URL that this function returns has A5SessionFile/ as a prefix. So, the actual name of the file that is stored in the file system on the device is not __myAlphaFiles/data1.json as you might have expected, but is instead __myAlphaFiles/A5SessionFile/data1.json.
The OnSuccess property allows you to specify the Javascript to run once the file has been read and the OnFailure property allows you to specify the Javascript to run if the file cannot be read.
The onSuccess function can refer to a variable called data, which contains the contents of the file that was read. The data that was read will be a string in JSON format, so we will need to use the Javascript JSON.parse() function to turn it into a Javascript object.
Edit the onSuccess property and enter this Javascirpt:
var _d = JSON.parse(data);
var _dt = '';
for (var tableName in _d) {
_dt = _d[tableName];
var msg = 'Rows in table \'' + tableName + '\': ' + _dt.length;
alert(msg);
}
Here is what this code does.
You can set the onFailure code to
alert('could not read file');
After you have completed filling in the genie, click ok and then view the generated Javascript. The generated code will look like this:
{dialog.object}.phoneGapReadFile('__myAlphaFiles/A5SessionFile/data1.json',function(data)
{
var _d = JSON.parse(data);
var _dt = '';
for (var tableName in _d) {
_dt = _d[tableName];
var msg = 'Rows in table \'' + tableName + '\': ' + _dt.length;
alert(msg);
}
},function() {
alert'Could not read file');
}
)
Putting it All Together
At this point we have separate buttons for:
Ideally, we would like to combine all of this into a single action so that the user can click a button, which makes a callback to the server and then the file is automatically downloaded to the device, read and processed.
As you will recall, the whole client-side process starts when the Ajax callback completes and it calls the 'fetchFile' function which is current defined as follows:
function fetchFile(url) {
alert('Server has prepared this file: ' + url);
/*
eventually, we will put the Javascript here to make a
callback to the server to fetch the file
however, in the mean time, we are just going to store the URL
in a variable so we can reference it from another function
*/
{dialog.object}._urlToDownload = url;
}
Also recall that when we created a button to download the file from the server and we then examined the code to download the file, the generated code looked like this:
var _list = window['getFiles']();
var arr = [];
for(var i = 0; i < _list.length; i++) {
arr.push( {filename: _list[i]} );
}
var options = {
targetFolder: '__myAlphaFiles',
showProgress: true,
forceDownloadIfFileExists:
false,
onComplete: function(array) {
alert('file was downloaded');
},
onError: function(array,arrayIndex) {
alert('error');
},
progress: {
color: '#9fa1e8',
width: '300px',
allowCancel: false,
progressElement: '{dialog.componentname}.V.R1.PLACEHOLDER_1'
}
}
{dialog.object}.phoneGapFileDownload(arr,options);
So let's take this code and inject it directly into the fetchFile() function. We know the url of the file that needs to be downloaded (it is passed into the fetchFile() function), so we don't need to call the getFile() function as we did previously. The fetchFile() function will become:
Let's change this function to:
function fetchFile(url) {
/*
we need to put the url into an array of objects where the filename is
specified by the 'filename' property.
*/
var arr = [];
arr.push({filename: url})
var options = {
targetFolder: '__myAlphaFiles',
showProgress: true,
forceDownloadIfFileExists: false,
onComplete: function(array) {
alert('file
was downloaded');
},
onError: function(array,arrayIndex) {
alert('error');
},
progress: {
color:
'#9fa1e8',
width:
'300px',
allowCancel:
false,
progressElement: '{dialog.componentname}.V.R1.PLACEHOLDER_1'
}
}
{dialog.object}.phoneGapFileDownload(arr,options);
}
The next step is to replace the onComplete code above, which current simply does:
alert('file was downloaded');
with the code that reads and processes the JSON file.
As you will recall when we defined the action to read the file and then examined the generated Javascript, the code to read the file was:
{dialog.object}.phoneGapReadFile('__myAlphaFiles/A5SessionFile/data1.json',function(data)
{
var _d = JSON.parse(data);
var _dt = '';
for (var tableName in _d) {
_dt = _d[tableName];
var msg = 'Rows in table \'' + tableName + '\': ' + _dt.length;
alert(msg);
}
},function() {
alert'Could not read file');
}
)
We need to simply replace the codeblock that says alert('file was downloaded'); with the above code block. However, rather than simply injecting the read file code into the onComplete event let's wrap the code that read the file in a function and then call this function in the onComplete event.
So we have:
function readFileAfterDownload() {
{dialog.object}.phoneGapReadFile('__myAlphaFiles/A5SessionFile/data1.json',function(data)
{
var _d = JSON.parse(data);
var _dt = '';
for (var tableName in _d) {
_dt = _d[tableName];
var msg = 'Rows in table \'' + tableName + '\': ' + _dt.length;
alert(msg);
}
},function() {
alert'Could
not read file');
}
)
}
And the fetchFile() function becomes:
function fetchFile(url) {
/*
we need to put the url into an array of objects where the filename is
specified by the 'filename' property.
*/
var arr = [];
arr.push({filename: url})
var options = {
targetFolder: '__myAlphaFiles',
showProgress: true,
forceDownloadIfFileExists: false,
onComplete: function(array) {
readFileAfterDownload();
},
onError: function(array,arrayIndex) {
alert('error');
},
progress: {
color:
'#9fa1e8',
width:
'300px',
allowCancel:
false,
progressElement: '{dialog.componentname}.V.R1.PLACEHOLDER_1'
}
}
{dialog.object}.phoneGapFileDownload(arr,options);
}
UX Component - Abstract Events - Tweaking Settings - For mobile applications built with the UX component, several abstract events, such as tap, double tap, swipe, etc. are implemented. In certain cases you might want to customize aspects of the way these abstract events are implemented. For example, you might want to:
This can be done by setting properties on the $e.abstractEvents object. You could, for example, set these properties in the onRenderComplete client-side event.
Examples:
//if the user's finger moves by more than 20px after touching the screen, the 'tap' event will not fire.
$e.abstractEvents.tap.wiggle = 20
//if the user puts a finger on an element that has a 'click' event handler and then scrolls the screen by
//more than 20px, the 'click' event will not fire.
$e.abstractEvents.click.scrollMax = 20
//if the time between the first tap and the second tap is less than 600ms, a 'dblTap' event will fire.
$e.abstractEvents.dblTap.duration = 600
$e.abstractEvents.dblClick.duration = 600
//see dblTap example
//if you hold down on an element for less than 600ms the 'downHold' event will not fire
$e.abstractEvents.downHold.duration = 600
//if you hold down on an element for more than the 'downHold' duration, but move your finger
//by more than 10px after you touch the screen, the 'downHold' event will not fire
$e.abstractEvents.downHold.wiggle = 10
//specify the 'swipe' velocity - a smaller value will mean that a less 'dramatic' gesture is needed
//to register a 'swipe' event on an element
$e.abstractEvents.swipe.velocity = .75
UX Component - Captcha Controls - Captcha control got broken in build 2970. This is now fixed.
Editors - Horizontal Scroll Bar - Various editors in the Development version (e.g. code editor, CSS editor, etc.) did not automatically display a horizontal scroll bar if the current line in the editor too long to display in the window.
CSS Icons - Google Material Design Icons - The open source Google Material Design icon set is now included with Alpha Anywhere. When you select an image, and you select the 'Css Icon' category, in addition to the built-in 'FontAwesome' category, there is now a new category called 'MaterialIcons'. There are over 700 icons in the Material Design icon set.
UX Component - List Control - Custom Data Source - Pagination - Fetch More - If the Xbasic function for the custom data source set the e.fatalError flag to .t. the 'Fetch More' button in the List was not turned off.
Trial Version of Alpha Anywhere - If a user was using Alpha Anywhere in trial mode (i.e. they did not have a license key), certain features of the product that should have been enabled were incorrectly disabled.
UX Component - PhoneGap Applications - Setting Default Properties for the PhoneGap Genie - When you build a PhoneGap application it is critical that you turn on all of the required plug-ins for your application in the PhoneGap Build Project Settings genie.
Now, a new property in the UX Builder allows you to specify that certain PhoneGap settings should be automatically set when a PhoneGap application is built using a particular component.

When you click the smart field for the PhoneGap default settings property, a dialog is shown where you can set certain PhoneGap Builder properties. When you open the PhoneGap genie, the corresponding properties in the builder will automatically be set.
UX Component - List Builder - Refresh Database Schema - By default when you edit a List that is based on one or more SQL tables, the database schema information is refreshed every time you click OK to exit the List builder. In most cases, if your database is local, the time taken to refresh the database schema is negligible. However, if your List is based on one or more tables in a remote SQL database, the time taken to refresh the schema can be significant.
A new property Automatically refresh database schema on edit allows you to turn off the automatic refresh of schema information when the List builder is opened. If you subsequently change the structure of any of the tables that the List is based on you should click the 'Refresh Database Schema' link shown below.

type::Definition::Exists(
Syntax
L flag = type::Definition::Exists("mynamespace::mytype")
This method is particularly useful for checking if a .NET dll has been successfully registered.
UX Component - List Control - SQL Data Source - Group By in SQL - Filter List - If a List control is based on a SQL statement that uses the GROUP BY clause and the UX contains a button to filter the list, if a filter is defined on any of the summary fields in the SQL statement, an appropriate HAVING clause will now be generated.
UX and Grid Component - Class Name Selector - Filter - When you bring up the Class Name selector dialog you can now filter the list of CSS class names to make finding the class name you want easier.

UX and Grid Component - Javascript Actions - Filter List Of Actions - If you opened the Javascript Actions dialog and you applied a filter to filter the list of actions shown in the window, then clicked the OK button without first clearing the filter, the actions that were excluded by the filter were permanently deleted.
UX Component - Pre-render at Design-Time - {dialog.object}.getParentObject() - If a child UX (that is pre-rendered at design-time) was opened by a parent Grid or UX component, the {dialog.object}.getParentObject() method did not return the correct value.
UX Component - Pre-render at Design-Time - Session Timeout Warning - Was not working if the UX was pre-rendered at design-time.
UX Component - Pre-render at Design Time - 3rd Party CSS Icons - Working Preview - If your UX included any 3rd party CSS icons (e.g. FontAwesome, Fontello, etc.) these icons did not display in working preview if the UX was pre-rendered at design-time.
UX Component - Spin Lists - Percentage Width - If the width of a Spin List control was set to a percentage value (e.g. 50%), the width setting was not correctly applied. NOTE: To see the fix you will need to edit any property on the Spin List control to cause the generated code to be recalculated.
UX Component - Google Map - Getting a Pointer to the Low Level Map Object - The UX component allows you to place a Map control on the UX. Alpha Anywhere creates a map object that has many methods (such as placing markers on the map). Behind the scenes, the Alpha Anywhere map object just calls methods of the underlying Google Map object.
In some cases you might want to get a pointer to the underlying Google map object so that you can invoke methods on it directly. For example, you might have read about some feature in the Google Map API documentation that is not implemented in the Alpha Anywhere map object. Getting a pointer to the underlying Google Map object will allow you to implement any feature you might read about in the Google Map API documentation.
Here is how you can get a pointer to the Google Map object:
// get a pointer to the Alpha Anywhere map object
//assume your map control is called 'MYMAP1'
var mObj = {dialog.object}.getControl('MYMAP1');
//now get a pointer to the underlying Google Map object
var gMap = mObj.map;
| UX Component | File Upload to Amazon S3 Storage |
Amazon S3 is a popular service for storing
files. In this video we show how you can build a
UX component that allows a user to upload files
from their machine directly to S3 storage. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2014-12-31 In this next vide we show how you can make an Ajax callback after all of the files have been uploaded. By making an Ajax Callback this action can be used as a replacement for the 'File Upload - User Defined' action in Action Javascript: Watch Video - Part 1 |
| UX and Grid Component | Image Upload |
When you use the Image Upload action in Action
Javascript to upload an image to an image field
in a database you now have the option of
uploading the image to Amazon S3 storage, rather
than to a folder on the Alpha Server. This video shows how to set up image upload to Amazon S3 and discusses some of the benefits of upload to images to Amazon S3, rather than to the Alpha Anywhere server that is hosting your application. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2015-01-28 |
| UX Component | Applying Security Client-Side |
A common pattern in applications is to control
the visibility (or enabled state) of certain
controls on a page based on the 'role' that the
user has in the application security framework.
For example, a button might only be visible to
users in the 'Administration' role. Typically, the security settings are enforced server-side. But in some situations you might want to enforce the security rules on the client-side. In this video we show how controls in a UX can be shown/hidden client-side based on the user's role. Watch Video - Part 1 Watch Video - Part 2 Download Component Date added: 2015-02-06 |
| UX Component - List Control | Exporting Data in List to Excel or Ascii Files |
A popular feature in the Grid component is the
ability to export the data in the Grid query to
an Excel or Ascii file. The UX component List
control also allows the data in the List to be
exported to Excel or Ascii. When you export data
from a List you can either export the data
currently shown in the List, or the data in the
query that the List is based on. Setting up the
code to export the List data is easily done
using Action Javascript. In this video we show how the data in a List and in a List query can be exported to Excel. Watch Video Download Component Date added: 2015-02-09 |
| UX Component | 'File Upload' Action in Action Javascript |
This video shows how you can configure the UX
component to upload a file to the Alpha Anywhere
server and then store the filename of the
uploaded file in a character field in the table
to which the UX component is data bound. Watch Video - Part 1 Watch Video - Part 2 Date added: 2015-02-15 |
| UX Component | 'File Upload' Action in Action Javascript - Uploading to Amazon S3 |
This video shows how you can configure the UX
component to upload a file to Amazon S3 storage
and then store the object name of the S3 object
in a character field in the table to which the
UX component is data bound. TIP: It is recommended that you watch these videos (Watch Video - Part 1 Watch Video - Part 2 ) which discuss uploading files to the Alpha Anywhere server (as opposed to Amazon S3) before watching this video. Watch Video - Part 1 Watch Video - Part 2 Date added: 2015-02-15 |
| UX Component | File Download from Amazon S3 |
This video shows how you can use the File
Download action in Action Javascript to download
files that were previously uploaded to Amazon S3
storage. The video discusses the two different download modes - 'Indirect' (in which the Alpha Anywhere server retrieves the file from S3 and then sends it to the client) and the much more efficient 'Direct' mode (in which the file is downloaded to the client directly from Amazon S3 storage, thus placing minimal load on the Alpha Anywhere server). Watch Video - Part 1 Watch Video - Part 2 Date added: 2015-02-15 |
| UX Component | File Upload to Amazon S3 Storage - Ajax Callback On Complete |
When all files have been uploaded to S3 a
Javascript event is fired, but there is no
property in the builder that allows you to
specify the name of an Xbasic function to
execute. In this video we show how an Ajax callback can be made after all of the files have been uploaded to S3. The Xbasic function that handles the callback gets passed an array with the names of all of the files that were uploaded. A typical use case for this technique would be to store the name of the files that were uploaded in some database on the server. Watch Video - Part 1 Date added: 2015-02-18 |
| UX Component | Stripe Checkout |
The Stripe API allows you to use the popular
Stripe service to process credit card
transactions. Watch Video Download Component Date added: 2015-04-01 |
| UX Component - List Control | Client-side Summary Values - Aligning Summaries with List Columns |
The List control allows you to insert
client-side group breaks in a List and to
display summary values in the group headers and
footers. In a columnar List layout you typically
want to align these summary values with the
appropriate List columns. In this video we show how a genie can generate the necessary Javascript to make it easy to align the summary data with the corresponding List column. Watch Video Download Component Requires build 4465 or above Date added: 2015-04-07 |
| Reports | Linked Reports |
The Alpha Anywhere report writer lets you create
'Linked reports'. A linked report is a report
that is embedded inside a parent report and
linked on some common fields. Linked reports can
themselves also contain other linked reports. In this video we take a simple database that has a 'customer', 'orders' and 'payments' table and create reports on each of these tables. We then link the 'orders' and 'payments' reports into the parent 'customer' report. When you use linked reports you will often want to reference fields values in the linked reports from the parent report. The video shows how this is done by computing the net amount due for each customer, which is the total for their orders minus the total for their payments. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Files Requires build 4469 or above Date added: 2015-04-17 |
| UX Component - List Control | Using the a5-item Template Item Attribute to Add Custom Event Handler to the List Row Template |
Each row in a List control is rendered by
merging data into a row template. The row
template is standard HTML which you are free to
edit. You can include events in the HTML, but
adding onClick and other events directly into
the HTML template is not efficient and does not
work well on touch enabled devices. A much
better solution is to use 'template items' to
add custom events to the HTML template. In this video we show how the a5-item attribute can be added to the HTML template and how you can define event handlers for these 'template items'. Watch Video Requires build 4473 or above Date added: 2015-04-17 |
| UX Component - List Control | Field Level Events - Adding Events for Click, Double Click and Right Click on a Field in a List |
The List control has several events that fire
when the user clicks, double clicks, taps, etc.
on a List row. Now there are additional events
that fire when the user clicks, double clicks or
right clicks on individual fields in a List. The
onFieldClick event fires when the user click on
a column in a particular row of the List. The
event handler that get called is passed an
object with the row number of the row, the name
of the field and the value of the field that was
clicked. Watch Video Requires build 4473 or above Date added: 2015-04-17 |
| Grid Component | Master Template - Tabs - Controlling Active Tab with Javascript |
When you build a Grid component you can specify
that the Grid parts (Search, Grid and Detail
View) should be shown in a Master Template.
There are several pre-defined Master Templates
that you can choose from. For example, you can
choose a template that puts each Grid part in
its own tab. In this video we show how you can use Javascript to automatically control which tab has focus. For example, after the user does a search you would want the Grid tab to have focus. After the user clicks on a row in the Grid to show the Detail View for that row, you would want the Detail View tab to have focus. Watch Video Download Component (requires a connection string called Northwind that connects to the sample Northwind database). Date added: 2015-04-28 |
| Grid Component | Adding 'Genie-Style' Tabs to the Detail View |
When you build a Grid component you can specify
that the Detail View fields should be shown in a
Tab Control. A common design pattern with tabs
is to hide the tab buttons and instead display
Next and Previous buttons that allow the user to
step through the tabs one at a time. This style of moving from tab pane to pane by clicking Next and Previous buttons is called 'Genie-style' tabs. The Grid does not have a built-in option for creating 'Genie-style' tabs (unlike the UX, which does), but with a small amount of Javascript you can add this feature to the Grid, as shown in the video. Watch Video Download Component (requires a connection string called Northwind that connects to the sample Northwind database). Date added: 2015-04-28 |
| UX Component - List Control | Disconnected Applications - Compressing Data Before Storing it in Local Storage |
When you build applications that are designed to
work while disconnected, the data in the List
controls in your UX component are persisted to
Local Storage. There is a limit to the amount of
data that can be put into Local Storage. The
limit varies by browser, but it typically in the
5MB range. By compressing the data before it is put into Local Storage you can store more data. In this video we show how to turn the compression feature on and how to measure the impact of data compression. Watch Video |
| UX Component | Using Date Variables in Client-side Calculated Fields |
When you define a client-side calculated field
expression in a UX and a fields in the
expression is a 'Date' type field, it is
important to understand what goes on behind the
scenes. Alpha Anywhere converts the date string
into a Javascript date object, which enables
date calculations in your client-side calculated
expression. This video explains some of the subtleties when working with 'Date' type fields in client-side calculated fields. Watch Video - Part 1 Watch Video - Part 2 Addendum. In the video we describe how the formatDate() function should be defined. Under some circumstances the formatDate() function, as defined in the video, will give an error because the code that adds the .toFormat() method to the date object has not yet executed. The modified version of the formatDate() function, shown below, can be used instead: function formatDate(dt) { var fmt = A5.__dtfmt + ' ' + A5.__tfmt; try{ return dt.toFormat(fmt); } catch(err) { } } Date added: 2015-06-26 |
| UX Component - List Control | Capturing Photos in a Disconnected Application when using PhoneGap |
If your disconnected application runs in a
PhoneGap shell then you can capture a large
number of photos while you are disconnected
without being constrained by the amount of Local
Storage available on a device. You can also load
photos onto your device so that they are
available while you are disconnected. In this video we show how photo capture works in a PhoneGap application when the option to use the file system on the device is enabled. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 We also show how the List control is configured to use PhoneGap and the file system on the device: Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date added: 2015-07-07 |
UX Component - Methods - {dialog.Object}.refreshClientSideComputations([flagSynchronous]) Method - Now takes an optional flag to indicate whether the refresh should be synchronous or asynchronous. By default, this method now executes asynchronously and the refresh is delayed for 300ms. The reason for changing the behavior of this method to be asynchronous is to prevent multiple calls to this method within a very short time from degrading performance of a UX component (especially in the case where the UX has a lot of watch expressions or the UX is running on a mobile device - which will have a relatively slow processor compared with a desktop machine). If multiple calls to the method are made within a 300ms window, only the last call is now executed - unless the calls are made with the flagSynchronous flag set to true.
Application Server - Open SSL - Updates to OPenSSL 1.0.1p
PhoneGap - UX Component with Child UX Components - Pre-render at Design-time - When you build a PhoneGap application you specify the name of the UX component that is the 'start-up' component. This is the UX that is loaded when the user taps on the application icon on the device home screen. Since the start-up component is physically part of the PhoneGap app, the application can be launched regardless of whether the mobile device has a connection or not.
A common design pattern is for this start up component to call child UX components. These child UX components can either be embedded into the start-up component (for example on a Panel Card that is not initially visible) or might be displayed in pop-up windows. These child components are loaded by making an Ajax callback to the server.
However, if you do not have a connection, you will not be able to make the callback to load the child component.
Now, when you add an embedded object to a UX, or when you use Action Javascript to define an event to open a child UX, you can specify that the child-UX should be pre-computed.
In the image below, the new property (Method for opening UX in a PhoneGap or Static HTML application) for an embedded object is shown in the Optimizations (PhoneGap/Static HTML) section.

A similar property is also available in the Action Javascript builder for opening a child UX.

The options for this property are:
Benefits of the Pre-computed Method
The primary benefit of the precomputed method is speed. No callback is necessary, so the child UX will load very quickly.
Limitations of the Pre-computed Method
Since the child UX component is pre-computed at the time the PhoneGap application (or Static HTML) application is build, there is no concept of what the user's security groups are and what the value of any session variables are. Therefore this option is not appropriate if you have any server-side show/hide expressions, or if certain controls have associated security settings. Also, any data in the component will have been rendered at design-time so you may need to write Javascript code to set certain control values in the child UX after it has been rendered.
PhoneGap - Action Javascript - Working with Files - New actions have been added to Action Javascript that make it easy to work files files in the file system of a mobile device. The new actions are:
PhoneGap - File Upload Action - Action Javascript - Uploads files from the file system on a mobile device to a server.
When you select this action, the following dialog appears:

IMPORTANT: Your PhoneGap application must include the Device, File, File Transfer plug ins.
Properties of note in this builder include:
If you select multiple files to upload, the files are uploaded
asynchronously. Each selected file has its on 'On Upload Complete'
event. There is also an 'On Upload Complete' event that is fired once
all selected files have been uploaded.
If you upload files to the Alpha Anywhere server, you can specify an
Xbasic function to call after each file has been uploaded.

PhoneGap - File Download Action - Action Javascript - Downloads files from a remote server and stores the files in the file system a mobile device.
When you select this action, the following dialog appears:

IMPORTANT: Your PhoneGap application must include the Device, File, File Transfer plug ins.
Properties of note in this builder include:
PhoneGap - File System Action - Action Javascript - A collection of actions that make working with files in the mobile device file system easier.
When you choose this action, you can select from the following list of file system actions:

Note: All PhoneGap file system actions are asynchronous. When you define any of these actions you specify a success function that gets called once the PhoneGap action has successfully completed.
List Control - Detail View - Photos in PhoneGap Applications - Previously, when you built a disconnected application (using List controls with associated Detail Views) you were limited as to how many photos you could capture while you were disconnected because the photos had to be stored (as base64 encoded data) in the browser's Local Storage cache until a connection was available and you could synchronize the data. On most mobile devices, Local Storage is limited to about 5MB.
Also, if the data you were loading from your server onto a mobile device contained photos, the number of records you could retrieve from the server and keep on the mobile device was limited because the photos had to be stored along with your data in Local Storage on your device.
Now, if your application uses PhoneGap, you can use the file system on the device to store your photos and you can capture a large number of photos while you are disconnected, without having to worry about the limits of Local Storage. Future versions of Alpha Anywhere will also allow you to capture video and audio while you are disconnected.
NOTE: Photos, videos and audios are collectively labeled as 'media' files in this topic.
Quick Summary of Steps to Use PhoneGap File System
for Photos:
- Photo fields in your SQL database must be character fields.
- Create a List control with a Detail View on your UX component.
- In the Detail View, set the control type for the Photo fields to
Image.
- In the List builder go to the
Detail View pane and set the
Media and other Linked Files
properties. Most importantly, specify if the media files should
be uploaded to Amazon S3 or the Alpha Anywhere server. It is also
recommended that you check the
Automatically download media files... property so that your
photos in your existing data are available when you go offline.
- In the List builder, go to the
Fields pane and set the
control type for the Photo fields to
Image. Also, if you have
specified that the media files should be uploaded to the Alpha Anywhere
server, edit the Image Capture
and Storage properties to specify the folder where the uploaded
photos should be stored.
- Add a button to the Detail View to capture an image using the camera.
Define the click event for this button using the
Image Capture for List-Detail
View action in Action Javascript. In the builder for this action
set the Image Capture Method
to Phonegap and set the
Data capture mode to
Filename.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
NOTE: In order to use this feature, your PhoneGap application must include these PhoneGap plug-ins: Camera, Console, Device, File, File Transfer, Media, Media Capture.
Similarly, when you retrieve data from the server to store on your device, there is no need to store the photos in Local Storage. The photos can be downloaded and stored in files on the device. This will substantially increase the amount of data you can load onto your device.
In order to use the file system for your images (rather than Local Storage), you configure the Image Capture for List-Detail View - Camera/Photo Library action in action Javascript to use the 'Filename' option (rather than the 'Base64' option). See below for more detail.
When you sync the List with the server database, the photos (and other media files, once support for videos and audios is made available) are first uploaded (to the Alpha server or to Amazon S3) and then once the media files are all uploaded, the data in the Lists are synchronized.
Before examining how to configure the Image Capture for List-Detail View - Camera/Photo Library action in action Javascript and the List Detail View to use this option, it is helpful to understand more about what happens behind the scenes when you capture photos, and then sync the data in your List controls.
Behind the Scenes
When you take a picture, the List data for a row in the List might look like this (where the file in the picture field is a local file on the mobile device):
{Name: 'Fred Smith', picture: 'file://folder_in_the_file_system/image1.jpg'}
Note: If you had not set the action
that captured the picture to use the 'filename' option, the data in
the List might have looked like this (note that the picture field
contains a long string of base64 encoded image data):
{Name: 'Fred Smith',
picture: 'xysshdh24g22334hack46h2dk43hahdh...........'}
When you sync the List data, the media files (the photo in this case) are first uploaded to the server. Let's assume you are uploading media files to S3. The URI of the image on S3 might be something like:
https://yourS3bucketName.s3.amazonaws.com/image1.jpg
After the media files have been successfully uploaded to the server, the data in the List are changed as follows:
{Name: 'Fred Smith', picture: 'https://yourS3bucketName.s3.amazonaws.com/image1.jpg'}
The data in the List can then be synchronized with the server database. The following record would be written to the database:
Name Picture
Fred Smith https://yourS3bucketName.s3.amazonaws.com/image1.jpg
Once the data synch operation has completed, the data in the List is again changed back to:
{Name: 'Fred Smith', picture: 'file://folder_in_the_file_system/image1.jpg'}
The reason to change the data in the List back to its original state is that there is no need to reference a remote image (on say S3) when the local copy of the image is already available in the device file system.
Taking Your Media Files With You When You Go Off-line
If the data in your List has references to remote files (e.g. photos, videos, audio files, etc.) that are located on remote servers (such as the Alpha server, or Amazon S3), you can retrieve those files and store them in the file system on the mobile device. By doing this, you ensure that even when you are disconnected, your application can still reference these files.
Assume that a typical row in the SQL table that you are querying to populate the List contains data like this:
Name Picture
Fred Smith https://yourS3bucketName.s3.amazonaws.com/image1.jpg
When you retrieve data from the server, the JSON representation of the data in a typical row in the List might look like this:
{Name: 'Fred Smith', picture: 'https://yourS3bucketName.s3.amazonaws.com/image1.jpg'}
The picture field is pointing to an image on Amazon S3 and this image will not be available if you are not connected. However you can fetch the image while you do have a connection, store the image in the file system, and update the data in the List to something like this:
{Name: 'Fred Smith', picture: 'file://folder_in_the_file_system/image1.jpg'}
Notice that the picture field in the List no longer points to the remote server, but instead is pointing to a file on the mobile device.
Orphaned Files
Assume that when the List is initially populated, the data in the List are:
[
{Name: 'Tom Smith', picture: 'https://yourS3bucketName.s3.amazonaws.com/image1.jpg'},
{Name: 'Jan Toms', picture: 'https://yourS3bucketName.s3.amazonaws.com/image2.jpg'}
]
When you fetch the media files, the following files will be stored in the file system on the mobile device:
Assume that the user then does another query and retrieves this data with which to populate the List:
[
{Name: 'Tom Smith', picture: 'https://yourS3bucketName.s3.amazonaws.com/image1.jpg'},
{Name: 'Ian King', picture: 'https://yourS3bucketName.s3.amazonaws.com/image3.jpg'},
{Name: 'Jack Jon', picture: 'https://yourS3bucketName.s3.amazonaws.com/image4.jpg'}
]
At this point, the file system on the device will contain these files: 'image1.jpg', 'image2.jpg', 'image3.jpg' and 'image4.jpg', Notice that it still contains a file called 'image2.jpg', but there is no data in the List that references this file. 'image2.jpg' is an 'orphan' file and it can be deleted. The List Detail View has settings that allow you to automatically delete orphan files (see below). There are also events that are fired before and after orphan files are deleted.
Configuring Photo Capture to Use the File System
In order to capture photos in disconnected application you will need a List control with an associated Detail View. Let's assume that the List control is bound to a SQL table that has these fields
NOTE: When you are capturing base64 data, the photo field could be a character field, or a binary field. But if you want to use the file system on the mobile device for your photos, your photo field must be a character field.
Assume that you have have added a List control that is bound to this table to your UX. The control type for the photo field (imageChar) in the Detail View should be set to Image.
First you will need to edit the List control and go to the Fields pane and ensure that the control type for the imageChar field is set to Image. Since imageChar is a character field the List does not set its default type to Image.

You should then add a button next to this Image control and set the action on this button to Image Capture for List-Detail View - Camera/Photo Library.
When you click the smart field to configure this action, the builder will open as shown below:

Note that the builder has several properties shown as read-only properties.

In this example, the target field (i.e. the Bound field type) is a character field. Therefore we have the option of uploading the image to either Amazon S3, or the Alpha Anywhere server when the data in the List are synchronized.
NOTE: If the Bound field type is a binary field then uploading the image to Amazon S3 is not an option. The image can only be uploaded to the Alpha Anywhere server.
NOTE: More properties... are actually stored in the List control settings. It is merely a convenience that you can edit these setting in this builder. Open the List builder and go to the Field pane to see the settings for each image field.
NOTE: Upload target settings are actually stored in the List control settings. They are not stored as part of your Action Javascript definition. It is merely a convenience that you can edit the Upload target settings from within this builder. If you open the List builder and go to the Detail View pane, Media and Other Linked Files (PhoneGap Application Only) section, you will the upload settings.
NOTE: Upload target settings apply to all image fields in the List (and any child Lists with pre-fetched data that are linked to this List). For example, assume that you have two image fields in your List. You might have one button to capture a photo for the first image and another button to capture a photo for the second image. If both of these buttons are configured to use the Filename option for the Data capture mode, then both of these images will be uploaded to the same target (either the Alpha Anywhere server, or Amazon S3). It is not possible to upload the first image field to S3 and the second image field to the Alpha Anywhere server.
Upload Target Settings Dialog
The Upload Target Settings Dialog allows you to define if the media files should be uploaded to the Alpha Anywhere server or to Amazon S3. There are two ways to get to this dialog:

The Upload Target Settings dialog is shown below.

NOTE: In the case where you are not using PhoneGap, you can still access photos in your data when you are offline. However, the amount of data you can load into the List will be limited because the photos are stored in Local Storage along with the List data. In order to store images in the List data so that they are available when you are offline, the photo field in your database must be a binary field (as opposed to a character field - which is required if you are using the PhoneGap option) and you must configure the List to embed the image data (as base64 encoded data) into the List (by checking the Embed images into HTML property for the image field in the List settings, Fields pane).
Methods
The following methods are available
Events
The following client-side events have been added:
UX Component - Optimizing Initial Load Time - When a UX component is opened, the layout of the component is computed from the UX component definition. In a large component that can take some time and the component will appear to be slow to open.
NOTE: If the component is opened from a button on
a parent component, and the action that defines how the
component is opened uses the 'Use cached UX Component'
option, the second and subsequent times the button on
the parent component is clicked, the UX will open
quickly.

A new option in the UX allows you to pre-render the component layout at design-time, thus speeding up the load time for the component at run-time.
NOTE: Not all use cases are appropriate candidates for this option. In particular, if you have controls on your UX that are shown/hidden based on a user's security group, or based on session variables, then you should not use this option. The reason is that at design-time when the component is rendered, it is not know what the value of the session variables or group assignments are.
TIP: You can easily check if a component uses
security and/or server-side show hide expressions by
click the Menu button and then selecting the 'Security
and server-side show/hide settings in component...' menu
choice.

To turn on this optimization feature go to the Properties pane in the UX builder and check the 'Pre-render component at design-time' property.

When you check this property you will see two additional properties:
TIP: When you save a pre-rendered component at design-time, you might have Xbasic code in functions you have defined that is meaningless at design-time, but is nevertheless being called when the component is being pre-rendered. You can test if you are in pre-render mode by checking the flagPreRender property of the rtc object that is passed to all server-side code in the e object. For example:
function someXbasicFunction as c (e as p)
if eval_valid("e.rtc.flagPreRender") then
if e.rtc.flagPreRender then
exit function
end if
end if
.... your code
end function
json_sqlQuery() Function - Allows you to filter a JSON array using a simple SQL query syntax. For example assume you have a JSON string as shown below. The JSON is an array of objects. You can think of this as a table with the following fields: firstname, lastname, city and state.
dim json as c
json = <<%str%
[
{firstname: 'John', lastname: 'Smith', city: 'Boston', state:
'MA'},
{firstname: 'Fred', lastname: 'Jones', city: 'Cambridge',
state: 'MA'},
{firstname: 'Tom', lastname: 'King', city: 'New York', state:
'NY'}
]
%str%
Assume that you want to apply a filter to this string to retrieve certain records and also to sort the result.
The SQL that you would need to express your query might be:
select * from JSONTABLE WHERE state = 'MA' ORDER BY lastname
Or if you would like to use arguments in your SQL, you might express your query as:
select * from JSONTABLE WHERE state = :whatstate ORDER BY lastname
Here is how you can use the json_sqlQuery() function:
dim args as sql::arguments
args.add("whatstate","MA")
dim jsonResult as c
json2 = json_sqlQuery(json,"select * from jsontable
where state = :whatstate ORDER BY lastname",args)
The resulting string will be:
[
{firstname: 'Fred', lastname:
'Jones', city: 'Cambridge', state: 'MA'},
{firstname: 'John', lastname: 'Smith', city: 'Boston', state:
'MA'}
]
UX Component - List Control - Persisting List to Local Storage - The UX component has a property that allows you to minify the data before it is put into Local Storage, thereby reducing the amount of space needed to stored the List data.

When you check the Minify data option now, any blank fields in the JSON data are automatically removed and system fields that are used internally in the List (these are field that have a leading '*' in their name) are also removed. This can result in a significant reduction in the amount of space needed to save a List in Local Storage.
UX Component - SQL - Native SQL and Stored Procedures
- You can now enter native SQL statements (including SQL
to execute Stored Procedures) in the SQL Statement for a
List that is based on a SQL data source.
Previously if you wanted to base a List on native SQL,
or on a Stored Procedure you had to use a Custom data
source. However, when you used a custom data source you
then had to write your own code to handle pagination and
server-side filtering.
Now, pagination and server-side filter all work
regardless of whether the SQL for the List is portable,
native or a Stored Procedure.
If you apply a server side filter to a List that is
based on a Stored Procedure, or a native SQL statement
that cannot be parsed, Alpha Anywhere will execute the
SQL (without the filter/order clause) and then apply the
filter/order to the data that is retrieved from the
database server.
For example, suppose you based on List on this SQL
statement:
exec getAllCustomers
The you apply a server-side filter to the List:
Country = 'USA'
Since the Stored Procedure can only return all customers
and since it (presumably) was not designed to take an
arbitrary 'where' clause, Alpha Anywhere will execute
the Stored Procedure and then apply where filter to the
data after it has been returned by the database server,
but before it is sent to the List control.
Storage Connection Strings - Amazon S3 - Connection String Builder - Region Name - The dialog now uses 'friendly' region names that match the region names used in the AWS Management Console.

Web Applications = Development Server - The Alpha
Anywhere Development Server now allows an unlimited
number of sessions from localhost clients (i.e. browsers
running on the same system) without requiring an
Application Server license. This extends the existing
Development Server functionality that has always allowed
5 sessions from any client. Localhost clients are no
longer counted towards the 5 session limit, so a
developer may do unlimited testing using local browsers
and device emulators, and still test from 5 non-local
clients such as an actual mobile device, a coworker's or
client's computer, etc.
Previous versions of Alpha allowed an unlimited number
of localhost sessions and no non-local sessions when
running the server without a license.
Web Security - Password Validation - The password
validation in the web security now supports regular
expressions in the Text Format. Previously, if a regular
expression was used for validation, it had to be added
as a custom expression. Publishing to IIS does not
support custom expressions, so a custom expression
should be converted to a regular expression if possible.
PhoneGap Builder - File Opener Plugin - The File Opener plugin has been added to the options screen in the PhoneGap Builder.
More info on the plugin is available here.
http_fetch() Function - Validation has been added to the host specified for the HTTP request. Users have occasionally specified a full URL as the host name, which has caused a failure. The new validation logic will extract the host name from the URL if one is mistakenly provided and allow the HTTP request to be completed
UX Component - List Control - Scroller - You can now dynamically show/hide the scroller for a List control. This is useful if you are dynamically populating the List and under some circumstances that are so few rows in a List that the scroller is not wanted, but in other cases there will be many rows in the List and the scroller would be wanted.
The List's .setDisplay() method is used for this as follows:
var lObj = {dialog.object}.getControl('myList');
lObj.setDisplay('scroller',false); //hide
lObj.setDisplay('scroller',true); //show
Other parts of the list that can be controlled with the .setDsiplayMethod() are:
Grid Component - .filterCheckedRows() Method - Now takes an optional argument to filter the unchecked rows as opposed to the checked rows.
Syntax:
{grid.Object}.filterCheckedRows([flagUncheckedRows])
UX Component - DataBound UX Components - Refreshing Schema Information - The UX builder has an option to automatically refresh the stored schema information every time the UX is opened for editing. For complex data bindings, this can slow down the time taken to open the UX for editing. If you know that the table schema has not changed, there is no need to refresh the stored schema in the UX and you can therefore speed up opening the UX for editing by skipping this step. When you specify that the schema should be refreshed when the UX is edited, there is now a new option to prompt for confirmation each time the UX is opened.

a5_getExifInfo() Function - Extract EXIF information from an image.
Syntax
P result = a5_getExifInfo(c imageFilename)
The result object that is returned has these properties
UX Component - Action Javascript - Populate Controls in an Unbound UX - New options if no matching record found - If the specified primary key is not found in the table you can now specify that the values in the databound controls should be cleared, you can also suppress the error message, and you can call a Javascript function.
See 'Errors and No Match Found' section in the genie.

Faster Startup - Alpha Anywhere now starts up faster because the licensing check is now done in a background thread.
PhoneGap - Index.HTML Meta Tags - When you build a PhoneGap app, a new option in the PhoneGap builder now allows you to insert custom META tags in the index.html file that is generated for your PhoneGap app.
A common use case for this feature is to turn off iOS auto-detection of phone numbers and email addresses.

Web Applications - Context Object Documentation - The Context object is available to all server side code that executes in the context of a Web application (for applications that use the Alpha Anywhere server and for those that use the Alpha Anywhere plug-in for IIS). This object has an extensive set of methods and properties that allow you to get information about the request and the response to interact with the security framework.
Click here to see Context object documentation.
json_parse() Function - Parsing Javascript Object Literals - The JSON parse function now takes an optional second argument to indicate if the JSON being parsed is a Javascript object literal rather than a JSON string. For example, consider the following Xbasic code which defined an Xbasic object (i.e. dot variable):
dim p as p
p.name = "Fred"
p.sayHello = "{javascript}function() { alert('hello');}"
Now, generate a Javascript object literal. Pass in .t. as the second argument to vartojson() to indicate that we want an Javascript object literal and not a JSON string.
dim jsObject as c
jsObject = vartojson(p,.t.)
Here is what the resulting string looks like:
{
name: 'Fred',
sayHello: function() { alert('hello');}
}
Now, in order to be able to parse this object literal back to Xbasic, we use the json_parse() function but we set the optional second argument to .t.
dim pj as p
pj = json_parse(jsObject ,.t.)
?pj.name
= "Fred"
?pj.sayHello
= "{javascript}function() { alert('hello');}"
UX Component - List Control - Template Items - a5-item Attribute - Template Items are a powerful new way to efficiently add event handlers to the HTML markup used in the List template. Template items are added to the HTML markup by adding an a5-item attribute to the markup, as explained below.
Regardless of whether the List is defined as a free-form or columnar layout, every row displayed in the List is created by merging data into the row template. For a free-form List, there is a single template for the entire row and for a columnar List, there is a template for each column in the List. The template is HTML with placeholders for the List data.
For example, the template for the Firstname field in a columnar List might be:
{Firstname}
The template for a free-form List might be:
<b>{Firstname} {Lastname}</b> <br>
{City} {State} {Zip}
You might want to add an event handler so that when the user clicks on the Firstname field, an event fires. You might change the template for the Firstname field to:
<span onClick="event1()" >{Firstname}</span>
When the user clicks on the Firstname field in any row of the List, the event1() Javascript function should be called.
While inserting the onClick attribute into the <span> that wraps the {Firstname} placeholder seems easy enough there are two problems with it:
Both problems can be solved by using template items. The template could be defined as:
<span a5-item="item1" >{Firstname}</span>
In the above example, 'item1' is the name of a template item. The event handlers for the 'item1' template item are defined in the Template Item editor.
To define template items, you can either click the Quick Access... button at the bottom of the List Builder window and then select 'Template Items' from the menu.

Or, you can click the Template 'items' hyperlink in the Column Template of Layout Template editor.

When you open the Template Items editor you get a screen that looks like this:

You can define as many template items as you want. For each item you define event handlers for the Click, Double Click and Right Click events.
You can also set the 'Selectable' property. If this property is set, then when the user clicks on the item, the row in which the user clicks is selected. Otherwise, the row is not selected.
When you insert a template item into the HTML markup you can insert an optional 'item argument'. The item argument follows the item name, delimited by a colon. In the example below, 'item1' is the item name and 'argumentValue' is the item argument. The purpose of the item arguments is to pass additional information to the Javascript event handler.
<span a5-item="item1:argumentValue" >{Firstname}</span>
The Javascript event handlers for the item can reference:
When you are editing the List template the Template 'items' hyperlink also gives you access to a special genie that makes it easy to insert items into the template:

UX Component - List Control - onFieldClick, onFieldDblClick, onFieldRightClick Events - New events have been added to the List that fire when you click, double click or right click on fields in the List.
Contrast these events with the onClick, onDblClick, etc. event which fire when you click on a row (as opposed to a field) in the List.
When the onFieldClick, onFieldDblClick or onFieldRightClick events are fired, the e object that is passed into the event handler has these properies:
NOTE: The above events are only implemented for Label and RawData control types.
varToJsonHash() Function - Converts an Xbasic property array to a JSON hash
Syntax:
C jsonHash = varToJSonHash(p propertyArray, c hashProperty [, L flagSpecialTags [, L flagCondense [, flagUseDoubleQuotes ]]])
Where:
Example:
Consider the following Xbasic property array:
DIM P[0] as p
p[].name = "John Smith"
p[..].address = "123 Main Street"
p[..].age = 23
p[].name = "Fredia Malt"
p[..].address = "456 Center Lane"
p[..].age = 33
We can convert this to a JSON hash, using the 'name' property as the hash index as follows:
dim jsonHash as c
jsonHash = vartojsonHash(p,"name")
The resulting JSON string looks like this:
{
'John Smith' : {address: '123 Main Street',age: 23},
'Fredia Malt' : {address: '456 Center Lane',age: 33}
}
In this next example we use the flagSpecialTags property
DIM P[0] as p
p[].name = "John Smith"
p[..].address = "123 Main Street"
p[..].age = 23
p[..].sayHello = "{javascript}function() { alert('hello John') }"
p[].name = "Fredia Malt"
p[..].address = "456 Center Lane"
p[..].age = 33
jsonHash = vartojsonHash(p,"name", .t.)
The resulting JSON string is:
{
'John Smith' : {address: '123 Main Street',age: 23,sayHello:
function() { alert('hello John') }},
'Fredia Malt' : {address: '456 Center Lane',age: 33}
}
AlphaDAO - SQLServer Driver - Faster Connections - There are two changes in the SQL Server Extension driver:
As a result of both changes, the connection times are now in the microsecond range when connecting to a local machine.
UX Component - Edit Combo - Stored Value is Different than Display Value - Resolving Value Message - When you define an Edit-Combo that sets the stored value to be different than the display value, and the Edit-Combo is populated using an Ajax callback, you can now control the message that is shown when the stored value is resolved into a display value. By default the message:
Resolving: <stored value being resolved>
is shown while the Ajax callback that resolves the stored value is running. But you can customize this message or even eliminate it by setting the message text to <None>.

UX Component - List Controls - Detail View - Parent/Child Data - In disconnected applications, when you define parent-child relationships between List controls you must set the child List's 'Pre-load data' property to true.
However, when you are building a connected application you might still want to define a parent-child relationship between Lists and you might want to define a Detail View for each List to allow editing of the List data, but you might not want to pre-load the child data (since Alpha Anywhere can easily fetch the child data as needed as you have a connection).
Previously, if you did not have the pre-load option checked, you were not allowed to edit data in the child Lists (using the child List's Detail View).
Now, you can edit data in the child Lists, but you must specify linking values in the optional Linking fields section. The data you fill into these properties is used to ensure that the values in the linking fields are automatically set to the corresponding values in the parent List record when insert or updates are performed.

a5_sql_schema_to_json() Function - Takes a schema of a SQL database and generates a JSON representation of the schema showing all tables in the database, and their relationships.
Example:
Type the following commands in the Interactive window:
dim cn as sql::Connection
?cn.Open("::Name::northwind")
= .T.
dim sn as sql::Schema
?cn.GetSchema(sn)
= .T.
dim jsonSchema as c
jsonSchema = a5_sql_schema_to_json(sn,{ show_field_type_info : true })
showvar( jsonSchema)
UX Component - Action JavaScript - Geolocation Functions- A new option, Get accurate position within a designated radius has been added to the Action JavaScript Geolocation functions. When enabled, you may specify a desired accuracy radius. The returned lat/lon will fall within the desired accuracy radius if at all possible. This option calls a new custom method that has been added to the navigator.geolocation object called getAccuratePosition(). This method uses the geolocation watchPosition() method to attempt to get position data within a specified accuracy radius. The method will time-out at the maximum wait time and will return the last known location, even if the accuracy does not meet the desired accuracy target.
The maximum wait time defines the maximum amount of time in ms to wait for a geolocation change event.
If Ignore first result is checked, the first geolocation point returned will not be used. Some devices return cached location data for the first result, which is, in most cases, inaccurate.
The returned geolocation data can be accessed through the {dialog.object}.getGeolocation() method.
Example code for the 'Callback function' in the above image:
function gotResults() {
var e = {dialog.object}.getGeolocation();
alert('Lat = '+e.latitude+' Lon = '+e.longitude);
}
UX Component - Client-side Group Breaks - Aligning Summary Values with List Columns - The List control allows you to insert client-side group breaks in a List and to display summary values in the group headers and footers. In a columnar List layout you typically want to align these summary values with the appropriate List columns.
A new genie in the Header/Footer builder make this easy to do. The genie generates a sample Javascript function that you can easily modify.
Watch Video
Download Component
UX, Grid, TabbedUI and Custom Components - Local CSS and Linked CSS Files - SASS - When you define local CSS (at the Local CSS definitions property), or when you link in CSS files you can now use SASS syntax in your CSS definition.
NOTE: For more information on SASS syntax see http://sass-lang.com/
In the case of linked CSS files your CSS file should have a .scss extension and when you specify the name of the linked CSS files you should include the .scss extension.
TIP: You can turn off automatic SASS
processing of your local CSS definitions by adding this property to the
Advanced, Other Properties section in the builder:
tmpl.sassProcessor =
.f.
UX and Grid Builder - Editing HTML Content - Script Tags - When you add a <script> tag to HTML content that you are editing, by default Alpha Anywhere assumes that the type is 'text/javascript' and does not auto-complete or syntax highlight the text between the opening an closing <script> tags.
However, if you set the type to 'text/html', then Alpha Anywhere will treat the text in the <script> tags as HTML and will do syntax highlighting and html code completion.
This feature is very useful when you want to create strings of HTML for use in Javascript code.
UX and Grid Component - HTML Snippets - When writing Javascript functions, a common requirement in the Javascirpt code is to define a long string of HTML markup. A good example of where this requirement is common is when using the A5.u.template.expand() function in client-side templates.
For example, you might write Javascript like this:
var _d = {
firstname: 'Fred',
lastname: 'Smith',
Address: {
Street: '123 Main St',
City: 'Boston',
State: 'Ma'
}
};
var _t = [
'Hello {firstname} {lastname}<br>',
'Address: {Address.Street}<br>',
'{Address.City} {Address.State}'
].join('');
var settings = {
template: _t,
partials: ''
}
var html = A5.u.template.expand(_d,settings);
The HTML template in the above code was written as an array of single-line strings that were then joined to create a long string.
While the above pattern for creating long strings is perfectly reasonable, it is difficult to write because the single-line strings all need to be Javascript escaped and you do not get any HTML auto-complete help while you compose the script.
A better technique is to add a static-text control to the UX and then to add the HTML template to the static-text control using a <script> tag with a type of "text/html".
Because the HTML markup is in a <script> tag, it will not be rendered when the UX is run. And because the type is 'text/html' the markup will not be executed as Javascript code.
Any text inside a <script> tag with a type of "text/html" will be highlighted as HTML text and the standard HTML auto-complete help will apply.
By giving a unique Id to the <script> tag, your Javascript can easily reference the contents of the <script> tag.

In the above example Javascript, the code can be changed as follows:
var _d = {
firstname: 'Fred',
lastname: 'Smith',
Address: {
Street: '123 Main St',
City: 'Boston',
State: 'Ma'
}
};
var _t = $('template1').innerHTML
var settings = {
template: _t,
partials: ''
}
var html = A5.u.template.expand(_d,settings);
And the template can be defined in a static-text control as follows
<script id="template1">
Hello {firstname}
{lastname}<br>
Address: {Address.Street}<br>
{Address.City} {Address.State}
</script>
json_flatten() Function - Takes a JSON string that defines an array of hierarchical objects and 'flattens' the array.
This function is useful for Reporting where the report data source is set to a Custom data source that returns JSON data. If the JSON data that is returned is hierarchical, then you will need to 'flatten' it in order to get it into an appropriate format for the report writer.
The syntax for json_flatten() is
c output = json_flatten(C jsonIn, c template)
The format of the template is shown in the following example.
Consider the following JSON String:
[
{
"id": "alfki",
"name": "customer 1",
"__a5crc": -253329,
"orders": [
{
"orderId": 1,
"orderData": "12/1/2013",
"ordcust": "1|||alfki",
"orderDetails": [
{
"lineitemId": 1,
"prodId": 1,
"qty": 3,
"ordprod": "1|||1"
},
{
"lineitemId": 4,
"prodId": 3,
"qty": 2,
"ordprod": "1|||3"
}
]
},
{
"orderId": 3,
"orderData": "12/3/2013",
"ordcust": "3|||alfki",
"orderDetails": [
{
"lineitemId": 6,
"prodId": 4,
"qty": 9,
"ordprod": "3|||4"
},
{
"lineitemId": 7,
"prodId": 3,
"qty": 1,
"ordprod": "3|||3"
}
]
}
]
},
{
"id": "bolid",
"name": "customer 2",
"__a5crc": -194126,
"orders": [
{
"orderId": 2,
"orderData": "12/2/2013",
"ordcust": "2|||bolid",
"orderDetails": [
{
"lineitemId": 2,
"prodId": 6,
"qty": 6,
"ordprod": "2|||6"
},
{
"lineitemId": 3,
"prodId": 9,
"qty": 7,
"ordprod": "2|||9"
}
]
}
]
}
]
The JSON object defined by the above string shows an array of customers with embedded orders. For each order, there are embedded line-items.
The structure of the JSON object is
Customers
Orders
Order Details
The json_flatten() function takes two arguments - the JSON string you want to flatten, and a template that defines which properties in the input JSON you want to map to the output JSON.
Assume that the following template is specified:
{
"id" : "id" ,
"name" : "name" ,
"orders" : [
{
"orderId" : "orderId" ,
"orderData" : "orderData" ,
"orderDetails" : [
{
"lineitemId" : "lineitemId" ,
"prodId" : "prodId" ,
"qty" : "qty"
}
]
}
]
}
If you 'flatten' this JSON using the above template, you will get the following output:
[
{
"id": "alfki",
"name": "customer 1",
"orderId": 1,
"orderData": "12/1/2013",
"lineitemId": 1,
"prodId": 1,
"qty": 3
},
{
"id": "alfki",
"name": "customer 1",
"orderId": 1,
"orderData": "12/1/2013",
"lineitemId": 4,
"prodId": 3,
"qty": 2
},
{
"id": "alfki",
"name": "customer 1",
"orderId": 3,
"orderData": "12/3/2013",
"lineitemId": 6,
"prodId": 4,
"qty": 9
},
{
"id": "alfki",
"name": "customer 1",
"orderId": 3,
"orderData": "12/3/2013",
"lineitemId": 7,
"prodId": 3,
"qty": 1
},
{
"id": "bolid",
"name": "customer 2",
"orderId": 2,
"orderData": "12/2/2013",
"lineitemId": 2,
"prodId": 6,
"qty": 6
},
{
"id": "bolid",
"name": "customer 2",
"orderId": 2,
"orderData": "12/2/2013",
"lineitemId": 3,
"prodId": 9,
"qty": 7
}
]
Notice that the template has omitted the '__a5crc' in the input property. The template indicated which properties were to be extracted from the input JSON. It also indicates that the property name should be called in the output JSON.
For example, the template indicates:
"id" : "id"
Had that been:
"id" : "CustomerId"
The output JSON would have named the 'id' property 'CustomerId'.
Here is a simpler example:
dim json as c
json = <<%str%
[
{"id" : 1, "name": "John", "kids" : [ {"name": "callie"},{"name"
: "griffin"} ]},
{"id" : 2, "name": "Tom", "kids" : [ { "name" : "betty" } ]}
]
%str%
dim template as c
template = <<%str%
{"id" : "id", "name" : "firstname", "kids" : [ {"name":
"name"} ] }
%str%
dim json2 as c
json2 = json_flatten(json,template)
json2 = json_reformat(json2)
Here is what json2 looks like:
[
{
"id": 1,
"firstname": "John",
"name": "callie"
},
{
"id": 1,
"firstname": "John",
"name": "griffin"
},
{
"id": 2,
"firstname": "Tom",
"name": "betty"
}
]
The json_flatten() function can also be used to simply map property names in the input JSON to new property names in the output JSON. For example, consider the following script:
dim json as c
json = <<%str%
[
{"id" : 1, "name": "John"},
{"id" : 2, "name": "Tom"}
]
%str%
dim template as c
template = <<%str%
{"id" : "id", "name" : "firstname"}
%str%
dim json2 as c
json2 = json_flatten(json,template)
json2 = json_reformat(json2)
showvar(json2)
The resulting JSON will look like this:
[
{"id" : 1, "firstname": "John"},
{"id" : 2, "firstname": "Tom"}
]
PhoneGap- Modified The Default Location For Persistent Files - Previous versions set the Persistent File Location property to "Compatibility" mode on both Android
and iOS devices. It has now been changed to "Internal" for Android and "Library" for iOS. This is the recommended setting on Android to ensure the files are
contained within the app folder and that the files are deleted when the app is deleted. Under iOS, the files are always in the app folder, however, files in the
Library folder are not available to iTunes nor are they synchronized to iCloud.
When "Compatibility" mode is set as the persistent file location for an Android PhoneGap app:
When "Compatibility" mode is set as the persistent file location for an iOS PhoneGap app:
In general "Compatibility" mode is NOT the recommended setting.
If you have used the PhoneGap file plug-in in previous versions, the default setting will make your app files inaccessible.
The setting will not change for existing PhoneGap apps because the previous "Compatibility" setting will remain within the configuration file.
Your app will only be affected if you delete the previous PhoneGap project and create a new one.
You can change this setting by enabling Show Advanced Options in the Configuration Options settings of the PhoneGap App Builder Genie.
Once the Show Advanced Options is enabled, you can change the persistent file location as required
Web Applications - Web Projects Control Panel - 'Search all files in this Project' Command - This command will now search in report, label and letter file (.i.e. .a5rtp, .a5lab and .a5ltr). The data source definition of the report layout (not the report body itself) will be searched.
UX Component - Action Javascript - PhoneGap - File System Actions - A new action in Action Javascript allows you to perform actions on the file system of the mobile device on which your UX is running.
NOTE: File system actions are only supported for PhoneGap applications.
The actions currently supported are:
All of these actions are performed asynchronously. For each action you specify the Javascript to execute once the action has successfully completed. If the action fails, the Javascript you specify for the on failure action is executed.
Because the actions are asynchronous, you cannot simply define an Action Javascript that calls two file system actions sequentially. For example, assume that you defined an Action Javascript that did this
This would likely fail because the second action (write a file to the new directory) would be executed immediately after the first action (before the new directory had actually been created).
In order to make the above work, the second action (write a file) needs to be called in the first action's onSuccess function.
The asynchronous nature of file system actions makes it tricky to write complex scripts that perform many file system actions
In the above example, you would need to convert your Action Javascript to text mode and then rearrange the code.
For example, assume you defined the above two actions using Action Javascript. Once you converted to text mode your code would look like this:
{dialog.object}.phoneGapCreateDirectory('dir1', function() { //ok}, function() { //fail } );
{dialog.object}.phoneGapCreateFile('dir1/file1.txt','some data',function() { //ok }, function() {//fail },false);
To re-organize the code so that the write file action happens after the new directory has been created, we simply paste the action into the create directory's onSuccess function:
{dialog.object}.phoneGapCreateDirectory('dir1', function() {
//ok
{dialog.object}.phoneGapCreateFile('dir1/file1.txt','some data',
function() { //ok },
function() {//fail },false);
}, function() { //fail } );
UX Component - PhoneGap File System Methods - The following methods have been added to the UX for working with files on the mobile device.
NOTE: File system actions are only supported for PhoneGap applications.
| Create a directory | {dialog.object}.phoneGapCreateDirectory(dirName, onComplete, onError) |
| Create a directory (recursively) | {dialog.object}.phoneGapCreateDirectoryRecurse(dirName, onComplete, onError) |
| Read a directory | {dialog.object}.phoneGapGetDirectory(dirName, onComplete, onError) |
| Read a directory (recursively) | {dialog.object}.phoneGapGetDirectoryRecurse(folder, onDirComplete, onDirError) |
| Remove a directory | {dialog.object}.phoneGapRemoveDirectory(dirName,onSuccess,onError) |
| Remove a directory (recursively) | {dialog.object}.phoneGapRemoveDirectoryRecurse(dirName,onSuccess,onError) |
| Delete a file | {dialog.object}.phoneGapDeleteFile(fileName,onSuccess,onError) |
| Check if a file exists | {dialog.object}.phoneGapFileExists(fileName,onResult,onFailed) |
| Read a file | {dialog.object}.phoneGapReadFile(fileName,onReadFile,onReadFileERROR) |
| Create a file | {dialog.object}.phoneGapCreateFile(fileName,text,onCreatedFile,onCreateFileERROR,flagAppend) |
UX Component - Action JavaScript - Stripe Checkout- A new Action JavaScript has been added to the UX component that allows you to easily use Stripe Checkout.
Stripe Checkout, and the Stripe API, allow you to process credit card payments from within your desktop web or mobile app.
You will need to obtain your unique test and live authentication/api keys from Stripe prior to working with Stripe Checkout within your app.
See the Stripe Website to setup your account.

A typical use case is to assign the action to a button click event, once the total of all items to be purchased has been computed.
Specifying your Stripe API Keys: Stripe will issue you a total of four authentication/api keys. One set is for testing and one set is for a live app.
The keys can be entered in explicitly within the Action Javascript builder or you may specify the keys within your project properties
(click the Project Properties button when the Web Control Panel has
focus).

Entering the Stripe Checkout keys in the Project Properties
Entering the Stripe Checkout Keys in the Project Properties allows you to easily use Stripe Checkout within multiple components. Be careful to
enter the test keys (typically prefixed with sk_test and pk_test) and the live keys (typically prefixed with sk_live and pk_live) in the appropriate fields.
The secret key is used server side when the server is communicating to the Stripe API with the token supplied by Stripe Checkout. The secret key is never revealed client side.
Stripe App Type: The app type can be Test or Live. Use Test for all of your testing and when you are ready to go live you must switch this property to Live and republish the app. If you are building a PhoneGap app, make sure to rebuild the PhoneGap app and upload to PhoneGap Build.
Icon Image: The icon image is displayed at the top of the Stripe Checkout component. The recommended minimum size is 128 x 128 px. Supported image types include .gif, .jpeg and .png.
Currency type: This specifies the currency of the amount being charged. The code entered here is the 3 letter ISO country code. Stripe offers support for a worldwide range of currencies. You can accept payments in your supported currencies from almost any credit card and debit card no matter where the customer lives. Customers in other countries may be charged additional fees by their bank.
Charge description: A general description of the product or service being purchased. The JavaScript you enter here can simply return a string (like the example below), return the value contained
within a control or return the result of a JavaScript function, defined within the UX component's JavaScript Functions property.
Charge amount: The amount (in cents) that is being charged. The JavaScript you enter here may simply return a number (example: return 1235; for a $12.35 charge),
may read the value of a control (make sure you convert to cents!) or may return the result of a JavaScript function, defined within the UX component's JavaScript Functions property.
OnStripeCheckoutComplete: This event fires after Stripe has attempted to process the payment with the token supplied by Stripe Checkout. The JavaScript you enter here
can examine the results returned from Stripe by calling the {dialog.object}.getStripeResults() method (see the sample code below). The {dialog.object}.getStripeResults method
returns either a Stripe charge object with a wide range of properties or an error.
See Stripe Charges Doc for more information.
HTTPS For Your Site All submissions of payment info using Stripe Checkout are made via a secure HTTPS connection. However, in order to protect yourself from certain forms of man-in-the-middle attacks, it is suggested that you serve the page containing the payment form with HTTPS as well.
UX Component - Image Upload Action Javascript - Mobile - Amazon S3 - When defining an Image Upload action for a UX component that is run on a mobile device you can specify in the image should be uploaded directly to Amazon S3 rather than to the Alpha Anywhere server.
This option is only available if the image is bound to a character field in the Table to which the UX component is bound.
Image upload in a mobile application uses the camera, or the photo library to select the image.
The option to upload to S3 is available for both HTML5 camera access and PhoneGap camera access.
NOTE: In the case where you are building a PhoneGap application, it is very important that when you build your PhoneGap project you include all of the necessary plugins when you define your PhoneGap project. You must include the File, FileTransfer and Camera plugins.
The ability to upload file images to Amazon S3 when using the Image Upload action in Action Javascript for the 'Desktop' mode was released previously. More information about this feature can be found in this topic: Action Javascript - Image Upload Action - UX and Grid Component - Amazon S3
UX Component - Android - Client-side Events - onKeyboard Event - A new event has been added that fires when the keyboard comes up, or is dismissed. This event is only supported on Android devices.
NOTE: The reason that the event is not supported on iOS is that under iOS the reported screen size of the device does not change when the keyboard is up.
NOTE: If you have set the UX quirks mode
keyboardAffectsScreenSizeCalc property to true
for backward compatibility then the
onKeyboard
event will not fire. For example:
{dialog.object}._quirks = {
keyboardAffectsScreenSizeCalc: true};
UX Component - List Control - .setValue() Method - New Options - Several new options have been added to the List control's .setValue() method. The options allow
Examples:
Select all records in a List:
var lObj = {dialog.object}.getControl('MYLISTNAME');
lObj.setValue({select: 'all'});
Select records by Group name (deselecting any existing selections):
var lObj = {dialog.object}.getControl('MYLISTNAME');
lObj.setValue({
select: 'group',
groups: ['CA','MA'],
additive: false
})
Select records by Group name (preserving any existing selections):
var lObj = {dialog.object}.getControl('MYLISTNAME');
lObj.setValue({
select: 'group',
groups: ['NY'],
additive: true
})
Select all rendered records in a 'Virtualized' list (if there are 100 records per 'page' and the List has (say) 2,000 records then there are 100 rendered records that will be selected):
var lObj = {dialog.object}.getControl('MYLISTNAME');
lObj.setValue({
select: 'view',
additive: false
})
UX and Grid Component - Javascript Actions - Filter List - The Define Javascript Action dialog now has a filter control to allow you to easily filter the list of actions. This is useful because some developers now have a large number of Javascript Actions defined in their components.

a5_json_viewer() Function - The A5_json_viewer() function can be used to open a viewer for JSON data.

Xbasic - CURL Genie - The code generated by the Xbasic CURL Genie is now more flexible. Instead of generating a constant for the post body length, it now generates a variable. For example, assume that you paste this CURL command into the genie.
curl --data "param1=value1¶m2=value2" https://example.com/resource.cgi
The generated output from the genie will now be:
dim cf_1 as extension::CurlFile
dim flag_1 as l
dim ce as extension::Curl
ce = extension::Curl.Init()
ce.setOpt("URL","https://example.com/resource.cgi")
ce.setOpt("NOPROGRESS",1)
dim posted_fields as c = ("param1=value1¶m2=value2")
ce.setOpt("POSTFIELDS",posted_fields)
ce.setOpt("POSTFIELDSIZE_LARGE",
len(posted_fields) )
ce.setOpt("USERAGENT","curl/7.40.0")
ce.setOpt("MAXREDIRS",50)
ce.setOpt("CAINFO",a5.Get_Exe_Path()+"\caroot\ca-cert.pem")
ce.setOpt("CAPATH",a5.Get_Exe_Path()+"\caroot")
ce.setOpt("SSH_KNOWNHOSTS","C:\Users\Cian\AppData\Roaming/_ssh/known_hosts")
ce.setOpt("TCP_KEEPALIVE",1)
ce.SetOpt("FILE",cf_1)
flag_1 = ce.Exec()
if flag_1 then
showvar( "Headers: "+crlf()+cf_1.GetHeaders()+crlf()+"Content:"+crlf()+cf_1.GetContent())
else
showvar("error: " + ce.Error() )
end if
ce.close()
File.to_property() Function - Can now automatically de-serialize a file that was serialized using property_to_string(), property_to_blob() or json_generate().
Example:
dim src.fname as c = "john"
dim src.lname as c = "public"
file.From_string("c:\data\sample.txt",property_to_string(src))
file.From_string("c:\data\sample.json",json_generate(src))
file.From_blob("c:\data\sample.dat",property_to_blob(src))
dim p1 as p
file.to_property("c:\data\sample.txt",p1)
? p1
= fname = "john"
lname = "public"
dim p2 as p
file.to_property("c:\data\sample.json",p2)
? p2
= fname = "john"
lname = "public"
dim p3 as p
file.to_property("c:\data\sample.dat",p3)
? p3
= fname = "john"
lname = "public"
UX Component - Static HTML Web Sites - Publishing to Amazon S3 - If you have a static UX component (i.e. the component does not make any callbacks to an Alpha Anywhere server), you can publish the static HTML site to Amazon S3. The advantage of this is that you don't need to publish your site to an Alpha Anywhere server and the site will be accessible from any browser that has an internet connection.
VERY IMPORTANT - The Amazon S3 bucket that you publish to must be configured to allow 'Public Read' otherwise when you try to access the application Amazon will return a 'Permission Denied' error. To set the correct policy on your Amazon bucket, you can use this JSON setting string in the Amazon Web Services console.
{
"Version": "2008-10-17",
"Statement": [
{
"Sid": "AllowPublicRead",
"Effect":
"Allow",
"Principal":
{
"AWS": "*"
},
"Action": [
"s3:GetObject"
],
"Resource": [
"arn:aws:s3:::specify_the_name_of_your_bucket_here/*"
]
}
]
}
Web Applications - Publishing - Check Security Before
Publish - You can now check if any pages,
components, or reports in the list of files to be
published are set as 'Always Denied' in the web
security. This is useful if publishing new pages or
components to verify the security is set before the new
elements are published. The check is only performed if
security is active, and will check all pages, and
components and reports if component security is
activated. Most other files have security set by file
extension.
If the option is selected and the file list to publish
includes pages, components, or reports that are set as
'Always Denied', a list of these files will be shown
before publish. You can continue with the publish or
cancel and correct any errors.
This option can be selected at publish, and a default
value for the option can be set in the publish profile.
The option can also be set separately for right click
publish.
Web Applications - Publishing - Publish Page Security
as Binary - Some projects may have very large number
of entries in the 'Pages.SecuritySettings' security
file. The file is normally stored as a text file, but if
it is very large (over 1 MB for example), it may load
slowly on the application server when the security is
loaded. This security file can be converted to a binary
file when published which will load much faster. If the
security cache timeout is set to 0 to never check for
updates, a slow load time will only impact the first
request for a project.
a5_url_fromStorageJSONformat() Function - Generates a signed URL to download a file from Amazon S3 storage.
The a5_url_from_storageJSONformat() function can be used to display/download a file from storage (e.g. Amazon S3) directly, with very little load on the Alpha server. The purpose of the function is to take a JSON string that defines the address of an object in storage (e.g. Amazon S3) and to generate a signed URL that can be used to download the object directly to the client from storage without having to first download the object to the Alpha server and then have the Alpha server send the file to the client.
The JSON string format that defines the address of an object in storage is:
{cs: 'storage connection string', object: 'name of object', source: 'vendor'}
NOTE: Currently the only vendor supported is Amazon S3 so vendor must be set to 'S3'
NOTE: The storage connection string is defined by selecting the Tools, Storage Connection Strings menu when the Web Projects Control Panel has focus. When you define storage connection strings you have the option of encrypting the storage connection string. You must NOT encrypt the storage connection string or else Alpha Anywhere will not be able to parse the storage connection string to determine your storage credentials.
For example, assume you have a named storage connection string called 'myS3bucket'. A JSON string that defines the address of an object called 'ProductPrices.pdf' would be:
{cs: 'myS3bucket', object: 'ProductPrices.pdf', source: 'S3'}
To generate a URL to display or download this object you would do the following:
dim address as c
address = <<%txt%
{
cs: 'myS3bucket',
object: 'ProductPrices.pdf',
source: 'S3'
}
%txt%
dim url as c
url = a5_url_from_storageJSONformat(address)
The resulting URL would look something like this (assuming that the bucket name specified in the connection string was 'myBucket'):
https://s3.amazonaws.com/myBucket/ProductPrices.pdf?AWSAccessKeyId=key&Expires=expiration&Signature=signature
Where:
key - your access key - as defined in the storage connection string
expires - indicates how long the URL can be used for (only applies if the object was uploaded to storage as 'Protected Read')
signature - a special signature based on the credentials specified in the storage connection string.
By default, the expires property is 240 seconds. That means that if the URL is used more than 240 seconds after it was generated, Amazon S3 will return a 'permission denied' error. The a5_url_from_storageJSONformat() function takes an optional second argument where you can specify how long the URL is good for in seconds. The default value for this parameter is 240.
File Upload - Amazon S3 - A new action has been added to Action Javascript for the UX component to upload files to a bucket in Amazon S3 storage.
NOTE: This action is not available for the Grid Component. However, the standard 'File Upload' and 'Image Upload' actions in Action Javascript, which are supported in the Grid now supports an option to target the upload to Amazon S3.
Watch Video
- Part 1
Watch Video
- Part 2
The benefit of this method is that the upload occurs directly to the Amazon servers without putting any load on the the Alpha Application Server.
NOTE: There is a small load on the Alpha Server for each file that is uploaded because a callback has to be made to the Alpha server to sign the URL used for the upload. This is necessary because the secret key for your Amazon account is stored on the Alpha server.
Features of the Amazon S3 File Upload include:
IMPORTANT: Before you can upload files to Amazon S3, you must configure your Amazon bucket to allow CORS support. CORS (Cross-Origin Resource Sharing allows you to make callbacks to a different server than the server (the Amazon server in this case) from which the page was originally loaded (your Alpha server). To configure your bucket you will need to open the AWS console. You can click the 'Setting CORS Support on your Amazon Bucket' in the Action Javascript builder for more information.
In order to create an action to upload files to Amazon S3, use Action Javascript. Select the 'File Upload = Amazon S3 Storage' action.

The genie for this action is shown below:

Method for specifying Amazon S3 credentials and bucket - There are two ways in which you can specify the credentials for your Amazon S3 bucket. You can specify a named storage connection string, or you can use the 'Explicit' option, in which case you will need to specify your Amazon access key, secret and bucket name.
NOTE: To create a named storage connection string, go to the Tools menu when the Web Projects Control Panel has focus and select the Storage Connection Strings menu item.

Allow multiple files - If you check this box, the user will be able to select multiple files. The files will be uploaded in parallel.
If you check this box then you can specify value for the Max total file size property, which is the maximum combined size of all selected files. By default, this property is set to -1, which means no maximum.
Display progress during upload - If you check this property, then progress will be displayed during the file upload.
NOTE: If you do not check this property, you can still create your own progress display by adding custom code to the Javascript On Progress event.
Allow cancel - Specify if the user can cancel the upload after it has been started, but before it completes.
Progress indicator type - The progress can be displayed either as a text that shows the percentage complete, or as a bar.
In the image below, progress is shown for a multiple file upload using the 'bar' option. Note that the Allow cancel property was also checked, and so a small button to the right of the bar is shown where the user can click to cancel the upload.

This next image shows progress using the 'text' option.

Placeholder for progress indicator - You must specify the name of a Placeholder control where the progress will be shown.
Authenticated read - Allows you to specify whether the file that is uploaded to S3 is 'public read' or 'authenticated read'. A 'public read' file can be read by specifying the URL of the object on Amazon S3. For example, assume you upload a file called 'Image1.jpg' and you use the same object name on S3 (i.e. you don't specify any code in the Target object name on Amazon S3 event so that the name of the object on Amazon is the same as the filename of the file on the client-machine), you will be able to read the file using this URL:
http://<nameOfYourAmazonS3Bucket>.s3.amazonaws.com/Image1.jpg
If the Authenticated read property is checked then you can retrieve an object from S3 using Xbasic functions in server-side code.
For example, assume you wanted to retried 'Image1.jpg' which had been uploaded to S3 with the Authenticated read property turned on, you could perform an Ajax callback that executed this code to retrieve the file and save it to a local file called c:\myfiles\Image1.jpg.
dim cs as c
cs = "::storage::YourStorageConnectionStringName"
a5storage_getitem_as_file(cs,"Image1.jpg","c:\myfiles\Image1.jpg")
The full list of a5storage helper functions is shown below:

Validating File Selection
You can specify a maximum file size for any file that the user can select. By default this is set to -1, which means no maximum.
If the Allow multiple files property is checked you can also specify a maximum total file size for all files combined.
You can specify list of file types that the user can select in the Allowed file types property. You can enter a comma delimited list of file extensions. For example
.png,.jpg,.jpeg

You can also customize the error messages that are shown if a rule is violated. For example, in the image below, the message that will be shown if the user selects a file that is larger than 1,000,000 bytes is
File exceeds max allowed size of [maxfilesize]
[maxfilesize] is a placeholder that will be replaced at run-time.
You can also completely customize the display of validation error messages by defining your own on Validate Error event handler in the Javascript Events section. You can also use language and text dictionary tags (<a5:r>..</a5:r> and <a5:t>..</a5:t>) to translate the messages into different languages.
If you define a custom on Validate Error handler then you should blank out the default messages so that the system messages do not display.
Javascript Events
The genie exposes the following Javascript events:
Target object name on Amazon S3 - If this event is not defined, the name of the object in the S3 bucket will be the same as the name of the object on the client machine. For example, if the user uploads a file called 'sales_analysis_march_2015.xlsx', the name of the file in the Amazon bucket will be 'sales_analysis_march_2015.xlsx'.
Your code in this event can reference these variables:
However, you can add code to this event to compute a different name on S3. Your Javascript code must return the name you want to use. For example, assume you want to store the uploaded file in a folder called 'sales analysis' then your Javascript code in this event will be
return 'sales_analysis/' + e.name
Before file select - fires after the user clicks the button to initiate the action, but before any files are selected. If your code executes return false, the action is aborted.
After file select - fires after the user has selected the file(s) to upload, but before any uploads have actually started. Your code can reference a Javascript variable called e, which is an array of objects containing information about each file that was selected. If your code executes return false, the action is aborted. You can use this event to perform custom validation on the selected files before initiating the upload. If you are writing a custom onProgress event handler you can use this event to set up the HTML for your custom progress indicator.
On progress - Fires each time progress information is returned by Amazon. You can use this event to create a custom progress handler. You code can reference these variables:
On Upload Complete - Individual File - (If multiple files are allowed) - fires after each individual file has been uploaded.
On Upload Complete - All Files - (If multiple files are allowed) - fires after all files have been uploaded.
On Upload Complete - (If only a single file is allowed) - fires after the file has been uploaded.
On validate error - Fires if any file violates the file rules (maximum size or allowed type).
File Download - Amazon S3 - A new option has been added to the File Download action in Action Javascript to allow you to download files that are stored in Amazon S3 storage.
The File Download dialog allows you to specify the File Download 'Type' as 'Amazon S3 Storage'.
Watch Video - Part 1
Watch Video - Part
2

Once you set the type as Amazon S3 Storage you can specify additional properties. These include:

Download Mode - Direct and Indirect Mode
When you download a file from Amazon S3 you have the option of using Direct or Indirect mode. Indirect mode is most like a regular file download, excepting that the file must first be retrieved from Amazon S3 before it can be sent to the user. The user will be prompted to save the file on his computer. This mode is inefficient because the file has to first be retrieved from Amazon S3 before it can be sent to the user. Depending on the size of the file being retrieved, this can place a heavy load on the Alpha Anywhere server.
The Direct method on the other hand is much more efficient because the file is downloaded directly to the client from Amazon S3 storage. A lightweight callback is still made to the Alpha Anywhere server to 'sign' the URL used to retrieve the file from S3, but this callback places very little load on the server.
When you download using the Direct method there are some additional considerations that you have to be aware of. The typical way in which the download is accomplished is by setting the URL of a hidden IFrame element on the page (which Alpha Anywhere automatically includes on the page) to the URL of the object on S3. So, for example, consider the case where the user wants to download a .xlsx file from Amazon S3. The URL to this object might be something like:
https://s3.amazonaws.com/bucketnameOnS3/myspreadsheet.xlsx
Setting the src property of the hidden IFrame to this URL will cause the browser to display a prompt asking the user if they want to save the file. The browser does this because it does not have a built-in handler for .xlsx files.
Now consider the case there the user wants to download a .pdf file from storage. In this case the URL to this object might be something like:
https://s3.amazonaws.com/bucketnameOnS3/mypdf.pdf
However, browsers typically do have built-in handlers for .pdf files and so setting the src property of the hidden IFrame to this URL will not result in the user being prompted to save the file. Instead, the browser will actually render the PDF, but the user will not see it because the IFrame is hidden.
Therefore, the Download Action builder prompts for the ID of the IFrame where PDFs will be rendered (TIP: Set the initial address of this IFrame to about:blank) . The user will still not receive a prompt to save the file, but they will see the PDF document rendered in the IFrame that they specified. Once the PDF has been rendered, they will be able to right click on it and then save it to their machine (since the PDF render feature of the browser exposes this option).
A similar situation exists for image files and therefore the ID of an Image element must be supplied to render the images that are downloaded from S3.
The ID of the elements for PDF and Image files are specified at these prompts in the builder:

Action Javascript - Image Upload Action - UX and Grid Component - Amazon S3 - The Image Upload action allows you to upload an image and store the image in a field in the table to which the UX or Grid component is bound.
In the case where the image is bound to a character field in the target table you now have the new option of uploading the image to Amazon S3 storage rather than to the Alpha Anywhere server.
Watch Video
- Part 1
Watch Video
- Part 2
Watch Video
- Part 3
Uploading the image to Amazon S3 storage is an extremely efficient solution because it places minimal load on the Alpha server (both for uploading the image and then subsequently displaying the image when the component is run).
When you choose the option to upload to Amazon S3 storage you can either upload the image as:
NOTE: The Image Upload builder has a property called Authenticated read. To use the 'public read' option, the Authenticated read property should not be checked. To use the 'protected read' option, the Authenticated read property should be checked.
When you upload using the 'public read' option, the image is uploaded to Amazon S3 and then the URL to the image is stored in the character field in the database. For example, this URL might look like:
https://s3.amazonaws.com/yourBucketNamehere/imageFileName
This URL can be pasted into a browser address bar and the image from Amazon S3 storage will be shown. In other words, it is not necessary to supply any credentials in order to see the image.
When you upload using the 'protected read' option, the image is uploaded to Amazon S3 as a protected file and the value that is stored in the character field in the database is a special JSON string that contains information about the storage connection string and the object name on Amazon S3. For example:
{cs: 'name of your storage connection string', object: 'name of object on S3', source: 'S3'}
NOTE: When you check the Authenticated read property you must use the Named Storage Connection String option as the Method for specifying Amazon S3 credentials.
When the component is rendered, the Alpha server automatically takes this JSON encoded string and computes a special signed URL that can be used to retrieve the image from S3. This special signed URL expires after a certain amount of time (current set to 240 seconds).
When an image is upload to S3 the work flow is as follows:
When the component is run, if the image field in the current row that is being displayed, contains the special JSON encoded string which is used for protected reads, the Alpha Anywhere server converts this JSON string into a signed Amazon S3 URL that can be used to retrieve the image.
To use the Amazon S3 image upload option in the Image Upload genie, select the Upload target property and set it to AmazonS3 as shown in the image below.
The options for the Upload target property are:
Once you select AmazonS3 as the upload target the Amazon S3 Storage Properties section is displayed, allowing you to set your Amazon S3 properties. For a complete discussion on these properties see the topic that documents the 'File Upload - Amazon S3' action in Action Javascript.

Action Javascript - File Upload Action - UX and Grid Component - Amazon S3 - The File Upload action allows you to upload a file and store the file in a field in the table to which the UX or Grid component is bound.
In the case where the file is bound to a character field in the target table you now have the new option of uploading the file to Amazon S3 storage rather than to the Alpha Anywhere server.
Watch Video - Part 1
Watch Video - Part
2
Uploading the file to Amazon S3 storage is an extremely efficient solution because it places minimal load on the Alpha server when the file is uploaded. In addition, once the file has been uploaded to Amazon S3, when the file needs to be downloaded, there are options to configure the download so that the download takes place directly from Amazon S3 to the client, placing no load on the Alpha server, or in the case of a protected read (see below), placing minimal load on the Alpha server.
When you choose the option to upload to Amazon S3 storage you can either upload the file as:
NOTE: The File Upload builder has a property called Authenticated read. To use the 'public read' option, the Authenticated read property should not be checked. To use the 'protected read' option, the Authenticated read property should be checked.
When you upload using the 'public read' option, the file is uploaded to Amazon S3 and the File Upload action builder gives you an option of storing the URL to the file in the character field, or a special JSON string that contains information about the file's location on S3.
If you choose the URL option, the format of the data stored in the field is:
https://s3.amazonaws.com/yourBucketNamehere/fileName
This URL can be pasted into a browser address bar and the file from Amazon S3 storage will be downloaded, (or shown -- if the browser has a built-in handler for the file MIME type). It is not necessary to supply any credentials in order to retrieve image.
If you choose the JSON option, the format of the data stored in the field is:
{cs: 'name of your storage connection string', object: 'name of object on S3', source: 'S3'}
When you upload using the 'protected read' option, the JSON option is the only option.
NOTE: When you check the Authenticated read property you must use the Named Storage Connection String option as the Method for specifying Amazon S3 credentials.
When a file is upload to S3 the work flow is as follows:
To use the Amazon S3 file upload option in the File Upload genie, select the Upload target property and set it to AmazonS3 as shown in the image below.
The options for the Upload target property are:
Once you select AmazonS3 as the upload target the Amazon S3 Storage Properties section is displayed, allowing you to set your Amazon S3 properties. For a complete discussion on these properties see the topic that documents the 'File Upload - Amazon S3' action in Action Javascript.

Xbasic Modules - Live Preview - If you do a 'Full Preview' when doing Live Preview, Xbasic Modules that are used in your Xbasic code are now automatically published to the Live Preview folder.
Reports - Layout Table Reports - 'Keep Row Together' Property - A new property is available for Layout Table reports. This property will prevent a page break in the middle of the row. This property is useful for 'growable' row content, such as HTML and Linked Reports.

Alpha DAO - ODBC - New SQL Connection Property =
A5ODBCTableList - There is a new property available
on the ODBC connection string dialog labeled 'ODBC Table
List' and identified in the connection string as
A5ODBCTableList.
The default value for A5ODBCTableList is false; meaning
no change in behavior. When set to true, the selected
vendor behavior will continue for most functionality.
The one exception will be listing tables. This will
defer to the ODBC driver as you would see if you used
'ODBC' as your vendor.
This new option provides a fallback for ODBC drivers
giving better control over the list of tables than the
native syntax implementation.
One use case for this option is to limit the number of
tables displayed in AS/400 (DB2 iSeries); which tend to
include an entire library list (like a path in Windows)
and can be quite large. The DB2 iSeries driver has
optional parameters for the library list that can be set
when creating a DSN; and which our connection string is
unaware of. Checking 'ODBC Table List' when connecting
to the AS/400 DB2 iSeries driver through an ODBC DSN
defers to the driver itself to create the table list.
UX Component - List Control - Export Data to Excel or Ascii - You can now export data in a List control to either Excel or to Ascii files.
After the export file has been created you can either download the file to the client, or call an Xbasic function to further process the exported file. A typical use case where you might want to call an Xbasic function to process the exported file would be if you wanted to email the file to a list of recipients, or upload the file to cloud storage, such as Amazon S3 storage.
In the case where the List is based on a SQL query you have the option of:
Consider the case where you have defined a List and have turned on the pagination feature. You might have set the page size to 100 rows. The query that the List is based on might have 1,000 records, but the List will only show 100 rows of data at a time. If the export is based on the 'Data in the List' the export file will have 100 rows in it (because the List only has one page of data - 100 rows - in memory at any time). However, if the export is based on 'Data in the List Query' the export file will have 1,000 rows in it (subject to the Max Records setting which might limit the number of rows in the export file).
To export data in a List you can use Action Javascript to define the code.


In the case where the List is based on a SQL query, the builder shows the 'Export what' property which can be set to 'Data in List query' or 'Data shown in List'.
If the 'Export what' property is set to 'Data in List query' the 'Maximum number of records to export' property is shown.

In the case where the 'Export what' property is set to 'Data shown in List' or if the List is not based on a SQL query (in which case the data that is exported is always the 'Data shown in List'), the 'Customize field sizes and column heading in export file' property is shown.
NOTE: The 'Customize field sizes and column heading in export file' property is only shown if the 'Export format' is Excel.
This property allows you to customize the column headings in the Excel file and control the data types of the data in the excel file.

To customize fields, click the smart field for the 'Customize field sizes and column heading in export file' property.
A build opens up where you can enter a CR-LF delimited list of definition - one for each field you want to customize.
The syntax for the definition can be shown by clicking the 'Show syntax help' hyperlink.
The syntax allows you to specify the data type, size and column heading of each column in the Excel file.

UX Conponent - List Control - List with Detail View - .addTableRows() Method - Insert Rows - The .addTableRows() method now has new options to allow you to add the new row at a specified position in the List (i.e. insert rows), rather than at the end of the List (append rows). For information on the .addTableRows() method, click here.
UX Component - Tab Controls - Method For Selecting Active Pane - Automatic - Nested Tabs - If you had nested tab controls and the outer tab was set to use the 'Automatic' method for selecting the active pane, the watch expression that selected the active pane was not being generated correctly.
UX Component - Android - Scrolling - Fixed an issue where (in certain cases), after editing in a text control in a component, you could no longer scroll a Panel Card to the top or bottom of the Panel Card.
UX Component - onSynchronize Server-side Event - Open UX in Window - Cached Option - If a data-bound UX component was opened in a pop-up window and the allow caching of the child UX feature was turned on, and if the child UX had a long-running onSynchronize event, it was possible for the primary keys in the child UX to get overwritten with the wrong values the second and subsequent times the child UX was opened. If this occurred, any edits to data made in the child UX would have been applied to the wrong record.
UX and Grid Component - Amazon S3 - File and Image Upload - Uploading files to S3 buckets that were not in the default US East region was not working correctly.
UX Component - Container Width 100% - Break - On some browsers, if you have a two consecutive containers, each with a width of 100% and you do not have the break between the containers turned on, you might get strange behavior when you scroll the Panel Card that contains that containers. Turning on the break between the containers resolves the issue. Now, if you set a container's width to 100%, the break in the Container End is automatically turned on.
TabbedUI Component - onLogout Event - Fixed various issues with the onLogout event.
Grid Component - AlphaDAO - Compound Primary Key - If you specified that a Grid had a compound primary key and you selected the columns in the Primary Key in the order in which they should appear in the Primary Key, Alpha Anywhere would define the Primary Key in the order in which the columns existed in the schema. For example, if you specified that the primary key was Lastname, Firstname, but the schema order was Firstname, Lastname, the primary key was defined as Firstname, Lastname. To fix the problem you must edit the existing grid and reselect the primary key columns.
UX Component - {dialog.object}.panelGet() Method - Previously, if you called this method with an invalid Panel name, the method returned the top-most Panel (root Panel). Now, false is returned.
UX Component - List Control - Multiple Layouts - onOrientationChange - If a List has a separate layout for Landscape and Portrait mode, now, when changing orientation, the selected row is remembered when the List layout is changed.
UX Component - Edit Combo - Different Stored and Display Values - Data Source Type Xbasic Function - Previously different display and stored values were only supported if the data source was AlphaDAO. Now, it is supported for Xbasic Functions.
Grid and UX Component - Export to Excel - Text Dictionary Tags - Text dictionary tags in column headings were not honored when exporting to Excel or Ascii files
Grid and UX Component - Export to Excel - SQL Databases - Dates - Dates are now exported using a date format that such that when the Excel file is opened the dates are shown using the regional settings of the machine. Previously the dates used a format that matched the regional settings of the server.
AlphaDAO - Postgres - Geography Searches - Fixed bugs in geography searches. Radius search was failing and case of search field was not properly preserved when the SQL WHERE clause was composed.
copy_folder() Function - Under some circumstances, the copy_folder() function did not copy files.
UX - List Control - Server-side Summary Fields - Under some circumstances the server-side summary fields values were not available in the 'summary' object when the afterServerSideSummaryFieldsComputed event was fired.
Grid Component - Read Only Grid - .getValue() Method - Empty Values - If the .getValue() method was used to read the value in a control that was empty, the method would return ' ' for the value rather than a blank string.
Javascript Library - Date Object - .fromFormat() Method - The Alpha Anywhere Javascript library add a .fromFormat() method to the Javascript date object prototype. Under some circumstances (when using 'yyyy-MM-dd' as the date format string) strings representing date values were not correctly parsed into date objects.
UX Component Builder - Moving Controls Up/Down - Fixed an occasional error that was reported when moving controls up/down in the UX Component builder.
UX Component - onOrientationChange Event - Android - Fixed an issue where the onOrientationChange event did not fire on Android devices after the first orientation change, and then after that, it fired, but reported the wrong orientation. This bug resulted from know bugs with the Android orientation event that cause the screen size to be reported incorrectly when the orientation event is fired. We have worked around this issue by introducing a 300 ms delay after the system reports an orientation change before we read the screen size.
When computing the orientation on Android, the keyboard position is now ignored. Previously on Android if the screen was in (say) portrait mode and the keyboard came up, the onOrientationChange event would fire and report that the screen was in landscape mode. The onOrientationChange would also fire when the keyboard was dismissed. This is because when the keyboard is visible, the screen size that Android reports is affected by the size of the screen. On iOS, the keyboard does not affect the reported screen size.
If, for backward compatibility reasons, you want to use the old method on Android where the keyboard does affect the reported screen size, add this code to the onRenderComplete client-side event:
{dialog.object}._quirks = { keyboardAffectsScreenSizeCalc: true};
Navigation Component - iOS - Navigation component menus did not operate well on iOS devices.
Report Server - Temp File Cleanup - Under certain conditions temporary files created for SQL based reports were not being deleted when the report was completed. These files are now immediately deleted when the report is finished. The report server now uses the temporary file cleanup setting from the parent Application server to remove other old temporary files created by the report server.
UX Component - List with Detail View - Image Capture - Fixed an issue when a UX component had more than one Detail View image capture field on it.
UX Component - Panel Card - Text Area Control - Scrolling - Fixed an issue with scrolling text in a text area control when the control was in a Panel Card.
Excel Import - Determining Field Type of Imported Data - Made a change to Excel import so that more rows of the sheet are examined in order to determined the field type of each column in the Excel sheet.
UX Component - Arguments - Bound to Session Variables - If an argument value was bound to a session variable, the argument value was not getting updated on Ajax callbacks if the value of the session variable was changed after the component was initially rendered. Also, if the session variable was set in the onDialogInitialize or onDialogExecute server-side event, the argument values were not getting reset to the new value of the session variables.
Video Component - Opening from Button on uX Component - Under some circumstances, if you had a button to open a Video component on a UX component, it would fail.
UX Component - PhoneGap - Linked Javascript Files - {HeadSection} Directive - If a UX component linked a Javascript file and specified the special {HeadSection} directive, the linked file was not copied into the PhoneGap project folder.
Web Applications - Web Security - New Password
Encryption - A new password encryption process has
been added that generates a much longer encrypted value
for a password. This is considerably more secure than
previous encryption methods as a password cannot be
decrypted even if a person has the project's password
encryption key.
The security settings genie now has a new property on
the 'User Id
and Password Options' tab under 'Password
Options'. If password encryption is selected, a 'Password
use legacy encryption' option is shown. When
checked, the system will use the legacy encryption
method used in earlier Alpha Anywhere builds for any new
passwords entered. If the option is not checked, any
new passwords entered will use the new password
encryption process.
New security systems will use have the 'Password
use legacy encryption' property un-checked by
default and will use the new encryption process.
Existing security systems will initially have the 'Password
use legacy encryption' property checked and will
continue to use the older encryption methods. The
property can be changed at any time and will only impact
new passwords being
entered. Existing passwords are not converted when the
property is changed. The new process will still use any
existing encryption key that has been defined for the
web security.
This system is compatible with previous Alpha Anywhere
builds as passwords encrypted in previous versions will
still work. It is not necessary to convert any existing
passwords.
However, all existing passwords in a project or
published application can be converted to the new scheme
if desired with a new utility function.
The function 'a5ws_RefreshPasswordEncryptionUtility()'
can be run from the development program interactive
window or the application server interactive window.
When run from the development program, a list of all
projects in the workspace that have security will be
shown (unless there is only one project). When run on
the application server, a list of all applications in
the webroot that have security will be shown (unless
there is only one application).
The function will convert all previously encrypted
passwords in the selected application or project to the
new password encryption. If the optional parameter 'UseLegacy'
is set to True, all passwords will be converted back to
the legacy encryption scheme.
NOTE: Only Alpha Anywhere builds after release build 2614-4409 can recognize passwords that are encrypted with the new method. If you want to roll back to build prior to 2614, you must first run the utility to convert all passwords back to the legacy encryption used in the earlier builds.
If you change the encryption key or add a new key, all
existing passwords will be lost, and will need to be
re-entered.
Recommended Action
UX Component - Tab Controls - Fixed a bug where the UX would fail if the last control in a Tab Pane was hidden and the previous control was any type of container end control.
a5_merge_JSON_into_template() Function - Application Server - The a5_merge_JSON_into_template() function did not work when called from Xbasic code running in the Application Server. It only worked in the Development Server.
Xbasic Code - File System Dictionaries - Fixed a bug when exporting code to a File System Dictionary that was not relative to the Workspace.
UX Component - Arguments - OnSynchronize and OnDialogExecute Events - Under some circumstances argument values shown in the server-side onSynchronize and onDialogExecute events did not reflect the argument bindings that had been defined.
Javascript Code Editor - Code Colorization of Commented Out Code - Code in commented out sections was not always colorized correctly. This was a cosmetic bug - it had no effect on application.
Reports - SQL Data Source - Image File Reference Fields - Fixed a bug where Image File Reference fields were not working correctly.
Grid Component - Row Expander - Scroll Position on Page - If a Grid had been scrolled on the page and then a Row Expander for a row near the bottom of the page was opened and the user clicked on one of the rows in the Grid shown in the Row Expander, the parent Grid would scroll back to the top of the page. This is fixed now, but you can also work around the issue by using a master template in the child Grid and wrapping the master template in a div with a position:relative; style attribute. For example
<div style="position:relative;">
</div>
UX Component - Panel Cards - Tab Control - Hidden Controls - If a UX component used Panel Cards and you had a Tab Control in one of the Panels, if the last control in a given Tab Pane was hidden, the UX would fail. This is now fixed but you can also work around the bug by simply moving the hidden control up so that is is no longer the last entry for the Tab Pane.
UX Component - Pop-up Window - Google Map - As a result of a recent change Google made to Google Maps, the following pattern had stopped working:
When the UX was run the map, which should have been hidden because the window had not yet been shown, should have been hidden, but was not. This is now fixed.
List Control - Image Fields - Missing Images - In some situations, the 'missing image' for a field that did not have an image, was not being displayed.
Grid Component - Geography Search - Radius Search - If you performed a search for all records within a specified radius of a point and you specified that the search result should be sorted by distance from the center point, then if you tried to navigate to the next page of records in the search result you would get an error.
UX Component - List Control - Using a Slider Control to Scroll a List - Say you have a List control and you want to put a Slider control under the List to scroll the List. Assume that the name of the Slider control is 'Slider1'
Step 1 - Put this code in the List's AfterRenderComplete event
var s = {dialog.object}.getControl('Slider1');
var l = {dialog.object}.getControl('{dialog.listId}');
s.min = 0;
s.max = (l._data.length -1);
s.refresh();
This code sets the min/max values on the slider to match the row count of the List.
Step 2 - Put this code in the Slider control's onSlide event:
var l = {dialog.object}.getControl('LIST1');
//the value of the slider while it is being
dragged is in arguments[0].value
var val = arguments[0].value
l.scrollToItem(val);
UX Applications - PhoneGap - iOS Native Date Picker - If your UX component allows editing for date field fields you might want to use the native iOS Date Picker in your app. This is easily done by:
1. Setting the HTML5 type for the textbox where you edit the value to 'date'
2. Setting the display format for the textbox to yyyy-MM-dd
3. If the UX uses a List control with a Detail View the client-side display format for the date field can be set in the List Control, Fields tab.
UX Component - List with Detail View - Searching while Offline - When you use the List Detail View genie to create a List control with an associated Detail View and Search part, the genie inserts code like this in the Search button's click event:
{dialog.object}.getControl('name_of_the_list').searchList({searchMode :
'auto'});
The 'auto' in the .searchList() method means:
1. if the List is not dirty then do a server-side search
2. if the List is dirty do a client-side search (because doing a
server-side search would repopulate the List and blow away your unsynchronized
edits)
If your List is not dirty and you do not have a connection, the command will do a server-side search (because the List is not dirty), but because there is no connection, the search will obviouslyfail.
Once approach is to test for connectivity before doing the search, and if there is no connection, then automatically switch to a client-side search. For example, you can change the code in the button's click event to:
var flag = {dialog.Object}._getOnlineStatus();
if(flag) {
// device is connected - ok to so a server-side search
{dialog.object}.getControl('name_of_the_list').searchList({searchMode :
'auto'});
} else {
// device is not connected - must do a client-side search
{dialog.object}.getControl('name_of_the_list').searchList({searchMode : 'clientSide'});
}
UX and Grid Component - Tab Controls - Right to Left - For Hebrew and Arabic applications you might want the Tab buttons on a tab control to be displayed right to left, rather than the standard left to right format.
To do this, you can add the following CSS markup to the Local CSS property in the component.
.{dialog.style}TabTButton, .{dialog.style}TabTButtonSelected, .{dialog.style}TabBButton, .{dialog.style}TabBButtonSelected {
float: right;
}
Application Server - Silent Install - The Alpha Anywhere server installation program can be run in 'silent mode' by using the /S command line switch.
For example:
a5v12_AppServer.exe /s
However, the first time you install the Alpha Anywhere server on a machine you will need to specify your license key. Since you are doing a silent install, you cannot enter the license key in the Application Server UI as you normally would do.
You can add the license key to a special registry key and Alpha Anywhere will automatically install the license if it is found in this registry location.
The registry key in which you must install your license number varies depending on whether you are running on a 32 bit or 64 bit operating system.
The following command line shows how you can add your license number to the appropriate registry key
For 64 bit operating systems
reg add "HKLM\SOFTWARE\Alpha Software\Alpha Anywhere Application Server
12.0\httpd" /v ActivateLicense /t REG_SZ /d "yourlicensenumber"
For 32 bit operationg systems
reg add "HKLM\SOFTWARE\Wow6432Node\Alpha Software\Alpha Anywhere
Application Server 12.0\httpd" /v ActivateLicense /t REG_SZ /d "yourlicensenumber"
The commands to add the registry key should be executed before you
run the Alpha Anywhere install.
You can also specify the install path and the install group when you run the installer by setting Environment variables before you run the installer.
The installer reads the following environment variables
For example, from the Windows command prompt:
SET A5_MAINDIR=c:\AlphaAnywhere\Server
PDF Report Print on Development Server But Not Production Server - Occasionally we here from developers who report that their PDF reports are working fine on their Development server but when they deploy their application to their production server, the PDF reports do not print. The error that is report is:
Report did not print. Error reported was:
The error indicates that the Amyuni Printer Driver (also called the 'Alpha Five Printer') did not install properly on your server machine when the Alpha Anywhere Application Server was installed.
Here are some things you can check to resolve the problem:
That indicates the print driver did not install. This can happen for a couple reasons.
The first issue can be checked and corrected fairly easily. Log onto
the server machine with administrator rights. Open the "Devices and
Printers" from the Windows control panel and see if the driver for
"AlphaFivePrinterV4p5" is installed. If it is, then open the "Printer
Properties" and verify the printer is assigned to a port. Normally, it
is assigned to a NUL port.
If the printer isn't listed, open Windows Explorer or My Computer, and
look for the folder that contains the Alpha Anywhere Application Server
program. It would normally be at:
C:\Program Files (x86)\a5V12 ApplicationServer
Find the subfolder named "AmyuniV4" and find the file "InstallAmyuniPrinters.exe". Right
click on the file and select to "Run as Administrator". A window should
open showing the progress. If it fails to install, check any error
message. If it fails, the last issue may be the problem as Windows may
not install any print driver if the spooler is not running.
If the driver is installed, or installs correctly, then the problem may
be is the user rights. If running the Application Server as a service
with srvany, or under AlwaysUp, make sure the user login is not the
"Local System Account". That account does not normally have printing
privileges. Is is best to run the program under a user with full
administrator rights
UX Components - Panel Cards - Child Components that Open in a Parent Component Panel -- A common pattern when building mobile applications using the UX component is to have a master component with one or more Panel Cards and then have buttons that open child components in a Panel Card in the master component.
When utilizing this pattern be sure to turn off the 'Body can scroll' property for the target Panel (i.e. the Panel in which the child UX will be rendered).
| UX Component | Hiding/Showing/Enabling/Disabling Buttons in a Button List Control |
You can use Javascript to dynamically hide,
show, enable and disable buttons in a Button
List control on a UX component. You can also
dynamically add and remove buttons from the
Button List. In this video we show the Javascript to dynamically alter the Button List. Watch Video Download Component Date added: 2015-01-30 |
Web Applications - Publishing Using FTP - CURL - When you publish your web application to an ISP, your publishing profile will typically specify that the method for publishing the files is FTP.
You then have the option of using either the built-in FTP features in Alpha Anywhere, or using an external FTP client.
If you choose to use the built-in FTP features in Alpha Anywhere, you now have a new option of using CURL FTP. Unlike the standard FTP feature in Alpha Anywhere (which uses Active mode), the CURL FTP option supports passive mode. Passive move is more reliable as is has enhanced error checking and error messages.
NOTE: Some FTP servers require passive mode and will not support the standard built-in Alpha Anywhere FTP features, which use active mode. In this case you must use the CURL FTP option.
To select the CURL option, check the 'FTP Publish with CURL' property in the Profile Editor dialog.

Passive mode FTP is slower than active mode FTP, especially when uploading a lot of files, rather than one large zipped file. Therefore it is recommended that you only use the CURL FTP option when using the 'InternalOptimized' option (which zips all of the files to be published into a single zip file).
UX Component - List Control - Disconnected Data Entry - Preventing Duplicate Records when Connectivity is Lost - When you are working with disconnected data in a List control there is a small possibility of a synchronization request being submitted to the server more than once - resulting in the possibility of duplicate records in the database.
To understand how this might happen, consider what happens when the user clicks the 'Synchronize' button on a device to synchronize edits that were made while offline.
Obviously, in order for the server to receive the synchronization request, the user must have a connection. But suppose that AFTER the user sends a synchronization request to the server, but BEFORE the server completes the work and can send a response back to the client, the client looses connectivity.
The server will continue processing the updates to the server and will do all of the synchronization requests contained in the package sent from the client. The server does not know that the client is now offline and so, after it completes all of the work, it will send a response to client indicating which rows were successfully synchronized. However, since the client is now offline, the client will not receive this message from the server. This means that all of the rows on the client that were edited are still marked as 'dirty' (even though the server has successfully applied all of the edits).
Now assume that the client gets its connection back and the user clicks the 'Synchronize' button again. The client will send a JSON package to the server and this package will include all of the updates that were previously sent to the server.
In order to protect against this possibility, a special server-side log can be used to prevent synchronization commands from being executed more than once.
In order to turn on the server-side synchronization log, edit the List control and on the Detail View pane, check the Use server-side synchronization log table property.

Before you can check this property however, you must first define the setting for the Synchronization Log Table. To define these settings, click the Project Properties button when the Web Projects Control Panel has focus.
Scroll to the Offline Data Synchronization Log Table Settings section and set the properties for the table. You can map this table to an existing table in your SQL database or Alpha Anywhere can create a new table for you with the correct table structure.

UX Component - List Control - Dynamic Images - Client-Side - Fixed an issue with dynamic, client-side images in a List control. Image did not display correctly after data in the List had been edited.
Grid Component - Linked Grids - Detail View - New Record - If a child Grid was linked to a parent Grid, when going to the new record in the child Grid's Detail View, the linking fields in the Detail View were not filled in with the linking values as they should have been.
Reports - Native SQL - Dynamic Filter at Runtime - If a report was based on native SQL, rather than portable SQL, then if you tried to apply a dynamic run-time SQL filter to the report, the dynamic filter was ignored. Now, the dynamic filter will be added to the native SQL query for the report. However, because this may be combining a native SQL query with a portable dynamic filter, there is no guarantee that the resulting SQL statement will execute correctly.
Video Finder - A bug was introduced in the previous update that prevented the Video Finder from opening.
UX Component - Signature Capture - Build 2682 introduced a bug when saving data from a signature capture control.
Grid Component - Linked Grids - Up/Down Keys - In some cases when using the up/down keyboard navigation keys to navigate in the child grid, the keystrokes were being handled by the parent Grid.
| UX Component | Dynamically Re-populate the Choices in an Edit-Combo using Javascript |
The choices shown in an edit-combo can be
dynamically repopulated at run-time using
Javascript. Watch Video Date added: 2014-12-21 |
| UX Component | Constraining an UX that has Panels to an Element Rather Than Entire Window |
When a UX component that uses Panels is
rendered, by default it consumes the entire
window (only true if UX uses Panels). That means
that if you have created an .a5w page to render
the component and placed HTML markup on the page
that you would like to be rendered in addition
to the UX component, that markup will be
overwritten by the UX. An advanced property of
the UX now allows you to specify that the UX
should be constrained to an element, rather than
the entire window. In this video we show how an .a5w page can be defined with a DIV to contain the UX and how the UX can be configured so that it is constrained to this DIV element. (Requires build 4411 or above). Watch Video Download Component Date added: 2014-12-22 |
Publishing Web Applications - Publishing Profiles - Lock Profile - A new property has been added to each publishing profile. The 'Lock' property allows you to lock a profile to prevent accidental publishing to a deployed application.
The 'Lock' property can be set to blank (not locked), 'Locked' or 'Locked with password'.
At publish time, if you select a profile that has been locked, the publish will be aborted. If you select a profile that is 'locked with password', you will be prompted for a password before publish continues.
UX Component - List Control - List Builder - Resizeable - The List builder dialog window is now resizeable.
ui_bitmap_info_get() Function - Image Type - Now can return the image type of image binary data.
Syntax:
c type = ui_bitmap_info_get(b blobImageData,"T")
Example
dim b as b
b = file.to_blob("c:\images\image1.jpg")
? ui_bitmap_info_get(b,"T")
= "JPG"
UX Component - List Control - Numeric Fields - Client-side Display Format - The List Builder now allows you to specify a client-side display format for numeric fields. Previously you had to define a client side display format by directly editing the template for the field. This method is easier than editing the template.

AlphaDAO - MS SQL Server - DateTimeOffset Field Type - Support has been added for the SQL Server DateTimeOffset field type.
The Alpha Anywhere support for the SQL Server DateTimeOffset type works as follows:
UX Component - Web Security Server-Side Action Scripts - The web security action scripts in a UX component now allow the password to be optional in the variable mapping even if the security setting require a password. The password is optional if the component can only edit an existing security record. The password mapping is required if the component can add a new user security record. A warning message will appear when the action script is saved if a password variable is not specified.
Xbasic Code Editors - JSON Strings - Real-time Validation - If you use the specify <<%json%... %json% delimiters to enter a long string of JSON data, the Xbasic editor will perform real-time validation on the JSON data.
For example, in the image below, the JSON has an error because of the trailing comma after the last property (age: 23). Notice the squiggly red line indicating the error. If you click on the error indicator you will see the error message.

Reports - Free-form Reports - Text Dictionary Tags - You can now use text dictionary tags (<a5:t>...</a5:t>) to internationalize the labels in a report.
For example, you can set the label of a column to
<a5:t>Last Name</a5:t>
Next, turn on the text dictionary feature in your web application by going to the Web Projects Properties dialog when the Web Projects Control Panel has focus and specify the connection string and table name for your text dictionary.
To define entries in the Text Dictionary select the 'Text dictionary...' menu item from the 'Reports', 'Label' or 'Letter' menu while you are editing the report, label or letter.
json_to_xml() Function - ATOM Format - The json_to_xml() function can now generate XML using the "atom" format:
For example:
js = <<%str%
{
"OrderId":10248,
"ProductID":11,
"UnitPrice":14,
"Quantity":12,
"Discount":0
}
%str%
dim xml as c
xml = json_to_xml(js)
<?xml version="1.0" encoding="UTF-8"?>
<data>
<OrderId>O10248</OrderId>
<ProductID>11</ProductID>
<UnitPrice>14</UnitPrice>
<Quantity>12</Quantity>
<Discount>0</Discount>
</data>
dim format as c
format = <<%str%
{ "format" : "atom"}
%str%
dim xml as c = json_to_xml(js,"",format)
<?xml version="1.0" encoding="UTF-8"?>
<atom:entry xmlns:atom="http://www.w3.org/2005/Atom"
xmlns:m="http://schemas.microsoft.com/ado/2007/08/dataservices/metadata"
xmlns:d="http://schemas.microsoft.com/ado/2007/08/dataservices">
<atom:content type="application/xml">
<m:properties>
<d:OrderId>O10248</d:OrderId>
<d:ProductID>11</d:ProductID>
<d:UnitPrice>14</d:UnitPrice>
<d:Quantity>12</d:Quantity>
<d:Discount>0</d:Discount>
</m:properties>
</atom:content>
</atom:entry>
UX Component - Panels - Render Position - By default, when a UX component that has Panels is rendered, it consumes the entire window. In certain cases you might want to constrain the UX to a particular element.
The 'Render position type for UX component with Panels' property allows you to constrain a UX with Panels to a specified element. The default for this property is 'window'

Dynamic Connection Strings - Field Validation - Cross-file Validation Rule - Was not honoring dynamic connection strings.
UX Component - PhoneGap - Windows Phone 8.1 - Ajax callbacks in PhoneGap applications on Windows Phone 8.1 were not working.
AlphaDAO - SQL Server - Varchar fields - Memory Leak - Fixed a memory leak when executing update statements that used arguments.
UX Component - List Control - Detail View - Image Capture using Camera - PhoneGap - Fixed an issue where the image was lost when the data was synchronized. This issue only occurred in PhoneGap applications.
UX Component - List Control - No Records in List Message - List Virtualization - The 'no records in list' message did not display if List Virtualization was turned on.
Security Framework - Editing an Existing User - Under some circumstances you would get an error when trying to edit the properties of an existing user account.
UX Component - Client-side onSynchronize Event - Changed the order in which this event is fired. It is now fired after the code that sets argument values in the stateInfo object has executed.
UX Component - Chart Control - Javascript Events - If you executed an event (say a click on a pie chart slice) and the data that was passed to the event handler had single quotes in it, you would get a Javascript error.
UX Component - Tab Controls - Panels - Fixed a bug rendering nested Tab controls when the UX used Panels.
Web Applications - Security Framework - Alternate Login - Under certain conditions, when a new user was added a duplicate record in the security tables was being created.
UX Component - Buttons - Label Position - If a button (or other non-data control) had its label position set to some value other than 'None' the control did not render correctly. This bug was introduced in the previous update.
Grid Component - Edit-combo - v.hasStoredValue Error Message - If a Grid that contained an edit-combo was built using an older version of Alpha Anywhere and then run using Version 3.1 you would get an error stating that the v.hasStoredValue property was not found. The solution was to edit the edit-combo and then re-save it. Now, it is no longer necessary to edit edit-comb control and re-save it.
PhoneGap Build - Unable to Log-in to PhoneGap Build from the PhoneGap Genie - As a result of a change in the ca-cert.pem certificate file (in the CARoot folder in the Alpha Anywhere executable) that was made in build 4410, you were not able to log into PhoneGap. This update installs a new ca-cert.pem file which fixes the problem.
Chrome Browsers - Making Text Selectable - By default when running a component (Grid or UX) in Chrome, the static text (not the text in textarea or textbox) is not selectable. Alpha Anywhere does this automatically so that when a component is run on a mobile device, you do not unintentionally select text when dragging on different parts of the screen.
However, in a desktop application you might want the static text to be selectable. Here is how you can do this for a Grid:
Specify that the Grid has a master template. Then define a custom template using this HTML markup:
<div style="-webkit-user-select: text; ">
{grid.Search_Part}
{grid.Grid_Part}
{grid.DetailView_Part}
</div>
In the case of a UX component, add a Container control around any controls that you want to be selectable and then set the in-line style of the container to:
-webkit-user-select: text;
Xbasic - OLE Automation - Implementing Callback Event Handlers in Xbasic - This topic discusses how you can write Xbasic code to handle callback events when running OLE automation code.
For example, consider the following Xbasic code that uses the ADODB.CONNECTION object to connect to SQL server and then execute a SQL command.
dim adow as ADODBOleWrapper
dim conn as p = ole.create("adodb.connection" )
conn.Open("driver={SQL Server};server=LOCALHOST;database=Northwind")
conn.Execute("select * from customers")
conn.Close()
When this code executes, it will raise these events:
In order to handle these events with Xbasic code you need to pass in an optional second argument to the ole.create() method.
First, to get the function prototype for the event handlers you can use this method:
dim events as c
events = ole.Class_Event_Prototypes("
showvar(events)
Once you have the function prototypes, you can create an Xbasic class using this pattern:
define class ADODBOleWrapper
'Your class code goes here
implementation EventHandler as OLE::A5Events
'your Xbasic code to handle the
callback functions goes here
end implementation
end class
Note that the class has a special 'implementation' section where the OLE callback handlers are defined.
For example, let's create a real class that writes the name of the event that was raised to a property of the class (called 'traceEvents').
define class ADODBOleWrapper
dim traceEvents as c
function TraceEvent as v(event as c)
self.traceEvents = self.traceEvents + event
end function
implementation EventHandler as OLE::A5Events
function begintranscomplete as v(TransactionLevel as N,pError as
a,adStatus as a,pConnection as p)
self.TraceEvent("begintranscomplete "+TransactionLevel+crlf())
end function
function committranscomplete as v(pError as a,adStatus as a,pConnection
as p)
self.TraceEvent("committranscomplete "+crlf())
end function
function connectcomplete as v(pError as a,adStatus as a,pConnection as
p)
self.TraceEvent("connectcomplete "+crlf())
end function
function disconnect as v(adStatus as a,pConnection as p)
self.TraceEvent("disconnect "+crlf())
end function
function executecomplete as v(RecordsAffected as N,pError as a,adStatus
as a,pCommand as a,pRecordset as p,pConnection as p)
self.TraceEvent("executecomplete "+crlf())
end function
function infomessage as v(pError as a,adStatus as a,pConnection as p)
self.TraceEvent("infomessage "+crlf())
end function
function rollbacktranscomplete as v(pError as a,adStatus as
a,pConnection as p)
self.TraceEvent("rollbacktranscomplete "+crlf())
end function
function willconnect as v(ConnectionString as C,UserID as C,Password as
C,Options as a,adStatus as a,pConnection as p)
self.TraceEvent("willconnect "+crlf())
end function
function willexecute as v(Source as C,CursorType as a,LockType as
a,Options as a,adStatus as a,pCommand as p,pRecordset as p,pConnection
as p)
self.TraceEvent("willexecute "+crlf())
end function
end implementation
end class
As you can see, this class defined a method called TraceEvent() which writes to the 'traceEvents' property of the class instance.
In the Implementation section, the event handlers are all defined and they call the TraceEvent() method (using self.TraceEvent() ) to write the name of the event that was just fired to 'traceEvents' property of the class instance.
Now, putting this all together, we can rewrite the OLE automation code as follows:
'DIM an instance of the class
dim adow as ADODBOleWrapper
'pass the class into the ole.create() call
dim conn as p = ole.create("adodb.connection" , adow )
conn.Open("driver={SQL Server};server=LOCALHOST;database=Northwind")
conn.Execute("select * from customers")
conn.Close()
'show the value of the class instance 'traceEvents'
property
showvar( "Events " + crlf() +adow.traceEvents )
This next example is a different take on the previous example in which .open(), .execute() and .close() are implemented as methods of the class instance.
define class ADODBOleWrapper2
dim conn as p
dim traceEvents as c
function TraceEvent as v(event as c)
self.traceEvents = self.traceEvents + event
end function
implementation EventHandler as OLE::A5Events
function begintranscomplete as v(TransactionLevel as N,pError as
a,adStatus as a,pConnection as p)
self.TraceEvent("begintranscomplete "+TransactionLevel+crlf())
end function
function committranscomplete as v(pError as a,adStatus as a,pConnection
as p)
self.TraceEvent("committranscomplete "+crlf())
end function
function connectcomplete as v(pError as a,adStatus as a,pConnection as
p)
self.TraceEvent("connectcomplete "+crlf())
end function
function disconnect as v(adStatus as a,pConnection as p)
self.TraceEvent("disconnect "+crlf())
end function
function executecomplete as v(RecordsAffected as N,pError as a,adStatus
as a,pCommand as a,pRecordset as p,pConnection as p)
self.TraceEvent("executecomplete "+crlf())
end function
function infomessage as v(pError as a,adStatus as a,pConnection as p)
self.TraceEvent("infomessage "+crlf())
end function
function rollbacktranscomplete as v(pError as a,adStatus as
a,pConnection as p)
self.TraceEvent("rollbacktranscomplete "+crlf())
end function
function willconnect as v(ConnectionString as C,UserID as C,Password as
C,Options as a,adStatus as a,pConnection as p)
self.TraceEvent("willconnect "+crlf())
end function
function willexecute as v(Source as C,CursorType as a,LockType as
a,Options as a,adStatus as a,pCommand as p,pRecordset as p,pConnection
as p)
self.TraceEvent("willexecute "+crlf())
end function
function ping as v()
self.TraceEvent("PING "+crlf())
end function
end implementation
function adodbolewrapper2 as v ()
self.conn = ole.create("adodb.connection",self)
end function
function Open as v( connectionString as c )
self.conn.Open(connectionString)
end function
function Execute as v( sqlStatement as c )
self.conn.Execute(sqlStatement)
end function
function Close as v( )
self.conn.Close()
end function
end class
To test this example:
'dim an instance of the class. this class has a constructor function
'which will execute when the class is dimmed
dim adow as ADODBOleWrapper2
'now call the methods of the class instance
adow.open("driver={SQL Server};server=localhost;database=Northwind")
adow.execute("select * from customers")
adow.close()
showvar( "Events "+crlf() + adow.traceEvents )
| UX Component | Tutorial - Uploading Files using the File Upload - User Defined Action |
There are two different actions in Action
Javascript for uploading files from a UX
component. If the UX component has been 'data
bound' then the 'File Upload' action is
appropriate. But if the UX component is not data
bound, or if you want to write your own handler
for the binary data that was uploaded to the
server, the 'File Upload - User Defined' action
should be used. When you use the File Upload - User Defined action, an Xbasic function that you define is called after the file (or multiple files if you choose to allow multiple files to be uploaded) has been uploaded. Your Xbasic function is free to process the uploaded data in any way. In this video we show how the File Upload - User Defined action can be used to save the uploaded data to a file on the server. Watch Video - Part 1 Watch Video - Part 2 Download Component Date Added: 2014-10-02 |
| UX Component | Tutorial - Uploading Files and Images to a Data Bound UX Component |
When you upload a file or an image to a data
bound UX component, the assumption is that you
want to store the uploaded image or file in the
record to which the UX component is bound. You
can either store the binary data that was
uploaded in a field in the record, or you can
save the binary data that was uploaded into a
file on the server and then store the filename
of the file in a character field in the record. In this video we show how image upload and file upload to a data bound UX component can be done. Images and files are uploaded to both binary and character fields in the record. Introduction Watch Video - Part 1 File Upload to a Character Field Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 File Upload to a Binary Field Watch Video - Part 5 Watch Video - Part 6 Image Upload to a Character Field Watch Video - Part 7 Watch Video - Part 8 Image Upload to a Binary Field Watch Video - Part 9 Download Component (Note: The zip file also contains the MySQL SQL script to create the table that the UX component is based on.) Date Added: 2014-10-02 |
| UX Component | Using the CSS Calc() Function Instead of Flex Layout Containers to Create Dynamically Sized Controls |
A common requirement when building UX components
is to create a row of controls where some of the
controls are fixed size and the other controls
dynamically contract or expand to consume the
remaining space on the row. Typically, the Flex Layout container is used to achieve this design goal, but the built-in CSS calc() function is an alternative (and simpler) way for achieving the same result. The drawback of the calc() function is that not all versions of the Chrome browser on older Android devices support the CSS calc() function. In this video we contrast the use of Flex Layout containers and the CSS calc() function. Watch Video Download Components Date Added: 2014-10-12 |
| UX Component | Getting the Display Value in a DropdownBox Control |
When you define the choices in a Dropdownbox
Control you can specify both the display value
and the stored value for each choice in the
control. When you read the value from the
control (using the .getValue() method), the
stored value is returned. In some cases you
might want to read the 'display' value. In this video we show how you can write a small amount of Javascript to read the dropdownbox control's display value. Watch Video Download Component Date Added: 2014-10-13 |
| UX Component | Intro to JSON |
JSON is ubiquitous in Web application
development. Having a good understanding of JSON
is very helpful in building web applications. In
this series of videos we introduce you to
various ways in which you can work with JSON on
the server side (using Xbasic) and on the
client-side (using Javascript). We show how JSON is the ideal way for sending complex data from the client to the server, or from the server to the client (in an AJAX callback). Using Xbasic on the server-side to work with JSON Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Using Javascript on the client-side to work with JSON Watch Video - Part 1 Watch Video - Part 2 Using JSON to send complex data to the server from the client Watch Video - Part 1 Watch Video - Part 2 Using JSON to send complex data from the server to the client Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Advanced example - sending complex data from the server and formatting the data for presentation on the client side using a template Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download component Date Added: 2014-10-15 |
| UX Component - Disconnected Applications | Showing Which Fields Have Been Edited |
When you have a List with an associated Detail
View and you edit the data in one of the rows of
the List, an icon (whose appearance you can
customize) is shown in the List row to indicate
that the List row has data that has been edited,
but not yet synchronized. In this video we show how you can indicate the dirty fields in a List row that has been edited. You can specify a custom CSS class to apply to the Detail View control if the field value has been edited. Watch Video Download Component Date Added: 2014-10-18 |
| UX Component - Mobile Applications | Panel Navigator with a Button Bar To Select Active Panel - Quick Start Templates |
A common design pattern when building mobile
applications is to use a button bar in the
footer of the screen to select the active 'page'
in the application. The selected button should
be highlighted so the user knows which button
corresponds with the current page. In this video we show how you can use a built-in template to get a quick start on your application if you want to use this pattern. We explain what's going on behind the scenes so that you understand how the component works. Watch Video - Part 1 Watch Video - Part 2 In the next video we show how the component can be extended to allow for more navigation buttons that can been seen at once on a phone. The user can drag scroll horizontally on the button bar to see the other buttons. Watch Video Date Added: 2014-10-28 |
| UX Component | Video Player Control |
The UX Component now includes a Video Player
control. Previously, to include videos in the UX
component, you created a Video Player component
and embedded the Video Player component in
a UX control. Using the new Video Player control
is much easier.
In addition, there are new actions in Action
Javascript that allow you to perform actions on
the Video Player control. Watch Video Download Component Date Added: 2014-11-15 |
| UX Component | Embedded Components - Delay Render - Techniques |
(This video is aimed at advanced developers.) A
common pattern in large applications is to
design a UX component that has several embedded
components. The embedded components are
typically on different Panel Cards that are all
wrapped in a Panel Navigator. The embedded
components all have their 'Delay render till
visible' property set to true so that the
initial load of the parent UX is not slowed
down. However, while the user is working on PanelCard 1 (for example), you might want to fire off a Ajax callback to load PanelCard2's embedded components in the background so that when the user does eventually navigate to PanelCard 2, the embedded component has already been loaded and the user does not perceive any delay. This video shows how this can be done. Watch Video Download Components Date Added: 2014-11-19 |
| UX Component | Using a 'Slider' to Display the Value in a Numeric Field |
In a List control that display numeric values,
instead of displaying the number, you might
instead want to use a 'slider' to represent the
numeric values. This video shows how the template for the numeric field can be easily modified to display the number using a 'slider'. Watch Video Download Component Date Added: 2014-11-19 |
| UX Component - List Control | Displaying a Google Map in Each Row of a List |
In this video we show how you can add a Google
Map to each row in a List to display the
position of a point in the current row on a map. Watch Video Download Component Date Added: 2014-11-19 |
| UX Component | Printing a Report Using Same Filter/Order as a List Control |
A common pattern in Grids is to have a button on
a Grid that prints a report showing the same
records that are in the current Grid query. Now
you can use a similar pattern for List controls
on a UX component. In this video we show a UX with a List control. The List control is based on a SQL query and the UX has a button that allows you to perform a server-side filter on the List (for example, search for all records in France or Denmark). The UX has a button that prints a report that is based on the same SQL tables as the List and automatically uses the same filter for the report as the List. Watch Video Date added: 2014-11-27 |
| Miscellaneous | Javascript File Editor |
When you edit a Javascript File from the Web
Projects Control Panel, the editor used to edit
the file was previously a modal editor. It has
now been rewritten to use a MDI window, which
means you can leave the editor open while you
work on other files. Also, the editor has an
integrated Interactive Window that allows you to
test Javascript code. Watch Video Date added: 2014-11-30 |
| UX and Grid Component | Xbasic Function Library |
When a component makes an Ajax callback, an
Xbasic function that you define handles the
callback. This function is typically defined
within the component (in the Xbasic Function
Declarations section). This means that the
function definition cannot be used in some other
component. By defining the function in an Xbasic Function Library that is linked into the component, you can now easily define Xbasic functions that can be shared among multiple components. NOTE: Xbasic Function Libraries are an alternative to compiling your functions into an .aex file. Watch Video Date added: 2014-11-30 |
| Miscellaneous | Xbasic Modules |
An Xbasic Module is a file that contains Xbasic
function and class definitions. The code defined
in a module can be made available to other
Xbasic code by using the require() function. This video demonstrates how Xbasic Modules can be used. Watch Video Date added: 2014-11-30 |
| UX Component - List Control | Image Capture Using the Camera in the List Detail View - Disconnected Applications |
A common requirement in a mobile application is
to be able to capture images using the camera on
the device. It is also a common requirement that
the application work when it is disconnected
(i.e. there is no internet connection
available). In this video we show how to build a disconnected mobile application that supports image capture. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Converting the app to a mobile layout - Part 1 Watch Video - Converting the app to a mobile layout - Part 2 Download Component Date added: 2014-12-18 |
WorldPay API - A new XBasic class called WorldPayAPI::SoapActions has been added to support the WorldPay Online Commerce Suite. All of the documented methods of the WorldPay SOAP API are included in this class.
For more information on the WorldPayAPI Xbasic class, click here.
json_to_xml() Function - Convert JSON to XML - Takes a string of JSON data and converts it to XML.
Syntax
c xml = json_to_xml(c json, c attribute)
Example
dim json as c
json = <<%txt%
{
"firstname" : "john" ,
"lastname" : "public" ,
"num" : [1,2,3] ,
"flag" : true ,
"place" : { "state" : "Texas"}
}
%txt%
dim xml as c
xml = json_to_xml(json,"person")
The resulting XML string looks like this:
<?xml version="1.0" encoding="UTF-8"?>
<person>
<firstname>john</firstname>
<lastname>public</lastname>
<num>1</num>
<num>2</num>
<num>3</num>
<flag>true</flag>
<place>
<state>Texas</state>
</place>
</person>
UX Component - List - Detail View - Client-side Events - 'hasClientSideValidationErrors' - A new client-side event has been added. the 'hasClientSideValidationErrors' event fires when the user tries to save Detail View edits back to the List and one or more controls in the Detail View has a client-side validation error.
UX Component - Action Javascript - Camera - A new action has been added to Action Javascript to allow you to capture an image using the camera on a mobile device.
The 'Image Capture - Camera/Photo Library' action allows you to specify some Javascript code to execute once the image has been acquired. Your Javascript code can reference:
NOTE Contrast this action with the 'Image Capture for List-Detail View - Camera/Photo Library' which also allows you to capture an image using the camera. This action however, is specifically for an Image control in a List View with a Detail View. The 'Image Capture - Camera/Photo Library' action simply returns the image data (base 64 encoded) and the native file URL (in the case where PhoneGap is being used). It is up to the developer to decide what to do with the base64 encoded data or file URL.

UX Component - Detail View - New Records - Default Values - When you define a List control with a Detail View you can specify Javascript code to return the default value for a field when a new record is created in the Detail View. A new option has been added to the List builder to allow you to automatically use the default value that was defined for the control to which the List field is bound for new record default values.
For example, assume:
When you click the New Record button in the List Detail View, the default value for the FIRSTNAME control (i.e. the control to which the FNAME List field is bound) will be set to 'Sam' because there was an explicit Default value rule set in the List builder. The default value of 'Sam' will be used even though the FIRSTNAME control defined a default value of 'Fred'.
However, assume that you now edit the List and delete the Default value Javascript code for the FNAME field. Now, when you create a new Detail View record, the default value shown in the FIRSTNAME control is governed by the setting of the 'Default values policy for new record in Detail View' property in the List builder.
This property can either be set to:
UX Component - List Control - Detail View - Image Capture using Camera/HTML5 - Disconnected Applications - You can now build mobile, disconnected applications, that include the ability to capture images using the camera on the device. When running on a device that does not have a camera, the image to use can be selected from the file system.
To create a button to capture a new image for an Image control in a List Detail View use the 'Image Capture for List-Detail View - Camera/Photo Library' action.

For more information on capturing images in the List Detail View, click here and search for 'camera'.
Application Server - Report Server - HTML Reports - By default, the Report Server is only used for PDF reports. Now, you have the option of offloading your HTML reports to the report server.
To turn this feature on, go to the Project Properties dialog and check the 'Use for HTML Reports' property.

urlencode() Function - New Parameters to Make Signing Requests when Using oAuth Easier - The urlencode() function now takes optional arguments that are useful when working with APIs that require oAuth authentication. In many of these APIs, the request body must be specially encoded.
The flags that you can use are:
Examples:
? urlencode("text-value=foo bar;")
= "text%2dvalue%3dfoo%20bar%3b"
? urlencode("text-value=foo bar;","u")
= "text%2Dvalue%3Dfoo%20bar%3B"
? urlencode("text-value=foo bar;","s")
= "text%2dvalue%3dfoo bar%3b"
? urlencode("text-value=foo bar;","r")
= "text-value%3dfoo%20bar%3b"
? urlencode("text-value=foo bar;","o")
= "text-value%3Dfoo bar%3B"
rsa_hash() function - Generates a RSA digital signature of the data using the key and SHA1, or any other signing method supported by the .NET framework.
Syntax
c result = rsa_hash(c data, C key [, c algorithm])
Example
dim parameters as b = "name=some url parameters"
' Pull the RSA private key out of the file
dim pemFile as c = file.to_string("c:\<somefolder>\<privatekeyfilename>.pem")
pemFile = word(pemFile,2,"-----BEGIN RSA PRIVATE
KEY-----")
pemFile = word(pemFile,1,"-----END RSA PRIVATE
KEY-----")
pemFile = alltrim(pemFile)
? rsa_hash(parameters,pemFile)
=
"EA1c/M2q9QhxTE/EgV5gljzAzeg8Xhj+0DY/7qzF4RXskp5g6ZDimRGJu1f........."
UX Component - {dialog.object}.activateControlContainer(UXControl) Method - Previously this method would activate the Tab or Accordion pane in which the specified UX Control had been placed. Now, the method will also activate the PanelCard in which the control has been placed.
UX Component - List Control - Detail View - No Record in List is Selected Action - A new property has been added to the List control to allows you to specify the action if no record is currently selected (which can happen if the List's 'Allow null selection' property is not checked).
The options are:
Note: If you have not defined any default values for fields then there is little difference between the 'None' option and the 'NewRecord' option because in both cases the Detail View will be enabled and will not have any default values filled in. If the user edits data in the Detail View and then clicks the Save button, a new row will be added to the List.

Grid Component - Query By Example Menus - Internationalization - The menus that are shown in Query by Example can now be internationalized.

A new property in the Query-by-Example Row section allows you to specify if the entries in the menu should be wrapped in Language Tags (<a5:r>..</a5:r>) or Text Dictionary tags (<a5:t>..</a5:t>).

Once you have wrapped the menu strings in tags, you can go to the Language definitions or Text dictionary properties section in the Grid builder to define the replacement strings for each language you want to support.
Web Applications - Xbasic Function Libraries - When you build a web component that does Ajax callbacks, you typically define the Xbasic function that handles the Ajax callback in the component itself (in the Xbasic Function Declarations section of the component). Alternatively you can create a .AEX file that creates a library of global Xbasic functions that your component can call.
Now a new method is now available. The Web Projects Control Panel now has a new category called Xbasic Function Library.

An Xbasic Function Library is a text file with a .a5xbfl extension that is stored in your Web Project. This file contains definitions for one or more Xbasic functions.
To use an Xbasic Function Library in a component you must link the file by specify the Xbasic Linked files property in the component. You can link as many Xbasic Function Library files as you want.

The benefit of using Xbasic Function Library files over defining the Xbasic function directly in the component is that you can share function definitions across multiple components. Xbasic Function Library files are text files, which makes them easy to manage in a source control system (such as Git), and they are easier to work with than .aex files (which provide an alternative method for sharing Xbasic function definitions across multiple components).
NOTE: If an Xbasic function is defined in both the Xbasic Function Declarations section within a component and also in a linked Xbasic Function Library file, the locally defined function is used.
Web Applications - Xbasic Modules - The Web Projects Control Panel now has a new category called Xbasic Module.

An Xbasic Module is a text file with a .a5xbm extension. It is stored in the web project folder. The purpose of an Xbasic Module is to allow you to package Xbasic functions and class definitions so that they can easily be used in other Xbasic code you write.
NOTE: Xbasic Modules are very similar to the concept of Node modules.
An Xbasic Module must end with an exports command that defines which functions and classes the Module 'exports' (makes available to the calling code).
To use an Xbasic Module in your Xbasic code you use the require() function to 'register' the Module.
The require() function can take an optional CRLF delimited string of search paths. By default the require() function will look in the Web Root (if you are running live) and in the Web Project Folder (if you are in Working Preview). If the file is not found there, it will search for the module in the <ExeFolder>\xbasic_modules folder. If you pass in a CRLF delimited string of folder names as the second parameter to the require() function, these folders will also be searched for the module.
For example, assume you had defined the following Xbasic Module called MyXBModule.a5xbm.
The module file was defined as follows:
function greeting as c (name as c )
greeting = "Hello " + ut(name) + " the time is now: " + currentDate()
end function
function currentDate as c ()
currentDate = date()
end function
exports.sayHello = greeting
Notice that the module defines two functions, but only the greeting() function is 'exported' (i.e. made public). Also notice that the greetings() function was exported as sayHello. This means that to the calling code the function sayHello() can be called (but not the internal greetings() function).
Now assume you had define an .a5w page with this code:
<%a5
dim pxb as p
pxb = require("myxbmodule")
?pxb.sayHello("jim")
%>
The Xbasic code in the .A5w page uses the require() function to register the 'myxbmodule' Xbasic Module and assigns the function to a namespace called pxb. Then, to call any of the exported functions, you must use the pxb prefix.
Modules can be loaded recursively. For example, in the definition of a module can reference another module.
What is the Difference between an Xbasic Function Library and an Xbasic Module?
On the surface an Xbasic Function Library and an Xbasic Module seem similar in that they are both files in which you can define multiple Xbasic functions.
However an Xbasic Module only makes 'public' certain of the functions and classes it defines (through use of the 'exports' keyword) and the exported functions are all in their own namespace and must be called using the namespace prefix.
On the other hand an Xbasic Function Library must be linked into a component before any of the functions defined in the library can be called. The functions defined in the Xbasic Function Library are in the same namespace as any locally defined functions in the component itself.
CSS Files - MDI Editor - When you edit a CSS file in the Web Projects Control Panel, the editor is now an MDI window. Previously, a modal window was used. Because the window is a MDI window, you can edit multiple CSS files at once and you can keep the CSS editor open while you edit other files.
Javascript Files - MDI Editor - When you edit a Javascript file in the Web Projects Control Panel, the editor is now an MDI window. Previously, a modal window was used. Because the window is a MDI window, you can edit multiple Javascript files at once and you can keep the Javascript editor open while you edit other files.
Also, while you are editing Javascript files you can test your code by executing it directly in the code editor. You can also switch to the Interactive Windows to test different Javascript code snippets.
NOTE: When you test code in the Javascript editor you are not testing it in the context of the browser. That means you can't test code that assumes that the DOM is present. Also certain Javascript global objects such as window and document are not defined. The alert(), function is also not defined.
The Interactive Window pane in the Javascript editor is shown below. The window is divided into two sections. The top section is the Javascript code that you want to test and the bottom window shows results.
You can print text to the results window by using any of the following functions in your Javascript code:
NOTE: When you are done testing your Javascript, be sure to remove or comment out any print(), printJSON() or printJSONCompact() functions in your code as these functions only are defined in the context of the Javascript editor.

UX Component - Lists - Printing Reports Using Same Filter as List - A common pattern in Grids is to have a button on a Grid that prints a report showing the same records that are in the current Grid query. Now you can use a similar pattern for List controls on a UX component.
NOTE: This feature is only for Lists and Reports based on SQL tables.
When you define the filter and order for the report in the Action Javascript genie you can use these special functions
currentListFilter("NameofList")
currentListOrder("NameOfList")
For example, if your UX component has a List called CUSTOMERS, you might specify the report filter and order as :
currentListFilter("CUSTOMERS")
currentListOrder("CUSTOMERS")
Reports - Custom Data Sources - Previously, when you created a Report in Alpha Anywhere you could choose to base the report on a SQL data source, or a native .dbf table.
Now you can specify that the report is based on a Custom data source.

NOTE: When creating 'Project reports' (Reports defined in the Web Projects Control Panel), the option to base the report on a .dbf table is not available.
When you specify a custom data source the following dialog appears:

You specify the name of an Xbasic function that will return the data to be printed by the report.
The Xbasic function can return data in one of two formats:
In both cases, the Xbasic function returns a string of data (that is either in delimited or JSON format - explained below).
The function prototype for the Xbasic function is (assuming you specified that the Function name was myDataFunction in the Function name property in image shown above):
function myDataFunction as c (e as p)
myDataFunction = <<%txt%
......the delimited, or JSON format data goes here
%txt%
end function
Notice that the function takes a single input parameter, e.
The e object that is passed into the function includes the value of any arguments that were passed into the report.
For example, assume that you specified that the Custom Data Source uses an argument called whatCountry. Your Xbasic function can reference the value in this argument as follows:
dim country as c
country = argVal(e.arguments,"whatCountry")
Understanding the Format of the Delimited Data Your Custom Function Must Return
The delimited option allows you to return a CR-LF delimited list of data. Each row in the data that are returned represents a row of data in your report. The 'fields' in the data are typically delimited with a pipe character (e.g. |), but you are free to specify any delimiter. For example, here is how a simple Xbasic function could be defined to return some data for a report.
function myXBfunction as c (e as p)
dim txt as c
txt = <<%txt%
Firstname|Lastname|City
Fred|Smith|Boston
John|Jones|London
%txt%
myXBfunction = txt
end function
Notice that the first row of data in the string that is returned by the function are the field names. In this example, the field names are Firstname, LastName and City.
The first row of data can optionally include additional information that defines the data type and size of each field.
For example:
function myXBfunction as c (e as p)
dim txt as c
txt = <<%txt%
Firstname=C20|Lastname=C30|City=C20|DOB=D|Salary=10.2
Fred|Smith|Boston|12/6/1972|86500.00
John|Jones|London|11/5/1982|76000.00
%txt%
myXBfunction = txt
end function
For Character fields, the format is defined as Cw where 'w' is the size of the field. For Numeric fields, the format is defined as Nw.d where 'w' is the size of the field and 'd' is the number of decimal places.
The following field type codes can be used:
Understanding the Format of the JSON Data Your Custom Function Must Return
The JSON data that your function returns can be Simple or Complex.
Simple JSON
For Simple JSON, the string that you return is just an array of JSON objects, For example:
function myjson as c(e as p)
myjson = <<%json%
[
{"Firstname" : "Fred", "Lastname" : "Smith"},
{"Firstname" : "Harry", "Lastname" : "Jones"}
]
%json%
end function
In this case since no schema is supplied the data are all considered to be character type of length 1024 characters. While the advantage of this format is that is extremely simple, it does mean that you will need to adjust the size of each field you place on your report because its default size will likely be too large.
Complex JSON
For Complex JSON, the string that you return is an object with two properties, schema and data. The schema object defines the schema of the data (for example, field type, size, etc.) and the data property is an array of JSON objects that define the data for the report. For example:
function myjson as c(e as p)
myjson = <<%json%
{
"schema" : { "firstname" : { "type" : "C" , "width": 30 }
, "lastname" : { "type" : "C" , "width": 30}
, "company" : { "type" : "C" , "width": 30}
, "age" : { "type" : "N" , "width" : 3, "decimal" : 0 }
},
"data":
[
{"firstname":"Fred", "lastname":"Smith", "company" : "Alpha Software", "age" : 30},
{"firstname":"John", "lastname":"Jones", "company" : "Beta Software", "age" : 23}
]
}
%json%
end function
In the above example, we have specified the size and type of each field in the data array. Notice that we have also specified the number of decimal places for the numeric field.
The data types supported in the schema are:
Note: If you specify that a field uses the Date (D), Date/Time (T) or Short time (Y) format in the schema, the data in the data array must be a string in UTC date format. For example: 2014-10-27T23:06:50.361Z. The date part format is yyyy-mm-dd and the time part uses GMT. In the case of a Short time field, the date portion of the UTC date string is ignored.
The schema also allows you to extract data from objects within each row and to map property names in the data array to different names. For example in the data shown below, the address property is an object with two sub-properties.
{
"name": "Fred Smith",
"company" : "XYZ Corp",
"address": {
"street": "Main Street",
"number": 23
}
}
Shown below is how the function would be defined to return the JSON data. Notice that the JSON object has both a schema and a data property. The schema indicates what fields will be available to the report. The list of fields specified by the schema are: name, companyName, street and number.
Notice that the data array does not have a property called companyName. It has a property called company. So the schema property for the companyName field indicates that the source of this field is the company property in the data array. Similarly, the street field in the schema is mapped to the address.street property in the data array.
If the definition for a field in the schema omits the source property, then the source is the same as the item name. For example the definition for the name field in the schema shown below does not have a source property, therefore this field is mapped to the name property in the data array.
function myjson as c(e as p)
myjson = <<%json%
{
"schema": {
"name": {
"type": "c",
"width": 30
},
"companyName: {
"source": "company",
"type" : "c",
"width" : 30
},
"street": {
"source": "address.street",
"type": "c",
"width": 40
},
"number": {
"source": "address.number",
"type": "n",
"width": 5,
"decimal": 0
}
},
"data": [
{
"name": "Fred Smith",
"company" : "XYZ Corp",
"address": {
"street": "Main Street",
"number": 23
}
},
{
"name": "John Jones",
"company" : "ABC Corp",
"address": {
"street": "Corner Road",
"number": 3
}
}
]
}
%json%
end function
In the next example, we show how the JSON object that you specify can include image data. The binary data for the image are encoded as base64 strings. The example shows the complete function definition. Notice that the schema indicates that the image field will be stored as a PNG. Notice also that in the first record, the base64 encoded data in the image property does not include the MIME type at the start of the base64 encoded data. This data is therefore presumed to be a PNG image since the schema indicates that the image is a PNG type. Notice however, that the second row of data in the data array has a MIME type prefix on the base64 encoded image data. The data for the image is for a BMP image. The image will therefore be converted from BMP to PNG automatically.
function myjson as c(e as p)
myjson = <<%json%
{
"schema" : {
"name" : { "type" : "C" , "width": 30 },
"image" : { "type" : "Png" }
},
"data":
[
{"name":"John Smith", "image" : "iVBORw...(data truncated for readability)....AAAElFTkSuQmCC" },
{"name":"Jane Smith", "image" : "data:image/bmp;base64,Qk02AwAAA...(data truncated for readability)....AAAADYAAAAAA=="}
]
}
%json%
end function
UX Component - Action Javascript - Dial Telephone Action - A new action has been added to Action Javascript to allow you to dial a telephone number.
The number to dial can either be static (i.e. specified at design time), or it can be read from controls on the UX, columns in a List, or returned by a Javascript function.
Apperian EASE Integration, Mobile Application Management -Added support for Apperian which allows you to publish your PhoneGap apps directly to the Apperian EASE platform.
The Apperian EASE platform can secure, manage and deploy enterprise mobile apps for all platforms.
Apperian’s mobile application management platform provides:
To publish apps to the Apperian Ease platform, you will need to setup an Apperian account. See the Apperian Web Site for more information.
To enable the Apperian features, from within the PhoneGap App Builder, check the Enable Apperian EASE Integration Options.
Next, enter your Apperian account credentials and make sure to specify the correct Apperian server. Different servers are used for US and non US accounts.
Once the Apperian features have been enabled, a number of optional items are enabled within the PhoneGap App Builder.

The Apperian Admin Console will display all of the apps you may have previously published to the Apperian EASE platform.
To Add A New App To Apperian
Make sure to download and save the app bundle for the target platform. The app bundle files will be automatically
saved to the appDownloads folder of the PhoneGapProjects target project directory.
Next click the Add App button and fill out all of the required information for submission to Apperian.
All of the fields must has valid data and the version number should include a decimal, ie: 1.20, 0.20, 2.52, etc.
The app.bundle.id will be automatically retrieved from the app bundle.
To Update An Existing App
Click the update button. You do not need to upload a new app bundle unless the files have changed.
You can simply edit the information and save.
To Access the Apperian EASE Platform
Log in to your Apperian EASE account at Apperian.
Once you've logged in, you will see the files and data that have been uploaded from Alpha Anywhere.
Further deployment options will be set within the Apperian EASE Management Console.
Keep in mind that you can update the app within Alpha Anywhere and update the app bundle and app meta data
anytime.
AlphaDAO Connection Strings - Mask Passwords - Previously, the connection string builder masked (i.e. obfuscated) the password by using high order characters. For example, a password of 'alpha' would be masked as 'áìðèá'. Now, the connection string builder uses a different technique to mask password that does not use high order characters. The reason for this change is so Alpha Anywhere IIS server can correctly interpret the connection strings.
Passwords masked using the new scheme will now have the 'A5:B64' prefix.
If you edit an existing connection string, the existing masked password will be masked using the new scheme.
NOTE: The reason that the connection string builder masks passwords is so that someone looking over your shoulder as you define a new connection string will not see the real password. This is much like the way a login dialog will mask your password as you enter it.
You do not have make any changes to your existing applications because of this change.
However, if you edit an existing connection string, or you add a new connection string and then publish your application, you will need to ensure that the server is also running this build or a higher build.
There are two methods on the SQL::Connection object that allow you to mask and unmask as string
For example:
dim cn as sql::connection
?cn.MaskPassword("alpha")
= ":A5:B64:YWxwaGE="
?cn.UnMaskPassword(":A5:B64:YWxwaGE=")
= "alpha"
PDF Reports - Set Maximum Allowed Time - You can now set a timeout for PDF reports. This is useful to prevent tying up the Application Server (or Report Server if the Report Server is enabled) for a long time in the event the user requests a report that might take too long to process.
To set the maximum allowed time for a PDF report, open the Project Properties dialog from the Web Control Panel. By default, the timeout is set to 0 seconds (which means that reports will run to completion, regardless of how long they might take).
It is recommended that you set this property to a non-zero value.

UX Component - Video Player Control - The UX component now includes a built-in video player control. Previously, to add video playing functionality to a UX component, you had to first create a stand-alone Video Player component and then embed the Video Player component into your UX component.

The Video Player Control supports YouTube, Vimeo,
Viddler and HTML5 video players.
The player supports many options specific to the type of
player used.
NOTE The 'auto play' option does not work on mobile devices as it is disabled in an effort to conserve bandwidth.
An 'automatic sizing' option is included to adjust the
video player size on device orientation change. This
feature is important on Android devices.
A typical use case is to include a panel navigator with
two panel cards. The first panel card contains a list
control that may display the video title, the second
panel card includes the video player control. When the
user taps on a row in the list, the second panel card is
transitioned into view and the video may be played.
Download a sample component that demonstrates this
use case.
HTML Reports in Components - Display limit -
Large reports (more than 1,000 records) may be slow to
open when created as HTML reports. This will add load to
the application server and slow the server response. You
can now set a limit on the number of records to display
in a report opened as HTML. This will allow a large
report to open faster as a preview of data in the
report. If the report is then printed as PDF or
exported, the full number of records will be in the
final report.
The HTML Report Viewer Options will show an option for
'Maximum records to display' if the initial view is
HTML. An embedded report in a UX will show the property
in the Report definition. Set the value to 0 to show all
records, or set a value to limit the maximum records to
display. The limit only applies to HTML reports. A
reasonable upper limit is 1,000 records as larger
reports may be slow to generate.
You can set a 'More records' message with placeholders
and a style for the message container. This message will
be added to the bottom of the report if the number of
actual records in the report is greater than the display
limit. The message will not be shown if the number of
records in the report is less that then display limit.


UX Component - Data-Bound Image Field - Image File Transformation Template - If you have image fields that are bound to a character field (that contains the image filename), you need to define the 'Image File Transformation Template' to resolve the image name stored in the table. The Image File Transformation Template can now include field placeholders. For example
{folder}\<value>
If the current record you were viewing had a value of c:\project1 for the 'folder' field, the images for this record would be found in the c:\project1 folder.
UX Component - Hide Container Window - New methods and actions in Action Javascript have been added to hide (i.e. close) a 'container' window.
A 'container' window is a pop-up window that is defined in the UX by wrapping controls in a 'Container' and setting the sub-type to 'Window'.
Opening a container window has always been easy as there is an explicit method in Action Javascript to open a container window and there is a corresponding method ( {dialog.object}.showContainerWindow() ) in the UX object.
However, closing the window programmatically involved first getting a pointer to the actual window object that was created and then calling that object's .hide() method.
Now, the UX object has a new method:
{dialog.object}.hideContainerWindow(containerName);
UX Component - List Control - Client-side Display Format for Date, DateTime and Short-time Fields - A new property has been added to the 'Fields' pane in the List Builder to allows you to set the client-side display format for date, date/time and short-time fields.

The builder for the 'Date/time display format' field allows you to set the format to:
If you choose <None> then no client-side formatting rule is applied. This means that the date/time values will be displayed using the regional settings on the server from where the UX is loaded. So for example, if the server is located in Switzerland where the date format is dd.MM.yyyy, then dates in the List will be displayed like this: 12.31.2014.
If you choose <Default> (or <Default - date part only> for a date/time field), the client side display format will match the setting for the 'Date format property' (shown below). This property is set on the Properties pane in the UX builder. This property can be overwritten at run-time by setting a session variable (__protected__clientSideDateFormat) at the time a user logs into your application.

Grid and UX Component - Action Javascript - File Upload - User Defined Action - A new property has been added to the builder for the 'File Upload - User Defined Action'.
The 'Xbasic function arguments array mode' property can be set to either 'Filename' or 'Data'.

For all existing actions this property is set to 'Data'. For all newly defined actions, this property will default to 'Filename'.
When the upload is complete, the 'After upload' Xbasic function is called. This function gets passed an array (in the 'e' object that is passed into the function) that contains information about each of the files that was uploaded.
For example, if the 'Data' option is selected, and (say) the user uploaded two files. the e object passed to the 'After upload' function will contain these properties:
e.fileArray[1].file.characterSet - character set of the
uploaded file
e.fileArray[1].file.contentType - MIME type (e.g.
'application/octet-stream')
e.fileArray[1].fileName - filename of the file on the
client machine
e.fileArray[1].encoding - For text files, specifies the
encoding type
e.fileArray[1].data - data that was uploaded.
e.fileArray[1].file.dataType = Either 'text' or 'binary'
e.fileArray[2].file.characterSet - character set of the
uploaded file
e.fileArray[2].file.contentType - MIME type (e.g.
'application/octet-stream')
e.fileArray[2].fileName - filename of the file on the
client machine
e.fileArray[2].encoding - For text files, specifies the
encoding type
e.fileArray[2].data - data that was uploaded.
e.fileArray[2].file.dataType = Either 'text' or 'binary'
Note that the array has a .data property that contains the data that was uploaded.
On the other hand, if the 'Filename' option is selected the array will not have the .data and file.dataType properties. Instead it will have a property called 'tempFileUploadedData' that contains the filename of the temporary file on the server where the uploaded data was saved. So, in the case where the user uploaded two file, the e object will contain:
e.fileArray[1].tempFileUploadedData
e.fileArray[2].tempFileUploadedData
It is recommended that for your existing actions you edit the action and change the mode to 'Filename'. This will require that you also change your Xbasic function that processes the uploaded data because the array passed to your function will no longer has a .data property.
The benefit of the 'Filename' option over the 'Data' option is that the uploaded data is never loaded into memory. If you use the 'Data' option, the uploaded data is read into memory. This consumes virtual memory on your server and may result in server errors if you have a large number of users uploading files (or just one user uploading a huge file).
With the 'Filename' option, your application will be able to handle larger file uploads, or more users concurrently uploading files.
Security Framework - Alternative Login - Microsoft Live Connect - The Alpha Anywhere alternative login feature now supports user authentication using Microsoft Live Connect.
The developer site for configuring a new Live Connect application can currently be found at:
https://account.live.com/
UX Component - New Quick Start Templates - When you create a new UX component, two new quick-start templates are available:

Watch Video - Part 1
Watch Video - Part 2
Watch Video- Part 3
Xbasic - UTC Date - Convert To and From - Xbasic functions have been added to convert UTC date strings to Xbasic date or time objects.
Examples:
? date_to_utc_date(now())
= "2014-10-28T17:23:27.681Z"
? date_to_utc_date(date())
= "2014-10-28"
? date_from_utc_date( "2014-10-28T17:23:27.681Z")
= 10/28/2014 01:23:27 68 pm
? now()
= 10/28/2014 01:23:36 06 pm
? date_from_utc_date("2014-10-28")
= {10/28/2014}
? date_from_utc_date( "2014-10-28T17:23:27.681Z" , "D")
= {10/28/2014}
? date_from_utc_date("2014-10-28","T")
= 10/27/2014 08:00:00 00 pm
Web Applications - Publishing Application - Command Line Options - Typically when you publish your web application you do it using the user interface in Alpha Anywhere. You start the process starts by clicking the Publish button on the Web Control Panel.
However, there may be cases where you would like to automate the process by creating a batch file that automatically invokes the publishing operation.
A new function, a5w_publish2() has been added to make it easier to do command line publishing.
This function takes either a dot variable or a JSON object that defines the publishing options. The function can be called from a batch file, as described below.
The a5w_publish2() function allows you to set values for the following publish options:
TIP: To view help for this function, enter the following command in the Interactive Window:
a5w_publish2("help")
The dot variable or JSON object that you pass into the a5w_publish2() function can set a sub-set of these properties.
To use the .dot variable syntax:
dim ops as p
ops.profile = "Profile1"
ops.publish_type = 1
dim flag as l
flag = a5w_publish2(ops)
To use the JSON syntax:
dim flag as l
flag = a5w_publish2("{profile: \"Profile1\",
publish_type: 1}")
Assume that you have a Workspace called 'c:\MyWorkspaceFolder\MyWorkspace.adb' and you want to publish all files in the 'project1' folder using the 'profile1' web publishing profile.
You could create the following batch file to do the publish.
Note: The batch file would be all on one line. The line breaks shown below are not part of the code.
C:\Program Files (x86)\alpha5.exe "C:\MyWorkspaceFolder\MyWorkspace.adb"
-COMMAND="a5w_publish2(\"{profile: 'profile1', projName:
'project1', publish_type: 1, exitAfterPublish: true}\")"
UX Component - Client-Side Events - securityNotAuthenticated and securityPermissionDenied Events - Two new client-side events have been added to the UX component.
When an Ajax callback is made and the server sends back a '401' status code in the response, the securityNotAuthendicated event will fire.
If the server sends back a '403' status code in the response, the securityPermissionDenied event will fire.
You can manually set the status code in an Ajax response (for example, if you want to test the events) by setting the
Response.StatusCode
property in the Xbasic function that handles the Ajax callback.
NOTE: Typically, when defining these events, you will also set the Security permission denied action property in the Other section of the UX properties to Fire client-side security events.
For example, assume you have a button on UX component that does an Ajax callback. The function that handles the callback is myXBFunction. Your could define the function as follows:
function myXBFunction as c (e as p)
Response.StatusCode = 401
end function
These events are primarily intended for use in a UX component that contains an integrated login section (for example in a mobile application where the UX has Panel Navigator with at least two Panel Cards and the Login controls are on Panel Card 1 and the afterLogin event sets focus to Panel Card 2).
In the case where the UX contains an integrated login section, these events can be used to direct a user back to a panel or section used for login on a UX component. For example, the UX may have login controls on a panel, PANELCARD_1. The securityNotAuthendicated event could set focus back to that panel.
{dialog.object}.panelSetActive('PANELCARD_1',true);
If the event was fired from a child component, the event
in the child component could redirect the user back to
the login panel.
var po = {dialog.object}.getParentObject();
if(po) {
po.panelSetActive('PANELCARD_1',true);
}
If the child was opened in a window, the child event
could also close the window. If the child UX had a
control named 'list1', the event would be:
var po = {dialog.object}.getParentObject();
if(po) {
var ele = {dialog.Object}.getPointer('list1');
{dialog.Object}.closeContainerWindow(ele);
po.panelSetActive('PANELCARD_1',true);
}
UX Component – Security Permission Denied Action Property - The UX component has a new property to set the server permission denied action.

This is the action the security system will take when a request is made from this component and the request is denied because of security restrictions.
This can occur if a UX attempts to open another component that has login restrictions and no one is logged in, or the user has insufficient permission to see the component being requested. The security action will also be taken if the current component has login restrictions, the login has expired, and some request is made to the server, such as a request to refresh a control or do a server-side sort on a column in a list control.
The new property UX property is
Security
permission denied action in the
Other
section of the UX properties.
The default action is Redirect to login page. This action will allow the security to redirect to the login or insufficient permission page as set in the security settings.
The action Fire client-side security event will cause the server to return either a 401 status code if the login has expired, or a 403 status code if a user is logged in, but not allowed to access the requested component. This will fire either the securityNotAuthenticated or securityPermissionDenied client-side events.
This action is currently only available in UX
components. The action applies to only Ajax requests
made from the component. A UX component ('parent'
component) can open other UX components ('child
components'). If any of the child components have a
login restriction, and this action is set to fire the
client side events on any of the components, the
recommended 'best practice' is to set the property to
fire the client side event on all of the child
components and the parent component. This should be set
even if the parent component is always allowed.
UX Component - List Control - Templates - Date Formatting - Typically the data in a List control is all text data. So even though a column in the List might be displaying a date value, the actual data in the List data array for that column is still a string.
The only exception to this is if the List is populated using Javascript and in the Javascript array that was used to populate the List, the column was explicitly set to a Javascript data object. Or, the data in the column was explicitly cast to a date object by setting the Transform data type property on the Fields pane in the List builder.
The template used to display data in the list allows you to specify an optional format.
For example, say you have a column in the List called 'OrderDate', the template for that column in the List will be:
{OrderDate}
However, say you wanted the display format for the OrderDate to be yyyy-MM-dd (e.g. 2014-12-25), then you can add a format directive to the template. For example:
{OrderDate:date('yyyy-MM-dd')}
However, the above format directive only works if the data in the 'OrderDate' column in the List are a date object.
But, as previously discussed, in many cases, the data in the List are all strings of text, so you cannot use the above format directive unless you first cast the data to a date object. When working with Lists that have updateable Detail Views, casing date strings to date objects introduces other complexities and it would be desirable to not have to cast the date string to a date object, but rather to be able to simply format the date string.
To do this, a new format directive has been added. For example:
{OrderDate:dateString('MM-dd-yyyy','yyyy-MM-dd')}
This directive takes two date formats. The first date format is used to parse the date string into a date object and the second date format is the output format.
UX Component - List Control - Detail View - Showing
Edited Fields - When you have a List with an
associated Detail View and you edit the data in one of
the rows of the List, an icon (whose appearance you can
customize) is shown in the List row to indicate that the
List row has data that has been edited, but not yet
synchronized.
You can now indicate the dirty fields in a List row that
has been edited by specify a custom CSS class to apply
to the Detail View control if the field value has been
edited.
For example in the image shown below, you can see that the first row in the List has been edited, and you can now also see that the field in that row that was edited was the city field that was changed to 'Frankfurt'.

To indicate the CSS class that you want to apply to dirty fields, open the List builder and set the 'Dirty control class name' property.

In the above example, the dirtyField CSS class was defined as follows:
.dirtyField {
background: #f6f9c2;
}
Watch Video
Download Component
Export Data - .dbf Tables - Delimited Data - A new option has been added to the export operation so that you can optionally suppress escaping characters.
The 'Disable Character Escapement' property has been added to the export options.

Consider a table that has this data:
| Name | Comment |
| Fred "J" Smith | This is a comment with a trailing \ |
| Hank Kaplan | No comment |
If you export the data and specify that the fields should be quoted, the exported data looks like this:
"NAME","COMMENT"
"Fred \"J\" Smith","This is a comment with a trailing
\\"
"Hank Kaplan","No comment"
Note that quotes in the data itself are escaped and that the trailing backslash in the data is also escaped.
This data could be successfully re-imported in Alpha Anywhere.
However, if you check the new 'Disable Character Escapement' property, the data will be exported as follows.
Note that the quotes in the data are converted to single quotes and the trailing backslash in the data is not escaped.
This data could NOT be successfully re-imported into Alpha Anywhere.
"NAME","COMMENT"
"Fred 'J' Smith","This is a comment with a trailing \"
"Hank Kaplan","No comment"
UX and Grid Component - File Download Action Javascript - You can now specify a dynamic 'client-side filename' by specifying the name of a Javascript function to call. For example, you can specify the following for the 'client-side filename':
function:myfunc
Where 'myfunc' is the name of the Javascript function you want to call to generate the client-side filename. You function must return a url encoded value.
AlphaDAO - Connection Strings - Dynamic - A dynamic connection string is a connection string that is resolved at the time the database connection is opened, rather than at the time the connection string is defined.
Alpha Anywhere has allowed for dynamic connection strings for some time now by allowing you to create a named connection that starts with DynamicConnection_. For example
DynamicConnection_MyCustomApplication
The actual value of the dynamic connection string is resolved by referring to a session variable called:
session.__protected__MyCustomApplication
which defines the actual connection string to be used.
The value of this session variable is typically set when the user logs into the application. For example, it might be set to:
::Name::User1Connection
Now, a new way of creating dynamic connection strings is available using the ::EVAL:: prefix in the named connection string, rather than the ::Name:: prefix.
Prefixing a connection string with ::EVAL:: causes the connection string to be evaluated as an Xbasic expression.
For example, consider the following connection string:
::EVAL::MyFunctionThatReturnsAConnString()
When an AlphaDAO connection is opened using the above string, the MyFunctionThatReturnsAConnString() is evaluated and the return value (which would typically be a named connection string with the ::Name:: prefix) is used as the connection string.
In this next example, the dynamic connection string uses an in-line Xbasic expression:
::EVAL::if(User = "Fred","::name::Fred","::name::EverybodyElse")
UX and Grid Components - Javascript Actions - Copy/Paste - You can now copy and paste Javascript Actions from one component to another component (of the same type). For example, you might have defined several Javascript Actions in component called 'UX1' and now you are building a new UX component and you would like to copy some of the Javascript Actions from 'UX1' to your new UX component.
Create PDF File from HTML - helper::HtmlToPdf Class - Xbasic now has a new class that allows you to convert HTML to PDF.
The helper::HtmlToPdf class has methods that allow you to convert HTML to PDF or a URL to PDF.
The following example code can be pasted into a new script in the Code editor and executed.
dim hp as helper::HtmlToPdf
dim html as c
html = <<%html%
<style>
.mystyle {color: red;}
</style>
<h1>This is So Cool</h1>
<h2>Generate PDF from HTML!</h2>
<p>This shows how you can turn <span class="mystyle">any</span>
html into a pdf</p>
%html%
dir_create_recurse("c:\mypdffiles")
hp.SaveHTMLToPdf(html,"c:\mypdffiles\mypdf.pdf")
'now open the file
sys_open("c:\mypdffiles\mypdf.pdf")
The helper::HtmlToPdf class exposes these methods:
The helper::HtmlToPdf class exposes these properties:
UX Component - List - Detail View - Client-side Validation - Client side validation was not being performed on all of the controls in the Detail View when the user tried to save Detail View edits back to the List. As a result, it was possible to save edits to the List when client-side validation errors should have prevented this. (The validation errors would still have been caught server-side when a sync operation was performed, and bad data could not have been entered into the database.)
UX Component - Android Mobile Devices - Keyboard - Responsive Events - Under some circumstances on Android mobile devices, if the device was in portrait mode and the keyboard came up, the UX would indicate that it was now in landscape mode even though the device orientation was still portrait.
Application Server - HTML Reports - Memory Leak - Fixed a memory leak in the Application Server when doing large HTML reports.
Application Server - Security Framework - SQL Tables for Security Tables - Postgres - Converting the security tables to use a Postgres database was failing. This is now fixed.
Label Reports = Setting an Image as the Background - In some case, setting an image as the background for a label was failing.
UX Component - List Control - Detail View - Incremental Refresh - Fixed an issue with incremental refresh in the case where the UX had multiple Lists in a parent-child relationship and the top-level parent List was based on a SQL statement that joined multiple tables and the top-level List pre-fetched the data for the child Lists.
UX Component - List Controls - Data Type Casting - The List Control allows you to cast the data type in any List column to a date object, number or logical value (by setting the Transform data type property on the Fields pane in the List builder). However, after data in the list was updated, or new rows were added to the List, the data casting rules were not being applied to the new data.
UX Component - List Control - Detail View - Editing a Value that Was Previously NULL - A change has been made in the SQL that gets generated when you edit the value in a field that was previously NULL.
UX Component - List Control - .getValue() method - Reading Value in List Column - The .getValue() method can get the value in a control, or in an individual column in a List control.
When reading the value in a control, there is no concept of a null value (since the UX does not have the concept of setting a control value to null).
However, List columns can contain null values and previously, when you read the value of a List column that contained a null value, .getValue() returned a null value, which was inconsistent with how .getValue() works when reading a control's value. Now, .getValue() returns a blank string when reading the value in a List column that is null.
For example
var = value = {dialog.object}.getValue('list::LIST1::CustNum');
now returns a blank string if the 'CustNum' column in LIST1 in the selected List row is null. Previously it returned null.
Note that you can still determine if a List column really does contain a null value as follows:
//get a pointer to 'LIST1'
var lObj = {dialog.object}.getControl('LIST1');
//get data in first selected row of the List
var _d = lObj.getData(lObj.selection[0]);
//read the value of the 'CustNum' property in the data
object
var _v = _d['CustNum']; //_v will be null if the
data in the column is null
PhoneGap - Web Security Framework - Fixed an issue with the Web Security Framework when running in a PhoneGap shell. Redirecting to the login page after a session timeout, or after an attempt to load a resource for which you did no have permission was not working correctly.
UX and Grid Component - Wait Message - Fixed a case where the wait message was not getting cleared after an Ajax callback had completed.
UX Component - File and Image Upload - Internet Explorer - Fixed a case where a Javascript error was generated when the file or image upload window was opened. Only happened in IE when in the UX component.
UX Component - Panel Navigator - Opening a Child Component in a Panel Card inside a Navigator - Fixed an issue where a child component was being opened in a Panel Card inside the Panel Navigator. After the child component was opened, the swipe gesture to move to a different Panel in the Navigator was causing a Javascirpt error.
Grid Component - Grid Based on Stored Procedure - If a Grid was based on a Stored Procedure and a surrogate Primary Key for query was defined, the _keys array in the Grid Object was not getting defined.
UX and Grid Component - Edit-Combo Control - Dynamically Populating Choices Using Javascript - The choices in an edit-combo control can be dynamically set using Javascript. For example, say you have an control on a UX called 'TEXTBOX1' and you want to dynamically set the choices in the edit-combo. The following code can be used:
var obj = {Dialog.object}.getControl('TEXTBOX1');
var newData = [
{COMPANYNAME: 'Alpha Corp'},
{COMPANYNAME: 'Beta Corp'},
{COMPANYNAME: 'Gamma Corp'}
]
obj.setData(newData);
UX Component - List Control - Freeform Layout - Hyperlinks - When you create a free-form List layout you can use any HTML that you want to lay out each row in the List. Your HTML template will include placeholders for the various fields in the List.
For example:
<div>
Name: {name}<br>
Address: {address}
</div>
Because the template is HTML, you might expect to be able to add hyperlinks. For example:
<div>
Name: {name}<br>
Address: {address}<br>
<a href="page2.a5w?{address}" target="_blank">Open Page</a>
</div>
This will not work because the List is configured to handle all events. However, you can make this pattern work by adding markup to your html to stop event propagation. For example:
<a href="page2.a5w?{address}" target="_blank" onclick="$e.stopPropagation(event);" ontouchstart="$e.stopPropagation(event);">Open Page</a>
With the addition of event handlers for the onclick and ontouchstart events which stop event propagation, the hyperlink will work as expected.
UX Component - PhoneGap Applications - Ajax Callback URL - Setting Dynamically at Runtime - When you build a PhoneGap application you have to specify the URL for Ajax callbacks in the PhoneGap genie.
When you perform any action in your PhoneGap application, the callback is made to the server address specified in the URL for Ajax callbacks property in the PhoneGap genie.
However, you might be building an app where you don't know what server the app will be running on (i.e. you don't know what server the app will be making its Ajax callbacks to) and so you would like to be able to set the URL for Ajax callbacks after the app has loaded.
Here is how this can be done.
First, when you specify the URL for Ajax callbacks, set the URL to some placeholder value. For example:
replaceMe
Next, put a textbox on your UX component where the user can enter the address of the server to which they will be making callbacks. For example, assume that this text box is called: ServerAddress.
Then put a button on the UX to set the callback URL. The callback URL is a property of the UX object (i.e. {dialog.object}. It is called ajaxURL.
Define the following Javascript for this button:
//read the server address from the serverAddress textbox
var prefix = {dialog.object}.getValue('SERVERADDRESS');
//the address should look something like this:
//'http://www.myserver.com/folderWhereAppWasPublished/';
//notice that the server address has a trailing forward slash
//read the existing callback URL
//it will start with 'replaceMe' since that is what you specified
//in the PhoneGap genie
var url = {dialog.object}.ajaxURL
//replace the placeholder with the server address
url = url.replace('replaceMe/',prefix);
//set the URL
{dialog.object}.ajaxURL = url;
Having done this, Ajax callbacks made to the server will now work. But what happens the next time the user loads the application? The Ajax URL will be wrong. You would want the Ajax URL to be automatically set correctly without requiring the user to go through the steps of having to enter the server address again.
The solution to this problem is to store the callback URL in local storage and then to restore from local storage whenever the application is started.
To do this, you would add code like this to the end of the above Javascript:
localStorage.setItem('AJAXCALLBACKURL',url)
In the onRenderComplete client-side event, you would add this code to restore:
//read url from local storage.
var url = localStorage.getItem('AJAXCALLBACKURL');
//if value exist, set the UX's ajaxURL property
if(url != null) {
{dialog.object}.ajaxURL = url;
}
UX Component - List Control - UX Component 'Dirty State' - Just like standard UX Components controls (such as Textbox, Textarea, RadioButton, etc), the List control is bound to a UX component variable. When the value in any control changes the UX component is considered to be 'dirty'. So for example, if you open a UX and then select a row in a List, ghe UX will go from 'clean' to 'dirty'.
In some use cases you might not want the UX go to 'dirty' when the user is making selections in a List. You can easily do this by adding some code to the onBeforeSelect and onSelect event in the List.
Here is the code to add to the List's onBeforeSelect event:
var flagUXIsDirty = false;
//see if the UX is already dirty
flagUXIsDirty = {dialog.object}._dirtyRows[0];
//store the dirty state of the UX in a variable in the
List object
this._flagUXIsDirty = flagUXIsDirty;
Here is the code to add to the List's onSelect event:
//if the UX was not dirty when you selected the row
//set the UX state back to clean after the row is selected.
//you need to use a timeout with a small delay.
if(this._flagUXIsDirty == false) {
setTimeout(function() {
{dialog.object}._setRowState(1,false);
},10);
}
Reporting - Group Breaks - mrec_eof() Function - The mrec_eof() function is useful if you want to put some conditional text in the header, detail or footer of the last group in a parent group.
The mrec_eof() function takes a group name as an argument and returns .t. or .f. depending on whether the you are in the last group within a series of groups.
Consider a report that has two levels of grouping. The top-most group is State and the inner group is City.
For a given state, there will be multiple city groups. For example, NY might have groups for Albany, Buffalo and New York City. E.g.
New York
Albany
Buffalo
New York City
When the 'Albany' group is printing, the following function will return .f.
mrec_eof(grp->city)
When the 'Buffalo' group is printing, the function will also return .f..
But, when the 'New York City' group is printing, the function will return .t. because 'New York City' is the last group within the parent group ('State').
Assume further that the states in the report are:
New York
Oregon
Washington
When the New York and Oregon groups are printing, the following expression will return .f. because both New York and Oregon are not the last groups in the list of states.
mrec_eof(grp->state)
However, when the Washington group is printing, the function will return .t. because Washington is the last group in the list of states.
Say you wanted to put some text in the group footer for the City group, but only if you were printing the group footer for the last group in a given state. To do this you would define a calculated field that referenced mrec_eof(grp->state). For example:
calc1 = if(mrec_eof(grp->city), "Last city in state","More cities...")
Similarly, you might define another calc field:
calc2 = if(mrec_eof(grp->state), "Last state","More states...")
For example
NY
Albany
Group footer for Albany - calc1 = "More cities..."
Buffalo
Group footer for Buffalo - calc1 = "More cities..."
New York City
Group footer for New York City - calc1 = "Last city in state"
Group footer for NY - calc2 = "More states..."
....
Washington
Olympia
Group footer for Olympia - calc1 = "More cities..."
Seattle
Group footer for Seattle - calc1 = "Last city in state"
Group footer for Washington - calc2 = "Last state"
Disabling a Hyperlink - A Behind the Scenes Look At How The UX Binds
Events
A user wrote about a case where he had a hyperlink control on a UX
component. The hyperlink had an click event which displayed an alert and
then 'disabled' the hyperlink by calling the
.setDiabled() method of
the UX component.
The actual code in the hyperlinks' click event was:
alert('I was clicked');
{dialog.object}.setDisabled('HYPERLINK_1');
When running the component in the UX builder with the Mobile
Simulator turned on, or on a mobile device the behavior of the component
was as expected. The first time the user clicked or tapped the hyperlink
the alert would display and then the next time he clicked or tapped on
the hyperlink nothing would display.
However, when running in a browser (or in the UX builder) with the
Mobile Simulator turned off, the behavior was not as expected. Every
time the user clicked the hyperlink the message displayed - the
{dialog.object}.setDisabled('HYPERLINK_1')
had no apparent effect.
Why?
Actually, there is a lot going on here behind the scenes.
First, if you run the component and then look at the source to see how
the click event was bound to the hyperlink, you will see code like this:
$e.add('DLG1.V.R1.HYPERLINK_1',A5.d.evnts.click,function(e)
{
alert('click event');
DLG1_DlgObj.setDisabled('HYPERLINK_1');
},
this,false,'DLG1.V.R1.HYPERLINK_1');
The $e.add() function
is a function in the Alpha Anywhere Javascript library that allows you
to bind events to DOM elements. It is really just a wrapper around the
built in Javascript .addEventListener()
function, but it works with older browsers that don't support the
.addEventListener()
function.
We only need to focus on the first three arguments passed to
$e.add()
First some background on events. The click event is fired when you
click or tap on an HTML element. On a desktop browser, the event fires
as soon as you click on the element. But on a mobile device there is a
300ms delay before the event fires. The reason for the delay is that the
browser on the mobile device is a 'touch enabled' device and when you
tap on the hyperlink it is not sure if the tap is really a tap, or just
the start of some type of dragging gesture. So it waits for 300ms and
then if it determines that you did not start some type of drag gesture,
it decides that you really meant to fire the click event.
This 300ms delay makes your apps feel unresponsive. So Alpha Anywhere
implements a special 'abstractclick'
event on touch enabled devices that fires immediately when the element
is tapped.
The A5.d.events.click
variable is how we allow the user to define a generic click handler, but
at runtime we either bind the code to the built-in 'click'
event or to the 'abstractclick'
event that Alpha Anywhere implements.
So, when running in a browser that is not touch enabled,
A5.d.evnts.click
resolves to 'click' and when running on a browser that is touch enabled,
A5.d.events.click will
resolve to 'abstractclick'.
However, when running on a browser that is not touch enabled, if you
have the Mobile Simulator turned on,
A5.d.events.click will
resolve to 'abstractclick'.
So getting back to the $e.add()
method that the UX uses to bind the event handler to the hyperlink. If
you are on a non-touch enabled device, the code that is being executed
is:
$e.add('DLG1.V.R1.HYPERLINK_1','click',function(e) { code to run when
hyperlink is clicked });
And when on a touch enabled device (or when running in the Mobile Simulator):
$e.add('DLG1.V.R1.HYPERLINK_1','abstractclick',function(e)
{ code to run when hyperlink is clicked });
So now that we know which event is really firing when the user
clicks/taps the hyperlink, lets try to understand why disabling the
hyperlink only seemed to work on a touch enabled browser (or when
running in a Mobile Simulator).
The way in which the code is 'disabling' the hyperlink control is by
calling the UX component's .setDisabled()
method. Here is how the
.setDisabled() method is implemented internally in the Alpha
Anywhere Javascript library:
HTML only allows you to disable form element. Form elements are input
controls and buttons. A hyperlink is not an input control. There is no
concept in HTML of a 'disabled' hyperlink.
So to be clear, the command:
{dialog.object}.setDisabled('HYPERLINK_1')
did nothing more than this:
var ele = {dialog.object}.getPointer('HYPERLINK_1');
//set the value of a 'disabled' property to true
ele.disabled = true;
We could just as easily have set the value of any other 'made up'
property name. For example:
ele.myFicticiousProperty = 'some value';
In the case of the hyperlink element, the 'disabled' property is, in
effect, a 'made up' property. As explained, there is no concept in HTML
of a 'disabled' hyperlink.
So, why does it appear that disabling the hyperlink works on a touch
enabled browser or in the Mobile Simulator, when, as we have discussed,
hyperlinks cannot be disabled?
The reason, as it turns out, is that when Alpha Anywhere fires an
abstract event on an element it checks first to see what the value of
the element's 'disabled'
property is. If the 'disabled'
property ti set to true, it does not fire the event.
In other words, when an 'abstractclick'
event is fired, the event will no do anything if the element's
disabled property is
true.
So now we understand what's going on here. When the component is run on
a non-touch enabled device, the built-in HTML click event is bound and
since hyperlinks cannot be disabled, the event fired every time the
hyperlink is clicked.
But when the component is run in a touch enabled browser (on in the
Mobile Simulator), the abstract 'abstractclick'
event is fired and this event does honor the value of the 'disabled'
property on the element.
So, how could the user have gotten this to work on both touch-enabled
and non-touch browsers? Simple. Just add a line of code to the event
handler:
if(this.disabled) return false;
alert('click event');
{dialog.object}.setDisabled('HYPERLINK_1');
After the .setDisabled()
method has been called on the hyperlink, reading the element's 'disabled'
property will return true. So
this.disabled will be true after the
.setDisabled() method
has been called.
UX Component - List Control - Detail View - A bug was introduced in build 2442 that caused the Detail View to not populate correctly in certain rare situations when a row in the List was selected.
Application Server - Reports - Under certain circumstances, a report would print correctly the first couple of times it was printed, and then start to fail.
UX and Grid Component - Grid Linked Content Section - .getParentObject() Method - If a UX or Grid was opened in a parent Grid's Linked Content Section, the child component could not use the .getParentObject() method to get a pointer to the parent Grid.
| Tabbed UI Component | Using Alternative Login |
The 'Alternative Login' feature allows a user to
log in to an application using their credentials
from a social network, such as Google, Twitter,
LinkedIn, etc. The UX component allows you to build Login dialogs that allow users to log into an application using an Alternative Login. The integrated login feature in the Tabbed UI, however, does not allow you to expose Alternative Logins. Therefore, if you want to allow a user to login into an application that uses the Tabbed UI, you must use a UX component in the Tabbed UI to do the log in. In this video we show how this can be done. Watch Video Date Added: 2014-09-11 |
| UX Component | Downloading a Google Chart as a Bitmap |
In the video 'Using Google Charts as an Alternative to the
Built-in Chart Controls' we showed how you can
use Google Charts in a UX component. In this
video we show how you can add a button to the UX
to download a Google chart as a bitmap image.
The user can then save the image to disk, or
print the image. Note: Not all Google chart types support this feature. Watch Video - Part 1 Watch Video - Part 2 Download Component Date Added: 2014-09-13 |
| Xbasic | Working with SQL Databases |
A common requirement in server-side events
handlers (including custom Ajax callbacks) is to
write some Xbasic code that manipulates data in
a SQL database. Xbasic has a very powerful set of objects (called AlphaDAO) for interacting with SQL databases. In this video we give a quick overview to using Xbasic to work with SQL databases. (For a full introduction and tutorial on using Xbasic to work with data in SQL databases, go to the Help, Open Documentation menu command and type 'Using Xbasic with SQL Tables' in the filter box.) Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 |
| Xbasic | Calling Into Node.JS from Xbasic |
Node.js is a popular technology for implementing
server-side utilities. Xbasic has very tight
integration with Node and it is possible to
create Node services that can be called from
Xbasic. In this video we show how a Node service can be defined and then called from Xbasic. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 |
UX and Grid Component - Ajax Callbacks - OnComplete Javascript - A new option has been added to the method that makes an Ajax callback from the Grid and UX component. You can now specify Javascript to run when the callback is complete.
This option has been exposed in the Action Javascript Ajax Callback action as shown in the image below:

The Javascript that you specify is run after the callback is complete and after any Javascript returned by the callback function has executed.
To specify the after callback complete Javascript in the UX or Grid's .ajaxCallback() method, you set the onComplete property in the optional optionsObject passed in.
For example:
{dialog.object}.ajaxCallback('','','myXbasicFunction','','',{onComplete: function() {
alert('callback is complete')
}
})
Tabbed UI - Integrated Login Feature - When the Login window is opened, the User name field is now automatically given focus. Previously the user needed to explicitly click on the user name control. In addition, when the password field has focus, pressing the Enter key will now execute the Login button.
Security Framework - Importing Data into the User Table - The previous import method, a5ws_ImportUsersDBF(), did not support import into SQL based security tables. The import feature has been rewritten and a new method, a5ws_ImportUsers(), is available. The import will now properly add records into SQL security tables.
The a5ws_ImportUsers() method can be used to import data into either .dbf security tables or SQL security tables. When importing into .DBF tables security tables, this new method is up to twice as fast.
TIP: You can also now use the a5ws_ImportUsers() function from the Interactive Window of the Application Server control panel to import users into your security tables on your server. When you use this function from the Interactive Window it will display a list of all web projects that have security and you can select the project into which you wish to import data.
Xbasic - Node.JS - Extending Server-side Functionality using Node.js - Node.js is a popular program for writing server side utilities in Javascript. Alpha Anywhere now has tight integration with Node and you can now define your own Node modules that can be called from Xbasic.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
To create a new 'Node Service' that can be called from Xbaisc, you create a new .js file in the Node_Services folder in the Alpha Anywhere executable folder. The syntax for this .js file is the syntax you would use for any Node module.
To call a Node service from Xbasic, you:
In the following example, we have defined a trivial Node service that takes as its input two variables, 'firstname' and 'lastname' and sends back a string showing: Hello firstname lastname.
The Node service in this example is called 'hello'. Therefore the '_command' property of the JSON command object is set to 'hello'
You must also set an '_id' property in the JSON command object. This can be any value. Using a UUID for this value is convenient.
The Node service is called using the .NodeRequest() method and the result is returned as a JSON string with properties for the error text (if there was an error) and 'result' - the result of the request. The JSON response can be parsed to get Xbasic varibles, or the json_extract() function can be used to extract the 'result' property.
dim n as helper::V8
dim p as p
'generate an id for the request we are about to send to Node.
'we just use a GUID for convenience
p._id = api_uuidcreate()
'set the _command property. This is the name of the Node
service we want to call
p._command = "hello"
'specify any variables you want to pass to the Node service
p.firstname = "Nellie"
p.lastname = "Jones"
'convert the Xbasic .dot variable to a JSON string.
dim jsonCommand as c
jsonCommand = json_generate(p)
?n.NodeRequest(jsonCommand)
= {"_id":"id1","error":"","result":"Hello Nellie Joness"}
Here is how the corresponding Hello.js file is defined. This file must be in the Node_Services folder in the Alpha Anywhere executable folder. This is a standard Node module. It can 'require' any other Node modules that you have written, or that have been installed using NPM (the Node Package Manager).
exports.handler = function(packet,response,sendResponse)
{
var e;
var attachments = null;
var msg = 'Hello ' + packet.firstname
+ ' ' + packet.lastname;
response.result = msg;
sendResponse(response,attachments);
};
If you edit the .js file in the Node_Services folder after having called it, your edits will not be seen until you shutdown the Node service. The next time you call the Node service you will see a short delay as Node starts up.
To shut down the Node service you can all the .NodeShutDown() method on the helper::V8 object instance. For example, in the above example the helper::V8 object instance was called 'n', so the following command will shut Node down.
n.NodeShutdown()
NOTE: Node.exe is automatically installed in the Alpha Anywhere executable folder when you install Node. You do not need to install Node yourself.
UX Component - Client-side Events - onPhoneGapReady - This event fires when the UX component is running in a PhoneGap shell and the PhoneGap library has been loaded.
NOTE: The existing onCordovaReady event has been deprecated and will be removed at some point. Move any code defined for the onCordovaReady event to the onPhoneGapReady event.
UX Component - {dialog.object}.phoneGapLoaded() Method - Returns true if the UX component is running in a PhoneGap shell.
List Control - Detail View - Disconnected Application - Count Records to Be Synchronized - A new method gives a count of the number of unsynchronized records.
Syntax:
object = {dialog.object}.countRecordsToSynch(listId)
Returns an object with properties showing the number of records that have not yet been synchronized with the server. The object has these properties: count, updatedRecords, newRecords, deletedRecords. 'count' is all dirty records (edits, inserts and deletes), 'updatedRecords' is all records that were edited, 'newRecords' is records that were added and 'deletedRecords' is records that were deleted.
Example:
var o = {dialog.object}.countRecordsToSynch(listOrders)
alert('You have ' + o.count + ' records to synchronize')
List Control - Detail View - New Events to Transform Data Before Display and Save - When you define a List control with a Detail View, two new properties are exposed for each List field.
These properties allow you to transform the data before it is displayed in the Detail View and before the Detail View is saved back to the List. The code you you specify in these two properties must 'return' the transformed value.
The Javascript for both of these properties can refer to
this._value
to get the default value that the Detail View control should be populated with when the user clicks on a Detail View row and to get the default value that the List should be updated with when the user clicks the Save button to save the Detail View back to the List.
For example, say that in the List data for row 2, the value for the Lastname field was 'Smith'.
In the onDetailViewPopulate event, you might specify this Javscript
return this._value.toUpperCase()
When the user clicked on row 2, the value shown for the Lastname field in the corresponding Detail View control would be:
SMITH
even though the actual data in the List for that field was 'Smith'.
Similarly, in the onListUpdate event, you might specify this Javascript:
return this._value.toLowerCase()
When Detail View edits were saved back to the List, the List would be updated with the the lowercase version of the data in the Lastname field
UX and Grid - Edit-Combo - Filter choices by searching anywhere in field - Previously, in an edit-combo, as you typed into the textbox, the choices were filtered, starting the search with the first letter in the entry. Now, you can set the 'Search style' property to search anywhere in each entry.
For example, if the choices in the edit-combo were
Austria
France
USA
UK
and you typed 'U' in the textbox, the choices would be filtered to
USA
UK
Now, if you set the 'search style' to 'Anywhere in field', the choices will be filtered to
Austria
USA
UK

UX Component - HTML Editor - Toolbar Icons - You can now customize all of the icons used in the HTML editor toolbar.
Reports - SQL - Native SQL - Previously, if a report was based on a custom SQL statement and the SQL type was set to 'Native', during execution of the report the SQL statement was parsed (sometimes more than once). Parsing the SQL was necessary in order to determine if the report used arguments that were not defined (and therefore if a prompt should be shown for missing arguments) and in order to add in dynamic filters and order definitions.
In certain cases, the native SQL being passed to the report engine was so complex that parsing the SQL added a substantial delay to rendering the report.
Now, if you specify that the report data source uses native SQL the SQL query for the report will never be parsed. It will simply be passed to the database engine to execute.
As a result of this change if your native SQL statement uses arguments and you do not pass in values for all of the arguments used in the SQL, the report will no longer be able to dynamically prompt for missing argument values. Also if you are attempting to dynamically add a filter or order to the report at runtime, this will no longer work in the case were the report is based on native SQL.
UX Component - List Control - Scroller - Previously, the 'scroller' feature was only supported for Lists if the UX style was set to iOS7, AndroidDark or AndroidLight. Now, the scroller is supported for all styles.
UX Component - Security Framework - Error Messages - Errors returned from the server-side Action Scripts to validate web security values, save web security values, and change web security passwords may not display property if the UX uses Panels, a placeholder is specified for the UX component validation errors, or the option to show errors in a popup window is selected. This is now fixed. The Action Scripting actions in the server-side events must be edited to apply the change. Select any of the web security actions in a server-side event and select "Edit action". Click OK to save and the code will be updated.
Grid Component - Oracle 9i - Fixed an issue using a Grid with Oracle9i.
UX Component - Textbox and Textarea Controls - Help Icon - Container With Layout Mode - If a textbox or textarea control had its help icon turned on, and if the icon was displayed left or right of the control and if the UX layoiut mode was set to 'Container width' (the default mode), the icon would show above or below the control. This is now fixed.
![]()
UX Component - Data Binding - Views - Auto-increment - Entering new records into a UX component that was bound to a View (rather than a Table) which had an auto-increment primary key would fail. The record was inserted, but not refreshed after insert.
UX Component - Display Wait Message on Ajax Callback - In some cases the wait message was not being cleared after the callback completed and the screen remained in a locked state.
UX and Grid Components - Lookup Grids - SQL - Filter - If you defined a Lookup Field that used a Grid based on a SQL database and you specified that the Lookup Grid had both a static filter and a dynamic filter, you would get an error when opening the lookup Grid. The error only happened if the static filter was defined as a 'base' filter.
Grid Component - Image Download - Detail View - Image download of an image field in the Detail View part was not working correctly.
Grid Component - File Upload Action - New Record Rows - Uploading a file on a new record row caused an error.
UX Component - HTML Editor - Container Window - If you added a textarea control (configured as an HTML editor) into a Window Container, then when the window was displayed, the HTML editor was displayed, but you could not type into the editor.
Grid and UX Builder - Working Preview - Internet Explorer V10 and Earlier - If you had IE10 or earlier installed on your computer, in some cases you would get a Javascript error when testing a component in Working Preview.
AlphaDAO - Oracle - Returning a Resultset from a Stored Procedure - Returning a SQL::Resultset object from an Oracle stored procedure can be tricky depending on which version of Oracle you are using.
As an alternative to returning a resultset from a stored procedure, you can use an Oracle function.
In this example we show how a resultset is returned using an Oracle function.
NOTE: The Oracle database used in this example was created by using the Workspace Upsize Genie (see the 'Tool' menu when the Control Panel has focus) to upsize the sample Alphasports Workspace that ships with Alpha Anywhere.
dim cn as sql::Connection
dim flag as l
flag = cn.open("::Name::oracle_alphasportsUpsize")
dim sql as c
sql = <<%str%
create or replace FUNCTION REFCURSOR_CUST(p_city IN VARCHAR2) RETURN
SYS_REFCURSOR AS p_recordset SYS_REFCURSOR;
BEGIN
OPEN p_recordset FOR select FIRSTNAME, LASTNAME, BILL_CITY from CUSTOMER
where bill_city LIKE p_city;
return p_recordset;
END REFCURSOR_CUST;
%str%
'Oracle does not like CRLF in statements, so convert CRLF to spaces
dim sql2 as c
sql2 = stritran(sql,crlf()," ")
'Execute the SQL statement to define the function
flag = cn.Execute(sql2)
dim sql::arguments
args.add("Whatcity","Boston")
'Execute the function. Notice the 'from dual'
syntax that Oracle requires
flag = cn.Execute("select REFCURSOR_CUST(:whatcity) from dual",args)
dim rs as sql::resultset
rs = cn.ResultSet
dim txt as c
txt = rs.ToString()
showvar(txt)
Here is what we see:
Mary McDonald Boston
Richard Queen Boston
If you are using Oracle 12, you have the option of using implicit cursors in a stored procedure.
The above function definition could be written as the following stored procedure:
CREATE OR REPLACE PROCESURE SP_GETCUSTOMERS (p_city IN VARCHAR2)
AS
p_recordset SYS_REFCURSOR;
BEGIN
OPEN p_recordset FOR SELCT FIRSTNAME, LASTNAME, BILL_CITY FROM CUSTOMER WHERE BILL_CITY LIKE P_city;
DBMS_SQL_RETURN_RESULT(p_recordset);
END;
UX Component - In-Control Buttons - Delete Text - Only Show Icon if Existing Text - The In-Control Button feature of a textbox allows you to embed icon inside a textbox. A typical use for for this feature is to allow the user to easily clear out existing text in the control.
You might want the icon to only show if there is existing text in the textbox, as shown in the the screenshots below.
![]() |
![]() |
In order to do this you will need to add code to t he Click action for the in-control button and to the onKeyUp event for the textbox control.
You will also need to add code to the onRenderComplete client-side event of the UX to set the initial state of the icon.

Here is the code you need to add to the Click action:
//clear the value in the control
{this}.value = '';
//get a pointer to the element that contains the
icon and hide it
var ele = $('{dialog.ComponentName}.V.R1.TXT1.CUSTOMBUTTONSTATIC.0')
ele.style.display = 'none';
Here is the code to add to the onKeyUp event for the textbox.
//get a pointer to the element that contains the icon
var ele = $('{dialog.ComponentName}.V.R1.TXT1.CUSTOMBUTTONSTATIC.0');
//if there is text in the control, show the icon,
else hide the icon
if(this.value == '') {
ele.style.display = 'none';
} else {
ele.style.display = '';
}
Here is the code for the onRenderComplete client-side event to set the initial state of the icon:
var ele = $('DLG1.V.R1.TXT1.CUSTOMBUTTONSTATIC.0')
ele.style.display = 'none';
We are pleased to announce Alpha Anywhere Version 3. This release contains a huge number of new features, enhancements, performance improvements and bug fixes.
The standout feature in the release are the enhancements made to the List control to support building disconnected mobile applications. See the 'Features' section for details.
| UX Component | Tree Control - Populating Data using Javascript |
The data in a tree control on a UX component can
easily be set using Javascript. In this video we
show how to repopulate the entire tree, or
dynamically add a node to an existing tree. Watch Video Download Component |
| UX Component | Submitting all of the Data in a List Control on an Ajax Callback |
When an Ajax callback is made, the data in the
variables on the UX are submitted, but the data
in List controls are not submitted. There may be
situations where you want to submit all of the
data that are currently in a List control to the
server. In this video we show how you can 'harvest' the data that is in a List control and then submit that data to the server when you make an Ajax callback. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| UX and Grid Component | Using Chrome for Working Preview - Debugging Javascript using the Chrome Debugger; |
When you are in the Component builders, the
Working Preview window now allows you to choose
whether you want to use Internet Explorer or
Chrome. Using Chrome has several benefits, including the ability to 'detach' the Working Preview window so that it can be moved to a second monitor and be kept open while you continue to design your component. You can also use the Chrome Debugger to debug your Javascript or inspect elements on the page. Watch Video - Part 1 Watch Video - Part 2 |
| UX Component | List Control - Custom Control - Client-side |
When you define a List control in a UX
component, one of the 'control types' that you
can insert into the List is a 'Custom Control'.
A 'custom control' is computed with an Xbasic
function. Because Xbasic is used to render the
custom control, it means that the custom control
is rendered server-side when the List is
initially rendered. If your UX component has
code that modifies data in the List, the
server-side custom control is obviously not
re-rendered. Therefore, you might want to define your custom control using client-side Javascript. This video shows an approach to creating client-side custom controls in a List component. Watch Video Download Component |
| UX Component - List Control | Vertically Justifying Data in a Row |
By default, data in a columnar List control is
vertically top justified. In a Grid, on the
other hand, data in a Grid row is vertically
middle justified. In a Grid this is easily done
because the generated HTML for a Grid uses an
HTML table. The generated HTML for a List is not
based on an HTML table, and so middle justifying
the data is a little trickier. In this video we show how you can vertically middle justify data in a List row. Watch Video Download Component |
| UX Component - List Control | Displaying Data From Twitter |
The Twitter API returns data in JSON format. The
List control on a UX component is easily
populated with JSON data. The Twitter API,
however, is a little tricky to work with because
it requires an OAuth authorization before you
can call the API functions. Xbasic contains two
built-in functions that simplify this. In this example we show how you can easily build a List control that displays Tweets that are retrieved by making a REST API call to Twitter. In the example we use built-in Xbasic functions to get a 'bearer token' from Twitter. Once we have this token, we can make calls to the Twitter API to get data in a JSON format that is used to populate the List control. IMPORTANT: The video shows selecting the Twitter List from the 'Defined Controls' section of the UX builder toolbox. This has been changed. You should now select the 'Twitter_Display_Tweets_in_a_List_Control' sample UX Component template in the dialog that appears when you create a new UX component. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 |
| Reports | Suppressing Blank Rows in a Layout Table Report |
The Layout Table report editor exposes a
property that you can set for each row in the
Layout Table to suppress the row if it is blank. In this video we show how blank lines in a Layout Table Report are suppressed. We also discuss how the report writer determines that a row is 'blank'. Watch Video |
| UX Component | Setting Content of Scrollable Containers/Windows |
Normally, you can set the content of an element
in a component by simply getting a pointer to
the element and then setting the element's .innerHTML
property. However, if the element whose content
you are setting has been configured to allow
drag scrolling, setting the .innerHTML directly
will destroy the drag scroll settings and the
new content will no longer be scrollable. The solution to this problem is to use the A5.u.element.setContent() function to set the element's content. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| UX Component | Edit-Combo Control - Specifying a Different Stored Value from the Display Value |
Dropdownbox controls allow you to specify that
the stored value is different from the display
value. For example, the control might display a
'ProductName' but the stored value in the
control might be the 'ProductId'. Edit-combo box controls can now also be configured to store a different value than their display value, just like a Dropdownbox control. The benefit of using an Edit-combo control over a Dropdownbox control is that you can display multiple columns of data in the choice list and you can dynamically populate and filter the choices in the list with an Ajax callback every time the control is opened. In this video we show how to configure an Edit-combo control to store a different value from its display value. Watch Video |
| Interactive Window | Executing Shell Commands Directly from the Interactive Window |
You can now execute shell commands directly from
the Interactive Window. You no longer have
to open a separate CMD window to execute shell
commands. This can be a very useful time saver
for developers. For example, when building an application that uses REST APIs, it is common for the API documentation to show how you can use CURL to execute the REST command. Using the Interactive Shell, CURL commands can be executed directly from the Interactive Window. Watch Video - Part 1 Watch Video - Part 2 |
| UX Component | Dynamic Images - Client-Side |
When you add a 'Dynamic Image' column to a List
control to display an image in the List that is
based on other data in each List row you can
specify if the computation of what image to show
should be server-side, or client-side. If
server-side, your expressions that define the
conditional tests are specified in Xbasic. If
client-side, your conditional expressions are
expressed in Javascript. The benefit of client-side dynamic images is that the image will be automatically recomputed when the data in a List row is updated. In this video we show how client-side Dynamic Images can be defined and then we show another technique for creating client-side Dynamic Images using the List's Computed Columns feature. This second technique has the advantage of offering more flexibility. Watch Video - Part 1 Watch Video - Part 2 Download Components |
| UX Component | Client-side Template Tutorial |
Client-side templating allows you to generate
HTML for display by merging a data object into a
template. The client-side template library in
Alpha Anywhere is extremely powerful and can be
compared with similar functionality in 3rd party
templating libraries, such as Mustache.js and
Handlebars.js. In this video we show how a complex template can be designed to display data (a list of Orders with OrderItems for each order) in a richly formatted display. The video shows how the templating system can compute values, including summary values. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Watch Video - Part 8 Watch Video - Part 9 |
| UX Component - PhoneGap | Displaying .PDF, .XLSX, .DOCX Files |
Unlike desktop browsers, the browsers on mobile
devices typically do not have built-in handlers
for displaying .pdf, .xlsx, .docx and certain
other types of files. If your mobile application is wrapped using PhoneGap you can easily use the built-in native document viewer on both Android and iOS devices. In this video we show how to build a PhoneGap app that can display .pdf and Microsoft Office files. Watch Video |
| UX Component - PhoneGap | Using Native Transitions |
If you wrap a UX component in a PhoneGap shell
you can now use native transitions to animate
certain Panel Cards in your app into view. This
feature relies on the Native Transitions
PhoneGap plugin (iOS only). In this video we show how the Native Transitions plugin can be called. Watch Video |
| Web Security Framework | Alternative Logins - Logging into an Application using Google, Facebook, LinkedIn or Twitter |
When the Application Server Security Framework
is turned on you can require that a user must
log into an application before they can use it.
A user will enter the userid and password
associated with their account in the Security
Framework in order to log into the application.
You can provide an option for a user to login to their account using the credentials from a social network as an alternative to their account userid/password. You can also allow someone to log into an application using social network credentials and then automatically create a new account in the Application Server Security Framework for that user. These videos demonstrate this functionality. If you have not yet read the documentation on Alternative Login, it is recommended that you read the documentation before watching the videos. Click here to read the documentation. Video 1 - Setting up the Providers Video 2 - Creating Named Providers Video 3 - Configuring Web Security Video 4 - Adding Alternative Login to a UX Component Video 4 - Testing Alternative Login |
| UX Component - List Control | Dialing a Phone Number Shown in the List |
When running on a phone, it is a common
requirement to be able to dial a phone number
that is displayed on screen. For example, you
might have a List control showing contact names
and for each name you have an associated phone
number. In this video we show how you can configure a hyperlink control in the List to dial a phone number. Watch Video |
| UX Component - List Control | Displaying a Custom Message in the List if the List has No Records |
A common requirement in a List is to show a
custom message if the List has no records. The List control has built-in properties to make this easy. You can also automatically center the message horizontally and vertically in the List. Watch Video |
| Video Finder | Finding Videos in the Video Library |
There are a large number of videos that have
been recorded to demonstrate and explain various
features in Alpha Anywhere. The Video Finder
application (accessed from the Help menu) allows
you to search for videos. In Alpha Anywhere V3,
the Video Finder application has been completely
rewritten to make finding videos even easier and
faster. The new Video Finder application has been implemented as a UX component with two List controls - one for the list of categories, and one to list the videos in each category. This video discusses the new Video Finder application. Watch Video |
| UX Component - List Control | Introduction to the List Control Detail View |
The List control can have an associated Detail
View. The Detail View allows you to see details
for the currently selected row in the List. The
Detail View can be updateable, allowing you to
update data that is in the List. In this video we show how you can add a Detail View to a List. We show two different genies that you can use - one for setting up a List with a Detail View, and another for adding a Detail View to an existing List. IMPORTANT: Lists with Detail Views are the essential building block for applications that can work while you are disconnected. For more information about the features of Lists with Detail Views, see the videos in the 'UX Component - Disconnected Applications' category. Even if you do not need to build mobile applications that work while disconnected, the information regarding Lists and Detail Views in these videos will be relevant. Watch Video - Part 1 Watch Video - Part 2 Date Added: 2014-09-07 |
| UX Component - List Control | Contrasting Data Binding at the UX Level with Data Binding at the List Level to Update a SQL Database |
When you want to update data in a SQL database
using a UX component you previously could define
Data Binding properties for the UX component,
then define a server-side action that loaded the
primary keys of the records you wanted to edit
and another server-side action to save the edits
back to the SQL database. Now, using a List control with an updateable Detail View, you can perform edits on a SQL database using the List and its associated Detail View. In this video we contrast the two methods of performing CRUD (create, read, update, delete) operations on a SQL database using Data Binding and List controls. Watch Video - Part 1 Watch Video - Part 2 Download Components Date Added: 2014-09-07 |
| UX Component - List Control | List Control Search Part |
The List control has a built-in Search Part that
allows you to perform searches on the database
that is used to populate the List. (This is very
much like the Search Part in a Grid component). The Search Part in the List can be configured in three different ways: - individual fields for the Search Part (allowing the user for example to enter criteria in a Name, City or Country field) - a single keyword field (allowing the user to enter criteria in a single field then then searching for matches in multiple fields) - query by form (allowing the List's Detail View to be used to enter the search criteria) In this video we show how the various options can be used to search a List. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Components Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Introduction |
You can build applications that are designed to
work when you are disconnected. The UX component
and the List control are the fundamental
building blocks of these types of applications. In this video overview we show how a UX component is built using a List control with an associated Detail View to display and edit data, how the data in the List is persisted to Local Storage and then how the edits made to the List data are synchronized with the server. We also show how your disconnected data can be 'hierarchical' - i.e. a list of customers, with orders for each customer and order details for each order. Watch Video 1 - Setting up a List with a Detail View using the Quick Setup Genie Watch Video 2 - Editing Data and Persisting Data to Local Storage Watch Video 3 - Introduction to Hierarchical Data Structures For more information on building disconnected applications, click here. Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Editing Data While Offline and then Synchronizing the Data |
When you build an application for disconnected
operation, the List control is the basic
building block for the application. The List
control is used as the 'offline' data storage.
The data in the List control can be thought of
as an in-memory table. Edits to this data are
persisted to Local Storage and then are pushed
to the server to synchronize with the server
database when a connection is available. In this video we look at how data in the List are edited and then synchronized with the server database. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Editing Data While Offline - Behind the Scenes - What Data are Stored in the List |
In order to get a better understanding of how
the data in a List control are stored to support
disconnected operation, this video shows how you
can debug into the internal data that is stored
in the List when the user edits, enters and
deletes records. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Synchronization Errors - Validation Errors |
When a user synchronizes edits to data that were
made while they were offline, there is the
possibility of synchronization errors. These errors can typically result because the user entered a value in a field that was rejected by some server-side validation logic, because of a write conflict, or because the database rejected the edit. In this video we show how synchronization errors that result from server-side validation errors and database errors are handled. Watch Video - Part 1 Watch Video - Part 2 Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Synchronization Errors - Write Conflicts |
When a user synchronizes edits that were made
while they were offline, there is the
possibility that some other user edited and then
synchronized the same data before the user had a
chance to synchronize his/her edits. If this happens a write conflict will occur and the user will be notified that the synchronize operation could not be completed. The user will have to choose how to resolve the conflict. The developer also has the option of handling write conflict errors programmatically. In this video we show how write-conflict errors are handled. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Synchronization Events |
When data in a List control is synchronized with
the server database there are a number of events
that fire (on both the client-side and the
server-side) that give you a lot of control over
the process and allow you to inject custom code
to be executed. In this video we discuss some of the events that fire when data are synchronized. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Custom Synchronization Handlers |
When the user synchronizes a List that is based
on a SQL database, Alpha Anywhere automatically
generates the SQL statements to perform the
various CRUD (create, read, update, delete)
operations. However, if your List is based on a custom datasource (for example, a web service), then you must write your own functions to handle synchronization of the data. In this video we show an example of how custom handlers can be written to synchronize data. Watch Video - Part 1 Watch Video - Part 2 Download Component Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Incremental Refresh |
After a List has been populated with data from
the server you can perform incremental refreshes
on the List data to retrieve any edits that have
been made to server data. Unlike a full refresh,
only rows that have been edited are sent to the
client, resulting in a much smaller payload
being sent to the client compared to a full
refresh of the List data. You can also set a 'synchronization policy' in the List definition to specify that every time edits to the List data are synchronized with a server an incremental refresh of the List should also be performed. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Geographic Data - Capturing Location Information when the User Edits Data |
You can configure a List so that every time the
user enters a new record, or edits a record, the
user's location will be stored. This allows you
to create applications where you capture the
location of the device at the time a record was
edited or entered. In this video we show how this is done. Watch Video - Part 1 Watch Video - Part 2 Download Component Schema for MySQL Table Used in Component Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Geographic Data - Capturing Location Information when the User Synchronizes Data |
In a previous video we show how location
information can be captured at the time the user
edits a record in the List. But you can also
capture location information at the time the
user synchronizes the data. In this video who show how to configure the List to submit location information at the time the user synchronizes the List. Watch Video Download Component Schema for MySQL Table Used in Component Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Geographic Data - Geocoding Data |
In order to perform geography searches on your
data (for example, find all records that are
within 5 miles of my current location), you need
to geocode the data in your table. For example,
if you have captured the address for the record,
when the record is synchronized, you can make a
call to a geocoding service to get the
latitude/longitude for the record. Then when the
record is written to the database you can also
compute the location field value so that
geography searches are possible. In this video we discuss the features that the List control exposes to support working with geographic data. Watch Video Download Component Schema for MySQL Table Used in Component Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Setting Default Values for Fields in New Records |
When you enter a new record in a List with a
Detail View you might want to set default values
for certain of the fields in the Detail View. The List builder allows you to execute Javascript code to compute the default value for each field in the List. This allows for sophisticated computations for the default value, including setting the default value for a field to the value that was just entered into the previously entered record. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Synchronizing Data in Batches |
If the user has made a large number of edits
while they were offline you might want to
synchronize the data in batches, rather than
sending all of the edits to the server at once.
In this video we show how you can configure the synchronization process so that data are sent to the server in batches. Watch Video Download Component Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Delaying Populate List Till Active Search |
In an application designed for disconnected
usage, the user will typically load a subset of
the database onto their mobile device while they
have connection. This is usually done by adding a Search Part to the primary List control in the component and specifying the the List should not be populated until the user has performed a search to retrieve the 'records of interest'. TIP: For more information on how to set up the Search Part for a List control see the video titled 'List Control Search Part'. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Settings Maximum Number of Records that a Search Can Return |
In an application designed for disconnected
usage, the List controls in the UX component
hold the data that will be available while the
user is offline. These Lists are populated when
the user does a search to retrieve the 'records
of interest' that they want to have available to
them while they are on-line. Since the amount of data that can be held on a mobile device is limited, you will typically want to ensure that the user does not enter search criteria that retrieve too many records. In this video we show how you can set limits on how large a result a user search is permitted to return. Watch Video Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Persisting Data to Local Storage |
When you build an application for disconnected
operation you need to be sure that the data in
the application is persisted to Local Storage so
that edits that are made to any data are not
lost if the application is restarted before the
user has had a chance to synchronize the data
with the server. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Working with Hierarchical Data |
The data for disconnected applications are
stored in List controls. In many types of
applications the data you need to work with is
hierarchical. For example, you might have a list
of customers. Each customer has orders and each
order has order details. In a connected application, you can make an Ajax callback to the server when a user selects a different customer to fetch to orders for that customer. However, in a disconnected application you cannot make callbacks to the server, so when the user selects a customer, the orders for that customer must already have been retrieved from the server so that the data can be shown without making an Ajax callback. The List control can easily be populated with hierarchical data. In this video we explain how a List control is populated with a customers, each customers' orders, and each order's details. Watch Video - Part 1 Watch Video - Part 2 In this follow on video we show how new records can be added to child tables and how the new records are automatically linked to their parent. In the video we show how a new order is added for the selected Customer record and then how new order detail records are added for the new order. When the data are synchronized, the linking fields are automatically filled in - the customer Id is filled into the new order record and the order id is filled into the new order detail records. Watch Video - Part 3 Download Component Date Added: 2014-09-07 |
| UX Component - Disconnected Applications | Managing Local Storage |
When you build an application that is designed
for offline use (i.e. a disconnected application), the data in
the List controls, and the variables in the UX
component are persisted to Local Storage. In this video we show how you can manage the data in Local Storage using the built-in Local Storage manager and using methods of the UX component. Watch Video - Part 1 Watch Video - Part 2 Date Added: 2014-09-07 |
Building Disconnected Mobile Applications - The UX component now allows you to build mobile applications that work while you are disconnected.
The following videos will give you a quick overview of building disconnected applications in the UX component:
Watch Video 1 - Setting up a List with a Detail
View using the Quick Setup Genie
Watch Video 2 -
Editing Data and Persisting Data to Local Storage
Watch Video 3 - Introduction to Hierarchical
Data Structures
For detailed information about this feature, click here.
UX Component - List Control - Detail View and Search Part- List controls can now have an updateable Detail View and an integrated Search Part.
This feature is central to building disconnected applications, but should also be of great interest to developers of traditional desktop web application. (See the section in the detailed information - see link below - that contrasts Data Binding with updateable Lists).
For detailed information about this feature, click here.
Application Server - 64 bit Machines - Alpha
Anywhere is now compiled using a special compiler switch
that allows access to more system RAM when running on a
64 bit machine. As a 32bit application, the amount of
system RAM that Alpha Anywhere can access is limited to
approximately 2GB. Now, up to 4GB of system RAM can be
accessed. As a result of this change larger files can be
uploaded, more simultaneous uploads can be performed,
more sessions can be handled, and server restarts
because of memory fragmentation should be needed less
frequently.
Video Finder - The Video Finder (accessible from the Help/Video Finder menu) has been completely rewritten. The Video Finder now loads much more quickly and searches are much faster. Also, you can now click the 'Preferences' button on the toolbar to specify if the Video Finder should be opened in a MDI window or a modeless window. The modeless window option is useful if your computer has two monitors because it allows you to drag the Video Finder window to the second monitor and keep it open while you are working.
UX Component - List Control - Custom 'No Records in
List' Message - A common requirement in a List is to
show a custom message if the List has no records.
The List control has built-in properties to make this
easy. You can also automatically center the message
horizontally and vertically in the List. See image
below.
Watch Video

UX Component - List Control - Hyperlink - Telephone - You can now configure a hyperlink control in a List to dial a telephone number. This is particularly useful in mobile applications that are run on a phone.
Assume you have a List control with this data:
name|phoneDisplay|phoneDial
John Smith (home)|(555) 555-5555|+15555555555
John Smith (mobile)|(555) 555-5556|+15555555556
The List data contains both the phone number to display in the List and the phone number to actually dial. Notice that the phone number that should be dialed includes the +1 prefix to indicate that this is a U.S. phone number. The phone number to be dialed must start with + and then the country code (1 in the case of the U.S.).
The phone number to be dialed can also include special directives. For example you can insert 'p' in the number to indicate a one-second pause and 'w' to indicate 'wait for dial tone'.
Using the sample data shown above, to configure the hyperlink to dial the telephone number in the 'phoneDial' field, but display the number shown in the 'phoneDisplay' field, you would set the 'Action type' property to 'Telephone', the 'Phone number' field to '{phoneDial}' (note that the placeholder is case-sensitive) and the 'Hyperlink text' property to '{phoneDisplay}', as shown in the image below.
It is permissible for the value passed in as the phone number to dial to include spaces and parentheses. For example, +1(555) 555-5555 is a valid number to dial.

If, for example, your List data had separate fields for the phone number (called 'phone' for example) and country code (called 'code' - without the leading + in the data), you could set the 'Phone number' field to:
+{code} {phone}
UX Component - List Control - Hyperlink - E-mail - You can now configure a hyperlink control in a List to open the associated e-mail client and fill in the 'to' address with a field.
To configure a hyperlink to open an e-mail client, set the 'Action type' to 'Email' and the 'Email address' to the value you want to put into the email client's 'to' address field. You can use placeholders in the 'Email address' property to refer to data in a field in the current row of the List.

UX Component - List Control - Hyperlink - Specifying a Target HRef - Previously, when you added a hyperlink control to a List, the action associated with the hyperlink was always some Javascript code. Now you can define standard HTML hyperlinks with an 'href' attribute that specifies the hyperlink target.
To specify a hyperlink target, set the 'Action type' to 'Href' and then specify the 'Hyperlink address'. You can use a placeholder for the address. For example if your List has a field called 'address', you can specify the 'Hyperlink address' as {address}.
The hyperlink address must include the protocol if the target is not a page in the application webroot. For example, to display bing.com, you would need to set the target to 'http://www.bing.com', but to display a page called 'page1.a5w' in the current webroot, you would just need to set the target to 'page1.a5w'.

Client-Side Template Tester - User Interface Improvements - The user interface in the client-side template tester window has been enhanced. The window is now resizable and has separate tabs for JSON Data, Template, Javascript and CSS.
As you edit in any of these windows the template preview is automatically updated in the right part of the window.

json_reformat_safe() Function - Reformats as string of JSON data with line-breaks and optional indentation.
Syntax:
c json_text = json_reformat_safe(json_text [, flagIndent = .t.])
For example:
dim json as c
json = <<%txt%
{firstname: 'Fred', lastname: 'Smith', Address: {
Street: '123 Main St',
City: 'Boston',
State: 'Ma'
}
}
%txt%
?json_reformat_safe(json)
= {
"firstname": "Fred",
"lastname": "Smith",
"Address": {
"Street": "123 Main St",
"City": "Boston",
"State": "Ma"
}
}
NOTE: json_reformat_safe() wraps the lower level json_reformat() function. The json_reformat() function only accepts 'properly formed' JSON strings (property names must be double quoted and string values must be double quoted). json_reformat_safe() will automatically convert JSON strings where property names are not quoted and strings are single quoted.
json_extract() Function - Extracts a property from a JSON object .
Syntax
c text = json_extract( C json_text, c property_name)
NOTE The JSON text passed to the function must be properly formed (i.e. use double quotes on property and string names). You can use json_reformat_safe() to 'clean' up the JSON string before calling json_extract.
For example:
dim json as c
json = <<%txt%
{
name: 'Fred',
address: {
street: '123 Main St',
city: 'Boston',
state: 'MA'
}
}
'json_extract() requires properly formed JSON, so
'we first call json_reformat_safe()
dim json2 as c
json2 = json_reformat_safe(json)
?json_extract(json2,"name")
= "Fred"
?json_extract(json2,"address")
= "
{
street: '123 Main St',
city: 'Boston',
state: 'MA'
}
"
%txt%
Grid Component - Export - Comma Delimited ASCII - Quoting Fields with Commas - If the data you are exporting has commas in the data, the fields with commas are now quoted. If there are quotes inside a field, the quotes are escaped as double quote (e.g. "").
UX Component - Image Upload - Clear Image - Action Javascript has a method to upload an image and save the uploaded image in a field in the table that the UX is bound to. However there was no easy way to clear out a previously uploaded image - and set the field back to a null value. A new action in Action Javascript now support the 'Delete Image' action.
UX Component - Security Framework - Alternative Login - Login with Google, Facebook, Twitter and LinkedIn - You can now allow users to log into an Alpha Anywhere application using a 'social network' login.
The social network logins are referred to as 'alternative logins' because they provide an alternative way for a user to log into their account in the Alpha Anywhere security system using their social network credentials, rather than the userid/password associated with their account in the Alpha Anywhere security system.
The Alternative Login features are exposed as new actions in Action Javascript for use in a UX component.
For complete details on the Alternative Login feature click here.
Video 1 - Setting up the Providers
Video 2 - Creating Named Providers
Video 3 - Configuring Web Security
Video 4 - Adding Alternative Login to a UX Component
Video 4 - Testing Alternative Login
NOTE: In a previous pre-release build we added support for Google's OpenID protocol.Google has deprecated this protocol, and therefore we will not be supporting it in Alpha Anywhere. If you attempted to test the OpenID protocol in a pre-release build, please send a bug report and we can provide instructions on removing the OpenID elements as they are not compatible with the current system, which is based on oAuth.
Xbasic - CURL - CURL is a popular utility that can be used for many tasks, such as making REST API calls. CRUL is now exposed as a top level Xbasic object, allowing you to execute CRUL commands from your Xbasic code.
Many APIs are documented using CURL examples.
You can use a built-in genie to convert a CURL command into an Xbasic script.
To get to the CURL genie, right click on white space in the Xbasic code editor and select the 'Genies...' command. The select the 'CURL command to Xbasic....' command.

This opens the CURL to Xbasic Genie where you can type in a CURL command then then click the 'Generate Xbasic' button to generate the Xbasic code to execute the specified CURL command.

For more information on the Xbasic CURL object, click here.
Xbasic - Parsing a Name/Value String - extension::URIQuery Class - Xbasic now has a new utility class that makes it very easy to parse name/value pairs in a 'query string'.
The following Interactive Window session demonstrates use of this class:
dim qs as c = "name=fred&city=boston&country=&age=25"
dim postQ as extension::URIQuery
postQ.ParseURIQuery(qs)
?qs
= "name=fred&city=boston&country=&age=25"
?postq.age
= "25"
?postq.country
= ""
?postq.ToJson()
= {"name":"fred","city":"boston","country":"","age":"25"}
Template Tester - Tools Menu - The Template Tester can now be opened directly from the Tools menu when the Web Control Panel has focus.
The Template Tester is useful when you are constructing templates that generate HTML by expanding data in an object. See 'Client-side Templates' in the Release Notes for information on templates.
NOTE: While templates are documented in a section called 'Client-side Templates' this is somewhat misleading because you can also use templates in server-side code using the a5_merge_JSON_into_template() Xbasic function.
Client-side Template Enhancements - Client-side Templates (first introduced in build 2091 - 4284 - see Release Notes for more information) have been enhanced.
The {*root} Tag
Previously if the data you passed into the A5.u.template.expand() function was an array (as opposed to an object with an array as property of the object), you could not use the {*header} and {*footer} directives in your template to generate a header or footer for the array data.
Now, you don't have to artificially structure your data as a top level object with an array as a property of the object. The {*root} tag is now supported when the data passed in is an array.
Consider the following sample data:
var data = [
{firstname: 'Fred', lastname: 'Smith'},
{firstname: 'John', lastname: 'Jones'}
]
and the following template:
var template = [
'{*root}',
'{*header}There are {root.length} people<br
/>{/*header}',
'{firstname} {lastname}<br />',
'{*footer}Count: {root.length} {/*footer}',
'{/*root}'
].join('');
This data and template will product this output:
There are 2 people
Fred Smith
John Jones
Count: 2
Because the template uses the {*root} tag, the data that is passed in is implicitly restructured as:
var data = {
root: [
{firstname:
'Fred', lastname: 'Smith'},
{firstname:
'John', lastname: 'Jones'}
]
}
Escaping the { and } Characters in a Template
The { and } characters in a template indicate placeholders for merged data. If you want to explicitly output either of these characters you can escape them using a leading backslash.
Assume that the data you pass to the template expander is:
{firstname: 'Fred'}
Assume that you want the output from the template to be
{Fred}
You would define your template as:
\{{firstname}\}
Pre-processing Arrays Before They are Expanded
You can now pre-process arrays before they are expanded.
For example, assume you have the following data:
var data = {
company: [
{firstname: 'Fred', lastname:
'Smith'},
{firstname: 'John', lastname:
'Jones'},
{firstname: 'Andrea', lastname:
'Jones'},
{firstname: 'Margo', lastname:
'Jones'}
]
}
And the following template:
var template = [
'{company}',
'{firstname} {lastname}<br>',
'{/company}'
].join('');
This template and data combination will result in this output:
Fred Smith
John Jones
Andrea Jones
Margo Jones
But, say you only wanted to output the top two customers. To do this you would need to pre-process the company array before it was expanded. You can specify the name of a function (which can be a global function, or a function in a namespace) to call before an array is expanded using the @functionName directive in the placeholder for the array.
For example, notice in the template below, the placeholder for the company array specifies that the processCompany function should be called before the data are expanded:
var template = [
'{company@processCompany}',
'{firstname} {lastname}<br>',
'{/company}'
].join('');
The array pre-processor function gets called with three arguments
Your array pre-processor function must return the array that you want to render.
Here is how the processCompany array pre-processor function could be defined:
function processCompany(data,temp,root) {
//limit to first two items in the array
data = data.slice(0,2);
return data;
}
The resulting output is now:
Fred Smith
John Jones
Now assume you want to first sort the data by the 'firstname' property, then return the top two entries. In this case, the array pre-processor function would be defined as:
function processCompany(data,temp,root) {
//sort on the 'firstname' property
data.sort( function(a,b) {
if (a.firstname < b.firstname) return
-1;
if (a.firstname > b.firstname) return
1;
return 0;
}
)
//limit to first two items in the array
data = data.slice(0,2);
return data;
}
The resulting output is now:
Andrea Jones
Fred Smith
An important use for the array pre-processor function is to compute summary data for the array. See Using the Special "root" and "temp" Variables in Templates below. You can compute all of the summary values your template needs in a single function, rather than defining separate functions for each summary value your template outputs.
Using the Special "root" and "temp" Variables in Templates
You can use the special "root" and "temp" variables in a template by enclosing them in [ and ].
The example below demonstrates the use of both [root] and [temp] in the template.
Download component that demonstrates this example.
TIP: To watch a video of how the template used in this example was developed, watch these videos:
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
Watch Video - Part 5
Watch Video - Part 6
Watch Video - Part 7
Watch Video - Part 8
Watch Video - Part 9
For example, consider the following data set:
var data = [
{
orderId: 1,
date: '1/1/2014',
orderItems: [
{itemId: 1, qty: 3, price: 23.4},
{itemId: 23, qty: 2, price: 3.3},
{itemId: 7, qty: 5, price: 5.3}
]
},
{
orderId: 2,
date: '1/2/2014',
orderItems: [
{itemId: 31, qty: 7, price: 3.8},
{itemId: 17, qty: 4, price: 9.2}
]
},
{
orderId: 3,
date: '1/5/2014',
orderItems: [
{itemId: 11,
qty: 9, price: 13.3},
{itemId: 27,
qty: 2, price: 19.2},
{itemId: 6,
qty: 19, price: 3.6},
{itemId: 7,
qty: 22, price: 9.1}
]
}
]
The data are an array of order objects. Each order has a nested array called 'orderItems' that have the order items for that order.
Assume that you would like the template to render as shown below:
| # | Item Id | Quantity | Price | Extended Total |
| 1 | 1 | 3 | $23.40 | $70.20 |
| 2 | 23 | 2 | $3.30 | $6.60 |
| 3 | 7 | 5 | $5.30 | $26.50 |
| Count: 3 | Avg Quantity: 3.33 | Avg Price $10.67 | Total: $103.30 |
| # | Item Id | Quantity | Price | Extended Total |
| 1 | 31 | 7 | $3.80 | $26.60 |
| 2 | 17 | 4 | $9.20 | $36.80 |
| Count: 2 | Avg Quantity: 5.50 | Avg Price $6.50 | Total: $63.40 |
| # | Item Id | Quantity | Price | Extended Total |
| 1 | 11 | 9 | $13.30 | $119.70 |
| 2 | 27 | 2 | $19.20 | $38.40 |
| 3 | 6 | 19 | $3.60 | $68.40 |
| 4 | 7 | 22 | $9.10 | $200.20 |
| Count: 4 | Avg Quantity: 13.00 | Avg Price $11.30 | Total: $426.70 |
There is a lot going on in this example. The template for this example is shown below.
Items of note in this example include:
Here is the template for this example:
'<td style="text-align:right;">{qty}</td>',
'<td style="text-align:right;">{price:number(\'$#,###.00\')}</td>',
'<td style="text-align:right;">{qty*price:number(\'$#,###.00\')}</td>',
'</tr>',
'{*footer}',
'<tr>',
'<td>Count: {[temp].itemCount}</td>',
'<td></td>',
'<td>Avg Quantity: {[temp].averageQuantity:number(\'#.00\')}</td>',
'<td>Avg Price {[temp].averagePrice:number(\'$#,###.00\')}</td>',
'<td style="text-align:right;">Total: {[temp].totalExtendedPrice:number(\'$#,###.00\')}
</td>',
'</tr>',
'</table><br>',
'{/*footer}',
'{/orderItems}',
'{*footer}',
'Grand total for all {[root].length} orders is: {[temp].grandTotal:number(\'$#,###.00\')}<br>',
'{/*footer}',
'{/*root}'
].join('');
The array pre-processor function for the 'orderItems' array is defined as follows:
function orderItemsPreProcessor(data,temp,root) {
var totalQuantity = 0;
var totalPrice = 0;
var totalExtendedPrice = 0;
var extendedPrice = 0;
var _d = '';
for(var i = 0; i < data.length; i++) {
_d = data[i];
extendedPrice = _d.qty * _d.price;
totalExtendedPrice =
totalExtendedPrice + extendedPrice;
totalPrice = totalPrice + _d.price;
totalQuantity = totalQuantity + _d.qty;
}
//the first time this function is called temp.grandTotal will be undefined
//so we initialize it to 0
if(typeof temp.grandTotal == 'undefined') temp.grandTotal =
0;
//we can then accumulate the grand
total for all orders
temp.grandTotal = temp.grandTotal + totalExtendedPrice;
temp.averagePrice = (totalPrice /
data.length);
temp.averageQuantity = (totalQuantity / data.length);
temp.totalExtendedPrice = totalExtendedPrice;
temp.itemCount = data.length;
//it is CRITICAL that the pre-processor function return an
array to be expanded
//even though this function has not modified the data in the
'data' array,
//it must still return the 'data'
array
return data;
}
Templates Can Reference Functions in Any Namespace and Can Take Arguments
Previously, when a template referenced a function, the function needed to be defined as a global function. Now, templates can reference functions an arbitrary namespaces.
Consider the following simple example:
Data:
var data = [
{firstname: 'Fred', lastname: 'Smith'},
{firstname: 'John', lastname: 'Jones'}
]
Javascript function definition:
(Notice that the function takes two arguments and is in the 'obj' namespace.)
var obj = {
fullname: function(fn,ln) { return 'Hello <b>' + fn + ' ' +
ln + '</b>'}
}
Template:
(Notice that the template calls the function in the 'obj' namespace and passes in argument values from the current row.)
var template = '{firstname} {lastname} Function call is output here: {@obj.fullname(firstname,lastname)}<br>'
The output HTML produced is:
Fred Smith Function call is output here: Hello Fred
Smith
John Jones Function call is output here: Hello John
Jones
Defining Custom Formatters
Templates can format data before it is output using the built-in format directives. For example, you can format a number so that it has $ and two decimal places by using the :number() format directive.
For example:
{price:number(\'$#,###.00\')}
However, you can also define your own custom format directives. This is done by adding functions to the A5.u.template.formats object.
Consider the following example:
Data:
var data = {
company: [
{firstname: 'Fred', lastname:
'Smith', phone: 7815551234},
{firstname: 'John', lastname:
'Jones', phone: 2125551234},
{firstname: 'Jane', lastname:
'Jones', phone: 4155551234},
{firstname: 'Margo', lastname:
'Jones', phone: 4325551234}
]
}
Template:
var template = [
'{company}',
'{firstname:formatName(\'l\')} {lastname:formatName(\'u\')} {phone:phoneNumber}<br>',
'{/company}'
].join('');
Notice the template uses custom formatters for the each of the fields. Both 'firstname' and 'lastname' use a custom formatter called 'formatName' and in one case an argument value of 'l' is passed in (to format the data as lower case) and in the second case, an argument value of 'u' is passed in (to format the data as upper case).
The 'phone' field uses a custom formatter called 'phoneNumber'. This formatter does not take any arguments.
To define these two custom formatters, the following Javascript is used to add the format functions to the A5.u.template.formats object:
A5.u.template.formats.formatName = function(value,flag)
{
if(flag == 'u') return value.toUpperCase();
else if(flag == 'l') return value.toLowerCase();
else return value;
}
A5.u.template.formats.phoneNumber = function(value) {
return value.toFormat('=(###)-###-#####');
}
Notice that the custom format functions all get passed 'value' - the value to be formatted.
Arguments Passed to Template Functions
If a template function does not explicitly specify arguments, the implicit arguments passed to the function now include the special 'temp' and 'root' variables.
For example, consider the following template snippet:
{@myCustomFunction}
This template function does not specify any arguments.
Therefore the 'implicit' arguments for the function
called are:
Previously, only 'data' and 'context' were passed to the function.
Where context is a string with the name of the variable that the function was being called in the context of. For example, in a {*header} or {*footer} directive for an array called 'company' the 'context' would be 'company'. Hhowever in an individual item in the company array, the context would be blank (as the context is implicit).
UX Component - List Control - Dynamic Images - Client-Side - The List control now allows you to define client-side Dynamic Image fields.
Previously, Dynamic Images were computed on the server. This meant that if the List was populated dynamically using Javascript code, the Dynamic Images would not be computed.
The Dynamic Image builder now allows you to specify the type of Dynamic Image.

If you choose the 'Client-side' option, then you must enter the condition expressions using Javascript. Keep in mind that Javascript is case-sensitive, you must use double equals (i.e. ==) and not a single equals for equality tests, and that strings must be single quoted. Also, when referring to a field in the current row, the field name is prefixed with data. .
The major benefit of client-side dynamic images is that if the data in a List row is edited, the Dynamic Image is immediately recomputed.
Watch Video - Part 1
Watch Video - Part 2
Download Components
UX and Grid Components - Javascript - Trapping Syntax Errors - When you save a component, Javascript function declarations are checked for syntax errors. Also when you edit the Javascript for an event handler, the syntax is checked for syntax errors. Previously this functionality was available, but was turned off by default. Now, it is turned on by default because a more robust method for checking Javascript syntax is used. (Based on the Node.JS 'Grasp' module).
If you want to disable Javascript syntax checking, go to View, Settings, Preferences, Javascript.
OLE Automation - Named Parameters - You can now use named parameters in an OLE automation call. The technique for doing this involves defining a dot variable with the parameters, then passing in the dot variable to the OLE method.
Previously, if you want to specify a value for an optional parameter you had to supply values for all of the optional parameters preceding the one you wanted to define. This could be very tedious.
For example, consider the function prototype for the Microsoft Word .open() method.
.Open(FileName, [ConfirmConversions], [ReadOnly], [AddToRecentFiles],
[PasswordDocument],
[PasswordTemplate], [Revert], [WritePasswordDocument], [WritePasswordTemplate],
[Format],
[Encoding], [Visible], [OpenAndRepair], [DocumentDirection], [NoEncodingDialog],
[XMLTransform])
As this prototype shows, only the first argument (FileName) is required. All other arguments are optional. If you wanted to supply a value for (say) the 'ReadOnly' argument, you would need to specify a value for the 'ConfirmConversions' property as well.
Now, you can define a dot variable and define property values for just the arguments you want to set.
For example:
Dim wrdApp As P 'Word.Application
Dim wrdDoc As P 'Word.Document
wrdapp = ole.create("word.application")
'define a .dot variable and define the arguments you care about
dim args as p
dim args.FileName as c = "e:\files\hello.docx"
dim args.ReadOnly as l = .t.
'pass in the .dot variable to the OLE .open() metehod
wrdDoc = wrdapp.Documents.Open(args)
OLE Automation - Bubble-help for OLE Methods - The Xbasic editor and Interactive window now show the argument list for OLE methods. This is especially useful when you want to use named parameters and pass in a dot variable to the method because it lets you see the argument names, which you will use in the dot variable.

Interactive Window - Shell Commands - You can now execute shell commands directly from the Interactive window. Examples of the different use cases for this feature include:
Watch Video - Part 1
Watch Video - Part 2
Any command with a $ prefix that you enter in the Interactive window is considered to be a shell command. For example, type the following in the Interactive window:
$dir c:\windows
For detailed information on the Interactive window shell commands click here.
Action Javascript - Open .a5w Page Action - Page URL - If the page URL is specified by a placeholder that references fields in the current component, or uses placeholders in the URL, you can now specify that the value in individual placeholders should not be URL encoded by entering the placeholder name as:
{nourlencode:placeholderName}
For example:
{nourlencode:field1}
By default all placeholder values are URL encoded when they are replaced in the URL.
UX Component - Edit-Combo Control - Specifying
Different 'Stored' and 'Display' Values -
Dropdownbox controls allow you to specify that the
stored value is different from the display value. For
example, the control might display a 'ProductName' but
the stored value in the control might be the 'ProductId'.
Edit-combo box controls can now also be configured to
store a different value than their display value, just
like a Dropdownbox control.
NOTE: If you configure an Edit-combo to have a different stored value from its display value, then you must check the option to only allow the user to select values in the choice list. The user cannot type arbitrary values into the control.

The benefit of using an Edit-combo control over a
Dropdownbox control is that you can display multiple
columns of data in the choice list and you can
dynamically populate and filter the choices in the list
with an Ajax callback every time the control is opened.
Watch Video
jQuery - Make Safe for Alpha Anywhere - a5_make_jQuery_safe() Function - Many jQuery Javascript files are written using the $ object as a proxy for the jQuery object. This makes it impossible to use these files in AlphaAnywhere without first editing the files and changing the $ object to the jQuery object. This can be a tedious process because a simple search and replace will not work as that would replace the $ string literal.
The a5_make_jQuery_safe() function converts all references to the $ object to 'jQuery' while leaving $ in variables names and strings unchanged.
NOTE: This function is built on top of the Node.JS GRASP module.
Syntax:
L flag =a5_make_jquery_safe(c filename [, flagCreateBackup = .t. ])
If fileCreateBackup is .t. a file with the extension of .old is created with the original text in the file.
HTML Reports - No Records in Report - If an HTML report has no records in it, it previously displayed a blank page. Now a 'No records in report' message is shown.
UX Component - A5.u.element.setContent() Function -
Normally, you can set the content of an element in a
component by simply getting a pointer to the element and
then setting the element's .innerHTML property. However,
if the element whose content you are setting has been
configured to allow drag scrolling, setting the .innerHTML
directly will destroy the drag scroll settings and the
new content will no longer be scrollable.
The solution to this problem is to use the
A5.u.element.setContent() function to set the element's
content.
Watch Video - Part 1
Watch Video - Part 2
Download Component
Syntax
A5.u.element.setContent(element,html [, options])
Where:
Example:
//get a pointer to the 'CONTAINER_1' container
var ele = {dialog.object}.getPointer('CONTAINER_1');
var string = 'define some long string of html here';
string = string + '<span id="span1">end of string</span>';
var settings = {animation: {allow: true}};
var settings: {
fireEvent: false, //fire the scroll event
mode: 'into-view', //mode can be 'into-view', 'top', 'bottom'
axis: 'both', //which axes do you want to scroll on
offset: {x: 0, y: 0}, //offset from the element that you are
scrolling to
animation: {allow: true, duration: 300} //animation
}
//scroll the element 'span1' into view
var obj = {element: 'span1', settings: settings};
A5.u.element.setContent(ele,string,obj);
//in this next example, instead of scrolling an element into view,
//we scroll to position 0,0 in the new content
//get a pointer to the 'CONTAINER_1' container
var ele = {dialog.object}.getPointer('CONTAINER_1');
var string = 'define some long string of html here';
string = string + '<span id="span1">end of string</span>';
var settings = {}
var obj = {x: 0, y:0, settings: settings};
A5.u.element.setContent(ele,string,obj);
Temp File Folder - Temporary Files - Code has been added to more aggressively clean up any temporary files that Alpha Anywhere created in the temp file folder. To turn on this feature for the development version go to the View/Settings/Preferences menu and set the value for the 'TEMP files' property.
To specify the setting in the Application Server (or the Development Server), go to the 'Advanced' tab in the server control panel.

Reports - Layout Table Reports - Suppress Blank Rows - A new property has been added for each row in a Layout Table report that makes it easy to suppress the entire row in the report if all of the columns in that row are blank.
To set the property, click in the vertical ruler to the left of the row whose property you want to set.

Then, in the property sheet, set the 'Suppress Blank' property.

A row is considered to be blank if the expression that defines the contents for each column in the row is a NULL value (i.e. equals the value returned by the null_value() function).
Note that:
UX Component - List Control - Show/Hide List Footer - .rowExpander() Method - Each row in a tabular List layout can have an optional 'List Item Footer'. (Similar to a row expander in a Grid component). The initial state of the List Item Footer can be opened, or closed. The <listObject>.rowExpander() method can be used to show, hide, or toggle the show/hide state of the List Item Footer. The show/hide can optionally be done using animation.
Syntax:
<listObject>.rowExpander([rowNumber, [animationObject [,mode]]]);
Where:
Twitter - New functions have been added to make working with the Twitter API easier. Working with the Twitter API now requires that you use OAuth. The following two functions have been added:
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
twitter_getBearerToken() Function - Gets a 'bearer token' from Twitter.
Syntax:
c bearerToken = twitter_getBearerToken(C client_id, C client_secret)
The client_id and client_secret must be obtained from Twitter. Go to dev.twitter.com and create an application. Once you have created an application, you can get the keys.
The bearerToken that is returned will allow you to make Twitter API calls.
Typically you will only need to get the bearerToken once in your application. You can then save it in a session variable for use throughout your application.
The source code for the twitter_getBearerToken() function might be of interest to some developers, and is shown below:
function twitter_getBearerToken as c ( client_id as c ,
client_secret as c )
'DESCRIPTION:Uses OAuth 2.0 to get a bearer token from
Twitter.
'LIMITATIONS:X
dim bl as b = client_id+":"+client_secret
dim cf_1 as extension::CurlFile
dim flag_1 as l
dim slist1[2] as c
slist1[1] = "Authorization: Basic "+base64encode(bl)
slist1[2] = "Content-Type: application/x-www-form-urlencoded;charset=UTF-8"
dim ce as extension::Curl
ce = extension::Curl.Init()
ce.setOpt("URL","https://api.twitter.com/oauth2/token?grant_type=client_credentials")
ce.setOpt("NOPROGRESS",1)
ce.setOpt("USERAGENT","curl/7.34.0")
ce.setOpt("HTTPHEADER",slist1)
ce.setOpt("MAXREDIRS",50)
ce.setOpt("CAINFO",a5.Get_Exe_Path()+"\caroot\ca-cert.pem")
ce.setOpt("CAPATH",a5.Get_Exe_Path()+"\caroot")
ce.setOpt("CUSTOMREQUEST","POST")
ce.setOpt("TCP_KEEPALIVE",1)
ce.SetOpt("FILE",cf_1)
flag_1 = ce.Exec()
if flag_1 then
dim result as p = json_parse(cf_1.GetContent())
twitter_getBearerToken = result.access_token
end if
ce.close()
end function
twitter_clientApiCall() Function - Allows you to call a REST API function in Twitter.
Syntax
C result = twitter_clientApiCall( c bearerToken, c request)
The bearerToken must have previously been obtained using the twitter_getBearerToken() function.
Example:
The following Interactive window session shows how you can get 10 tweets for 'London'
dim bt as c = getBearerToken("YourUserKeyHere","YourUserSecretHere")
dim url as c
url = "/search/tweets.json?q=london&count=10&lang=en&type=recent"
json = twitterClientApiCall(bt,url)
'make the JSON 'pretty'
json = json_reformat(json,.t.)
json = convert_utf8_to_acp(json)
showvar(json)
This example gets a user time line
dim bt as c =
getBearerToken("YourUserKeyHere","YourUserSecretHere")
dim url as c
url = "/statuses/user_timeline.json?count=100&screen_name=twitterapi"
json = twitterClientApiCall(bt,url)
'make the JSON 'pretty'
json = json_reformat(json,.t.)
json = convert_utf8_to_acp(json)
showvar(json)
The source code for the twitter_clientApiCall() function might be of interest to some developers, and is shown below:
function twitter_clientApiCall as c ( bearerToken as c ,
request as c )
'DESCRIPTION:Make a REST call to the Twitter API using a
bearerToken that was obtained using the
twitter_getBearerToken() function
'LIMITATIONS:X
dim slist1[1] as c
slist1[1] = "Authorization: Bearer "+bearerToken
dim cf_1 as extension::CurlFile
ce = extension::Curl.Init()
ce.setOpt("URL","https://api.twitter.com/1.1"+request)
ce.setOpt("NOPROGRESS",1)
ce.setOpt("USERAGENT","curl/7.34.0")
ce.setOpt("HTTPHEADER",slist1)
ce.setOpt("MAXREDIRS",50)
ce.setOpt("CAINFO",a5.Get_Exe_Path()+"\caroot\ca-cert.pem")
ce.setOpt("CAPATH",a5.Get_Exe_Path()+"\caroot")
ce.setOpt("TCP_KEEPALIVE",1)
ce.SetOpt("FILE",cf_1)
flag_1 = ce.Exec()
if flag_1 then
twitter_clientApiCall = cf_1.GetContent()
end if
ce.close()
end function
UX and Grid Component - Tab/Accordion Control - onLeave and onBeforeLeave Events - Two new events have been added to the Tab and Accordion Control. The events can be defined at the control level or at the individual pane level.
Report Server - Logging - A new logging feature
has been added for the Report Server. The report server
log is turned on automatically when the logging is
active on the server, which turns on the access and
error logs. With these logs on, be sure to set the
logging to rotate on size and daily to keep the files
sizes under control and easier to manage.
The report Server log data will look like this
[Fri Jul 11 06:58:34 2014] StartRpt
bb8f711ef8a8487f87a528b315827120
C:\A5Webroot\AppServerDemoV12\NWEmployees.a5rpt
C:\Users\Jerry\AppData\Local\Temp\tmp983.pdf
[Fri Jul 11 06:58:35 2014] Finished
bb8f711ef8a8487f87a528b315827120
C:\A5Webroot\AppServerDemoV12\NWEmployees.a5rpt
C:\Users\Jerry\AppData\Local\Temp\tmp983.pdf
| Value | Description |
| [Fri Jul 11 06:58:34 2014] | Date and time of the action |
| StartRpt | The action, which will be "StartRpt", "Finished ", or "RptError" if no error was reported, but the report was not created. |
| bb8f711ef8a8487f87a528b315827120 | A unique identifier that is assigned to each report at build time |
| C:\A5Webroot\AppServerDemoV12\NWEmployees.a5rpt | The report definition requested |
|
C:\Users\Jerry\AppData\Local\Temp\tmp983.pdf |
The physical file created - often a temp file as
shown here |
By matching the identifier, the time to build a report
can be calculated from the timestamp. This can help
identify reports that are slow to build.
If a report has a start action, but no finished or error
action, that would indicate the report server has not
finished the report.
If the action is "RptError", this error may be noted in the Xbasic error log and a special mini-dump file created in the Xbasic log folder. This mini-dump file will have a name syntax similar to "A5ReportServer_20140710115412520.a5dmp" This file can be used by Alpha Software to evaluate the report properties of a failed report.
UX Component - List - Client-side Events - New events have been added.
Xbasic - MongoDB - NoSQL document databases are becoming popular for certain types of applications. A new MongoDB class has been added to Xbasic to make it easy to query, update and manage a MongoDB database from Xbasic.
Technical Note: The Xbasic mongo class it built on top of the MongoDB node.js driver.
Xbasic - CouchDB - You can now query, update and manage a CouchDB NoSQL database from Xbasic.
Performance Improvements in Following Functions and Methods - Major performance improvements in
Web Applications - Security Framework - Active Directory - The Security Framework for Web Applications now supports Active Directory. That means you can authenticate a user using an Active Directory server.
UX, Grid, TabbedUI and PageLayout Components - Working Preview - Chrome - When you use Working Preview you now have the option of using either Internet Explorer, or Chrome. Previously, Working Preview automatically used Internet Explorer.
The benefits of using Chrome for Working Preview include:
Watch Video - Part 1
Watch Video - Part 2
The Working Preview window now has new hyperlinks at the bottom of the screen.
When Internet Explorer is being used, the menu looks like this:

Clicking on the Internet Explorer hyperlink will bring up a dialog that will allow you to change to Chrome. Your choice is stored as part of the component definition. You can choose to use Internet Explorer for some components and Chrome for others.
When Chrome is used for Working Preview, the menu has more options.
The 'Detach Working Preview Window' is particularly useful because it creates a separate, detached window for Working Preview. This window can be moved to a second monitor and be left open while you return to the Design pane to continue editing your component.
You can set the Detached Working Preview window to update immediately every time a property is changed.
NOTE: For very large components, setting the Detached Working Preview to automatically update is not recommended as the delay in updating the Working Preview window will make setting properties seem sluggish.

Debugging Javascript Using the Chrome Debugger
To use the Chrome Javascript debugger, you must insert the
debugger;
command into the Javascript that you want to debug.
You must also, click the 'Open Chrome Debugger' hyperlink before you execute the code you want to debug. This will open the Chrome Debugger in a background window.
You can then invoke the code that you want to debug. When the debugger; command is hit, the Javascript will pause and the Working Preview screen will show:

You can then click the 'Open Chrome Debugger' hyperlink again, and it will bring the Chrome Debugger window to the forefront:

UX Component - List Control - New Methods - New method have been added to the List control that fire when the data in the list are changed. The methods are:
The events fire when the .populate(), updateRow(), appendRows() and removeRows() methods are called.
If the 'before' events return false, the corresponding action does not occur.
UX Component - Mobile Simulator - Now includes iPhone5 option in dropdownbox to select simulator size.
UX Component - Action Javascript - Wait Message - Auto Close After Setting - You now have control over how long to wait before the wait message is closed. By default, the setting is 5000 milliseconds.

email_send_mandrill() function - Sender Name Alias - Support for specifying an alias for the sender name has been added. The dot variable that is passed into the email_send_mandrill() function can now have a .from_name property.
For example:
ms.from_name = "Sales at Alpha" 'friendly name - optional
Here is a complete example
'create a .dot variable to define the message
dim ms as p
ms.send_to = "john@acme.com:John Smith,sally@acme.com:Sally Jones"
ms.from_email = "sales@alpha.com"
ms.from_name = "Sales at Alpha" 'friendly name - optional
ms.subject = "Information You Requested"
ms.message_html = "Here is the <b>information</b> you requested."
dim pResult as p
pResult = email_send_mandrill("mysecretkey",ms)
UX Component - List Control - .scrollToClosestValue() Method - Scrolls to the closest record in the List.
Syntax:
<listObject}.scrollToClosestValue(value [, flagCaseInsensitive [, position [, animationObject]]])
Where
Example:
Scroll the List so that the first Customer with a Lastname starting with 'M' is shown at the top of the List
var lObj = {dialog.object}.getControl('list1');
lObj.scrollToClosestValue('m',true,top,{allow: true, duration: 200})
UX Component - List Control - Tabular Layout - Sorting Columns - Custom Javascript - When a user clicks on a column heading in a List to sort the data on that column, you can specify if the sort should take place client-side or server-side (only appropriate if the List is based on a SQL or DBF data source). Now, a new option has been added to the list of choices. The 'Javascript' option allow you to specify your own Javascript code to execute.
UX Component - Repeating Sections - Set Active Row - setRepeatingSectionActiveLogicalRow() Method - A new method is now available for setting the active row in a Repeating Section.
{dialog.object}.setRepeatingSectionActiveLogicalRow(sectionName,logicalRowNumber)
The logical row number of a row in a Repeating Section and its physical row number are the same, unless rows have been deleted from the Repeating Section. When a row is deleted from a Repeating Section it is not really deleted, it is only hidden.
So, for example, assume that a Repeating Section had 5 rows to start with and then the first three rows were deleted. There would now be two visible rows, (logical row number 1 and 2), but the physical row numbers for these two rows would be 4 and 5. In order to set focus to the last visible row in the Repeating Section (logical row 2, but physical row 5) you can now use the new .setRepeatingSectionActiveLogicalRow() method.
This is more convenient than having to first call the ._repeatingSectionLogicalToPhysicalRow() to convert the logical row number to a physical row number, and then calling the .setRepeatingSectionActiveRow() method.
UX Component - List Control - .getVisible() Method - Returns an object with two properties 'start' and 'end' which contain the zero based row numbers of the rows in the List that are currently visible.
var lObj = {dialog.object}.getControl('list1');
var obj = lObj.getVisible();
alert(obj.start + ' to ' + obj.end);
UX Component - List Control - onNavigate Event - The onNavigate event fires when the List has been scrolled. The e object passed into the event handler has two properties:
UX Component - Hide/Show Controls - .setControlDisplay() Method - A new method is exposed that can be used to show/hide controls. The method will hide/show the control and also its label (if the control has a label).
{dialog.object}.setControlDisplay(name, flag [, mode [, animatationJSON]])
The animJSON object has two properties:
NOTE: If you specify animation, you must load jQuery. To load jQuery, go to the Web Project Properties dialog and turn jQuery on.
Example:
{dialog.object}j.setControlDisplay('FRAME_1',false,'d',{type: 'fade',duration: 3000});
UX Component - Validation - Show/Hide Expressions - If a control has been hidden by a client-side show hide expression, the control is no longer validated.
AppLauncher Component - Browser Flags - A new option allows the query string that loads the target component to suppress the browser flags from showing in the query string. Instead, the browser flags are stored in a session variable called session.__browserFlags.

UX Component - List Control - .scrollToItem() method - This method now has new options that allow you to control where the target row will be in the List. Previously, the List was scrolled so that the target row became visible. But you could not control whether the target row was positioned at the top, or bottom of the List.
Now, you can pass in an optional object to the method with settings. For example:
var listObj = {dialog.object}.getControl('list1');
listObj.scrollToItem(50,{mode: 'top' ,animation: {allow:
true, duration: 200},offset: {x: 0,y: 0}});
Options for 'mode' are: top, bottom, in-view
The offset settings control the number of pixels at the top or bottom of the list between the List edge and the scrolled to row.
UX Component - ButtonList Control - Static JSON - A new option has been added to populate a ButtonList control. The Static JSON option allows you to enter some static data in JSON format as the data source for the ButtonList.
UX Component - List Control - Get List Row Number from Element Method - A new method of the List control allows you to get the List row number (zero based) from an element in the row.
For example, assume that you have a List with a freeform layout and a button in the freeform Layout with this code:
<button onclick="getRow(this);">What Row Am I On</button>
The getRow() function would be defined as:
function getRow(ele) {
//get a pointer to the list - assume list is called 'LIST1'
var lObj = {dialog.object}.getControl('LIST1');
//get the row index by calling the .indexFromElement() method.
//'ele' is a pointer to the button in the List row.
var index = lObj.indexFromElement(ele);
}
PhoneGap Builder - Now uses a token based authentication feature so that once you have successfully logged into the PhoneGap build service, all further interaction with the PhoneGap build service is done using the token (until the token expires - currently set for 24 hours after login). The benefit of this approach is that interacting with the PhoneGap build service is faster as we no longer need to authenticate each time.
UX Component - List Control - Javascript Function Datasource - If a List control specifies a Javascript function as its data source, when the .refreshListMethod() is called an Ajax callback is no longer fired (as it was meaningless). Instead, the function that populates the list is called and the List is repopulated with the function results.
UX and Grid Component - Edit-combo and Auto-suggest Control - The height property was not being honored if it was set to a value that included the 'max' keyword.
UX Component - Testing if the Alpha Anywhere Server is Available - The UX component now supports a new method, .serverIsAvailable() that tests if the Alpha Anywhere server is available. This is a more comprehensive test than simply testing if an Internet connection is available.
NOTE: Contrast this method with the UX component's ._getOnlineStatus() method. This method merely tests if there is an internet connection. It does not make an ajax callback to the Alpha Anywhere server. Is merely uses the HTML5 navigator.online property. The .serverIsAvailable() method, on the other hand, does a lightweight callback to the Alpha Anywhere server to test if the server is available.
The syntax for the .serverIsAvailable() method is:
{dialog.object}.serverIsAvailable( [timeOut [, successFunction [, errorFunction]]);
If you don't specify a timeOut, the default value is 300 milliseconds.
The 'successFunction' parameter allows you to pass in an Javascript function to be called once it is determined that the Alpha Anywhere server is available.
The 'errorFunction' parameter is called if the server is not available.
The function will set these variables in the global A5 Javascript object:
_serverAvailable - true/false
_serverCheckTime - the time the server availability was last checked.
Example:
Execute the 'refreshList' action is the server is available.
function success() {
{dialog.object}.playAction('refreshList');
}
{dialog.object}.serverIsAvailable(300,success);
Grid and UX Component - Search - QBE Syntax - Combining Multiple Wildcard Searches with AND - If your search style is set to 'Exact match' and you enter search criteria that use wildcards, and you have QBE syntax turned on, then you can enter search criteria in the following form:
%string1%,%string2%
This will be interpreted as a search for any record that contains either string1 or string2 in the field.
However, you may want to find records that contain
string1
AND string2.
You can now do this using the
&&
operator in your search definition, rather than the
comma.
Application Server - The Application Server now uses an updated default SSL cipher list to enhance the security of SSL-enabled servers. The new cipher list is based on https://wiki.mozilla.org/Security/Server_Side_TLS
UX Component - List Control - Frame - Modern - Show/Hide - If a List control was in a Frame container and the frame was defined as a modern frame that could be shown/hidden and if the initial state of the frame was hidden, the List controls in the Frame did not render properly when the frame was shown.
UX and Grid Components - Pop-up Modal Windows - Resizing - In some cases, when resizing a modal pop-up window, the window content would not redisplay properly after you stopped resizing the window.
Application Server - SSL - Test Certificates - Firefox - Certificate extensions are no longer generated into self-signed certificates when using the Application or Development Server Settings dialog to generate a self-signed certificate or calling directly from INET::SSLContext::CreateTestCertificate(). Version 31 of Firefox no longer accepts deprecated certificate extensions and this change corrects that problem.
IMPORTANT: You will have to regenerate your self-signed certificate.
UX Component - Map Control - onZoom Event - This event was not firing.
UX and Grid Component - Working Preview - Chrome - Memory Leaks - When using Chrome for Working Preview while building UX and Grids components there is a small memory leak that forces you to have to restart Alpha Anywhere occasionally. A number of these memory leaks have been fixed.
NOTE: This comment does NOT apply to the Application Server - it is only for the Development version.
UX Component - Logical Checkbox - Client-side Show/Hide - If you have defined a text label for the control, the text label was not being hidden when the control itself was hidden.
HTML Layout Reports - A number of minor bugs have been fixed. For example, scrolling HTML Layout reports in a mobile application when the report was shown in a pop-up window did not work the second time the report was opened.
Grid Component - File Upload - User Defined Action - Working Preview - Using this action in Working Preview had previously been supported, but got broken in a recent update. This is now working again.
UX Component - Tab Controls - Embedded Components - Server-side Show/Hide or Security - If a server-side show/hide expression or security group setting removed an embedded component from a tab pane at run-time, a Javascript error would occur.
UX Component - Panel Header/Footer - Container Height - The container height property was honored for a Panel Header or Footer.
Grid Component - Edit Row on Demand - afterRowSwitchFromEditable Client-side event - This event was not firing if the row you were editing was implicitly set to not-editable mode because the user clicked to edit another row and the Grid was set to edit one row at a time.
UX and Grid Component - Javascript Actions - Fixes a recently introduced bug where a Javascript Action that used Action Javascript to open a child component in a div on the parent component failed.
Report Editor - Layout Table Reports - Static HTML Cells - Now honor the font and alignment properties applied at the cell level.
Report Editor - Layout Table Reports - Row size to fit - Now works when row contains static HTML content.
UX Component - List Control - Client Side Summary - Client Side Filtering - Fixed an issue where the client-side summary values were not recalculated if a client-side filter was applied to the List.
UX Component - List Control - Client Side Summary - Fixed an issue where the items in the csSummary object were not upper case, as documented. Also, the count summary value was only being computed if the data in the field was numeric.
UX Component - Lookup Columns - Columnar Layout - If there was no matching row in the lookup List, the data in the List would be misaligned in the List columns.
Grid and UX Component - Lookup Grids - Dynamic Filter - If a Lookup Grid had a dynamic filter, the filter was being applied as a 'user filter' rather than as a 'base filter'. This meant that if the user clicked the 'Clear Search' button on the Lookup Grid, the dynamic filter was removed.
Grid and UX Component - Javascript Actions - Fixed an issue that could have resulted in the .playAction() method invoking the wrong action.
UX Component - Slider - Date Values - Two Value Mode - When a two value slider was configured to show date values, the dates were off by when when you set the value on the date start/end.
Reports - Named Datasources - Fixed a recently introduced issue with reports that use named data sources (not to be confused with named connection strings which do not have any issues).
UX and Grid Components - Client-side Expressions - Date Fields - Client side expressions (for example, show/hide, enable and calculated fields) that are based on controls whose data type is set to 'Date' or 'Time' now treat the controls as true Javascript date objected.
For example, say you had a UX with two input controls (called say 'DATE1' and 'DATE2') and a button. Say you defined as show/hide expression for the button as follows:
DATE1 > DATE2
Assume that the client side date format was set to MM/dd/yyyy and that the values in the two controls were '04/20/2000' and '02/01/2000'.
Previously, this expression was evaluated as as string expression. So the string '04/20/2000' was compared to the string '02/01/2000'.
This might have led to the correct result in some circumstances, but would not have been correct in other circumstances. For example, say that the client side date format was set to dd/MM/yyyy. Now the two values for the date controls would be '20/04/2000' and '01/02/2000' and comparing these two values as strings would lead to a different result.
Now, the input controls are converted to real Javascript data objects (in other words, the date string values are automatically parsed using the setting for the client side date format) and the client-side expression is evaluated using true date values.
Previously, some uses might have implemented their own solution to this problem by defining a custom Javascript function to use in the show/hide expression. For example, the show/hide expression might have been specified as:
compareDates(DATE1,DATE2)
And the compareDates function would have been defined as:
function compareDates(d1,d2) {
var _d1 = new Date();
var _d2 = new Date();
_d1.fromFormat(d1,'MM/dd/yyyy');
_d2.fromFormat(d2,'MM/dd/yyyy');
if(_d1 > _d2) return true;
else return false;
}
If you had previously implemented this pattern, you will now get an error because the inputs to the compareDates() function (d1 and d2) are now date objects and not strings.
UX Component - List Control - Cascading Lists - DBF Tables - Allow Null Selection - If you had defined cascading List controls (i.e. a child List whose data depends on the selection in its parent List) and the List data source was .dbf tables, and the parent List was set to not allow a null selection, then when the UX initially rendered, the child List was not populated, as it should have been. The child List was only populated after the user clicked on a row in the parent List.
Edit-Combo, Auto-Suggest and List Controls - Web Applications - Touch Enabled Computers - Windows 8.* - If you are running a web application on a touch enabled computer under Windows 8.*, Edit-combo, Auto-suggest and List controls will not display a vertical scroll bar because the assumption is that the user will use touch gestures on the list to scroll the data.
This assumption is valid for a mobile application that does not support mouse interaction, but in a web application on a machine that does support mouse interaction, you would want to see a vertical scroll bar.
You can turn off drag scrolling (and thus cause the vertical scroll bar to appear), by executing the following Javascript code:
A5.u.drag.useDragScrolling = 'never';
If your application is running in a Tabbed UI, a good place to inject this code is in the Tabbed UI's 'Javascript to run on startup' property.

In the case of a Grid, you can use the onGridRenderComplete client-side event.
UX Component - Define Custom Watch Events - The client-side 'calculated fields', 'enable expression' and 'show/hide' expressions all generate watch expressions that automatically fire when the 'watched' variables change.
You can completely bypass these properties and instead define your own watch expressions.
For example, the following code can be placed on the client-side beforePrepare event to define a custom watch event that updates the value in 'TEXTBOX1' whenever the value in 'TEXTBOX2' changes.
{Dialog.Object}.dialogWatches['MY_WATCH_EVENT'] = {
watch: ['TEXTBOX2'],
variables: [],
updateColumn: 'TEXTBOX1',
onChange: function(data) {
var dialog = {};
var summary = {};
{Dialog.Object}._getDialogVariables(dialog,summary,data);
var txt2 = {dialog.object}.getValue('textbox2');
{Dialog.Object}.setValue('TEXTBOX1',
{dialog.object}._functions.myFunc2(txt2) );
}
}
Using CSS Icon Images and Bitmap Images - A5.u.icon.html() Function - The Alpha Anywhere Javascript library contains a useful utility function that makes working with CSS Icon images and regular bitmap images easier.
The issue is somewhat complicated because the HTML markup to display a bitmap image uses the <img> tag, whereas the HTML markup for a CSS Icon image uses a <i> tag with special class names.
The A5.u.icon.html() function takes the name of the image you want to display and generates the appropriate HTML markup. It is also able to interpret the special syntax Alpha Anywhere uses to assign an in-line style to CSS Icons.
For example:
var icon1 = A5.u.icon.html('cssIcon=fa fa-align-center fa-2x {color: blue;}');
will return the following HTML markup:
<i class="fa fa-align-center fa-2x " style=";color: blue;"></i>
and:
var icon2 = A5.u.icon.html('images/$$application.chrome.png.a5image');
will return this HTML markup:
<img src="images/$$application.chrome.png.a5image" />
UX Component - List Control - Using the Client-side Computed Columns Feature to Display Dynamic Images in a List - The Computed Columns property allows you to define computed (virtual) columns to display in a List. The computed columns can display dynamic images (i.e. images that are based on data in the current row). For example, you could define the following Computed Column:
data.DYNAMICIMAGE = function(data,index) {
if(data.State == 'MA') {
return A5.u.icon.html('cssIcon=fa fa-align-center
fa-2x {color: #f6b5b5;}');
}
else if(data.State == 'CA') {
return A5.u.icon.html('cssIcon=fa fa-align-center
fa-2x {color: blue;}');
}
else if(data.State == 'NY') {
return
A5.u.icon.html('images/$$application.chrome.png.a5image');
}
else return 'Not Defined';
}(data,index);
UX and Grid Component - Sending E-mail From the Client Using Mandrill - Alpha Anywhere has well documented methods for sending email from a web component. These method are all server-side method. An Ajax callback is made to the server and the e-mail is sent from the server. However, it is possible to send an e-mail directly from the client without involving the Alpha Anywhere server at all using the Mandrill Mail service.
The technique discussed here uses the XMLHttpRequest object to make a REST call to Mandrill.
function sendMailData() {
//data for the message
var url = "https://mandrillapp.com/api/1.0/messages/send.json"
var json = {
"key": "Your Mandrill key here",
"message": {
"to": [
{
"email": "test@gmail.com"
}
],
"from_email": "customerservice@gmail.com.com",
"subject": "Message Subject",
"html": "Message text here",
"text": "Text form of message",
"preserve_recipients": false
},
"asynch": false,
"ip_pool": null,
"send_at": null
}
var obj = {};
obj.url = url;
obj.json = json;
return obj;
}
function sendMail() {
var obj = sendMailData();
var _url = obj.url
var params = JSON.stringify(obj.json);
var _xhr = new XMLHttpRequest();
_xhr.open('POST',_url,true);
_xhr.timeout = 5000;
_xhr.setRequestHeader("Content-type",
"application/x-www-form-urlencoded");
_xhr.setRequestHeader("Connection", "close");
_xhr.ontimeout = function(e) {
alert('error - timeout');
}
_xhr.onload = function(e) {
if(this.status == 200) {
alert('sent');
} else {
alert('failed')
}
}
_xhr.send(params);
}
UX Component - Drag Scrollable Elements (including Lists) - Dynamically Turning Scrolling On/Off - You can dynamically turn scrolling on/off on certain elements, including List controls.
The basic steps are:
1. Get a pointer to the element
2. Call this code:
A5.u.drag.setDisabled(element,dragType,value)
For example:
//get a pointer to the List obj
var lObj = {dialog.object}.getControl('mylist');
//get a pointer to the scrollable part of the List
var ele = $(lObj.contId+ '.CONTENTWRAPPER');
//disable scrolling
A5.u.drag.setDisabled(ele,'scroll',true);
//now enable scrolling
A5.u.drag.setDisabled(ele,'scroll',false);
The dragType parameter can be 'scroll' or 'custom'. 'Custom' is used for 'drag' actions that are not 'scroll' actions. For example, a Carousel uses a custom drag, not a 'scrolling' drag.
Basic Authentication - How to Create an .A5W Page that Requires Basic Authentication - Basic Authentication is a simple HTTP form of authentication.
As defined in Wikipedia:
HTTP Basic authentication (BA) implementation is the simplest technique for enforcing access controls to web resources because it doesn't require cookies, session identifier and login pages. Rather, HTTP Basic authentication uses static, standard HTTP headers which means that no handshakes have to be done in anticipation.
If you create simple web services in Alpha Anywhere, you might want to use basic authentication on the .a5w page that implements your web service.
In the example page below, basic authentication is used. In this trivial example, the only user Id/password combination that is valid is Alpha/Anywhere. However, the example could easily be extended to do a database lookup to authenticate the user.
When this page is called (by some other program that is trying to consume the web service implemented by this page), it is assumed that the headers will have been set to supply the user id and password.
If you try to call this page from a browser, the browser will prompt for a user id and password
<%a5
if ("Authorization: Basic " $ Request.Headers)
'extract the 'Authorization'
from the request header
dim EncodedUserAndPass as c =
filter_string(Request.Headers,"Authorization: Basic ", crlf())
EncodedUserAndPass = word(EncodedUserAndPass,2,": Basic")
EncodedUserAndPass = alltrim(EncodedUserAndPass)
'the authorization is base64 encoded. decode it.
dim DecodedUserAndPass as b =
base64decode(EncodedUserAndPass)
'extract the username and password
dim Username as c =
word(DecodedUserAndPass, 1,":")
dim Password as c = word(DecodedUserAndPass, 2, ":")
'here is where you could do a database lookup to authorize the user
if (Username = "Alpha" .and.
Password = "Anywhere")
? "Authorized as " + Username
'this is where you would implement the web service.
'at this point, the user has been authorized.
'for example, you might respond with some JSON data
'e.g. data = "{name: 'alpha', city: 'Boston'}"
'?data
else
?"Bad username or password"
'if you want to present the user with another change to log in, uncomment this
'Response.StatusCode = "401"
'Response.StatusDescription = "Not
Authorized"
'Response.Headers.Add("WWW-Authenticate",
"Basic")
end if
else
Response.StatusCode = "401"
Response.StatusDescription = "Not Authorized"
Response.Headers.Add("WWW-Authenticate", "Basic")
end if
%>
UX and Grid Component - Edit-Combo - Dynamically Repopulate Choices - When you define an Edit-Combo control, the builder allows you to specify that the choices shown in the edit-combo should be computed at render time, or dynamically, by making an Ajax callback every time you open the edit-combo.
If you choose the option to populate the edit combo at render time, you might still want to programmatically change the choices in the edit combo.
Here is the Javascript showing how it can be done:
//get a pointer to the edit-combo for 'TEXTBOX1'
obj = DLG1_DlgObj.fieldHelpers['TEXTBOX1'];
//define the new date for the edit-combo
var _d = ['Red','Green','Blue','Orange'];
//call the .setData() method to repopulate the
edit-combo
obj.setData(_d);
If you want to generate the new choices for the edit-combo by making an Ajax callback to the server, here is how the Xbasic function that handles the callback might be written:
This example is where the edit-combo shows a single column of data.
function xb_refreshData as c (e as p)
dim cn as sql::Connection
cn.open("::Name::northwind")
sql = "select customerid from customers where country = 'uk'"
cn.Execute(sql)
rs = cn.ResultSet
dim txt as c
txt = rs.ToString()
dim data as c
data = js_list_to_array(txt)
dim js as c
js = "var obj = {dialog.object}.fieldHelpers['TEXTBOX1']; "
js = js + "var _d = " + data + ";"
js = js + "obj.setData(_d);"
xb_refreshData = js
end function
This example is where the edit-combo shows a multiple columns of data.
function xb_refreshData as c (e as p)
dim cn as sql::Connection
cn.open("::Name::northwind")
'note that we alias the columns in the SQL statement with field names
'that are capitalized. this is because Javascript is case-sensitive and the
'property names in the JSON data that is used to populate the edit-combo
'are all capitalized. the column aliases will be uses for the property names
'when the .ToJSONObjectSyntax() method is called.
sql = "select customerid as [CUSTOMERID], contactname as [CONTACTNAME] from customers where country = 'uk'"
cn.Execute(sql)
rs = cn.ResultSet
dim txt as c
txt = rs.ToJSONObjectSyntax()
dim data as c
data = "[" +
stritran(alltrim(txt),crlf(),"
dim js as c
js = "var obj = {dialog.object}.fieldHelpers['TEXTBOX1']; "
js = js + "var _d = " + data + ";"
js = js + "obj.setData(_d);"
xb_refreshData = js
end function
UX and Grid Controls - Button Icons and Text - Setting Dynamically - In the case of 'advanced' buttons (all buttons in a UX are, by default 'advanced' buttons and 'Action Buttons' in a Grid are 'advanced' buttons), you can dynamically set the button icon, or button text by setting properties in the underlying button object, then refreshing the button object.
For example:
var bc = {dialog.object}.getControl('MYBUTTON1');
bc.icon = 'cssIcon=FontAwsomeIconHere';
// optionally you can also set 'hoverIcon', 'pressedIcon',
and 'disabledIcon'
bc.refresh();
UX Component - List Control - Cascading Lists - Delay Render - The UX component makes it very easy to create cascading Lists. For example, say you have 3 Lists:
You can easily configure the orders List to specify that the customer List is its parent List and the orderDetails List to specify that the orders List is its parent.
If you specify that a List has a parent, then when you click on a row in the parent List, ajax callbacks are automatically made to refresh the child Lists.
Now, assume that each List is placed in its own PanelCard and the PanelCards are wrapped in a PanelNavigtor. Further assume that for each List you have checked the 'Delay render till visible' property.
The desired behavior is that when the UX is initially rendered, ONLY the customer List is rendered. Then when the user clicks on a row in the customer List, a single ajax callback is made to populate the order List and the PanelCard that contains the orders List gets focus.
Next, when the user clicks on a row in the orders list, again a single ajax callback is made to populate the orderDetails list and the PanelCard containing OrderDetails gets focus.
However, if you set up your UX as described above, when you click on a row in the customer List, you will notice that there are two ajax callbacks and that the orders List is refreshed twice - not once as desired. The first ajax callback occurs because the customer List automatically refreshes all of its child Lists when the user selects a row in the List. The second callback occurs because the PanelCard that contains the orders List gets focus and the orders List was configured to render when it becomes visible.
To solve this problem here is how the setup of the UX component must be changed.
So, for example, in the onSelect event for List1 (the customer List), the following code is executed:
var l = {dialog.object}.getControl('list2');
l._hasBeenRendered = false;
var l = {dialog.object}.getControl('list3');
l._hasBeenRendered = false;
{dialog.object}.panelSetActive('PANELCARD_2');
This event sets the ._hasBeenRendered property for list2 and list3 to false, and then gives focus to PANELCARD_2. When PANELCARD_2 gets focus, list2 is rendered (an ajax callback is made). This is the only callback that is made. Because the orders List (list2) no longer has its 'Has Parent List' property set, no callback triggered by simply clicking on a row in the customer list.
Similarly, the onSelect event for List2 (the orders List), the following code is executed:
var l = {dialog.object}.getControl('list3');
l._hasBeenRendered = false;
{dialog.object}.panelSetActive('PANELCARD_3');
The sample component which uses Northwind demonstrates the concepts discussed in this topic.
UX Component - List Control - Sort Icon Position - By default, when you sort the data in a List column, the sort icon shows to the right of the Column heading. If you are working with a RTL language, such as Arabic or Hebrew, you might want the sort icon on the left of the column heading (as shown below):

This is easily done by customizing the component style. You can either make a change to the style sheet (which will affect all of your components). Or you can make a local change to affect just the UX that you are designing.
To define the changes so that they are local to the current component, edit the 'Local sub-theme definition' as shown below:

Edit the Javascript as shown below.
You can start by clicking the 'Show style.js file for current style' hyperlink. The search for 'listbox'. Copy the JSON to the clipboard and paste into the editor. You will need to wrap the pasted text in opening and closing curly brackets as shown in the image. The make the edit shown in yellow highlight below.

You will also need to make this change to the CSS:

Of course, if you are not using iOS7, but some other style, you will need to use the appropriate style names.
UX Component - Tree Control - How to Save and Restore the Open/Close State of Tree Nodes - Consider a UX that has a tree control with multiple levels of nested branches. Assume that the user has carefully navigated in the tree, opening some branches, while leaving others closed. The user would then like to save the 'state' of the tree so that at a future time, they can easily restore the state of the tree to its current state.
This is easily done with some simple Javascript that captures and restores the state. Below are two function. The first captures the tree state and stores it in a variable in the Dialog object. The second restores the tree state.
function getstate() {
//get a pointer to the tree control
var t = {dialog.object}.getControl('tree1');
//get the tree data and stringify
it.
var js = JSON.stringify(t.data);
//store in a variable in a dialog
object
{dialog.object}.treeData = js;
}
function setstate() {
//get a pointer to the tree
var t = {dialog.object}.getControl('tree1');
//get the stored data. parse it into an object
var d =
JSON.parse({dialog.object}.treeData);
//reopulate the tree
t.populate(d);
}
UX Component - Map Control - List Control - Add Markers to Map Using Data From List - Assume you have a List control with multiple records. Each record has a lat/lng value. You would like to add a marker to the map for each row in the List. You can certainly do this by using a built-in action in Action Javascript to 'Add multiple markers to a map'. However, the Action Javascript action involves making an Ajax callback.
Since the List already has lat/lng data for all of the markers you want to add to the map, it would be nice to be able to add the markers to the map without having to do an Ajax callback.
Here is a working example.
To do this, add a button to the List that calls the addMarkers() function.
Here is the definition of the addMarkers() function
function addMarkers() {
//get a pointer to the list
var lObj = {dialog.object}.getControl('list');
//get the list data
var _d = lObj._data;
//get a pointer to the map control
var m1Obj = {dialog.object}.getControl('map1');
m1Obj.removeMarkerGroup('GROUP1');
var _dr = '';
//loop through all of the rows in the list
//reading the 'name', 'city', 'state', 'latitude' and 'longitude'
//columns in the list.
for (var i = 0; i < _d.length; i++) {
_dr = _d[i];
delete _s;
_s = {};
_s.group = 'GROUP1'
_s.title = _dr.name ;
_s.detail = {};
_s.detail.has = true;
_s.detail.data = _dr.city + ' - ' + _dr.state;
m1Obj.addMarker('MARKER_' +
i,[Number(_dr.latitude),Number(_dr.longitude)],_s);
}
m1Obj.viewMarkerGroups('GROUP1');;
}
UX Component - Tabular Lists - Showing and Hiding Lists - When a columnar List is shown after initially having been hidden, the List will not render correctly until is has been explicitly refreshed. Here is how you can refresh a columnar List so that it displays correctly after having been shown:
var lObj = {dialog.object}.getControl('mylist');
lObj.refresh();
NOTE: This comment does not apply to free-form Lists. Free-form Lists do not need to be explicitly refreshed.
PhoneGap Application - iOS StatusBar - In iOS, it is common to have the status bar at the top of the screen (with time, Wifi, and battery information) display as an overlay of the app. For many designs this can be a problem. You might rather have the "old" style of having a separate status bar above the active area of the screen. You might also want to specify the color of the background of that bar (for example, to match or complement the top of your app) and text. PhoneGap gives you an optional "Status Bar" 3rd Party plug-in to customize the status bar on iOS.
See example code in next topic.
Android Back Button - In Android, users often expect the device's "Back" button to control the app. By default, in PhoneGap, this will just exit the app and go back to the previous app. If you have popup windows, or detail views, the users will expect (and their fingers will be trained) to dismiss pop-ups or go back up the view list. See "Navigation with Back and Up" on the Android Developers web site: http://developer.android.com/design/patterns/navigation.html
Here is some code that can be placed in your app (such as in the
Javascript functions or the onRenderComplete Client-Side Event:
// PhoneGap start up and initialization
document.addEventListener('deviceready', function() { // PhoneGap
started
var platform = device.platform;
switch (platform) {
case "Android":
// back button support
document.addEventListener('backbutton', handleBackButton, false);
break;
case "iOS":
if (typeof
StatusBar === 'undefined') break;
// configure statusbar in iOS 7+
StatusBar.overlaysWebView(false);
// Light statusbar text color. Use StatusBar.styleDefault() for dark
text.
StatusBar.styleLightContent();
StatusBar.backgroundColorByHexString("#3355AA"); // Hex RGB value,
similar to CSS
break;
}
}
);
function handleBackButton(e) { // Android back button event handler
// Go through UI items in priority order to do "back"
operation
var winobj = {dialog.Object}.getWindow('INTROWINDOW'); // Is
this window popped up?
if (!winobj.hidden) {
winobj.hide(); // no - hide and
finish
return;
}
winobj = {dialog.Object}.getWindow('SETTINGSPOPUP'); //
another potential window
if (!winobj.hidden) {
winobj.hide();
return;
}
. . .
var panel = {dialog.object}.panelGet('OVERALLLAYOUT'); // is
a docked panel being shown?
if (panel.state.dockPanelShown) {
panel.hideDock(); // yes - hide it
and finish
return;
}
if (canGoBack()) { // do normal user-initiated "back"
operation in app (like a browser)
doBackForward(+1);
return;
}
// nothing left - exit app
e.preventDefault();
navigator.app.exitApp();
}
Note that the "back" handling seems to work in Android 4.3, but may not
work in earlier versions.
Xbasic Classes - Property Getter and Setter Functions - You can create special .get() and .set() functions to read and write property values in a class. For example, in the class below the 'foo' property of the class has a .get() and .set() function. These functions are automatically invoked when you try to set or get the value of the classes' .foo property.
define class mynamespace::mySampleClass
dim _foo as c = "hello"
function sampleMethod1 as v()
ui_msg_box("sampleVar1",sampleVar1)
end function
function foo.get as c ()
foo.get = _foo
end function
function foo.set as v (value as c )
_foo = upper(value)
end function
end class
Using this class:
dim x as mynamespace::mySampleClass
?x.foo
= "hello"
x.foo = "Goodbye"
?x.foo
= "GOODBYE"
Calling SOAP Web Services From Xbasic - This topic shows 'real world' examples of Xbasic code that call SOAP web services.
Examples are provided here for WorldPay (a credit card processing company), Kareo (a medical billing software company) and Norman G Jensen, Inc (a provider of freight brokerage services).
The source code is extensively commented and is intended as a learning vehicle to help you write code to call these and other similar SOAP web services.
WorldPay
WorldPay provides credit card processing as a web service. For more
information go to
http://www.worldpay.com/us.
The function below encapsulates the process of charging a credit card using the
world pay service.
This example was provided by Max Hammond, who has extensive experience using
Alpha Anywhere with SOAP web services.
FUNCTION WorldPay_ProcessCC AS CallResult (acctid AS C, ccname
AS C, ccnum AS N, amount AS N, expmon AS N, expyear AS N )
dim Result as CallResult
on error goto errorWp_ProcessCC
dim webLink as c = "https://trans.worldpay.us/Web/services/TransactionService?wsdl"
dim assemblyFile as C = "C:\Program Files (x86)\a5V12\WorldPayService.DLL"
dim webEndpoint as c = "https://trans.worldpay.us/Web/services/TransactionService"
dim sv as DOTNET::Services
dim ay as DOTNET::AssemblyReference
ay.FileName = assemblyFile
' This extra call does the heavy lifting and registers the assembly DLL.
' If the assembly does not exist, create one.
if .not. File.Exists(ay.FileName)
if .not. sv.GenerateWCFWebServiceClientFromURL(webLink,
ay.FileName)
Result = sv.CallResult
end if
end if
' Load the assembly into the Alpha Anywhere type system.
if Result.Success
if .not. sv.RegisterAssembly("WorldPay", ay)
Result = sv.CallResult
end if
end if
if Result.Error
goto doneWp_ProcessCC
end if
' Set up HTTP Binding
' The binding object determines how we will communicate with the web service.
' This includes the underlying network transport, credentials
dim b as System::ServiceModel::BasicHttpBinding
b.MessageEncoding = System::ServiceModel::WSMessageEncoding::Text
' The settings below will depend on the service.
' We want sufficient capacity to retrieve very large nested structures.
' If you get an error that you have exceeded a size, make the adjustment here.
b.MaxReceivedMessageSize = 10485760
b.maxBufferSize = 10485760
b.MaxBufferPoolSize = 10485760
b.ReaderQuotas.maxDepth = 32
b.ReaderQuotas.MaxStringContentLength = 10485760
b.ReaderQuotas.MaxArrayLength = 16384
b.ReaderQuotas.MaxBytesPerRead = 4096
b.ReaderQuotas.maxNameTableCharCount = 16384
' Set up the security.
' In this case, we are using transport level security a UserName credential over
SSL and will provide a user name credential.
b.Security.Mode = System::ServiceModel::SecurityMode::Transport
b.Security.transport.ClientCredentialType =
System::ServiceModel::HttpClientCredentialType::None
b.Security.Transport.ProxyCredentialType =
System::ServiceModel::HttpProxyCredentialType::None
b.Security.Transport.Realm = ""
b.Security.Message.ClientCredentialType =
System::ServiceModel::BasicHttpMessageCredentialType::UserName
b.Security.Message.AlgorithmSuite =
System::ServiceModel::Security::SecurityAlgorithmSuite::Default
' Create an endpoint. This is the address information needed to find the service on the web.
dim endpoint as system::ServiceModel::EndPointAddress = new System::ServiceModel::EndPointAddress(webEndpoint)
' Create Client for WorldPay Service using endpoint and bindings
dim Client as WorldPay::TransactionSOAPBindingImplClient = new
WorldPay::TransactionSoapBindingImplClient(b, endpoint)
' Create Web Request using WorldPay Client
dim WebRequest as WorldPay::processCCSaleRequest
WebRequest.ccinfo = new WorldPay::CreditCardInfo()
WebRequest.ccinfo.acctid = acctid
WebRequest.ccinfo.ccname = ccname
WebRequest.ccinfo.ccnum = ccnum
WebRequest.ccinfo.amount = amount
WebRequest.ccinfo.expmon = expmon
WebRequest.ccinfo.expyear = expyear
' Make Web Service Call to WorldPay
dim WPResponse as p
WPResponse = Client.ProcessCCSale(WebRequest)
' End process in error or success
goto doneWp_ProcessCC
errorWp_ProcessCC:
on error goto 0
Result.Code = error_code_get()
doneWp_ProcessCC:
WorldPay_ProcessCC = Result
END FUNCTION
Kareo
Kareo Medical Billing Software provides a comprehensive web service to manage practices. For more information go to
http://www.kareo.com.
The sample code below was provided by Max Hammond, who has implemented a product using Alpha Anywhere and Kareo.
The following functions are included:
FUNCTION GetAppointments as CallResult (WSDLWebLink as C, ServiceWebLink as C,
AssemblyFile as C, CustomerKey as C, User as C, Password as C, ConnectionString
as C, PracticeName as C)
on error goto errorGetAppointments ' To catch the dim of service objects
dim Result as CallResult
' This extra call does the heavy lifting and registers the assembly DLL
CreateService(WSDLWebLink, ServicePointWebLink, AssemblyFile)
dim RequestHeader as Kareo::www::Kareo::com::api::Schemas::RequestHeader
RequestHeader.CustomerKey = CustomerKey
RequestHeader.User = User
RequestHeader.Password = Password
dim AppointmentsRequest as
kareo::www::kareo::com::api::schemas::GetAppointmentsReq
dim GetAppointmentsRequest as Kareo::GetAppointmentsRequest
AppointmentsRequest.RequestHeader = RequestHeader
GetAppointmentsRequest.request = AppointmentsRequest
dim Service as Kareo::KareoServicesClient = CreateService(WebLink,
EndPointWebLink, AssemblyFile)
' Create the filter for the GetAppointments call
dim filter as Kareo::www::kareo::com::api::schemas::AppointmentFilter
filter.FromLastModifiedDate = date()-30
filter.ToLastModifiedDate = date() + 10
filter.PracticeName = PracticeName
AppointmentsRequest.Filter = filter
' Set the fields you want populated in the return by marking them as true
dim fields as Kareo::www::kareo::com::api::schemas::AppointmentFieldsToReturn
fields.AllDay = .t.
fields.AppointmentReason1 = .t.
fields.AppointmentReason10 = .t.
fields.AppointmentReason2 = .t.
fields.AppointmentReason3 = .t.
fields.AppointmentReason4 = .t.
fields.AppointmentReason5 = .t.
fields.AppointmentReason6 = .t.
fields.AppointmentReason7 = .t.
fields.AppointmentReason8 = .t.
fields.AppointmentReason9 = .t.
fields.AuthorizationEndDate = .t.
fields.AuthorizationID = .t.
fields.AuthorizationInsurancePlan = .t.
fields.AuthorizationNumber = .t.
fields.AuthorizationStartDate = .t.
fields.ConfirmationStatus = .t.
fields.CreatedDate = .t.
fields.EndDate = .t.
fields.ID = .t.
fields.LastModifiedDate = .t.
fields.Notes = .t.
fields.PatientCaseID = .t.
fields.PatientCaseName = .t.
fields.PatientCasePayerScenario = .t.
fields.PatientFullName = .t.
fields.PatientID = .t.
fields.PracticeID = .t.
fields.PracticeName = .t.
fields.Recurring = .t.
fields.ResourceName1 = .t.
fields.ResourceName10 = .t.
fields.ResourceName2 = .t.
fields.ResourceName3 = .t.
fields.ResourceName4 = .t.
fields.ResourceName5 = .t.
fields.ResourceName6 = .t.
fields.ResourceName7 = .t.
fields.ResourceName8 = .t.
fields.ResourceName9 = .t.
fields.ServiceLocationName = .t.
fields.StartDate = .t.
fields.Type = .t.
' Create the GetAppointmentsRequest object with the request information
dim Response as p
' Make the service call
Response = Service.GetAppointments(GetAppointmentsRequest)
' Get the appointment information out of the response.
AppointmentsResponse = Response.GetAppointmentsResult
if AppointmentsResponse.ErrorResponse.IsError
Result.Code = -1
Result.Text = AppointmentsResponse.ErrorResponse.ErrorMessage
elseif .not. AppointmentsResponse.SecurityResponse.SecurityResultSuccess
Result.Code = -2
Result.Text = AppointmentsResponse.SecurityResponse.SecurityResult.ToString()
else
Result = LoadAppointments(AppointmentsResponse.Appointments, ConnectionString)
end if
Result.Code = error_code_get()
goto doneGetAppointments
errorGetAppointments:
on error goto 0
doneGetAppointments:
on error goto 0
GetAppointments = Result
END FUNCTION
The functions below make it easier to populate service requests.
FUNCTION CreateService as Kareo::KareoServicesClient(DefinitionWebLink as C,
EndPointWebLink as C, AssemblyFile as C)
' Make sure the client proxy DLL is created and loaded and create a client proxy
(an object we can make service calls on).
dim Result as CallResult = RegisterServiceDLL(DefinitionWebLink, AssemblyFile)
if .not. Result.Success
error_generate(Result.Code)
end if
' Set up HTTP Binding
' The binding object determines how we will communicate with the web service.
' This includes the underlying network transport, credentials
dim b as system::ServiceModel::BasicHttpBinding
b.MessageEncoding = System::ServiceModel::WSMessageEncoding::Text
' The settings below will depend on the service.
' We want sufficient capacity to retrieve very large nested structures.
' If you get an error that you have exceeded a size, make the adjustment here.
b.MaxReceivedMessageSize = 20485760
b.maxBufferSize = 20485760
b.MaxBufferPoolSize = 10485760
b.ReaderQuotas.maxDepth = 32
b.ReaderQuotas.MaxStringContentLength = 10485760
b.ReaderQuotas.MaxArrayLength = 16384
b.ReaderQuotas.MaxBytesPerRead = 4096
b.ReaderQuotas.maxNameTableCharCount = 16384
' Set up the security.
' In this case, we are using transport level security a UserName credential over
SSL and will provide a user name credential.
b.Security.Mode = System::ServiceModel::SecurityMode::Transport
b.Security.transport.ClientCredentialType =
System::ServiceModel::HttpClientCredentialType::None
b.Security.Transport.proxyCredentialType =
System::ServiceModel::HttpProxyCredentialType::None
b.Security.Transport.Realm = ""
b.Security.Message.ClientCredentialType =
System::ServiceModel::BasicHttpMessageCredentialType::UserName
b.Security.Message.AlgorithmSuite =
System::ServiceModel::Security::SecurityAlgorithmSuite::Default
' Create an end point object to represent the address of the server.
dim e as system::ServiceModel::EndPointAddress = new
System::ServiceModel::EndPointAddress(EndPointWebLink)
' Create the service object using the binding and the endpoint
dim MyService as Kareo::KareoServicesClient = new Kareo::KareoServicesClient(b,
e)
' There are some quotas that are harder to set.
' This utility function will take care of this in one place.
SetSvcGraphObjectQuota(MyService)
CreateService = MyService
END FUNCTION
FUNCTION RegisterServiceDLL as CallResult (WebLink as C, AssemblyFile as C)
' This function retrieves the Web Service Definition Language (WSDL) XML file
and generates a local .NET proxy.
' The proxy assembly is registered in Alpha Anywhere as a namespace (set of
types) and can be used
' as any other .NET type to make web service calls.
on error goto errorRegisterServiceDLL
dim Result as CallResult
dim sv as dotnet::Services
dim Assembly as dotnet::AssemblyReference
'Create Web Service Client and Register
Assembly.FileName = AssemblyFile
if .not. File.Exists(AssemblyFile)
if .not. sv.GenerateWCFWebServiceClientFromURL(WebLink, AssemblyFile)
Result = sv.CallResult
end if
end if
if Result.Success
if .not. sv.RegisterAssembly("Kareo", Assembly)
Result = sv.CallResult
end if
end if
goto doneRegisterServiceDLL
errorRegisterServiceDLL:
on error goto 0
Result.Code = error_code_get()
doneRegisterServiceDLL:
on error goto 0
RegisterServiceDLL = Result
END FUNCTION
FUNCTION SetSvcGraphObjectQuota as CallResult (Service as P)
' This utility function sets the maximum number of objects in the serializer.
' The serializer packages and unpackages the request as it is send over the Web.
' You should only need to do this for services that return large amounts of
data.
dim Result as CallResult
on error goto errorQuota
Operations = Service.Endpoint.Contract.Operations
for i = 1 to Operations.Count
Operation = Operations[i]
Behaviors = Operation.Behaviors
Enumerator = Behaviors.GetEnumerator()
while Enumerator.MoveNext()
Current = Enumerator.Current
if Current.gettype().FullName = "System.ServiceModel.Description.DataContractSerializerOperationBehavior"
Current.MaxItemsInObjectGraph = 2147483647
end if
end while
next
goto doneQuota
errorQuota:
Result.Code = error_code_get()
doneQuota:
SetSvcGraphObjectQuota = Result
END FUNCTION
Norman G. Jensen
Norman G. Jensen, Inc (JGJ) provides US and Canadian customers brokerage, freight forwarding, warehousing,
distribution and consulting services to North American importers and exporters.
For more information about the
company see http://www.ngjensen.com.
This script example downloads the service definition, generates and loads a
client proxy assembly and then calls a service
function that accepts raw XML requests.
dim WebLink as C = "https://forms.ngjensen.com/library/aes_jt_service.php?wsdl"
dim DLLName as C = "c:\temp\aesV12.dll"
dim EndPointWebLink as C = "https://forms.ngjensen.com/library/aes_jt_service.php"
dim Result as CallResult
' Test Values - See Jensen documentation for actual values.
Authorization = 12345
IPAddress = "127.0.0.1"
XML = "<?xml version='1.0'?><NGJDocument><DocInfo ... >"
Result = CreateDLL(WebLink, DLLName)
if Result.Sucess
Result = RegisterNamespace(DLLName, "submit_xml")
end if
if Result.Success
Result = SubmitXML(EndPointWebLink, Authorization, IPAddress, XML)
end if
FUNCTION CreateDLL as P (WebLink as C, AssyFile as C)
CreateDLL = new CallResult()
if File.Exists(AssyFile)
end function
end if
dim Service as DotNet::Services
if .not. Service.GenerateWebServiceClientFromURL(WebLink, AssyFile)
CreateDLL = Service.CallResult
end if
end function
FUNCTION RegisterNameSpace as P (AssyFile as C, NameSpace as C)
' Load the assembly and register the types in Alpha Anywhere
RegisterNameSpace = new CallResult()
dim Service as DotNet::Services
dim AssyRef as DotNet::AssemblyReference
AssyRef.FileName = AssyFile
Dim Result as CallResult
if .not. Service.RegisterAssembly(NameSpace, AssyRef)
RegisterNameSpace = Service.CallResult
end if
end function
function SubmitXML as C (EndPointWebLink as C, Authorization as C, IPAddress as
C, XML as C)
dim AES as submit_xml::AES_Methods
dim cc as c
cc = AES.js_submit_xml(Authorization, IPAddress, XML)
SubmitXML = cc
end function
UX Component - List of Switches - A common design pattern in mobile applications is to have a series of switch controls to set logical values. The screenshot below shows how this might look.

Here are some of the important settings for each switch control:

Notice that the 'Control Container Classname' property property has been set to a custom class name. The definition is shown below.
In the CSS, we first set the control container to have a relative
position - which means all absolutely positioned child elements will be
positioned relative to the parent - allowing parent width and position
to be honored be the child.
We then set the first level of child DIVs (of which there is only one -
the switch itself - the label is a LABEL element) to have an absolute
position, a specific width, and a right location of 0px - which means it
will stick to the right of the parent.
.switchCtrlGroup {
position: relative;
}
.switchCtrlGroup > div {
position: absolute;
right: 0px;
width: .75in;
}
Web Application - PhoneGap - If you have a lot of applications in PhoneGap build, retrieving the app icon for each app can be slow because the PhoneGap build API does not have a call to retrieve all icons at once. You have to call the API once for each app. Therefore, a new property has been added to the Get Icon Timeout Threshold property. If you set this property to <disable>, a default icon will be used.
AlphaDAO - MySQL - Numeric Fields with 7 or More Decimals - Fixed an issue with MySQL where you could not enter numbers with more than 6 decimal places.
Grid Component - Setting State Variables - Fixed an issue where setting state variables using the e._state pattern was not working in the AfterInsert, AfterUpdate and AfterDelete server-side events.
| UX Component | Multi-select List Control - Icon to Indicate Selected Rows |
The Button List control (and the Checkbox
control - configured to render as a Button List)
can show an icon on selected items. The List
control can also be configured to allow multiple
selections (like a Button List or Checkbox), but
it does not show an icon on the selected rows to
indicate the row has been selected (it shows
selected rows using a different row color). In this video we show how you can easily display an icon on the selected rows. The technique uses a custom CSS class. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| UX Component | Making a TextArea Fill a PanelCard |
Controls such as Lists and Maps have a 'Fill
container' property that allow you to
automatically cause the List or Map to fill the
Panel Card in which the control is contained.
Other controls, such as Text Areas, do not have
this property. In this video we show how you can configure the UX so that the Text Area control automatically fills the Panel Card in which it is contained. Watch Video Download Component |
UX and Grid Component - Image Upload Action - Image Scaling - Fixed issue with scaling image after it was uploaded.
Calendar Component - Editing Events - Fixed an issue editing an event the second and subsequent time. This issue was introduced in build 2089.
UX Component - Phone Gap - Fixed an issue with PhoneGap where Ajax callbacks were failing and images that were loaded from the server were failing.
AlphaDAO - SQL::TableInfo - ParseTableName() Method - A new static method has been added to the SQL::TableInfo object. The .ParseTableName() method takes a fully qualified tablename and returns the base table name, owner, schema and catalog for the table.
For example
dim CatalogName as C
dim SchemaName as C
dim OwnerName as C
dim BaseTableName as C
dim FullName as C = "dbo.[hello.world]"
dim ti as sql::tableinfo
?ti.ParseTableName(CatalogName, SchemaName, OwnerName,
BaseTableName, FullName)
= .T.
?CatalogName
= ""
?SchemaName
= ""
?OwnerName
= "dbo"
?BaseTableName
= "dAgency.06"
?fullname
= "[dAgency.06]"
UX Component - Action Javascript - Panel Actions - Navigate Action - History - The 'Navigate' action now has new options. The options with the 'History' prefix allow you to navigate through the Panel Navigator's history (much list the way a browser's history button works).

Code Editors - Xbasic and Javascript - Bookmarks - You can now get quick access to any bookmarks you insert into the script or function you are editing by clicking the 'Bookmark' icon on the status bar.
A bookmark is any comment that starts with //.
For example:
'//bookmark1 (Xbasic)
//''Bookmark1 (Javascript)

AlphaDAO - Listing Tables in a Database - When you use the <connection>.listTables() or <connection>.listTablesWithTypes() methods to list the tables in a database, by default, only the first 1,000 objects are listed.
As a result of this, many of the builders you use in AlphaAnywhere that require you to select a table only present a list showing the first 1000 tables in the database. Now, a new setting in the Settings dialog box allows you to set the maximum number of tables returned in a table listing.
To open the Settings dialog box, select the top-level View menu, then select Settings.

If you are using AlphaDAO to get your own listing of tables in an object, the SQL::TableFilter object which is passed into the .listTables() and .listTablesWithTypes() method now allows you to set the .MaximumTablesInList property on the SQL::TableFilter object. Set this property to -1 for no limit.
For example:
dim sqlFilter as sql::TableFilter
sqlFilter.IncludeAliases= .t.
sqlFilter.IncludeAllCatalogs= .F.
sqlFilter.IncludeAllOwners= .F.
sqlFilter.IncludeAllSchemas= .T.
sqlFilter.IncludeLinkedTables= .f.
sqlFilter.IncludeSynonyms= .t.
sqlFilter.IncludeSystemTables= .f.
sqlFilter.IncludeTables= .t.
sqlFilter.IncludeViews= .t.
sqlfilter.MaximumTablesInList = 2000
dim cn as sql::connection
cn.open("::name::myconnection")
dim list as c
list = cn.listTables(sqlFilter)
Tip: You can use the Xbasic helper function to list tables and automatically honor the setting you have defined in the Settings dialog. The helper functions are a5_list_tables() and a5_list_tables_with_types(). The functions take the connection object as the first parameter and the sql::tableFilter object as the second parameter.
AlphaDAO - Connection Strings - Postgres - Specifying the Default Schema - When working with a Postgres database that contains multiple schemas, you can specify the default schema in the connection string. Unfortunately, at this point, the connection string dialog does not let you specify the default schema, but you can easily edit the generated schema to add the necessary directive to set the schema.
For example:
{A5API='PostgreSQL',A5Syntax='PostgreSQL',A5UseServerSidePrepare=Y,A5InitialCommand='SET SCHEMA ''TestSchema''', Database='Alphasports', Password='alpha',Port='5432',Server='localhost',UserName='postgres'}
In this example, the following directive has been added to the connection string:
A5InitialCommand='SET SCHEMA ''TestSchema'''
Notice that the entire argument to the A5SetInitialCommand is enclosed in single quotes. Therefore the schema name, which must also be enclosed in single quotes uses escaped single quotes (a double single quote).
UX Component - List Control - Multi-Select - If the List control was configured to allow multiple rows to be selected, when the UX was submitted, the selections in the List were not being returned as an array, as they should have been. Instead, they were being returned as a '\n' delimited string. This bug was introduced in the last update.
| Grid Component | Opening a UX from a Button on a Grid and Passing Information Into the UX |
You can open a UX component from a button on a
Grid using several different actions in Action
Javascript. For example, there are built-in
actions to edit the data in the current row of a
Grid using a UX. But sometimes you want to simply open a UX and pass information from the current row in the Grid to the UX. In this video we show how this is easily done by defining arguments in the UX component and then automatically setting the value of these arguments when the UX is opened. Watch Video - Part 1 Watch Video - Part 2 Download Component |
Application Server - OpenSSL - 'HeartBeat' Bug - The Application server now uses Version 1.0.1g of the 3rd party OpenSSL library which Alpha Anywhere uses. This updated library patches the so called 'HeartBeat' vulnerability in the OpenSSL library.
UX Component - List Control - Group Summaries - If you are using the {dialog.object}.groupSummary() method in a Group header or footer, you will need to edit the component and change the method to
this.groupSmmary()
The .groupSummary() function is now a method of the List object. Previously is was a method of the UX object.
Application Server - Warning. A
change has been made to the web security system to load the security
much faster. This change alters one of the published security files. If
a project is published from the latest pre-release to an older
application server, the older application server will report a 500
internal server error as it won't be able to read the new file.
The application server should be the same build
as the development program.
| UX and Grid Component | E-mailing a Report |
A common pattern in both the UX and Grid
component is to place a button on the component
to print a Report and display the Report in a
window, div or TabbedUI pane. However, instead
of displaying the Report, you might want to send
it as an email. The Action Javascript action to Print a Report has an option to call an Xbasic function when the Report has printed. In this video we show how you can use this option to e-mail the report using the Mandrill e-mail service. (Note: The sample function prototype shown in the video is only available in build 4241 or above.) Watch Video - Part 1 Watch Video - Part 2 |
| UX Component | Cross-domain Ajax Callback |
A cross-domain Ajax callback is a callback that
takes places to a server that is in a different
domain than the domain from which the component
was loaded. In this video we show how a callback is made to the Apple iTunes store and we contrast the difference between making the callback directly to the Apple site versus making a callback to the Alpha server first and then having the Alpha server make the call to the Apple site. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download component |
| UX and Grid Component | Using CSS Icons from the Font-Awesome Icon Font Library |
The Font-Awesome CSS Icon library (http://fontawesome.io) is bundled with Alpha
Anywhere and can be used in the UX, Grid and TabbedUI
components. In this video we show how to use the Font-Awesome font library and CSS icons in general. Watch Videos - Part 1 Watch Videos - Part 2 Watch Videos - Part 3
|
| UX and Grid Component | Using 3rd Party Icon Font Libraries (CSS Icons) |
There are many 3rd party Icon Font (CSS Icons)
libraries that can be used with Alpha Anywhere.
In this video we show how you can go to a source
of icon fonts (http://www.fontello.com/)and
download a font library that can then be
installed into Alpha Anywhere. Watch Video |
| UX Component | Using CSS Icons in a List - List Menus |
A common pattern in mobile applications is to
use a List control as the menu. This list
control is then displayed in a Panel Window that
animates in from the left side of the screen.
Icons are typically displayed for each menu
choice. CSS Icons are ideal for these types of
icons. In this video we show how a List can be
easily configured to display a menu. Each item
in the List has a CSS Icon in it. Watch Video |
| UX Component - Mobile Applications | Creating a 'Split-View' using the Pre-Defined 'Split-View' Template |
A common pattern in mobile application is the
'split-view' which shows a menu on the left and
a work area on the right. On a phone, were space
is limited, the menu is hidden and only shown on
demand, but on a tablet, the menu is always
shown. In this video we show how you can quickly
create a UX component that implements a
split-view by selecting one of the pre-defined
'split-view' templates. We then explain some of
the concepts behind the component. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 |
| UX Component | Split Buttons |
A split button is displayed as a regular button
and a smaller button with a dropdown icon. You
can have different event handlers for the
dropdown button portion of the button and the
regular portion of the button. When space is
constrained, you can use a single split button
to perform many tasks, while still giving the
user single click access to the last selected
task. In this video we show how you can use split buttons in your applications. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download components |
| UX Component | List Control - Lookup Columns |
The List control allows you to define 'lookup
columns' where the data in the column is 'looked
up' either by calling a Javascript function
(that you define), or by looking up the value in
some other List. A typical use case for this is a List that shows Order Details. Each row in the list has a 'productId' field. You would like to display the product name for each product id. In this video we show how to define Lookup Columns in a List. Watch Video Download Component (You will need to change the connection string for both lists to point to the sample Northwind database). |
| UX Component | List Control - Client-side Grouping and List Navigator |
Group breaks can be inserted into the List
control. The group breaks can be 'server-side'
group breaks, or 'client-side' group breaks. The
advantage of 'client-side' group breaks is that
they can be dynamically applied to the data in
the List. That means you can easily switch from
grouping the data by 'Lastname' to grouping by
'City', etc. You can also display summary values
in the group headers and footer. For lists that have group breaks (regardless of whether the group breaks were computed server-side or client-side), you can also display a List Navigator, which allows the user to easily scroll a long List. In this video we give an overview of client-side group breaks and the List Navigator. Then, we go into depth on setting up client-side grouping using Action Javascript (to apply the group breaks after the List is initially rendered) and in the List definition itself (so that when the List is initially rendered, the group breaks are shown). We also show how summary data can be inserted into a List header or footer. Watch Video - Overview Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download components |
| UX Component | List Control - Using Native SQL For List Data |
When you create a List control that is based on
SQL data, you must use Alpha Anywhere 'portable'
SQL. If you want to base you List on 'native'
SQL (which includes stored procedures), you must
define a 'custom' data source for the List and
then in the Xbasic function that returns the
data, you can use your native SQL. In this video we show how this can be done. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| UX Component | Drag and Drop - Dragging Rows from a Source List to a Target List |
A common design pattern in applications is to
allows users to drag items from one List to
another. The Alpha Anywhere Javascript library contains powerful drag and drop functions that allow you to easily enable this type of functionality. In this video we show how you can create a UX with two List controls and drag rows from one List to the other. Watch Video In this video we explain the Javascript code that enables this functionality: Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download component Addendum. The previous videos show drag/drop on a List using a mouse. However, the previous examples do not work on some mobile devices because on iOS (for example), the 'up' event fires on the element that initiated the 'down' event (and not on the element on which the up event took place, as you might have expected). The next video explains how the component shown in the previous videos can be slightly rewritten so that it works on a mobile device (and as a bonus, also allows re-ordering of the rows within a List). Watch Video Download component |
| UX Component | List Control - Range Searches |
The List control has a built-in action in Action
Javascript to filter the List. An Ajax callback
to the server is made and the query that
populates the List is executed with a filter
that is computed based on values in the search
control on the UX. Now, you can easily perform
'range' searches, as shown in this video. NOTE: Another way to perform a 'range' search is to use a single search control, turn on the 'Allow QBF' option and then enter the search value as a range using the .. (two dots) synax. For example, to search for quantity between 10 and 20, you would enter 10..20 in the search control. Watch Video |
| UX Component | Absolute Layout Container - Save as PDF |
The Absolute Layout container in a UX allows you
to place controls at absolute locations,
typically using a bitmap image of a form as a
background. You can use an action in Action
Javascript to save the contents of the Absolute
Layout container as PDF file and then download
the PDF to the client, or call some Xbasic
function to process the PDF file. This video shows how this is done using Action Javascript. Watch Video |
| UX Component | Internationalization - Language and Text Dictionary Tags |
Language or Text Dictionary tags are typically
used to internationalize the strings in a UX
component. However, adding the tags to a large
component can be tedious. This video shows how
the Internationalization Helper can be used to
automate this task. Watch Video |
| UX Component | Client-side Formatting for Numeric Data and Templates |
You can use format directives in the Templates
that the UX component List control uses to
display data. This allows you to easily format
numbers (for example show thousands separated by
commas with 2 decimal places) and apply
templates to strings (for example, show
'5551234567' as (555) 123-4567) The video shows how you can insert a format directive into a List template using the Number Format Genie. Watch Video |
| UX Component | Using a List Control to Display Detail Information (in Field/Value Pairs) for a Record |
A common pattern in mobile applications is to
display a List of records and then when the user
clicks on a row in the List to display a list of
fields and corresponding values for the row the
user clicked on, with one field/value pair per
line. In this video we show how a second List can be used to display the field/value pairs and how this List can be dynamically populated when the user clicks on a row in the main List of records Watch Video - Part 1 Watch Video - Part 2 Download component Addendum: In this video we show how you can enhance the UX by showing a message in the Detail List when no record is active in the primary List. Watch Video |
| UX Component | Dynamically Populating a List with Data from a SQL Database |
Populating a List dynamically with data from a
SQL database is a very common pattern in
application development. In this video we show
how this is easily done. In the video we show how a List control on a UX can be populated with customers in a country. The country is selected from a dropdown control. Watch Video - Part 1 Watch Video - Part 2 Download component |
| UX Component | Transform Data Type of List Data |
By default, the data type for each field in a
List is a Javascript string. In some cases you
might want the data type for a column to be a
Javascript date or number object. A benefit of transforming dates into true Javascript date objects is that you can then use date formatting in the template for the List. For example, when displaying a field called OrderDate in the the List, instead of specifying {OrderDate} in the template, you might specify {OrderDate:date('yyyy-MM-dd')} Watch Video Download component |
| UX Component | List Virtualization - Optimizing the List for Large Number of Rows |
When you are working with List controls that
contain a large number of rows (say several
thousand rows), it is advisable to turn on the
List's 'virtualization' feature. With
virtualization turned on, the List will only
render a small number of rows at a time (the
visible rows and some additional rows above and
below the visible rows). Turning on List Virtualization will dramatically reduce both the time taken to load the List and the amount of memory consumed by the List. Watch Video Download component |
| UX Component | List Control - Modeless Preview Window in List Builder |
When you are designing a List control in a UX
component, the List Builder is a modal dialog.
This means that you need to first close the List
Builder before you can preview the UX component
to see how your List control looks. However, while you have the List Builder open, you can click the Preview button to open a modeless preview window which you can keep open whiel you are working in the List Builder. Simply clicking on the Preview button will quickly refresh the preview shown in the window. Watch Video |
| UX Component | Action Javascript - Merge Data into Template |
Alpha Anywhere has a very powerful client-side
template engine that allows you to merge
Javascript data into templates to produce HTML
output that can then be displayed on your
component. This functionality is exposed in the 'Merge data into client-side template' action in Action Javascript. NOTE: Other videos explain the template syntax in more detail. Watch Video Download Component |
| UX Component | Using the Template Tester to Help Design Templates - Tutorial on Template Syntax |
The client-side template engine in the UX
component is very powerful, but to be able to
take full advantage of its power it is necessary
to understand the syntax used in the templates. In this video we demonstrate how to use the Template Tester and we walk through the various examples that are built into the Template Tester. The video gives an extensive overview of the template syntax. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 Watch Video - Part 8 |
| UX Component | List Control - Column Resizing |
The List control allows you to specify that
columns in the list are resizable. This video shows how you can set the resizable property at the individual column level. Watch Video Download Component |
| UX Component | Destroy Child UX Component |
A common pattern when building large mobile
applications is to break the app into multiple
sub-component which are called from a master
component. Once the child component is no longer needed, it is useful to be able to delete the component from memory in order to conserve the limited memory available in the browser. The {dialog.object}.destroyChildComponent() method can be used to delete child UX components from memory, as shown in this video. Watch Video Download Components |
| UX Component | Generate a component at run-time using Xbasic |
In most cases, the UX components that your
application uses will be built at design-time.
However, there may be use cases for UX
components that are generated dynamically at
run-time using Xbasic. The a5wcb_createDialogUsingXbasic() allows you to generate a UX component using Xbasic. In this video we show how a button on a UX makes an Ajax callback to generate a UX on the fly. Another button then opens this dynamically generated UX component. Watch Video Download Component |
| Code Editor | Highlighting Opening and Closing 'Pair' Delimiters |
When editing Xbasic or Javascript code, html,
JSON etc. it is often helpful to be able to see
the start and end of different 'pairs'. For
example in an Xbasic function call, highlighting
the opening an closing parentheses. Or in a
Javascript function, highlighting the opening
and closing curly braces. In some HTML text, the
opening and closing tags (e.g. <div>, <body>,
<p> , etc.) In addition, once a 'pair' has been identified, keyboard shortcuts (Control ] and Control-Shift ] ) allow you to quickly move focus from the start of the 'pair' to the end of the 'pair' or to select all of the text inside the 'pair'. Watch Video |
| UX Component | Using the List Scroller to Move Through the Rows in a List |
When working with virtualized Lists, it is
possible to have Lists that have a very large
number of rows. Navigating a very large List by
drag scrolling on the List body could be
cumbersome. To facilitate navigating large
Lists, a 'List scroller' can be added to the
List. The scroller shows a message while you are
dragging on it showing which row in the List
will be shown if you were to stop dragging on
the scroller. Using the scroller, you can very quickly navigate to any row in the List. The List Scroller is not limited to virtualized Lists. It can also be used with non-virtualized Lists. In this video we show how to add a List Scroller to a List and we show how you can quickly navigate to the last row in a virtualized List that contains 100,000 row of data. Watch Video Download component |
Application Server - OpenSSL - 'HeartBeat' Bug - The Application server now uses Version 1.0.1g of the 3rd party OpenSSL library which Alpha Anywhere uses. This updated library patches the so called 'HeartBeat' vulnerability in the OpenSSL library.
Postgres ODBC Driver - Version 9.03.01.00 - Bugs - Postgres has introduced a bug in the latest version of their ODBC driver that affects the Grid component. The only solution is to roll back to a previous version of the ODBC driver, or turn off write conflict checking for all updateable fields in the Grid.
Specifically, the driver fails when an expression is
included in the WHERE clause that tests a bound variable
for NULL-ness.
Here is a summary of the bug:
Consider the following sample Interactive window session:
dim args as sql::arguments
args.add("tags", "rain, snow")
?cn.execute("select * from test_table where :tags is
null", args)
This will fail and the error reported is:
The PostgreSQL ANSI ODBC driver reports 42P18 - ERROR:
could not determine data type of parameter $<n>; when
preparing SQL with an expression of the form:
<bound parameter> IS NULL.
Update: A work around has been added in the SQL generated by the Grid Component so that Grids will work with the 9.03.01.00 ODBC driver.
AlphaDAO - Postgres - Connection String - Changes
In Default Values Set By the Alpha Anywhere PostgreSQL
Extension Driver
The Alpha Anywhere PostgreSQL extension driver now
defaults the following connection string attributes:
Protocol=7.4-1
UseServerSidePrepare=1
Previously only the following were set:
B8=1 // B8 = UnknownsAsLongVarchar (rather than varchar)
B9=0 // B9 = Bools as Char
ByteaAsLongVarBinary=1
If these defaults do not work for your installation for
some reason, you will need to create and ODBC DSN and
use the Alpha Anywhere ODBC driver.
Setting Protocol=7.4-1 has been demonstrated by one
customer to dramatically improve performance with
PostgreSQL 9.3 on large batches of inserts (about 25%).
Reports - HTML Reports - Export to PDF, Excel, Word - International Dates - If your date format was set to dd/mm/yyyy then if you printed an HTML report that used dates in its filter expression and then you clicked a toolbar icon to export the report to PDF, Excel, or Word, the date filter was not applied correctly.
Reports - Quick Report Genie - Summary Fields - Fixed a bug where the Genie would crash if you edited a field that had summary values.
UX Component - Responsive Design Genie - Absolute Layout Containers - Textbox Controls with In-Place Buttons - Fixed an issue that caused the textboxes to not display.
TabbedUI Component - HTML Reports - Reports with Parameters that are Set to Prompt at Runtime - If you had an HTML report that was set to prompt for parameters at runtime, the first time you ran the report, the report would render correctly. But if you tried to run the report a second time (by entering new parameter values, but NOT first closing the Tab Pane), the report did not render.
UX Component - AbsoluteLayout Container - Text Control - Fixed a bug with text controls in an AbsoluteLayout container which caused controls that followed the text control to render in the wrong position.
Reports - Export to Word - In some cases, numeric fields in a report would not export correctly to Word.
UX Component - Absolute Layout Container - PanelOverlay Container - Content in an AbsoluteLayout container that was inside a PanelOverlay container did not render correctly.
Web Applications - Security Framework - MySQL - Under certain circumstances using MySQL tables for web security, deleting a user could fail. This has now been fixed.
Web Security Framework - CSS Icon Fonts - The new iOS7 and Android style sheets use icon fonts. The images were not displaying if the security framework was enabled because the font files did not have the appropriate security settings.
The web security framework will now recognize the the
new font files for CSS icon fonts. The page security
must be opened from the web security menu to add the new
types to the page security. Then publish any page to
add the new settings to security. If the Security cache
lifetime is set to 0, the application server must be
stopped and restarted to apply the changes.
UX and Grid Component - Edit-Compo - Populate using Ajax Callback - If an edit-combo is dynamically populated using an Ajax callback, previously, the Order By property was ignored and the list was automatically ordered by the columns in the display list. Now, the order by clause is honored. Many SQL databases do not allow an order by clause on columns that are not in the select list. Therefore, you may need to ensure that the columns in your order by clause are also in the list of fields to display.
Grid Component - Font-Awesome - Live Preview - When you did a Live Preview from a Grid component that used Font-Awesome CSS Icons, the Font-Awesome files were not getting published to the Live Preview folder.
Layout Table Reports - Absolute Position Cell - Calculated Fields - If you created a cell in a Layout Table report that used Absolute Positioning and placed calculated fields in the absolute layout, the calculated fields were not shown in the Absolute Layout editor when you opened the editor a second time to make edits to the cell.
Web Applications - Report Server - SQL Reports - Under some circumstances, a report based on a SQL database would fail to print when using the Report Server. The error message was reporting that the connection string could not be resolved.
UX Component - Signature Capture Control - Tab Control - If a signature capture control was placed in a tab pane that was not initially visible, when the tab pane was made visible the control did not work.
Desktop Applications - Security - If you set permission on a .dbf table to disallow edits, changes or deletes, the permissions were not being honored.
UX Component - Server-side Save Records to Table(s) Action - User Defined Events - Aborting the Action - The help in the function prototype for the various events (such as beforeRecordInsert, beforeRecordUpdate, etc.) describe that you can abort the action by setting
rtc.abort = .t.
The help is wrong. It should have read:
e.rtc.abort = .t.
e.rtc.abortReason = "Reason"
Desktop Applications - Forms - Embedded Browses - Entering New Records - There was a cosmetic issue during data entry into a one-to-one child table in an embedded browser. Consider the following set:
TableMaster===>TableChild1---->TableChild2
If you were entering a new record into the embedded browse and you entered a value in the field in TableChild1 that links TableChild1 to TableChild2 and there was no matching record in TableChild2 (in other words, you were creating a new record in both TableChild1 and TableChild2, rather than the more common case of a new record in TableChild1 that links to an existing record in TableChild2), then as soon as you tabbed out of a field in TableChild2, the data you entered would disappear. When you saved the record, the data you entered would then show up. This is fixed.
UX and Grid Component - Edit-Combo - Static Choices - The 'Filter method for required selection' property was not shown if the choices were set to 'Static'. (This property was shown for 'Dynamic' choices).
On Firefox, if you do not set this property to 'Progressive' and you have set the 'User must select from list' property to true, then you will not be able to hit the tab key to tab out of the control to the next control in the form.

Xbasic - Passing Function Arguments By Referencing - Array Indexers - If a numeric value was passed into a function and then that value was as an array indexer, it failed. For example:
function myFunc as c (arr as p, byRef myIndex as n)
dim result as c
result = arr[myIndex].name
myFunc = result
end function
However, if you did this, it would have worked:
function myFunc as c (arr as p, byRef myIndex as n)
dim result as c
result = arr[myIndex.value].name
myFunc = result
end function
Desktop Applications - Forms and Browse - Lookup Field Rules - Display a Dropdown - Fixed an issue when you could not edit entries in a control that was defined as a lookup.
Calendar Component - TabbedUI - If you had a TabbedUI component that opened multiple calendar components, then buttons in the popup UX component would only render in the last calendar component that was opened.
UX Component - Signature Capture Control - Data Binding to .DBF Tables - Fixed an issue in the signature control if the UX was bound to .dbf tables.
Grid Component - Tree Control Navigator - Session Variables in Custom SQL Statement - If you specified a custom SQL statement for any level of the tree and used session variables in the WHERE clause, the query would fail.
Grid Component - Search Part - Cascading Dropdown Boxes - 'Explicit' Option - If the 'Explicit' option was used for defining the filter for the child Dropdown box, the child Dropdown was not populated correctly when its parent's value was changed. This bug only happened for controls in the Search part.
Grid Component - Radiobutton and Checkbox Controls - 'Not in List' Rule - Numeric Fields - The 'Not in List' property was not exposed for Numeric fields.
UX Component - Map Control - Bulk Add Marker - If the latitude sub-series name in the Data Series was not called 'latitude' and the longitude sub-series name was not called 'longitude' the action would throw an error.
UX Component - RadioButton and CheckBox Controls - Render as ButtonList Option - Events - When you check the property to render a RadioButton or CheckBox control as a ButtonList, the standard Javascript events that can be defined for a RadioButton or CheckBox are meaningless. ButtonsLists expose two Javascript properties:
Therefore, when you check the 'Render as ButtonList' property all of the standard Javascript properties in the Property Sheet are hidden and the onClick and onSelect events, which are standard for ButtonLists are now exposed.
UX Component - Panels - Internet Explorer V11 - Fixed some issues with Panels not working correctly under IE11.
Security Framework - Security Log in - The
security log in process no longer checks user id and
password values to see if they meet validation rules.
The process will now attempt to log in with any
non-blank value. This check is now only performed when
user credentials are created or edited.
Xdialog - UpperCase Only Input Control - A new directive, ^, allows you to specify that an input control will only accept uppercase characters. If the user types in a lowercase character, it will convert to uppercase. Previously you could have created a template to only accept uppercase, but that would have prevented the user from entering non-alphabetic characters.
For example:
ui_dlg_box("Convert to Upper","[%^%.10name]")
Using a template:
ui_dlg_box("Convert to Upper","[%X=LLLLLLLLLL%.10name]")
UX Component - Additional Resource Files Property - A new property has been added to the UX builder that allows you to specify the names of any additional resource files. These are files in the Web Project folder that you want to ensure get published every time you publish the UX component.
This property is in the 'Other' section of the UX Properties pane in the UX builder.
Additionally, if this component has been specified as the 'initial' component in a PhoneGap project then these files are automatically copied into the PhoneGap project that is submitted to PhoneGap build.
The files entered into this list must be in the form of a cr-lf list of relative filenames (relative to the Web Project folder).
UX Component - List Control - Scrollers - List scrollers allow you to quickly navigate to a particular record in a List. You can drag on the scroller in much the same way that you drag on the 'thumb' portion of a scrollbar in a desktop application. When you stop dragging on the scroller, the corresponding row in the List is brought into view.
Watch Video
Download component
While you are dragging on the scroller, a message is displayed showing what record would be shown if you were to stop dragging. The contents of the message is completely customizable. It is actually a standard HTML List template and it supports all of the template features for List controls. The message can display fields from the data in the List.
The List scroller is particularly useful for virtualized Lists because a virtualized List can contain a very large number of rows. Using the scroller you can quickly navigate to any row in the List without having to drag scroll one screen at a time.
However, List scrollers are not limited to virtualized Lists. They can also be used with non-virtualized Lists.
(See below for information on Virtualized Lists).

To turn on the List scroller, check the 'Has scroller' property on the List Properties pane in the List builder.
You can use placeholders for any field in the List in the template.

UX Component - Customizing the Scroll Indicator - When you are drag scrolling on a List (or any container that supports drag scrolling), scroll indicators are displayed. You can now customize the appearance of these scroll indicators (or even turn them off).
To customize the scroll indicator settings, click the smart field for the 'Custom scroll indicator settings' property.

UX Component - List Control - Fixed Headers and Footers - List controls have always supported 'data' headers and footers. Data headers appear before the first row of data (below the List titles) and after the last row of data. When the List is scrolled, the data header and footer can scroll out of view.
Fixed headers and footers, on the other hand, appear above and below the List and are always visible regardless of how the List has been scrolled.
To turn on fixed headers and footers, check the appropriate property in the List Properties pane in the List builder.
TIP: To insert controls in the header or footer (e.g. input controls, buttons, etc), add the control to the UX and wrap then in an 'Injectible' container. The inject the contents into the header or footer as shown in the image below. When you open the header or footer editor you will see a hyperlink that generates the required code.

Code Editor - Highlighting - The code editor now highlights opening and closing parentheses, curly braces html tags (when editing HTML text) and long string delimiter (e.g. <<%txt% .... %txt%).

In the image below, the long string has curly braces (it is a JSON object). Because the long string uses the special
%html% delimiter, the curly braces are highlighted.

When the braces are highlighted, the right click menu has a new option - Select Pair... - which selects all of the text between the opening and closing brace.

The following keyboard shortcuts can be use when a 'pair' has been identified (i.e. the editor is highlighting the start and end of a pair.
Grid Component - Action Scripting - Send e-mail Action - Mandrill - Now supports the Mandrill service as a method for sending the e-mail.
Grid Component - Action Scripting - Send e-mail Action - Dynamically Computing Message Body -
The message body can now be dynamically generated using an Xbasic function.
UX Component - Action Scripting - Send e-mail Action - A new action is now available in Action Scripting to send an e-mail. This is the same action that is exposed in server-side Action Scripting in the After Dialog Validate server-side event handler.
CSS Editor - Source View - Quick Navigator - When you are editing CSS in the Source tab of the CSS editor, the toolbar now has a quick selector that allows you to quickly jump to any rule. For example in the screenshot below, clicking on the down arrow icon in the status bar has opened a menu showing all of the selectors in the code being edited.

JSON_standardize() function - Takes non-standard JSON and standardizes it. Also corrects for trailing commas in the JSON (which are illegal)
For example:
?json_standardize("{name: 'Fred', age: 21}")
{
"name": "Fred",
"age": 21
}
?json_standardize("{name: 'Fred', age: 21,}")
{
"name": "Fred",
"age": 21
}
UX Component - {dialog.object}.destroyChildComponent()
Method - A common pattern when building large mobile
applications is to break the app into multiple
sub-component which are called from a master component.
Once the child component is no longer needed, it is
useful to be able to delete the component from memory in
order to conserve the limited memory available in the
browser.
The {dialog.object}.destroyChildComponent() method can
be used to delete child UX components from memory.
Watch Video
UX Component - List Control - Column Resizing - You can now specify that individual columns in the List can be resized by the user at run-time. To specify that a column can be resized, check the 'Resizable column' property.

UX Component - Customize Scroll Indicator - List, Panel and Containers - You can now customer the scroll indicator for List controls, Panels and Containers. By default the scroll indicator for vertical scrolled content is on the right edge and the for horizontally scrolled content, it is on the top. However, you can set the position to left or bottom, and you can control the class and various offsets.
In the image below, the scroll indicator is shown on the left edge with a 20px offset.

To open the scroll indicator customization dialog, click the smart field button:

Client-side Templates - Allows you to merge complex Javascript data in richly formatted templates to produce HTML that can be displayed in a UX or Grid component.
NOTE: A powerful tool is available when you working with templates. See section below: 'Using the Template Tester'
NOTE: Templates use the A5.u.template.expand() Javascript function in the Alpha Anywhere Javascript library. See section below 'The A5.u.template.expand() Function'
The basic idea of client-side templates is that you have some Javascript data - typically a Javascript object, or an array of Javascript objects, and a template (with placeholders for data) and you merge the data into the template.
For example, take the following trivial example. Say you have a Javascript object defined as follows:
var data = {Firstname: 'Fred', Lastname: 'Jones'};
And a template defined as follows:
var template = 'Hello {Firstname} {Lastname}';
When you merge the data into the template, you will get a string that looks like this:
Hello Fred Jones
Technical Note: The syntax for the template is identical to the syntax for free-form templates in the List control and for individual columns in a columnar List control.
Of course, in a real application the template will likely also include HTML markup. For example:
var template = 'Hello {Firstname} <span class="class1">{Lastname}</span>';
Array Data
The data for the template can be an array of objects, in which case the template will be expanded for each object in the array.
For example:
var data = [
{Firstname: 'Fred', Lastname: 'Jones'},
{Firstname: 'John', Lastname: 'Smith'},
{Firstname: 'Sally', Lastname: 'Rome'}
];
Using the same template as above, this will produce this output:
Hello Fred Jones
Hello John Smith
Hello Sally Rome
Object Data
The data object can include sub-objects. For example
var data = {Firstname: 'Fred', Lastname: 'Jones', Address: { Street: '123 Main St', City: 'Boston', State: 'Ma' }};
The template to consume this data could then be defined as follows:
var template = 'Hello {Firstname} from {Address.Street} in {Address.City}';
Alternatively, the template could be defined as follows:
var template = 'Hello {Firstname} from {Address} {Street} in {City} {/Address}';
Notice that the template includes {Address} and {/Address}. Inside the {Address} block, the placeholders do not need to be fully qualified. You can use {Street}, rather than {Address.Street}
The {Address} placeholder is referred to as a 'scope' placeholder.
Both of these templates will produce the same output:
Hello Fred from 123 Main St in Boston
Array Data and Object Data Combined
In the Array Data example above, the data was in the form of a Javascript array. In many cases it will be preferable have the data as an object. So, instead of specifying the data for the template as:
var data = [
{Firstname: 'Fred', Lastname: 'Jones'},
{Firstname: 'John', Lastname: 'Smith'},
{Firstname: 'Sally', Lastname: 'Rome'}
]
You could specify it as:
var data = {
Customers: [
{Firstname: 'Fred', Lastname: 'Jones'},
{Firstname: 'John', Lastname: 'Smith'},
{Firstname: 'Sally', Lastname: 'Rome'}
]
}
The template to consume this data could then be defined as:
var arr = [];
arr.push('{Customers}');
arr.push('Hello {Firstname} {Lastname}');
arr.push('{/Customers}');
var template = arr.join('\n');
NOTE: The template is created by pushing individual lines into a Javascript array and then joining the array. This is simply a convenient technique for creating long strings in Javascript.
This template will produce this output:
Hello Fred Jones
Hello John Smith
Hello Sally Rome
Notice that since the {Firstname} and {Lastname} placeholders are nested inside the {Customer}...{/Customer} scope placeholders, it is not necessary to use fully qualified placecholders (e.g. {Customer.Firstname}).
The benefit of placing your array as a property of an object, rather than at the top level, is that you can then use the {*header} and {*footer} constructs, and you can compute summary information (such as the number of items in the array, an average value of a field in the array, etc).
Client-side Template Syntax
There are a rich set of template directives that make templates both extremely powerful and also easy to use.
{scope} Placeholders
If the data passed to the template expand function contains nested objects, or arrays, you can use special {scope} placeholders, where scope is the name of nested object or array.
For example, consider the following simple data object:
{name: 'John Smith', address: {street: '1 Main', city: 'Boston'}}
The template to print this could be:
{name}
{address.street}
{address.city}
or more conveniently, a {scope} variable could be used:
{name}
{address}
{street}
{city}
{/address}
The {scope} variable acts like an 'with' statement in Xbasic.
Within the {scope}, it is not necessary to fully qualify the placeholder names.
In the case where the data contains a nested array, the {scope} variable indicates that the template should loop over the rows in the array.
For example, consider this data object:
[
{name: 'John Smith', children: [{name: 'Griffin'}, {name: 'Callie'}]},
{name: 'Toby Mohan, children: [{name: 'Kyle'}, {name: 'Katy', name: 'Luke'}]}
]
And the following template:
{name}<br>
<ul>
{children}
<li>{name}</li>
{/children}<br>
</ul>
Which will produce this output:
{[value]} Placeholder
The {[value]} Placeholder is a special placeholder to use when looping over arrays of values, rather than arrays of objects.
In the previous example, the data was specified as:
[
{name: 'John Smith', children: [{name: 'Griffin'}, {name: 'Callie'}]},
{name: 'Toby Mohan, children: [{name: 'Kyle'}, {name: 'Katy', name: 'Luke'}]}
]
The nested array is an array of objects.
However, the data could have been specified as:
[
{name: 'John Smith', children: 'Griffin','Callie'] },
{name: 'Toby Mohan, children: ['Kyle', 'Katy','Luke']}
]
In this case, the nested array is an array of values, not of objects.
To emit the data in the array, the template must use the special {[value]} placeholder. For example:
{name}<br>
<ul>
{children}
<li>{[value]}</li>
{/children}<br>
</ul>
NOTE: The [value] field can be followed by
formatting directives, just like any other field. For example:
{[value]:number('$#,###.00')}
Missing Data - Alternative Text - The || Directive
In some cases the data you pass in to the template expander will have missing data. For example, consider the following data object:
{
employees: [
{firstname: 'Fred', lastname:
'Smith', city: 'Boston'},
{firstname: 'Laura', lastname: 'Linneker'}
]
}
The 'city' property has been specified for the first object in the 'employees' array, but not the second.
{employees}
Employee name: <b>{firstname} {lastname}</b>
City: {city||Not available}<br>
{/employees}
The text to display for a missing value is specified in the placeholder after a || delimiter. In the template shown above, the missing text for the {City} property has been specified as 'Not available'.
The above template will render as follows
Employee name: Fred Smith City: Boston
Employee name: Laura Linneker City: Not available
NOTE: The missing data directive can be combined with formatting directives. For example: {price:number('#.00')||N/A}
Headers and Footer - {*header} / {*footer}
Headers and Footer can be used if the data object you pass into to the template expander contains array data.
For example, assume the data object looks like this:
{
employees: [
{firstname: 'Fred', lastname:
'Smith'},
{firstname: 'Laura', lastname: 'Linneker'}
]
}
And the template looks like this:
{employees}
{*header}
This is the header - it prints before
the first item in the array.<br>
{/*header}
Employee name: <b>{firstname} {lastname}</b><br>
{*footer}
This is the footer - it prints after
the last item in the array
{/*footer}
{/employees}
The merged data will look like this:
This is the header - it prints before the first item in the array.
Employee name: Fred Smith
Employee name: Laura Linneker
This is the footer - it prints after the last item in the array
Empty Arrays - Alternative Text - {*empty}
If an array does not contain any entries you can specify alternative text to display.
For example, consider the following sample data:
{
employees: [
{firstname: 'Fred', lastname:
'Smith', skills: [ {name: 'Javascript'},{name: 'CSS'}]},
{firstname: 'Laura', lastname: 'Linneker',
skills: [{name: 'Xbasic'}]},
{firstname: 'Junior', lastname:
'Programmer', skills: [] }
]
}
Notice that only the last array instances does not have any rows in the skills array.
The template might be defined as follows:
{employees}
Employee name: <b>{firstname} {lastname}</b><br>
<div style="border:solid 1px green; margin-left:50px;">
{skills}
{*empty}
No skills yet
{/*empty}
Skill Name: {name}<br>
{*footer}
<i>Count of skills: {@countSkills}</i>
{/*footer}
{/skills}
</div>
{/employees}
The Javascript function for the countSkills function (called by the {@countSkills} directive) is:
function countSkills(data,context) {
return data[context].length;
}
The merged data looks like this:
Conditional Sections - {*if logicalExpression}, (*endif}
Templates can include conditional sections. Conditional sections are defined using the following template commands:
where logicalExpression is any Javascript expression that evaluates to a true/false value.
The logicalExpression can refer to data in the current 'row' of data.
For example, consider the following data:
{
employees: [
{firstname: 'Fred', lastname:
'Smith', state: 'MA'},
{firstname: 'Laura', lastname: 'Linneker',
state: 'CA'},
{firstname: 'Junior', lastname:
'Programmer', state: 'MA'},
{firstname: 'Bill', lastname:
'Lindsey', state: 'NY'}
]
}
And the following template:
{employees}
Employee name: {[countOneBased]} <b>{firstname} {lastname}</b><br>
<div style="border: solid 1px blue; margin-left:20px;
margin-bottom: 10px;">
{*if state=='MA'}
Employee is
based in MA
{*elseif state=='CA'}
Employee is
based in CA
{*else}
Employee is
not based in MA or CA
{*endif}<br>
</div>
{/employees}
The merged data looks like this:
Formatting Directives
You can include formatting directives in the template placeholder to format numeric values and strings, and to format date values.
To format a numeric value, use the :number(formattingDefinition) directive in your placeholder.
For example, assume you have a field called Price, which contains this value: 123456.345.
You might define the template to emit this field as follows:
{Price:number('$#,###.00')}
This will result in the following output:
$123,456.35
You can also use the :number() directive to merge strings into templates. For example,, assume that you have a field called Phone, which contains 6715551234.
The placeholder for this field in your template could be defined as:
{Phone:number('=(###) ###-####')}
This will result in the following output:
(617) 555-1234
To format a date value, use the :date(formattingDefinition) directive in your placeholder.
You can use the following symbols in the formattingDirective.
You can also use the :uppercase and :lowercase directives to force string values to upper or lower case.
For example:
{name:uppercase}
{name:lowercase}
NOTE: The missing data directive can be combined with formatting directives. For example: {price:number('#.00')||N/A}
Expressions - {expression}
The placeholders in a template can be arbitrary Javascript expressions.
For example, assume that you have the following data and template:
{product: 'Book', qty: 4, price: 23}
Template:
Product: {product.toUpperCase()} - Price: {price}, Quantity: {qty} - Total: {price * total:number('$#,###.00')}
Result:
BOOK - Price 23, Quantity: 4 - Total $92.00
Functions - {@JavascriptFunctionName}
Your template can include calls to Javascript functions that compute values based on data in the current 'row'. To call a function you use the {@JavascriptFunctionName} placeholder in your template, where JavascriptFunctionName is the name of the Javascript function that you want to call.
The value returned by the function is emitted for the placeholder.
The Javascript function takes a single parameter, data, which allows you to reference data from the current row.
Consider the following simple data object:
{firstname: 'John', lastname: 'Smith'}
And the following template:
Hello {@fullname}
The fullname Javascript function might be defined as:
function fullname(data) {
return data.firstname + ' ' + data.lastname.toUpperCase();
}
The template result for the above data, template and Javascript function will be:
Hello John SMITH
Functions can also be used to compute summary data. For example, assume that the data object you define includes an array of data. You might want to output summary data that includes (say) the count of the number of rows in the array and the total of one of the fields in the array.
Consider the following sample data object:
{
customer: [
{name: 'Smith', amountDue: 345.34},
{name: 'Jones', amountDue: 35.43},
{name: 'King', amountDue: 45.14}
]
}
And the following template:
{customer}
{name} - {amountDue}<br>
{*footer}
Total amount due: {@amountDue} from {@count} customers.
{/*footer}
{/customer}
And the following definition for the 'amountDue' and 'count' javascript function:
function amountDue(data,scope) {
var arr = data[scope]
var tot = 0;
for(var i = 0; i < arr.length; i++) {
tot = tot + arr[i].amountDue;
}
return $u.n.round(tot,2);
}
function count(data,scope) {
return data[scope].length;
}
The above will produce this output:
Smith - 345.34
Jones - 35.43
King - 45.14
Total amount due: 425.91 from 3 customers.
In the above example, notice that the 'amountDue' and 'count' functions are in the {*footer}..{/*footer} block inside the {customer}..{/customer} scope. When the Javascript functions are called from inside a {*header} or {*footer} block the scope ('customer') is passed into the function along with the data. ('data' is the first argument, and 'scope' is the second argument).
What's in the 'data' object passed into a Javascript function depends on where the Javascript function is called from.
If a Javascript function is called from within a {*header} or {*footer} placeholder the data in the data object will be the same as if the function had been called from outside the scope. In other words, if the template has {@myfunction} after the closing {/customer} placeholder, the data passed to the 'myfunction' Javascript function will be the same as the data that would be passed to the function had it been called from inside a {*header} or {*footer} block inside the scope (e.g. {customer}...{/customer}.
On the other had, if the {@myfunction} placeholder is used anywhere within the scope (e.g. inside the {customer} ..{/customer} block), but not inside a {*header} or {*footer} block, the data object only contains data for the current array instance and the 'scope' value is blank.
The following example will help make this clear:
Data:
{
customer: [
{name: 'Smith', amountDue: 345.34},
{name: 'Jones', amountDue: 35.43},
{name: 'King', amountDue: 45.14}
]
}
Template:
{customer}
{name} - {amountDue} - {@data}<br>
{*footer}
In footer:<br>{@data}
{/*footer}
{/customer}
<br>
Outside the 'Customer' scope: {@data}
Javascript function:
function data(data,scope) {
if(scope == '') scope = 'BLANK';
var json = JSON.stringify(data,'\t');
var msg = '<div style="border: solid 1px red;"><b>scope</b>:
' + scope +
'<br><b>data</b>: ' + json + '</div>';
return msg;
}
The above produces this output:
Note that the 'data' Javascript function simply shows the data that is passed into the function (as a JSON string) and also shows the value of the 'scope' argument
The 'data' function is called in 3 different places:
As show, inside the {customer} scope, the data passed into the function is just the data for the current array instance and the 'scope' passed into the function is blank.
However, when the Javascript function is called from inside the {*footer} block, the data and scope passed into the function are the same as if the function had been called from outside the {customer} scope. In this case the data passed into the function includes all of the data in the scope.
With the above understanding of the what's passed into the Javascript function, let's re-examine the 'amountDue' and 'count' functions from the previous example. Here is the function definition again:
function amountDue(data,scope) {
var arr = data[scope]
var tot = 0;
for(var i = 0; i < arr.length; i++) {
tot = tot + arr[i].amountDue;
}
return $u.n.round(tot,2);
}
The amountDue function has been called from inside a {*footer} construct. Therefore the data passed into the function looks like this (in JSON format)
{"customer":[{"name":"Smith","amountDue":345.34},{"name":"Jones","amountDue":35.43},{"name":"King","amountDue":45.14}]}
Therefore we can get the array of data shown in the {customer} scope by using this Javascript statement:
data['customer']
However, the 'scope' variable that was also passed into the function contains 'customer', so we can get the array of data as follows:
data[scope]
Once we have the array of data, it is a simple matter of writing a Javascript loop to sum up the value in the 'amountDue' property for each row in the array.
Note that before we return the number we use the $u.n.round() function from the Alpha Anywhere Javascript library to round the result to 2 decimal places.
The 'count' function is even simpler. We simply return the length of the array.
function count(data,scope) {
return data[scope].length;
}
Here is a more complex example that shows an object with two arrays of data - 'charges' and 'payments'. Our template shows the total charges, total payments, and the net amount due (total charges - total payments)
Here is the data:
{
charges: [
{name: 'Smith', amount: 345.34},
{name: 'Jones', amount: 35.43},
{name: 'King', amount: 45.14}
],
payments: [
{name: 'Smith', amount: 123.34},
{name: 'Jones', amount: 45.45}
]
}
Here is the template:
<b>Charges</b><br>
{charges}
{name}<br>
{*footer}
Total charges: {@totaldue}
{/*footer}
{/charges}<br>
<br>
<b>Payments</b><br>
{payments}
{name}<br>
{*footer}
Total payments: {@totaldue}
{/*footer}
{/payments}<br>
<br>
Net amount due: {@netdue}
Here is the Javascript:
function totaldue(data,context) {
var tot = 0;
var arr = data[context];
for(var i = 0; i < arr.length; i++) {
tot = tot + arr[i].amount;
}
return tot.toFormat('$#,###.00');
}
function netdue(data,context) {
var arr = data['charges'];
var totDue = 0;
for(var i = 0; i < arr.length; i++) {
totDue = totDue + arr[i].amount;
}
arr = data['payments'];
var totPay = 0;
for(var i = 0; i < arr.length; i++) {
totPay = totPay + arr[i].amount;
}
var netDue = totDue - totPay;
return netDue.toFormat('$#,###.00');
}
And here is output produced by this template:
Notice in the above example that the same 'totalDue' function can be used to return both the total charges and the total payments (because in the first case the 'scope' passed into the function will be 'charges' and in the second case, the 'scope' passed into the function will be 'payments'.
The 'netDue' function that called from outside both the 'charges' and 'payments' scope gets called with the data for both arrays. This function gets the charges array using this syntax:
data['charges']
and then computes the total charges.
Then it gets the payments array, using this syntax:
data['payments']
and then computes the total payments.
Once the total charges and total payments are computed, the net amount due can be computed.
Using the [] directive to emit array instance data
When you are outside a scope that references array data, you can use a special syntax in the scope placeholder to display values from the scoped array.
For example, consider the following output from a template:
Notice that before the Employees are shown, the template shows:
Showing employees from: 'Smith' to 'Programmer'
Where 'Smith' is a value from the first row in the array, and 'Programmer' is a value from the last row in the array.
In the above example, the following template was defined:
Showing employees from: '{employees[0].lastname}' to '{employees[-1].lastname}' <br>
{employees}
{*header}
<b>Employees</b><br>
{/*header}
Employee name: {[countOneBased]} <b>{firstname} {lastname}</b><br>
<div style="border:solid 1px green; margin-left:50px;">
{skills}
{*empty}
No skills yet
{/*empty}
skillName: {[countOneBased]}
{name}<br>
{*footer}
<i>Count of skills: {@countSkills}</i>
{/*footer}
{/skills}
</div>
{/employees}
Notice that outside the {employees} scope, the following template directives can be used to emit data from the employees array:
{employees[0].lastname} - 'lastname' property from the 1st array instance.
{employees[-1].lastname} - 'lastname' property from the last array instance.
Partial Templates - {*partial partialName}
Partial templates are named sub-templates. A template can reference these partial templates using the {*partial partialName} command. This is useful if a template has text that is repeated. For example, consider the following Javascript code:
//define the data
var _d = {firstname: 'Fred', lastname: 'Smith'}
//define the template
var arr = [];
arr.push('Welcome<br>');
arr.push('Hello {firstname} {lastname}<br>');
arr.push('{*partial partial1}');
var _t = arr.join('\n');
//define the settings object (template and partials)
var settings = {
template: _t,
partials: {
partial1: 'from partial1: {firstname}
{lastname}<br>'
}
}
//merge the data into the template
var html = A5.u.template.expand(_d,settings);
This will produce the following output:
Welcome
Hello Fred Smith
from partial1: Fred Smith
NOTE: Several powerful new features for templates have been added in Alpha Anywhere V3. Please consult the Release Notes for additional information.
Using the Template Tester - The Template Tester is a powerful tool to help you design and test templates.
To open the Template Tester select the Tools menu when the Web Control Panel has focus and then select the 'JSON Data Template tester' command.
This will open a modeless window where you can enter test JSON data, template definitions and Javascript functions and then see the results in real-time.
NOTE: The Template Tester can also be opened from within the List control builder when you are defining a template for a column in a columnar list or you are defining a free-form template.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
Watch Video - Part 5
Watch Video - Part 6
Watch Video - Part 7
Watch Video - Part 8

You can also click the 'Load Example' button to open a menu showing several different examples that illustrate different concepts.


Whenever you open the Template Tester, the text that you had last entered is automatically restored.
The A5.u.template.expand() Javascript Function - Templates are expanded using the A5.u.template.expand() Javascript function, which is part of the Alpha Anywhere Javascript library.
The syntax is
var html = A5.u.template.expand(data,settings);
Where data is a the data array or object to be merged into the template and settings defines the template (and any partial templates).
For example:
var data = {firstname: 'Fred', lastname: 'Smith'};
var template = 'Hello {firstname} {lastname}';
var settings = {
template: template,
partials: ''
}
var html = A5.u.template.expand(data,settings)
NOTE: For an example that uses partials, see 'Partial Templates - {*partial partialName}' above.
A5.u.template.parse() Function - If a template is used multiple times in a component, you can pre-parse the template so that when the template needs to be expanded you can use the pre-parsed template for improved performance.
For example, take the following Javascript:
var data = {firstname: 'Fred', lastname: 'Smith'};
var template = 'Hello {firstname} {lastname}';
var settings = {
template: template,
partials: ''
}
var html = A5.u.template.expand(data,settings)
The could be re-factored as follows:
var data = {firstname: 'Fred', lastname: 'Smith'};
var template = 'Hello {firstname} {lastname}';
var parsedTemplate = A5.u.template.parse(template);
var settings = {
template: parsedTemplate,
partials: ''
}
var html = A5.u.template.expand(data,settings)
Action Javascript - Templates - Merge data into client-side template' Action - This action allows you to define a data and a template, merge the data into the template and then set the innerHTML of a div, placeholder control, or Panel with the resulting HTML.
Watch Video
Download Component

When you open the builder, the genie shows this screen:

You can either specify static data to merge into the template, or you can specify the name of a Javascript function that will return the data to merge into the template.
Similarly, you can specify a static template, or the name of a Javascript function that will dynamically create the template.
Using Client-side Templates on the Server-side - a5_merge_JSON_into_template() Function - Because Alpha Anywhere has the ability to execute Javascript from an Xbasic script, you can actually use client-side templates in Xbasic using the a5_merge_JSON_into_template() function.
The syntax for the function is:
c Result = a5_merge_JSON_into_template(C jsonData
,C template [,C javascriptFunctions [,C partialTemplatesJSON
[,C localCSS ]]])
For example:
dim data as c
data = <<%txt%
{firstname: 'Fred', lastname: 'Jones'}
%txt%
template = <<%html%
Name: {firstname} {lastname}
%html%
htmlOut = a5_merge_JSON_into_template(data,template)
showvar(htmlOut)
{grid.object}.getRowsInGrid() Method - Returns the number of rows in the current page of the grid. This is not the same as the number of rows in the Grid query.
Previously, users were using the internal ._rowsInGrid property to get the number of rows in the current page, but this value includes rows that have been deleted.
For example, say that the Grid is set to show 10 rows per page and that the refresh method is set to 'Auto' and that a minimal refresh is done after update, insert and delete operations.
If the user deletes a row from the Grid, the ._rowsInGrid property will still be 10, because the deleted row is not really deleted from the current page - it is just hidden and marked as deleted.
On the other hand, the {grid.object}.getRowsInGrid() method will return 9.
{grid.object}.getSelectedRow() Method - Returns the selected row number, or null if no row is selected.
Previously, users were using the internal ._selectedRow property to get the row number of the currently selected row. However, under some circumstances this property can return a confusing (but technically correct) value.
For example, if the refresh method on the Grid is set to 'Auto' and a minimal refresh is done after an update, insert or delete operation and the user deletes a row, the ._selectedRow property will return the row number of the row that was just deleted (which is actually correct internally, because the row that was deleted has simply been hidden in the page and it is still marked as selected).
On the other hand. the {grid.object}.getSelectedRow() method will return null, indicating that no row is currently selected.
UX Component - List Control - List Preview - Modeless - The List Builder has a 'Preview' button to do a quick preview of the List control while you are in the List builder. The Preview window is now modeless - which means you can keep it open while you are working in the List builder (and perhaps move it to a second screen if your computer has two monitors). This makes it very convenient to preview the List after every change you make.
UX Component - List Virtualization - Normally, when a List control is populated, the HTML for all of the rows in the List is rendered. If the list only has a few rows (say 200 rows), then there is no noticeable delay while the List is populated.
However, if the List has a lot of rows (say several thousand rows), then there will be a noticeable delay while the List is populated and also, a large amount of memory will be consumed by the List. On a mobile device where memory is more limited, the amount of memory consumed by the List could be a problem.
List virtualization allows you to only create HTML elements for a portion of the List - the portion that is currently visible and some additional rows above and below the currently visible portion. The number of rows that are rendered in the List is called the 'page' size.
When the user is scrolling the List and they hit a page boundary, the user can tap on a Next or Previous button (or optionally use a pull/release gesture) to populate the List with the next or previous page of data. It is important to recognize that tapping the Next or Previous button does not trigger an Ajax callback. It is simply rendering the next or previous page of data using the data that has already been loaded into the List and is in memory. Therefore, the time take to populate the next or previous page is practically instantaneous.
The advantage of virtualizing the List is that you can dramatically reduce the time taken to load large Lists and you can reduce the memory footprint of the List.
To turn on List Virtualization, set the Virtualization type property shown below to 'Dynamic'.
Watch Video
Download component
Once you do this, several additional properties will be shown

Virtualization type - Set to 'None' to turn virtualization off. Set to 'Dynamic' to turn virtualization on.
Size - The size property defines the 'page' size - the number of rows of data that should be rendered. This should typically be a multiple of the number of rows in the viewport. For example, say that your List can display 20 rows of data at a time, you might set the size to (say) 100 so that the user can scroll a fair amount before hitting the page boundary.
When you reach a page boundary (either on top or bottom
of the page), there are 'Next' and 'Previous' buttons to
get the next logical 'page' of data. The user can either
tap on the Next/Previous button, or use a pull/release
action to fetch the next page of data.
Max size - This is an advanced optional setting
that can be used to specify a type of 'hybrid'
virtualization. By default, this property is set to 0,
which means that the number of rows that the List
renders is always equal to the 'page' size. When you hit
a page boundary, the current page is memory is replaced
by the next page that is loaded.
However, if you set the Max size to -1 (which indicates
that the max size is equal to the number of rows in the
List), or some positive number that is greater than the
size property, then when you are navigating
forward and you hit a page boundary, the next page of
data is automatically rendered (without requiring the
user to tap the Next button). The number of rows in
memory continues to grow as the user scrolls down in the
List. In other words, the memory consumed by the List is
initially very small (as only a single page of data are
rendered) and the time taken to render the List is
optimized (again, because only a single page of data are
rendered), but as the user scrolls, the number of
rendered rows in the List continue to grow and more
memory is consumed. When the 'max size' is reached, then
the user will then have to use the 'Next' button to
continue to viewing additional records.
Offset - When you hit a page boundary, and click
the Next/Previous button, the 'offset' indicates the
number of rows from the page that is being discarded
that should be included in the new view. If this number
is less than the number of rows in the viewport, the
List will appear to 'jump' when you navigate to a new
page. It is recommended that this value be set to a
minimum of the number or records that can be seen in the
viewport at one time so that when the user taps the
Next/Previous button, the scroll position of the List
does not change. It is recommended that this number be
no more than half of the 'page size'. The larger the
number, the more rows the user can scroll backwards
before hitting the Next/Previous buttons.
Navigate on pull - Allows the user to
pull/release to navigate (in addition to tapping on the
Next/Previous buttons).
Pull size - Number of pixels before the
'pull/release' gesture is recognized as a 'navigate'
action.
UX Component - List Control - onBeforePopulate and onPopulate Client-side events - Two new client-side events have been added to the List control.
onBeforePopulate - fires before the List is populated. Allows you to transform the data that will be used to populate the List. The event handler gets passed in 'data' - an array with all of the data for the List.
onPopulate - fires after the List has been populated.
UX Component - List Control - Transform Data Type - Unless the List data source is a Javascript function (in which case you have complete control over the data types for each field in the List), all data in the List are string values.
Watch Video
Download component
The 'Transform data type' property allows you to transform the data type of the data in a List column to a Date, Numeric, or Logical data type.
To transform the data type, set the option in the 'Transform data type' property on the Fields pane in the List builder (as shown below).

The benefit of transforming dates into true date objects and numbers into true number objects is that you can then use the template formatting options to format date or numeric values.
For example, the template for a date field might be specfied as:
{DateOfBirth:date('MM-dd-yyyy')}
or a numeric field, the template might be specified as:
{Price:number('$# ###.00')}
NOTE: It is not strictly necessary to transform a string to a number in order to use the number format directive in the template. The sample template shown above ( {Price:number('$# ###.00')} would actually also work on a string value that contained a valid number.
Property Grids - Font Size - Property Grids are ubiquitous in the Alpha Anywhere builders. You can now change the default font size by selecting the View, Settings... menu item. Select the 'System Font's pane and then the 'Property Grid' category.

The image below shows a Property Grid with a 12 point font size:

word_i() function - A case-insensitive version of the word() function
Example
?word_i("alpha software corp",2,"SOFTWARE")
= "corp"
Web Applications - Session Object - .SaveSessionFileToFile() - A new method on the session object allows you to save a file that as previously stored as a session file to a permanent location.
The syntax is
session.saveSessionFileToFile(c Key, C DestinationFile)
Note: The session file might have been created in the first place using either of these methods:
session.saveFileToSessionFile( c fileName, c key)
session.saveDataAsFile( b data, c key)
Storage - Storage is an Alpha Anywhere abstraction for dealing with different types of storage using a standard interface. Currently, 3 type of storage are supported - Amazon S3, Azure and Disk storage.
Storage is used for storing files.
To work with Storage you will need a storage connection string to 'connect' to the storage object.
Named connection strings are typically used (in much the same way that named AlphaDAO connection strings are used when you connect to a SQL database).
To create a named storage connection string, select the Tools, Storage Connection strings menu item from the Tools menu when the Web Control Panel has focus.

This will open a dialog where you can create as many named storage connection strings as you want.
When you create or edit a named storage connection string, the Connection String dialog is shown:

Named storage connection strings are published in the a5_application.a5i file when you publish your application.
Summary of Helper Functions for Working with Storage - Several Xbasic helper functions make it easy to work with the storage. These helper functions are written on top of the low level storage objects that are documented here.
The helper functions are:
Examples for each of these functions is shown below.
a5Storage_saveFile() - Saves a file to storage
Syntax:
L a5Storage_saveFile(C connectionString ,C filename ,C
itemName [,C mimeType [,* pResult ]] )
Where:
connectionString - Storage connection string with ::storage:: as a prefix.
filename - name of the local file to save in storage.
itemName - name of the object in storage. You can can specify a logical folder by using forward slashes in the name. For example: image/image1.jpg
mimeType - the mime type of the object. If you don't specify this property, the value can be inferred from the extension you assign to the itemName property.
pResult - an optional dot variable that you can pass in that will be populated with information about the object.
Example:
dim pr as p
flag = a5Storage_saveFile("::storage::Amazon_East","c:\images\4290.jpg","movies/4290.jpg","",pr)
?flag
= .T.
If you examine the pr dot variable that was passed into the function you will see the following properties:
hasError = .f.
timeTakenMilliseconds = 239
AbsolutePath = "https://<bucketName>.s3.amazonaws.com/movies/4290.jpg"
ContentType = "image/jpeg"
ModifiedTime = CTODT('03/15/2014 01:53:13 00 pm')
Name = "movies/4290.jpg"
size = 5880
The AbsolutePath property gives you a URL to the object. Note that in order for this URL to work you need to make sure that you have set the appropriate permissions on the storage container ('bucket' in S3 terminology).
a5Storage_saveData() - Saves data to storage
Syntax:
L a5Storage_saveData(C connectionString ,b blob ,C itemName [,C mimeType [,* pResult ]])
Same as a5Storage_saveFile(), except takes a blob as input rather than a filename.
A5Storage_getItemProperties() - Gets properties of an item in storage
Syntax:
P itemProperties = a5Storage_getItemProperties(C connectionString , C itemName)
Where:
connectionString - Storage connection string with ::storage:: as a prefix.
pResult - an optional dot variable that you can pass in that will be populated with information about the object.
Returns a dot variable with these properties
a5Storage_getItem_as_blob() - Retries data from an item in storage and put the data in a blob variable
Syntax:
b blob = a5Storage_getItem_as_blob(C connectionString ,C itemName [,* pResult ])
Where:
connectionString - Storage connection string with ::storage:: as a prefix.
pResult - an optional dot variable that you can pass in that will be populated with information about the object.
Example:
dim p3 as p
b3 = a5Storage_getItem_as_blob("::storage::Amazon_East","movies/4290.jpg",p3)
?b3.size()
?p3
'= contentType = "image/jpeg"
timeTakenMilliseconds = 297
a5Storage_getItem_as_file() - Retries data from an item in storage and create a local file
Syntax
L flag = a5Storage_getItem_as_file(C connectionString ,C itemName, C filename [,* pResult ])
Where:
connectionString - Storage connection string with ::storage:: as a prefix.
pResult - an optional dot variable that you can pass in that will be populated with information about the object.
a5Storage_listItems() - Lists items in storage
Syntax:
c List = a5Storage_listItems(C connectionString [, C searchPrefix [,* pResult ]])
Where:
connectionString - Storage connection string with ::storage:: as a prefix.
pResult - an optional dot variable that you can pass in that will be populated with information about the object.
a5Storage_deleteItem() - Delete an item from storage
Syntax:
L flag = a5Storage_deleteItem(C connectionString, C itemName [,* pResult ])
Where:
connectionString - Storage connection string with ::storage:: as a prefix.
itemName - name of item to delete
pResult - an optional dot variable that you can pass in that will be populated with information about the object.
Note: The flag value returned by this function is .f. if the connection failed, but is .t. if the item was not found in storage.
Web Applications - .A5W Pages - Debugging - You can now debug live running .A5w pages from within the HTML editor. The editor now has a new 'Live Preview' tab.
Simply insert a debug(1) statement in your Xbasic code and then switch to the 'Live Preview' tab pane.

UX Component - Pop-up Javascript Windows - Customize Title Direction - A new property has been added to set the default title direction for pop-up Javascript windows. By default, the direction is 'ltr' (left to right), but the direction can now also be set to 'rtl' (right to left - title on right and close button on left).

Grid Component and UX Component - Image and File Upload - Show Progress and Allow Cancel - The image and file upload features in the UX and Grid components have been enhanced.
The image below shows the File Upload window showing progress as a large file is uploaded.

You can now:
Display progress while a file is uploading
Allow a user to abort the upload after the upload has started
Check the maximum allowed upload size before the upload is started. (Previously the file was uploaded and then if the uploaded file exceeded the maximum allowed size an error was returned to the user).
Check the allowed file types before the upload is started. (Previously the file was uploaded and then if the uploaded file was not of the correct type, an error was returned to the user).
In order to enable this new functionality, edit your Image Upload, File Upload or File Upload - User Defined actions (defined using Action Javascript) and set the properties shown below.

In the case of the 'File Upload - User Defined' when the 'Allow multiple files' option is selected, the size check that takes place before the upload begins is the combined size of all selected files. You can set the maximum combined size property in the builder. The 'Maximum file size' property which applies to individual files will also be enforced after all of the files have been uploaded.

The Action Javascript builders allows you to specify the style for the progress bar. The 'A5' style blends in nicely with the component style, but for older styles, such as GrBlue, GrOlive, etc. the 'A5' style might be too subtle for your taste and you might prefer to use the 'Basic' style, wich uses a standard HTML progress element.
The image below shows how the slider is rendered using the 'A5' option (first slider - using the iOS style) and the 'Basic' option (second slider).

Grid and UX Component - HTML Editor - File and Image Upload - The File and Image upload features in the HTML editor have been enhanced.
You can now:
Display progress while a file is uploading
Allow a user to abort the upload after the upload has started
Check the maximum allowed upload size before the upload is started. (Previously there was no way to specify a maximum file size).
Check the allowed file types before the upload is started. (Previously there was no way to specify allowed file types).
UX Componet - Slider Control - Displaying Progress - A new property on the slider control has been exposed that allows you to turn off the slider handle. This is useful for displaying 'progress'. In the image below the first Slider has its handle turned off.
When you want to use the slider to show progress, you should also disable it so that the user cannot change the value by clicking on the slider. For example, enter '1=2' as the client-side Enable expression for the slider.

UX Component - Tab Control - Genie Style - Genie Button Position - When defining 'Genie Style' tab controls (shows buttons to advance through the tabs), you can now specify the button position (Above or Below the Tab Panes). Previously, the buttons were always shown below the Tab Panes.

Xdialog - Edit Combo - Case-Insensitive - The edit combo in Xdialog is case-insensitive by default. You can now force it to be case sensitive using the new %CS% flag.
For example
dim selected as c = ""
dim colors as c
colors = a5.color_enum()
ui_dlg_box("Select Color",<<%dlg%
Color combo: [%CS%.50selected^+colors];
Color edit-combo: [%CS%.50selected^=colors];
%dlg%)
UX Component - Abstract Events - downHold Information - Click, Tab, Swipe, Etc. events now have additional information in the event's 'abstractData' object that tells you if a 'downHold' event occurred. The motivation for this additional information is to allow you to add code to Click, Tap and other abstract events to prevent them from executing their standard code when a downHold abstract event fires.
For example, if you examine the 'e' object that is available inside the event handler for a click abstract event, you will see the following information (screen shot taken from Visual Studio Javascript debugger). As the screen shows, the e.abstractData object has a property called 'downHold'. In this case the property is true, indicating that the click event has fired as a consequence of the downHold event firing.

You might then write your click event handler as follows
var flagRunCode = true;
if(typeof e.abstractData != 'undefined') {
if(e.abstractData.downHold) flagRunCode = false;
}
if(flagRunCode) {
//code you want to run in a pure click event
}
Code Editors - Search and Search and Replace - Regular Expressions - The Search and Search and Replace dialogs now support the ability to use regular expression. In addition, the history feature that shows previous search and replace values is now case-sensitive.
UX Component - Internationalization - List Controls - The UX component Internationalization genie (described later in this document), now allows you to add language and text dictionary tags to column headings for List controls.
Xbasic - Dot Variables - .data() Method - The .data() method can be used to read the value of a property in a dot variable. However, the .data() method trims trailing spaces. Now you can use an option to preserve trailing spaces by adding the '.raw' suffix to the property name.
delete p
dim p as p
p.name = " "
?"a" + p.name + "b"
= "a b"
?"a" + p.data("name") + "b"
= "ab"
?"a" + p.data("name.raw") + "b"
= "a b"
UX Component - List Control - Client-side Numeric Formats - You can now specify format directives in the template for the List control. For example, the image below the template for the 'longitude' column in the List.
Notice that the placeholder in the template shows:
{longitude:number('#.0'}
The numeric format is specified in the placeholder, separated from the field name by a colon.
The builder has a link labeled 'Insert format directive' that will open a genie to help you define formatting directives.
NOTE: In the screenshot shown below the List is a columnar List. Client-side format directives can also be inserted into the template for Freeform Layout Lists.

See 'UX and Grid Component - Client-side Calculated Fields - Builder' below for more information.
Xbasic - Image Metrics Class - The new Image
Metrics class gets both the pixel size and the logical
size of an image.
The logical size is expressed in twips, and reflects the
DPI stored with the image.
Example usage:
dim isize as Helper::ImageMetrics
isize.LoadImage("jpg",file.to_blob("C:\imgage.jpg"))
? isize
..
pixel_height = 1200
pixel_width = 1920
twip_height = 18000
twip_width = 28800
? *unit_convert(isize.twip_width,"tw","in")
= 20
? *unit_convert(isize.twip_height,"tw","in")
= 12.5
UX and Grid Component - Action Javascript - Open Grid
- The Action Javascript to "Open a grid component"
now has an option to set Autorefresh on focus if the
target is a TabbedUI Pane. When checked, the content in
the tab pane will be refreshed automatically every time
the pane gets focus.
UX and Grid Component - Masks - User Defined Formats - When you define a mask for an input control in either the UX or Grid you can select from a list of built-in masks, or you can define your own mask. Now, you can add your own entries to the list of built-in masks by creating a special text file in the executable folder. The text file must be called:
UserDefinedMasks.txt
The text in the file must be of this form:
{data=(000) 000-0000}US Phone number
{data=000-00-0000}Social Security Number
{data=00000}Zip code - 5 digit
{data=00000-0000}Zip code - 9 digit
{data=L0L 0L0}Postal Code - Canada
UX and Grid Builder - Live Preview - Caching - Previously if you made a change to CSS or linked Javascript files after previously having done a Live Preview in the builder, the changes were not always reflected because Internet Explorer was loading assets from its cache. Now, the builder is more aggressive about not caching assets during Live Preview.
UX Component - Internationalization - In order to design a UX component that adapts automatically to different languages, you typically wrap all labels in either language tags (e.g. <a5:r> ... </a5:r>) or Text Dictionary tags (<a5:t>..</a5:t>). Adding these tags to all of the text elements (such as labels, bubble help, frame labels, etc) in a large component can be quite tedious.
A new Internationalization Utility makes it easy to retrofit an existing UX component with language or text dictionary tags.
To access the utility, click the Menu button, shown below.

Then, select the Internationalization Helper Utilities... menu option.

This will open a dialog that allows you to select different options. Each option generates some Xbasic code that will set properties on your UX component.
TabbedUI - onTabbedUIInitialize Server-side Event - The TabbedUI Component now has a new server-side event that fires when the TabbedUI component is initialized.
TIP: You can use this event to simulate session variables when you are in Working Preview. For example:
if eval_valid("request.SERVER_PROTOCOL") then
if request.SERVER_PROTOCOL = "A5RES" then
session.var1 = "simulated value for var1"
end if
end if
UX Component - Get Online Status - {dialog.object}._getOnlineStatus() Method - The
{dialog.object}._getOnlineStatus() method returns true if the device has an internet connection and false if there is no connection.
NOTE: The onConnectionChange client-side event fires when the connection state changes.
NOTE: For testing how your application will behave when there is no connection, you can set your component to simulate a disconnected state by calling the {dialog.object}._setSimulatedOnlineStatus() method.
UX Component - Set {dialog.object}SimulatedOnlineStatus() Method - Allows you to force the return value from the {dialog.object}._getOnlineStatus() method to be true or false, regardless of the true state of the connection. This is useful for testing purposes when you want to test how your component behaves when it is disconnected, even though you currently have a connection.
The syntax is
{dialog.Object}._setSimulatedOnlineStatus(mode);
Where the mode flag is
UX Component - Client-side Events -
onAjaxCallbackNotAvailable Event - A new client-side
event has been defined. The onAjaxCallbackNotAvailable
event fires if the user tries to execute some Javascript
that does an Ajax callback and the device is not
currently connected to the internet.
UX Component - Client-side Events - onConnectionChange Event - The onConnectionChange event fires whenever the device's connection status changes. For example if the device was online and the connection was lost, the event will fire, and vice versa.
NOTE: If you set the simulated connection status using the {dialog.object}._setSimulatedOnlineStatus() method, the event will also fire (assuming that the _setSimulatedOnlineStatus() method changed the simulated online status.
UX Component - Ajax Callback Action - Offline Javascript - A new property can be set when defining an Ajax Callback. The 'Offline Javascript' property allows you to define Javascript to be called when the device is not connected. This differs from the 'Ajax failed Javascript' property in that if the device is not connected, the Ajax callback is not even attempted, and the Javascript specified in the 'Offline Javascript' property is executed immediately.
On the other hand, the 'Ajax failed Javascript' is only fired after the timeout period if a response is not obtained from an Ajax callback.
NOTE: You can also use the new client-side onAjaxCallbackNotAvailable event to specify Javascript to execute when a user tries to make an Ajax callback and there is no connection.

UX Component - List Control - Filter Records - Range Searches - Using Action Javascript, you can create actions that filter the records shown in a List control. Now, you can easily make 'range' searches (similar to the Search Part in a Grid).
To define a 'range' search, select the control that has the 'range start' value first. Then, check the 'Range search' checkbox. A new prompt will be shown where you can specify the name of the control that has the 'range end' value.
Range searches can also be defined for actions that search embedded grids on a UX, retrieve primary keys for a data bound UK and print embedded reports.

UX Component - Absolute Layout Containers - Save as
PDF - You can now create a button using Action
Javascript to save the contents of the container to a
PDF file.
Watch Video
To create a button to save an Absolute Layout container as a PDF, use the 'Absolute Layout Container - Create PDF' action in Action Javascript.
After the PDF is created you have the option of either:

UX Component - Control Containers - Class Name and Prevent Float - When a UX component is rendered, every control in the component is wrapped in a DIV control that has a class of 'A5CWLayout'.
NOTE: If you have set the UX 'Layout type' property to be 'ControlWidth', then the class is A5container.
The A5CWLayout (or A5container) class has two important functions:
Under some circumstances a developer might want more control over the styling of the container (a DIV) that is used to enclose each control. Two new properties have been added for most of the controls in a UX:

The 'Control container class name' property allows you to specify the CSS class name that will be used in the container DIV in addition to the standard 'A5CWLayout' (or 'A5container') class.
The 'Control container prevent float' property allows you to specify if the container DIV will use the 'A5CWLayout' (or 'A5Container') class at all.
With these two new properties you have complete control over the styling of all controls on the UX.
NOTE: For controls that are in a 'NoFloat' container, the 'Control container prevent float' property is implicitly true.
UX Component - Panels - .Refresh() Method - Panel Cards and Panel Navigators now have a .refresh() method. This means that if you change the contents in the header or footer of the Panel (which might change the height of a header or footer, for example), you can now call the .refresh() method to layout out the Panel again, showing the new footer or height.
For example:
var pObj = {dialog.object}.panelGet('PANELCARD_1');
//some code to change the HTML shown in the Panel header or footer
pObj.refresh();
Xbasic - CURL - Built-in Support For CURL - CURL is a popular library for calling URLs. A genie is available to convert a CURL command that you might read in some API documentation into Xbasic. To open the CURL command to Xbasic genie, right click on whitespace in the Xbasic code editor or Interactive window. The select the CURL command to Xbasic command.

The genie open up and you can paste in a CURL command, then click the Generate Xbasic button.
The generated Xbasic instantiates the Curl object in the extension namespace.
NOTE: When using the HTTPS protocol, you must have a certificate. In the sample shown below the certificate in the CARoot folder in the Alpha Anywhere executable folder is used.

Grid Component - SQL - Search Part - Grids Based on GROUP BY Statements - If you have defined a Grid that is based on a SQL statement that has a GROUP BY clause, interpreting what the user intends when they do a search using the the Grid's Search Part can be tricky. For example, does the user intend the submitted search criteria to be used in a WHERE clause, or a HAVING clause?
Previously, if the Grid based based on a GROUP BY statement, the SQL generated by the Search Part was added to the HAVING clause.
Now, a more flexible approach is implemented.
When you define the Search Part in a Grid, for each field you add to the Search Part, you can define the Search Expression. The Search Expression is used in the generated SQL when the user searches on this field. If the search expression uses a summary operator (for example Sum(AmountDue) ), then a search on this field will go into the HAVING clause. On the other hand, if the Search Expression does not use a summary operator (for example, AmountDue), then a search on this field will go into the WHERE clause.
As a result of this change, you can define a Search Part in the Grid that will generate SQL statements that have both WHERE and HAVING clauses.
Grid and UX Component - Image and File Upload - Window Position - You can now set an explicit position for the file select window in these actions:

Reports - HTML Content - Base64 Encoded Embedded Images - If you have HTML content in a report and the HTML content has base64 encoded embedded images, the images will now render correctly in the printed report.
UX Component - List Control - Action Javascript - List Control Actions - Client-Side Order Expression - The genie now allows you to perform multi column sorts.
Set the 'Client-side sort mode' to Advanced and then use the smart field to define the sort definition.
You can define ascending or descending sorts and you can specify whether you want to sort on the whole field, or a subset (for example, just the first character of the field).

This gene generates Javascript that uses the .setOrder() method of the List. For example, here is how a mult-level (Customer, Country) sort would be defined:
var listObj = {dialog.object}.getControl('LIST1');
var sortObj = {'Country' : 1 , 'City' : 1};
listObj.setOrder(sortObj);
UX Component - List Control - Group Breaks - Client-Side - The List control has always had a Group Break option, but this option is a server-side group break. This means that the data that is sent from the server to the browser has the group breaks physically embedded into the List data.
Now, you can define client-side group breaks. These group breaks are inserted into the List on the client-side (after the List has been populated). Client-side group breaks offer several advantages over server-side group breaks. Namely:
NOTE: One advantage of server-side group breaks over client-side group breaks is when the List data source is based on a SQL query and you have turned on the List pagination option. In this case, summary data shown in a List header will be for all of the data in that group, not just the records that are currently visible in the List.
In the image below, the List has two levels of grouping: Country and City. Notice that a custom style has been defined for the second level group headers (showing the city name in blue, with a left padding of 50px).

Here is the same List, but this time showing some summary data in the top level group header:

To turn on client-side grouping for a List, check the 'Has client-side group breaks' property for the List as shown in the image below:

You can then click the smart field to open the 'Client-side Grouping' genie.
The genie allows you to define multiple levels of grouping.
For each group you define:

When you define the HTML for the header or footer, you can click the smart field button to open a genie. This genie has an option that makes it easy to include summary data in the header or footer. For example, in the image below, which shows the editor for the header HTML expression, the user has clicked on the 'Insert summary field' hyperlink, and the Summary Field Genie is displayed.

When you use the Summary Field genie, the generated Javascript that is inserted into the expression calls a special helper method of the List object. For example, here is the code to compute the average of the Price column:
this.groupSummary(data,'Price:N','avg')
Note: The .groupSummary() method ignores NULL values in the data.
In the example below, the average is computed and then formatted using a format string
Number(this.groupSummary(data,'Price:N','avg')).toFormat('# ##0,00')
UX Component - List Navigator - When you have a lot of records in a List, scrolling the List to the bring a section of the List into view can be tedious - especially on mobile devices where there is no vertical scroll bar. The List Navigator makes it easy to scroll a List that has group breaks. In the image below a List is shown with group breaks on the first character of the Contactname field. A List Navigator is shown on the right side of the List.
NOTE: You can only display a Navigator if the List has group breaks. It does not matter, however, if the group breaks are computed server-side or client-side.

The user can drag on the Navigator to quickly scroll the List.
The Navigator has an entry for each Group Heading.
The Navigator can be positioned on the left, right, top or bottom of the List. Positioning the Navigator on the top or bottom is generally done when the List is set to scroll horizontally.
You have complete control over the size of the Navigator (when it is not in use) and its position (relative to to the edge of the List). The size of the Navigator when it is in use (i.e. when the user is dragging on it), is automatically determined by its contents. If the size of the Navigator (when it is not in use) is not wide enough (for left/right position), or high enough (for top/bottom position) to show its full contents when the user starts to drag on it, it will dynamically resize while it is in use and then go back to the smaller size when the user stops dragging on it.
To define a Navigator for a List, check the 'Has List Navigator' property on the List Properties pane of the List Builder. Then click the smart field to open the genie.

The List Navigator builder (shown above) allows you to define a Javascript expression that determines what data are put into the Navigator. You expression can reference the special html field. The html field contains the HTML that is shown in the Group Header.
In the above screen show, the HTML expression is:
html
This means that if the Group Headers in the List contain:
A
B
C
D.....
The Navigator will also contain the exact same values.
But, if the HTML expression was:
html.toLowerCase()
The Navigator would contain:
a
b
c
d...
UX Component - List Control - Action Javascript - List Control Actions - Client-side Group Breaks - A new action has been added to the List Control Actions genie that allows you to apply client-side Group Breaks to a List. The user interface for the Genie is identical to the user interface for client-side group breaks in the List Builder. See the section 'UX Component - List Control - Group Breaks - Client-Side' for more details.
UX Component - List Control - Action Javascript - List Control Actions - Show Navigator/Hide Navigator - New actions have been added to the List Control Actions genie that allow you to show a List Navigator for any list that has group breaks and to hide a previously shown List Navigator.
UX Component - List Control - Client Side Filter and Order Expressions - You can now define a client-side filter and order for any List. The client-side filter is applied to the data when it is loaded into the List. If you have defined a server-side filter/order, the client-side filter will be applied in addition to the server side filter/order.

UX Component - Lookup Columns - You can display columns in a List where the data in the column is 'looked' up in another List, or by calling a Javascript function.
Watch Video
Download Component (You will need to change the connection string
for both lists to point to the sample Northwind database).
Consider the following example. The image shows a List based on the Order Details table in the sample Northwind database. Notice that the List shows the ProductId, but not the ProductName.

It would be nice to show the Product Description in the List, as shown in the image below:

Obviously this could be done by specifying a SQL join for the List data source where the Order Detail table was joined with the Products table. However, this would mean that much more data would have to be sent over the network as every row of data in the List would include the Product Description field.
A much better approach would be to 'look up' the data on the client-side as the List was being rendered. You might create a second List based on the Products table that has the ProductId and ProductDescription fields in it.
To define a Lookup, click the smart field for the 'Lookup columns' property on the 'List Properties' pane in the List Builder.

This will open the Lookup Columns genie. You can define as many lookups as you want.
Each lookup must have a unique name. The lookup type is either 'List' or 'Function'.
A 'List' lookup will lookup the value in another List. You can Link the list to the Lookup List on one or more fields.
IMPORTANT: The List that is used as the data source must appear in the UX builder before the List that references it. For example, if the OrderDetails List lookups up values in the Products List, the Products List must appear before the OrderDetails List in the UX builder.
A 'Function' lookup will call a Javascript function that you define and return either a single value, or an object (with multiple values). Data from the current row in the List is passed into the Javascript function. You specify what data from the current row is passed into the Javascript function by setting the 'Lookup field(s)' property in the Lookup Columns builder.
If you specify more than one lookup field (for example, 'Firstname' and 'Lastname'), the lookup fields are passed into the Javascript function in an array. If there is only one lookup field, the value is passed into the Javascript function as a string. Here is an example of a very simple Javascript function that takes an array of input values:
function myLookupFunction(idValues) {
if(idValues[0] == 'John' && idValues[1] == 'Smith') return 'value1';
if(idValues[0] == 'John' && idValues[1] == 'Jones') return 'value12;
return 'Value not found'
}

Once you have defined the Lookup, the fields from the Lookup are available in the 'Available Fields' list in the List Builder.
Notice in the image above, the 'Lookup Name' was set to 'products'.
Notice in the image below the available fields include:
The 'products' prefix is derived from the 'Lookup Name'. The list of available fields includes all of the fields in the Lookup List.

UX Component - Buttons - Split Buttons - A new option on the Button control allows you to easily create 'split' buttons. A 'split' button has a 'button' part and a 'down' part. You can define different event handlers depending on which part of the button the user clicked on.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Download components
To define a split button, set the 'Display as split button' property

In your Javascript event handler you can reference
arguments[1]
If the user clicked on the button, arguments[1] is set to 'normal'
If the user clicked on the dropdown arrow, arguments[1] is set to 'split'.
IMPORTANT: You can only reference the arguments[1] parameter if your code is in the button's 'onClick' event. If you use the abstract 'click' event, then arguments[1] is not set to 'normal' or 'split'.

A typical use case for a split button is to display a menu when the user clicks on the down arrow. The user makes a selection from the menu, the action is performed AND the button is updated to show the action the user selected. The next time the user wants to perform the same action, a single click on the button will perform the action (rather than clicking on the down arrow and having to select from the menu).
The relevant methods that the menu can use to update the text in the button are:
For example:
var btn = {dialog.object}.getControl('button1');
btn.setContent( { html : 'New Button Text', tip: 'Help for button', icon: 'mynewicon.jpg'});
In some case, when the down arrow has been pressed, you might want to open a modal window and while the window is open you might want to show the button in a 'depressed' state, For example, notice the difference in the image below compared with the image above:

To set the state of a button to depressed or normal, you can use the <buttonObject>.setState() method.
The syntax is:
<buttonObj>.setState( pointerToButtonElement, true/false);
where true indicates the button is depressed and false returns the button to its normal state.
For example, assume the button Id is 'BUTTON_1';
var bEle = {dialog.object}.getPointer('BUTTON_1');
var bObj = {dialog.object}.getControl('BUTTON_1');
bObj.setState(bEle,true);
Application Server - Security Framework - Large Applications - The time to load security framework information for large applications has been significantly improved. In a test of a large application with 5,000 pages, each of which had security settings, the the time improvement is 2 orders of magnitude. To take advantage of this change, you must republish something in your application.
If a project is published from the latest pre-release to an older application server, the older application server will report a 500 internal server error as it won't be able to read the new file. The application server should be the same build as the development program.
SQL Query Builder - Column Alias Naming - When you build a SQL query that involves multiple tables and you select a column with the same name from multiple tables, Alpha Anywhere automatically assigns an alias to the column so that it has a unique name. The alias is a numeric suffix (e.g. CustomerID1). Now, you can specify if you prefer to use a table alias in the generated column alias. To set you preference, click the Preferences hyperlink in the image shown below.

PhoneGap - Support for the PhoneGap Build service is now tightly integrated into Alpha Anywhere.
PhoneGap is an open source product that allows you to build native applications for mobile devices. PhoneGap Build is a web service offered by Adobe that allows you to create native applications that use PhoneGap without having to install the device SDK on your machine, or in the case of iPhone/iPad apps, without even having to use a Mac.
PhoneGap creates a native application with an embedded browser control. Your Alpha Anywhere mobile app runs in the embedded browser, but has access to all of the native features of the phone that are exposed by PhoneGap.
To bring up the PhoneGap genie, click the PhoneGap button on the Web Control Panel toolbar.
You can download the documentation for the PhoneGap Build genie here.
For more information on PhoneGap, go to http://phonegap.com/

Web Applications - Security Framework - SQL Databases - The Web Application Security framework allows you to store the account information for the users and groups in your security framework in either .dbf tables or a SQL database. Previously, configuring the Web Security Framework to use SQL tables was a manual process, described in the following document:
http://wiki.alphasoftware.com/Using+SQL+tables+in+Web+Security
Now, a new genie makes it easy to configure the Security Framework to use SQL tables for your user and groups list. The genie also make it easy for you switch a previously configured Security Framework from .dbf tables to SQL tables without loosing any data.
When you edit your Security Properties (by clicking the Web Security button when the Web Control Panel has focus), the dialog now has a new property called 'Security Table Type', as shown in the image below.
If you select the 'SQL' option, then when you close the Security Settings dialog, a genie is launched (see screens below) to walk you through the process. The genie will prompt for a connection string and then will create the necessary security tables in your target SQL database.
If you are switching from .dbf security tables to SQL security tables, the genie will transfer your existing data to the SQL database.
NOTE: Remember, the genie will only be started once you close the Security Settings dialog and only if you have not previously configured security settings, or you are changing from .dbf to SQL tables. If you have previously configured your Security Settings to use SQL tables and you edit your security settings, the genie will not be started when you cloe the Security Settings dialog.
NOTE: The genie creates new tables in your SQL database. Mapping to existing tables is not supported.
TIP: If you want to change the SQL database in which your account information is stored you should first convert to use .dbf tables. That will import all of your existing account information into .dbf tables. The convert back to SQL. This will then export the data in the temporary .dbf tables to the new target SQL database.

After you click the OK button to close the Security Settings dialog, the Web Security Tables Upsize Genie is started.



AlphaDAO - <connection>.ListTables() Method - Limit Tables - The .ListTables() method is now limited to 1,000 table names. This change was made because a user had a database that has over 1,000,000 tables and returning the names of all tables in the database in this case is obviously impractical.
AlphaDAO - ODBC Connection String - DSN Less Connections - You can now create ODBC connections that do not use a DSN.
At the Data Source Name prompt in the Connection String builder, select <None> from the list.

When bypassing the DSN, you must provide the driver name by adding Driver='' as an additional parameter:
Example:
Driver='{Microsoft Paradox Driver (*.db )}'
For the generic ODBC API Alpha Anywhere populates the following parameters in the ODBC connection string if the we encounter corresponding values in the Alpha Anywhere connection string:
Prompt
SQL_DRIVER_NOPROMPT
NoPrompt SQL_DRIVER_PROMPT
Complete SQL_DRIVER_COMPLETE
Required SQL_DRIVER_COMPLETE_REQUIRED
See the Microsoft documentation for ODBC for a complete explanation of these
options.
Here is an example of an Access connection string and the equivalent DSN-less connection string that Alpha Anywhere automatically creates behind the scenes when the first connection string is used.
Connection String using the built-in Access option in the Connection String builder:
{A5API=Access,FileName='C:\temp\Northwind.mdb',A5TraceSQL=Y}
DSN-less ODBC connection string:
{A5API='ODBC',A5Syntax='Access',A5TraceSQL=Y,Driver='{Microsoft
Access Driver (*.mdb, *.accdb)}',DBQ='c:\temp\Northwind.mdb',ExtendedAnsiSQL=1,ImplicitCommitSync=Yes,UserCommitSync=Yes}
a5_show_htmlChrome() Function - Desktop Applications - Opens an Xdialog window and display HTML content using the embedded Chrome browser. Contrast with the existing a5_show_html() function that uses the IE activex control.
For example, consider the following script in a desktop application
dim html as c
html = <<%html%
<b>Hello World</b>
%html%
a5_show_htmlChrome(html)
UX and Grid Component - Styles - iOS7 and Android - New styles are included for iOS7 and Android. For Android, two styles are included - AndroidDark and AndroidLight.
IMPORTANT: If you are converting an existing
component that previously used the iOS style to iOS7,
AndroidDark or AndroidLight you will notice that the
'disclosure icons' on the right edge of your List
controls do not render properly. Also, if your component
was built using the Demo Mobile App that ships with
Alpha Anywhere, the Menu List control might not render
properly. Here is how to fix these two issues.
To fix the List template, edit the template and replace
the disclosure icon in the template with
{images.dialog.listNavSubtle}
or {images.dialog.listNav}.
The fixed HTML will then look like this:
<img src="{images.dialog.listNavSubtle}"
/>
To fix the Menu List, edit the Window container that
contains the Menu List and check the HTML template in
the Header HTML
property. This property is in the
Optional Window
Parts
section. Edit this template and make sure that
the following HTML markup exists at the end of the
template HTML:
<br style="clear:both;">
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
A particularly attractive feature of these new styles is the way that the icons in the style are rendered. Instead of using bitmaps for the icons, the styles use CSS Icons (also called Font Icons because the icons are all included in a special font file that is included as part of the style).
See below for more information on CSS Fonts in general and on Font-Awesome in particular. Font-Awesome is an open-source Font Icon that is now bundled with Alpha Anywhere.
UX, Grid and TabbedUI Components - CSS Icons (Icon Fonts) - Support has been added for CSS Icons (also know as Icon Fonts) - Icon fonts have become very popular, especially for mobile applications because they scale smoothly, and are smaller than bitmaps. Also, there are many libraries of icon fonts that can be used with Alpha Anywhere.
In the image below, the two icons in the buttons are both CSS Icons rendered using the Icon Fonts that come with the iOS7 style.
![]()
An icon font is just a regular font, excepting that instead of displaying characters, such as 'a', 'b', 'c', etc., the font has icons at each character position. So, assuming that the font defines a 'save' icon for character 'a', then in order to display the 'save' icon on your component, you would display the character 'a', and set its style to use the Icon Font.
Remembering that the 'save' icon corresponds to the character 'a', would be tedious, so a corresponding CSS file is defined. This CSS file has two main purposes:
For example, the CSS might define a rule called 'icon-save' that indicates what character the 'save' icon is mapped to.
When defining an image for a control (for example a button), you would indicate that the image name is:
cssIcon=icon-save
When the component is rendered the HTML markup, might look like this:
<img src="cssIcon=icon-save" />
This HTML markup is then automatically translated by Alpha Anywhere to:
<i class="icon-save"></i>
which correctly renders the icon using the appropriate character in the Icon Font.
You can also define an inline style for the CSS Icon. For example, if you define the image name as:
cssIcon=icon-save {color: blue;}
then, when this is translated automatically, the HTML becomes:
<i class="icon-save" style="color: blue;"></i>
UX, Grid and TabbedUI Components - Font-Awesome Icon Font Library - Font-Awesome is a popular open-source icon font library. Alpha Anywhere now comes with Font-Awesome pre-installed. The Font-Awesome library is installed in the CSSIcons folder in the folder where the Alpha Anywhere executable is installed.
For more information on Font-Awesome, please go to:
In order to use any icons in the Font-Awesome library, (or in any 3rd party CSS Icon Library) you must set a property in the UX, Grid or Tabbed UI builder to indicate that the library should be loaded. Click the smart field button for the CSS (Font) Icons property to open the dialog that allows you to select which CSS Icon library you want to load.

NOTE: When you close the 'Select CSS Icon Libraries to Load' dialog shown in the above image, the library files are copied from the CSSIcons folder in your executable folder to the CSS folder in your Web Project. Because the CSS Icon library files are then part of your Web Project, they will be automatically published when you publish your application.
Once you have indicated the libraries that you want to load, any time you are prompted for the name of an icon, you can select a regular bitmap, or a CSS Icon. For example, note the 'CSS Icon' option on the Image selector:

If you select the CSS Icon option you can select the icon source. If you are using a style that uses icon fonts (for example the iOS7, AndroidLight, or AndroidDark styles), the ImageSource list will show <Style> as an option.
The Image source list will always include 'Font-Awesome' since this library is bundled as part of Alpha Anywhere. But the list will also include any other libraries that you have installed. See section below on installing 3rd party CSS Icon font libraries.
To select an icon, click the Select button to open the genie:

The genie allows you to easily filter the list to quickly find a particular icon. You can specify the size of the icon using the dropdown 'Size' selector. If you select 'Custom' , then you can use the slider to select any size you want.
As you can see in the image below the icons scale smoothly, even when displayed at a large size - 127px in the image below.

You can also specify the color, CSS classes or in-line style to apply visual effects to the icon. For example:
(In the example below, the style for the Icon has been set to:
border: solid 3px; border-radius: 20px; padding: 4px;
)

CSS Icon Libraries - Installing 3rd Party Libraries - There are many sites on the web that supply Icon fonts and the accompanying CSS file to load and select icons from the font.
You can generally use any of these third party libraries as long as the accompanying CSS file for the library uses the convention of displaying the icon use the HTML <i> tag.
For example, to display the 'heart' image from the Font-Awesome library, the HTML markup is:
<i class="fa fa-heart"></i>
If the library you want to install uses the same conventions, then it can be used in Alpha Anywhere.
To install a 3rd party CSS Icon library, simply copy the folder that contains the CSS and font files for the library into the CSSIcons folder in the Alpha Anywhere executable folder (development version, not Application Server), and then 'install' the font (so that it can be used in Working Preview). See below for information on 'installing' fonts.
A popular source of icon fonts is http://www.fontello.com/
This site allows you to select icons from a menu of available icons and it then builds a custom icon font which you can download. After you download the files, just copy the folder into the CSSIcons folder in your executable folder.
Watch Video - Installing a 3rd Party CSS Icon Library
Registering the Font For Use in Working Preview
Icon fonts are loaded dynamically by the CSS file when you are in Live Preview or running your published application. However, when you are in Working Preview, in order to see the icons in the icon font, you must have previously 'installed' the font. Installing a font is easy. Just open the folder for the CSS Icon library. Look for a file with a .ttf (true-type font) extension (it will often be in a sub-folder called 'Fonts') and double-click on the .ttf file. Windows will bring up a dialog that has an Install Font button. Click this button. It will install the font so that it can be used when you are in Working Preview.
UX Component - List Control - Menu Lists - A common pattern in mobile applications is to use a List control as the menu. This list control is then displayed in a Panel Window that animates in from the Left side of the screen. Icons are typically displayed for each menu choice. The CSS Icons are ideal for these types of icons.
A new pre-defined control is available in the Defined Controls section of the toolbox.

TIP: If you are building a mobile application, rather than using the pre-defined List Menu, you might find the pre-defined SplitView examples more helpful. These are available by selecting 'QuickPanels' from the 'Panels' category in the UX Toolbox on the left of the UX builder. See 'New SplitView Examples' below for more information.
Selecting this option will produce a List control like this:

If you edit the List properties for the above List, you will notice that the control type for the icon field has been set to CSSIcon. See topic UX Component - List Control - Using CSS Icons below for more information.
UX Component - List Control - Using CSS Icons - You can now easily use CSS Icons in a List. A new Control type property is available on the Fields tab of the List Builder.
In the image below, the control type for the Image column has been set to CSSIcon.
The data in this List's Data Source could be something like this (using CSS Icons from the Font-Awesome library in this case):
MenuName|Image|Action
Menu One|cssIcon=fa fa-heart fa-2x|action1
Menu Two|cssIcon=fa fa-music fa-2x|action2
Notice that in the 'Image' column, the name of the CSS Icon is specified (including the cssIcon= prefix).
You can also use in-line styles or your own classes to style icons. For example, here is how the data could be represented using an in-line style for the icon in the first row and a custom class for data in the second row:
MenuName|Image|Action
Menu One|cssIcon=fa fa-heart fa-2x {color: red;}|action1
Menu Two|cssIcon=fa fa-music fa-2x myiconclass|action2

If your list uses a Free-form template, you can put a CSS Icon directly in the template using this HTML markup:
<i class="fa fa-heart fa-2x"></i>
Tip: You could just as easily add the following
HTML markup to your template:
<img src="cssIcon=fa
fa-heart fa-2x" />
and at run-time Alpha Anywhere will translate the
<img> tag to the correct <i> tag (because the src
attribute of the
<img> tag
starts with 'cssIcon')
UX Component - Mobile Applications - SplitView - Pre-Defined Quick Start Templates - A typical mobile application often includes a 'menu' panel that allows the user to navigate to different parts of the application. A common pattern is to use a 'split-view' with the menu in the left Panel and the main work area of the application in the right Panel. The menu is hidden on a phone (where screen space is limited), but shown on a tablet (where more screen space is available). If the menu is hidden, tapping on button in the PanelHeader, or swiping to the right, will reveal the menu.
In the images below, the UX is shown as it appears on a phone and a tablet. Notice that on the tablet, the menu is always visible and the button in the PanelHeader (shown when the UX is on a phone) is automatically hidden.
![]() |
![]() |
![]() |
|
If you want to use the pattern described here, you can select add a pre-defined set of controls to your UX component by selecting 'Quick Panels' from the UX toolbox.

Then select '{Predefined:SplitViewWithIconsAndPanels}'

UX and Grid Component - Client-side Calculated Fields - Builder - When you open the Builder to define a client-side calculated field, a new hyperlink appears on the dialog - 'Format String'. This hyperlink opens a genie that can be used to define the format string for the new FormatNumber() function which can be used in your client-side calculated fields to format numeric values.

When you click the Format String hyperlink, a genie opens to help you define your format string:

UX and Grid Component - Client-side Calculated field - FormatNumer() function - Client side calculated fields can now use a new psuedo function, formatNumber() to format a numeric field.
For example:
formatNumber(num1,"#,###.00");
The format string is very similar to the syntax used by Excel. For information on the syntax for format strings, see the section 'Number Format Strings' below.
NOTE: When you use the
formatNumber() pseudo function in a
client-side expression, the function gets converted to
the following Javascript:
number.toFormat('formatString')
where 'number' is any Javascript numeric variable. The
Alpha Anywhere Javascript library adds a
.toFormat()
method to the prototype for numeric objects.
UX and Grid Component - Number Format Strings
Number format strings are used in the .toFormat() method of numeric variables and in the formatNumber() function when defining a client-side expression in a Grid or UX component.
A number format string can have multiple formats in them
by using a ";" to separate multiple formats. The way a
given format in the format string is selected is based
on either its location in the string, or by an optional
condition.
If the format string doesn't contain any conditions then
the first format will be used for a positive value, the
second for a negative, and the third for a zero value.
Conditions can be put into the format by making the
first part of the format string contain
if(expression)
where n
equals the value of the number. For example:
if(n>999999999)=(###) ###-####;=###-####
is a multi-format string that the will return numbers
greater than 999999999 as a 10 digit phone number mask
and number less than 999999999 as a 7 digit phone number
mask.
You can also optionally process a number before it is
formatted by adding
=(expression)
onto the end of a format string where
n equals
the value of the number. For example:
##0.00 %=(n*100)
is a format string that will first multiply the number
by 100 before outputting it with the format. A value of
'.254' would be returned as '25.40 %'
A number format can be either of two types: a "number"
or a "mask" format.
A mask format is indicated by the first character in the
format being an
= sign. The
#
character in the mask will be replaced with the first
available digit from the number. An example of a number
format for a 10 digit phone number is:
=(###) ###-####
Using the above mask, the number
8004511018
would be formatted as:
(800) 451-1018
While 'masks' are simple, 'number' formatting can be
more complex. Below is a list of the special characters
that can be used in a 'number' format string:
| Character | Description |
| # | an optional digit |
| 0 | a required digit (will be output as "0" if no value in the number for the given location) |
| _ (an underscore character) | an optional digit (will be output as " " if no value in the number for the given location) |
| * | after the decimal character will cause there to be no rounding (number if output with its full precision) |
| ] | at end of a number format (before any suffix) means round to zero (there will be no decimal value) |
| [ | with "]" means force "0" for integer places in the number (e.g. 123 formatted with #[00] would be 100) |
| < | at end of a number format (before any suffix) means round decimal up, before "]" is the round up equivalent of "[" |
| > | at end of a number format (before any suffix) means round decimal down, before "]" is the round down equivalent of "[" |
| -/- | display decimals as fractions |
After optional conditions and number processing
expressions have been removed from the format string,
any non-special characters at the beginning and end of
the format string are placed into the prefix or suffix.
If a format string does not contain multiple formats for
positive and negative values, a
'-'
(minus sign) will be appended to the start of the result
if the number is negative.
Examples
| Number | Format String | Result | Description |
| 1256.2 | # ##0,00 | 1 256.20 | use a " " to separate thousands and a "," for the decimal, round to two decimal places and force "0" for those two decimal places |
| .257 | 0.00> | 0.25 | pad the integer part with a "0" and use a "." for the decimal, round down to two decimal places. |
| 1256.2 | #,#[00] | 1,300 | clip to two integer places and use a "," as thousands separator. |
| 1256.2 | #,#>00] | 1,200 | clip to two integer places, round down, and use a "," as thousands separator. |
| 1256.2256 | #,##0.* | 1,256.2256 | use a "." for the decimal and a "," for the thousands separator, don't round the decimal. |
| 1.256 | 0.##> and -/- | 1 and 1/4 | round down to two decimal places and render the decimal as a fraction in the suffix |
| 1256.2 | $#,##0.00;$ (#,##0.00);------ | $1,256.20 | multiple format strings for positive, negative and zero value. The thousands separator is "," and the decimal character is ".". Number if rounded to 2 places. Negative value is enclosed in parentheses. Zero value is output as "------" |
|
4 3 1 |
if(n>=4)# (Good);if(n>=2) # (Average);# (Bad) |
(Good) (Average) (Bad) |
render the number with a custom suffix based on
a condition. For example, if the number if 4,
the output value is (Good). If the number if 1,
the output value is (Bad) |
| 1256.2 | #[0] | 1260 | round to 10, integer only |
| 1256.2 | #[00] | 1300 | round to 100 |
| 1256.2 | #[000] | 1000 | round to 1000 |
UX Component - Ajax Callback - Timeout Setting - You can now specify an explicit value for the Ajax callback timeout. This is the amount of time to wait (in milliseconds) for the response from the Ajax callback. If the response is not received within the specified the, the callback is considered to have failed and the 'onAjaxCallbackFailed' event is fired and any code defined in the optional 'Ajax failed Javascript' property is executed.
Previously, the timeout setting used the default value set by the browser.
If you set the property value in the dialog shown below to <Default>, then a default value for the component is used. This default can be defined by adding code like this to the UX component's 'onRenderComplete' client-side event:
{dialog.object}.ajaxCallbackTimeout = 1000;
If you set the property value to 0, the default value as defined by the browser is used.

UX Component - Action Javascript - Ajax Callbacks - Cross-Domain - Because of security issues, browsers typically enforce a policy that requires that the page that responds to an Ajax callback must be loaded from the same domain that the original page was loaded. This does not represent a problem for typical Ajax callbacks that are handled by Xbasic code on the server.
However in cases where you want to call a web service directly from the client (without first going to the Alpha server), it does represent a problem.
Consider for example the following scenario:
Say you have a button on the UX and you want to make a call to the Apple iTunes store to retrieve information about a book.
The URL for this web service (including the query string for the particular book you are interested in) is as follows:
http://itunes.apple.com/lookup?isbn=9780316069359
The domain for this URL is obviously not the same as the domain from which the UX component was loaded in the first place.
There are two ways in which you could call this web service:
Clearly, the second approach is more desirable as it avoids hitting the Alpha server at all.
However, in order to implement the second approach you need to perform a cross-domain Ajax callback.
The new 'Ajax Callback - Cross Domain' action in Action Javascript allows you to perform cross-domain Ajax callbacks.
TECHNICAL NOTE: The Ajax Callback - Cross Domain action is built on top of jQuery. You must load jQuery core for this method to work. See the Web Project Properties dialog to enable jQuery.
When you define this action you specify the URL of the callback page. Any parameters that you want to pass in to the web service are in the query string. When you specify the URL, you can specify an explicit value, or any Javascript expression that evaluates to the URL. This allows you to dynamically construct the URL for the callback.
You also specify the name of a Javascript function that will be called when the Ajax callback completes successfully. The function gets passed an argument that contains the data retuned by the callback.
NOTE: Unfortunately, if the callback fails, there is no way to specify an 'onFailure' function. This is a limitation of the technique used for making cross-domain callbacks.
A useful technique for seeing what data in passed to the success function is to define the following success function for your action:
function mySuccessFunction(data){
alert(JSON.stringify(data,'','\t'));
}
This function will convert the data returned by the callback into a JSON string and display it.

Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
UX and Grid Component - Client-side Expressions - New Round() functions - In build 1788-4225 new options were added to the $u.n.round() function in the Alpha Anywhere Javascript library. These options allowed you to specify if the rounding was:
However, when using the client-side expression builder, there was no way to specify which option you wanted to use when you used the round() function.
Now, these new functions can be used in your client-size expressions:
HTML Reports - Export to Excel, Word or PDF - beforeHTMLReportExport event - A new client-side event has been added to the UX, Grid and Tabbed UI components. This event is fired when an HTML report is displayed and the user clicks one of the buttons on the report toolbar to export the HTML report to PDF, Word, Excel or Text mode. The main motivation for this event is to allow the developer to put up a custom wait dialog. The afterAjaxComplete event can be used to dismiss the custom wait dialog.
UX Component - List Control - Buttons and Hyperlinks - Set Focus Property - Buttons and Hyperlink controls now have a new property called 'Set Focus'. By default, when you click on a button or hyperlink in a List row, the row that contains the button or hyperlink does not automatically get selected. Now, if you check the 'Set Focus' property, when you click the button or hyperlink, the corresponding row is also selected.
Grid Component - Edit-Combo and Auto-Suggest Controls - NotInList Event - Added support for the NotInList event for edit-combo and auto-suggest controls in Grids. This event fires when the user enters a value that is not in the list of choices. The typical use case for this event is to write code to add the value that the user entered to the table that contains the choices so that in future, the value that was entered can be presented in the pick list.
UX Component - Javascript Controls - 'Initialized' property - All Javascript controls on a UX (for example, List, SpinList, ButtonList, Switch, etc.) now have a new 'initialized' property. Consider the following example that explains why this property is useful:
Assume you have a List control and you have unchecked the 'Allow Null selection' property. This means that when the List is rendered, the first row in the List will be automatically selected and the onSelect event of the List will fire.
Assume that in the onSelect event you reference some property of the List that does not yet exists because the List has not yet been fully initialized. Your code will generate a Javascript error. Using the new 'initialized' property, you can write your onSelect event as:
if(this.initialized) {
//your onSelect event code goes here
}
hmac_hash() Function - The hmac_hash() function is primarily for internal use in situations where OAuth authentication is used. The function is exposed to Xbasic as it might be useful to developers.
?hmac_hash("alpha anywhere","secret","HMACSHA1",.F.)
Grid and UX Component - .runAction() Method - Javascript Actions - Passing in an Object Reference - The .runAction() method now takes an optional second argument which is a pointer to an element on the page. The use case for the parameter is described below.
Assume you used Action Javascript for a button to open a window that was positioned relative to the button. If you examine the generated Javascript code, you will see that the Javascript in the button's onClick event passes in 'this' - a reference to the button. Therefore the windows can be positioned relative to the button.
However, if you define the exact same action as a Javascript Action, and then try to invoke the Javascript Action from a button (using the .runAction() method in the button's onClick event), you will get a Javascript error because the code that tries to position the window does not have any reference to the button.
Now, by passing in a reference to the button when the .runAction() method is called, the window can be positioned.
For example
{dialog.object}.runAction('myaction',this)
*property_filter() Function - Takes a .dot variable and filters out certain properties. The 'filter' specification is a cr-lf delimited string of directives that can include wildcard characters and a leading - sign to indicate that a property should be removed.
For example consider the following .dot variable:
dim prop.firstname as c
dim prop.lastname as c
dim prop.company as c
dim prop.age as n
'this filter selects the properties 'firstname' and 'age'
dim filter as c
filter = <<%str%
firstname
age
%str%
prop = *property_filter(prop,filter)
?prop
= age = 0
firstname = ""
'this filter removes the 'firstname' property, selects
all properties
'that end in 'name' and all properties that start with 'comp'
filter = <<%str%
-firstname
*name
comp*
%str%
prop = *property_filter(prop,filter
?prop
= company = ""
lastname = ""
property_from_url() Function - Parses a URL query string into an Xbasic .dot variable.
Syntax:
property_from_url(prop as p,url as c)
Example:
dim p2 as p
property_from_url(p2,"firstname=john&lastname=smith&company=ACME%20Industries")
? p2
= company = "ACME Industries"
firstname = "john"
lastname = "smith"
property_to_url() Function - Converts a .dot variable to a URL.
Syntax:
c Url = property_to_url(prop as p[,options as c])
options - 'S' - sorts the parameters so that they conform to the oauth specification for a normalized request. See http://oauth.net/core/1.0/#anchor14
Example:
dim prop.firstname as c = "john"
dim prop.lastname as c = "smith"
dim prop.company as c = "ACME Industries"
? property_to_url(prop)
= "firstname=john&lastname=smith&company=ACME%20Industries"
? property_to_url(prop,"S")
= "company=ACME%20Industries&firstname=john&lastname=smith"
AlphaDAO - Oracle - Executing SQL Commands - CRLF Characters - If you have an Xbasic script that executes some SQL commands against an Oracle backend, be sure that your SQL commands do not have cr-lf characters in the command string. You should replace all cr-lf characters with lf charactrs.
For example, consider the following Oracle SQL code to be executed
dim cmd as c
cmd = <<%str%
DECLARE
prdcode gm_test_t.prd_code%type;
method gm_test_t.method%type;
histid gm_test_t.history_id%type;
BEGIN
prdcode := :prdcode;
method := :method;
histid := :historyid;
insert into gm_test_t (prd_code,method,descr, history_id)
select prdcode, method,descr, gm_test_s.nextval from gm_test_t a where
a.prd_code = prdcode and a.method=method and a.history_id = histid;
COMMIT;
EXCEPTION
WHEN OTHERS THEN
raise_application_error(-20000,sqlerrm);
END;
%str%
dim cn as sql::connetion
cn.open("::name::myoracleconnection")
dim args as sql::arguments
'set argument values
cn.execute(cmd,args)
The above will fail because the SQL commands have cr-lf characters in the code.
Instead, change the code to this:
dim cn as sql::connetion
cn.open("::name::myoracleconnection")
dim args as sql::arguments
'set argument values
cmd = stritran(cmd,crlf(),chr(10))
cn.execute(cmd,args)
UX Component - List Control - Toggle Display of List or Map - A common pattern when designing a UX component is to wrap certain controls in a container, set the inline style of the container to display: none; and then have some button or event that will display the container when necessary - using the Toggle Display action in Action Javascript.
If the container has a List control that uses Columnar layout, or a Map control, then when the container is shown, the List or Map will not be rendered properly. This is because when the UX is initially rendered, the Map or List control is not shown and so these controls do not know how to size themselves correctly.
This issue is easily solved by using the onShowComplete Javascript event in the Toggle Display Action Script builder. You can use this event to refresh the List or Map.

For example, assume that the Id of a List control in the container is 'LIST1' and a Map control is 'MAP1'. Here is the Javascript to refresh the controls:
{dialog.object}.getControl('LIST1').refresh();
{dialog.object}.getControl('MAP1').refresh();
Xdialog - Chrome Control - Loading HTML in Chrome OnReady Event - Consider the following simple Xdialog that displays some HTML in Chrome control:
dim cr as helper::Chrome
cr.html = "HTML to show"
dim dlg_title as c
dlg_title = "Chrome Xdialog"
ui_dlg_box(dlg_title,<<%dlg%
{chrome=100,20cr}
%dlg%,<<%code%
%code%)
This Xdialog will render as follows:

In some cases, however, because of timing problems, the Xdialog window will open, but the Chrome control will not be properly populated.
The Xdialog can be restructured so that the HTML is only loaded into the Chrome control when its OnReady event fires:
dim html as c
html = <<%html%
<p>HTML - loaded in the Chrome onReady event</p>
%html%
dim cr as helper::Chrome
cr.html = "Dummy Content"
dim dlg_title as c
dlg_title = "Chrome Xdialog"
cr.OnReady = "ui_dlg_event("+quote(dlg_title)+",\"chromeReady\")"
ui_dlg_box(dlg_title,<<%dlg%
{chrome=100,20cr}
%dlg%,<<%code%
if a_dlg_button = "chromeReady"
a_dlg_button = ""
cr.html = html
end if
%code%)
UX Component - SpinList Control - Getting the value for the 'Display Value' - When you define the choices with which to populate a SpinList control, you can specify a 'display value' and a 'stored value' for each value. When you read the current value in the control (using the {dialog.object}.getValue() method, or the .value property on the SpinList object itesel), you well be reading the stored value. In this tip we show you how to get the current display value:
Assume that the SpinList control id is 'spin1'
//get a pointer to the SpinList control
var s = {dialog.object}.getControl('spin1');
var v = s.value; //get the current value
var _d = s._data; //get the array of data in the SpinList
//find the index in the array where the array's 'value' property
//matches the the current value in the SpinList
var indx = {dialog.object}._findArrayProp(_d,'value',v);
var html = _d[indx].html;
alert(html);
SQL Server - Date or Date/Time Fields - Errors - Installing correct Native Client - Occasionally we received a bug report from a user reporting that they are getting an error while doing some type of SQL query involving a SQl Server date or datetime field. Invariably, the error is caused because they do not have the correct drivers for the SQL server Native Client installed.
Here are the links to the download on the Microsoft web site:
X86
Package(sqlncli.msi) - 4549 KB
X64
Package(sqlncli.msi) - 7963 KB
IA64
Package (sqlncli.msi) -
11112 KB
See also:
https://www.microsoft.com/en-
Reports - PDF - Acrobat Viewer - Crash - In some instances, when doing a Live Preview of a component that prints a PDF report, the Adobe Acrobat viewer might report a crash, with a dialog similar to this:

Alpha Anywhere will then display a message like this:

Research on the Adobe site indicates that this has been a somewhat
random problem in Acrobat in IE since Acrobat X. One
common suggestion from Adobe was to open Reader and go to Edit ->
Preferences -> Security (enhanced) and disable protected mode by
unchecking "Enable Protected Mode at startup"
http://www.brain-cluster.com/
HTTP and FTP Functions Not Working on Certain Machines - Some users have reported problems with the built-in FTP and HTTP functions in Xbasic. They assume that the issue is a port conflict.
In fact, the client functions are not hard-coded
to a specific outbound port. They use the standard
Windows API for accessing a random available port. If
outbound access is being blocked, it is likely being
done so by a firewall, not by a conflict with another
running program. Most Windows installations have Windows
Firewall configured to block outbound access by default
for all applications. See
http://windows.microsoft.com/en-us/windows/communicate-through-windows-firewall#1TC=windows-7
for details on allowing the outbound access.
Grid Component - Search Part - Customizing the Search Part Toolbar
- The Search Part does not allow you to customize the toolbar, as you
can for the Grid Part and Detail View Part. A user wanted to put an
Action Button next to the 'Search' button. Here is how you can do this.

First, define your Action Button and place it anywhere on the Grid (it does not matter where you place it because we are going to move it using Javascript).
Then add this code to the Grid's onGridRenderComplete event:
//set this to the ID of your action button
var actionButtonId = 'MYBUTTON';
//get a pointer to the 'Search Button'
var ele = $( '{Grid.ComponentName}.SEARCHBTN' );
ele = ele.parentNode;
var ele2 = ele.parentNode;
var sele = $('{Grid.ComponentName}.ACTIONBUTTON.'+actionButtonId+'.G0');
ele2.appendChild(sele);
UX and Grid Components - Javascript Date Values - Parsing Strings into Date Values - The Alpha Anywhere Javascript library has added a very useful method to the Javascript Date object to help parse strings (that represent date values) into real date objects.
The Date.formFormat() method takes two arguments - a date string and a date format string. For example
var d1 = new Date();
d1.fromFormat('01/01/2014','MM-dd-yyyy');
You can also use the Date object's .toFormat() method to format a date object as a sting.
var dString = d1.toFormat('dd-MM-yyyy');
Tab Direction on UX For Right-to-Left Languages - For languages that go from right-to-left, it is desirable to also have the tab direction go from right-to-left so that when the user hits the tab key, the control to the right of the current control is selected. This is easily done by adding this CSS to the UX component's local CSS definition.
IMPORTANT: Be sure that the Layout Mode property on your UX is set to 'ContainerWidth'
body { direction:rtl; }
.A5CWLayout { float:right; }
TIP: If you have List controls on a UX component for which the body direction has been set to 'rtl', you will need to wrap each List control in its own container and set the direction property of the container to 'ltr', or else the titles on the List will not display correctly.
Generating an UX Component Using Xbasic - a5wcb_createDialogUsingXbasic() Function - The a5wcb_createDialogUsingXbasic() function can be used to generate an UX component programmatically.
Note that for each control, a minimal set of properties is defined. You can add additional properties for each control if necessary. The Xbasic tab in the UX builder shows the available properties for each control type.
dim wp as p
DIM wp.page_fields[0] as P
with wp.page_fields[]
.controltype = "layout_directive_statictext"
.v.StaticText = "Created by Xdialog"
end with
with wp.page_fields[]
.v.variableName = "c"
.v.breakType = "None"
end with
with wp.page_fields[]
.v.variableName = "d"
.v.label = "Field D"
.v.hasWaterMark = .t.
.v.waterMark.text = "Enter name"
end with
with wp.page_fields[]
.controltype = "layout_directive_button"
.v.buttonText = "click me"
.v.javascript.onclick = "alert('click');"
end with
with wp.page_fields[]
.controltype = "layout_directive_FrameBegin"
.v.FrameTitle = "frame"
.v.Frame.ID = "FRAME_1"
.v.Frame.type = "Simple"
end with
with wp.page_fields[]
.controltype = "layout_directive_hyperlink"
.v.hyperlinkText = "this is my hyperlink"
.v.javascript.onclick = "alert('you clicked a hyperlink');"
end with
with wp.page_fields[]
.controltype = "layout_directive_image"
.v.ImageMode = "Static"
.v.javascript.onclick = "alert('click on image');"
.v.Imagename = "images/$$application.alpha.png.a5image"
end with
with wp.page_fields[] ' initialize tmpl.page_fields[8]
.controltype = "layout_directive_FrameEnd"
end with
'create the UX and call it 'genByXbasic'
a5wcb_createDialogUsingXbasic(wp,"genByXbasic",.t.)
Generating a UX Dynamically in a Web Application - In the previous tip we discuss how to generate a UX component using Xbasic. The generated component is a permanent component that appears in the Web Control Panel.
Watch Video
Download Component
However, you might have a use case that requires the dynamically created UX component at run-time. The UX component, in this case, should be created as a temporary session file. This is done by specifying a name with '__sessionFile__' as a prefix when calling the a5wcb_createDialogUsingXbasic() function.
The following sample .A5W page shows how this can be done
<%a5
'define the UX component
dim wp as p
DIM wp.page_fields[0] as P
with wp.page_fields[]
.controltype = "layout_directive_statictext"
.v.StaticText = "Created by Xdialog"
end with
with wp.page_fields[]
.v.variableName = "c"
.v.breakType = "None"
end with
with wp.page_fields[]
.v.variableName = "d"
.v.label = "Field D"
.v.hasWaterMark = .t.
.v.waterMark.text = "Enter name"
end with
with wp.page_fields[]
.controltype = "layout_directive_button"
.v.buttonText = "click me"
.v.javascript.onclick = "alert('click');"
end with
with wp.page_fields[]
.controltype = "layout_directive_FrameBegin"
.v.FrameTitle = "frame"
.v.Frame.ID = "FRAME_1"
.v.Frame.type = "Simple"
end with
with wp.page_fields[]
.controltype = "layout_directive_hyperlink"
.v.hyperlinkText = "this is my hyperlink"
.v.javascript.onclick = "alert('you clicked a hyperlink');"
end with
with wp.page_fields[]
.controltype = "layout_directive_image"
.v.ImageMode = "Static"
.v.javascript.onclick = "{grid.Object}.ajaxCallback('G','{Grid.RowNumber}:all','xb','','',{deviceOfflineFunction:
function() { }});"
.v.Imagename = "images/$$application.alpha.png.a5image"
end with
with wp.page_fields[] ' initialize tmpl.page_fields[8]
.controltype = "layout_directive_FrameEnd"
end with
DIM wp.XbasicFunctionDeclarations as C = <<%code%
function xb as c (e as p)
xb = "alert('callback');"
end function
%code%
'give the component name a special name that starts with
__sessionFile__
dim componentName as c
componentName = "__sessionFile__mydynamicUx"
a5wcb_createDialogUsingXbasic(wp,componentName,.f.)
Delete tmpl
DIM tmpl as P
tmpl = a5w_load_component(componentName)
'set the following to properties in tmpl
tmpl.alias = "MYALIAS"
tmpl._dialogFilename = file.filename_parse(componentName,"N")
'now run the dynamically generated component
delete x_ux1
dim x_ux1 as p
x_ux1 = a5w_run_Component(tmpx)
?x_ux1.Output.Head.JavaScript
?x_ux1.Output.Head.CSS_Link
?x_ux1.Output.Head.Title
%>
</head>
<body>
<%a5 ?x_ux1.Output.Body.Dialog2_HTML
%>
</body>
</html>
Alternatively, you might want to generate the UX component dynamically on an
Ajax callback. For example, the following Xbasic function in a UX component
handles an Ajax callback. The function dynamically creates a UX and then sends
the name of the dynamically created UX component back to the UX so that the name
can be stored in a variable and used when you want to open this component.
function xb_generate as c (e as p)
dim wp as p
DIM wp.page_fields[0] as P
with wp.page_fields[]
.controltype = "layout_directive_statictext"
.v.StaticText = "Created by Xdialog"
end with
with wp.page_fields[]
.v.variableName = "c"
.v.breakType = "None"
end with
with wp.page_fields[]
.v.variableName = "d"
.v.label = "Field D"
.v.hasWaterMark = .t.
.v.waterMark.text = "Enter name"
end with
with wp.page_fields[]
.controltype = "layout_directive_button"
.v.buttonText = "click me"
.v.javascript.onclick = "alert('click');"
end with
with wp.page_fields[]
.controltype = "layout_directive_FrameBegin"
.v.FrameTitle = "frame"
.v.Frame.ID = "FRAME_1"
.v.Frame.type = "Simple"
end with
with wp.page_fields[]
.controltype = "layout_directive_hyperlink"
.v.hyperlinkText = "this is my hyperlink"
.v.javascript.onclick = "alert('you clicked a hyperlink');"
end with
with wp.page_fields[]
.controltype = "layout_directive_image"
.v.ImageMode = "Static"
.v.javascript.onclick = "{grid.Object}.ajaxCallback('G','{Grid.RowNumber}:all','xb','','',{deviceOfflineFunction:
function() { }});"
.v.Imagename = "images/$$application.alpha.png.a5image"
end with
with wp.page_fields[] ' initialize tmpl.page_fields[8]
.controltype = "layout_directive_FrameEnd"
end with
DIM wp.XbasicFunctionDeclarations as C = <<%code%
function xb as c (e as p)
xb = "alert('callback');"
end function
%code%
fn = "__sessionFile__myuxonthefly"
a5wcb_createDialogUsingXbasic(wp,fn,.f.)
'generate a response to send back to the client
'the name of the dynamically generated UX will be stored
'in a variable called {dialog.object}._ux
xb_generate = "alert('done: "+js_escape(fn)+"');" + crlf()+\
"{dialog.object}._ux = '"+js_escape(fn)+"';"
end function
Now, in order to open this dynamically generated UX, you would need to make another Ajax callback. The easiest way to code this is use use Action Javascript to define an action that opens a UX component, and then convert the action to text mode. Then edit the generated code and replace this line:
go.dialog2Name = 'Name of component to open';
with this line:
go.dialog2Name = {dialog.object}._ux;
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
| Xbasic - Xdialog | Using the Chrome Embeddable Browser in Xdialog |
Xdialog allows users who are building desktop
applications to create very powerful 'screens'
to prompt for and display information to users.
You can now embed Google's Chrome browser
directly into your Xdialogs. This means that you
can use the full power of HTML, CSS3 and
Javascript to create amazing looking Xdialog
screen. When you embed the Chrome control in an
Xdialog you can easily respond to events in the
HTML with either Javascript of Xbasic code. You
can also easily send events from Xbasic to the
HTML that is displayed in the embedded Chrome
control. If you have used Xdialog in your desktop applications in the past, this new feature will open up many exiting possibilities. Introduction Watch video - Part 1 Watch video - Part 2 Debugger Watch Video - Part 3 Binding events: Watch video - Part 1 Watch video - Part 2 Google Charts: Watch video Using jQuery: Watch video For extensive documentation on how to embed a Chrome control into Xdialogs see the release notes. |
UX Component - Abstract Events - Enable Expression - If the client-side enable expression was false, the click event did not fire (correct), but the down event did. This has now been changed and the down event will also not fire.
Grid Component - Image and File Upload - New Records - Form Layout - If a Grid component used a Form layout (as opposed to a Tabular layout), then image and file upload to the new record rows did not work. There was no problem when doing uploads to existing rows, or to new rows when the Grid used a Tabular layout.
UX and Tabbed UI Component - Session Timeout Warning Feature - Under certain conditions, the Session Timeout Warning for the UX and the Tabbed UI did not open at the correct time and did not show the correct time remaining. This has now been fixed and the message box will now show the actual seconds left in the session since the last request from the component.
sql_lookup() Function - As a result of a change made in build 1788 the data type returned by the sql_lookup() function was always a character value, when it should have been correctly typed (i.e. a datetime value, a numeric value, etc, depending on the data type of the column value that the function was returning).
Now, if sql_lookup() specifies a filter and returns a single field in the return expression, the return value is correctly typed. If more than one value is returned, or no filter is specified, the return value is a character string.
Grid Component - Search Part - SQL Query Using Group By - If a Grid built in V11 used a GROUP BY clause in the SQL statement, performing a search on the Grid would fail. The problem did not occur if the Grid was build in V12 and the solution was to de-select the Search Part fields and re-select them. Now, this is no longer necessary.
A5_HTML_Pretty() Function - XML - The A5_HTML_Pretty() function, which takes an HTML string and adds the correct indentation to all of the elements can now also be used to format XML. The function takes a second, optional, parameter that indicates if the input string is XML. By default, this flag is .f.
txt = http_get_page2("http://feeds.gawker.com/lifehacker/full")
txt = a5_HTML_Pretty(txt,.t.)
showvar(txt)
Xbasic - Working With XML - Working with XML in Xbasic is now even easier. The following functions have been enhanced:
In addition, the showXML() function has been enhanced.
Consider the following very simple snippet of XML.
xml = <<%txt%
<name city-name="boston">
Fred Smith
</name>
%txt%
If you view this XML using the XML viewer function (showXML()), you will see this:

You will notice that the XML has an attribute called 'city-name'. This is not a valid Xbasic variable name, so the attribute has to be renamed (to 'city_name'). In order that the *property_to_xml() function can get back to the same XML that was originally parsed, a list of all of the attribute names that were changed is kept in the special __A5_Xml_Manifest property.

Also, you will notice that in the XML snippet, the 'name' element has a value and also it has attributes. The attribute values are shown as properties and the element value is shown using the special property name '__A5_elementContent'.
Here is how you can parse the above XML into an Xbasic dot variable:
delete p
dim p as p
'set the optional 3rd flag to .t. to use the special
properties
*property_from_xml(xml,p,.t.)
'convert the dot variable into a script so we can 'see' what's in the variable
?*variable_to_script(p)
= DIM name as P
DIM name.city_name as C = "boston"
DIM name.__A5_elementContent as C = <<%str%
Fred Smith
%str%
DIM __A5_Xml_Manifest as C = <<%str%
@Mapping:
city_name=city-name%str%
'now, go back to XML
?*property_to_xml(p,"")
=
<name city-name="boston">
Fred Smith
</name>
Notice how this is a perfect 'round-trip'! The generated XML is the same as the initial XML that was parsed.
Now, try the above exercise without using the new optional flag on the *property_to_xml() function
delete p
dim p as p
*property_from_xml(xml,p,.f.)
'convert the dot variable into a script so we can 'see' what's in the variable
?*variable_to_script(p)
= DIM name as P
DIM name.city_name as C = "boston"
Notice how the Xbasic dot variable only has the value of the attribute. It does NOT have the value of the element!
*HTML_GET_ATTRIBUTE() Function - Quick way to extract an attribute value from some HTML markup.
The syntax is:
C result = *HTML_GET_ATTRIBUTE( markup as c, attributePattern as c)
Consider the following HTML markup:
dim html as c
html = <<%html%
<img
id="GRID1.V.R2.PICTURE1"
onmouseover="$('bp').src=img;"
style="height: 1in; cursor: pointer;"
src="pictures/5.jpg"
title="pictures/5.jpg"
onerror="{grid.object}._executeEvent('onImageError',{element:
this});" />
%html%
Say you wanted to extract the 'src' attribute from this HTML. A simple string search for the text 'src=' would be wrong because it would get confused by the code for the onmouseover event handler.
dim attr as c
attr = *HTML_GET_ATTRIBUTE(html,"src")
? = src="pictures/5.jpg"
AlphaDAO - ResultSet - Generating JSON Data - .ToJSONObjectSyntax() Method - When you use the .ToJSONObjectSyntax() method to generate JSON data from a resultset, and you set the optional ConvertToText flag to .f. (it defaults to .t.), then date and date time values in the resultset now create Javascript date objects. For example:
dim cn as sql::Connection
cn.open("::Name::_northwind")
cn.PortableSQLEnabled = .t.
cn.Execute("select first 5 orderid, orderdate from
orders")
rs = cn.ResultSet
?rs.ToJSONObjectSyntax(-1,-1,.f.,.f.)
= {"orderid" : 10255, "orderdate" : new Date(1952, 11,
18, 0, 0, 0, 0)}
{"orderid" : 10249, "orderdate" : new Date(1996, 6, 5,
0, 0, 0, 0)}
{"orderid" : 10250, "orderdate" : new Date(1996, 6, 8,
0, 0, 0, 0)}
{"orderid" : 10251, "orderdate" : new Date(1996, 6, 8,
0, 0, 0, 0)}
{"orderid" : 10252, "orderdate" : new Date(1996, 6, 9,
0, 0, 0, 0)}
Xdialog - Chrome Browser Control - Xdialog now allows you to embed the Chrome browser control. This allows you to build some amazing desktop applications using the full power of HTML, CSS3 and Javascript. This is a really fantastic new feature and all developers of desktop applications are strongly encouraged to check it out!
Previously, Alpha Anywhere allowed you to use the Internet Explorer ActiveX control in an Xdialog. While this is still possible, using the Chrome control is now so much easier and more powerful, that it is hard to imagine a scenario under which using the Internet Explorer ActiveX control would be preferable to using the Chrome control.
NOTE: With Internet Explore, some of Xdialogs that used the Internet Explorer ActiveX control have stopped working because of changes Microsoft has made to IE in IE Version 11. Using the Chrome control instead of the IE ActiveX control circumvents this issue.
With the Chrome control hosted in an Xdialog you can:
Since the HTML loaded in the Chrome control can use open source Javascript libraries, such as jQuery, you can build really powerful Xdialogs for your desktop applications using a myriad of techniques made possible by third party libraries. (See below for information on the a5_html_page_prepare() function.)
NOTE The code for all of the examples used here is available in the sample Learning Xdialog workspace that ships with Alpha Anywhere. To get an updated version of 'Learning Xdialog' you must do a full install, not a patch install.
A simple Xdialog that uses the Chrome Control
Create a new script with this code:
dim cp as helper::Chrome
cp.html = <<%html%
<h1>Hello</h1>
<p>This is html inside an Xdialog.</p>
%html%
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=100,20cp};
%dlg%
dim dlg_event as c
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
And here is the resulting Xdialog when you run the code.

In the above code, notice that a new object is declared with the
dim cp as helper::Chrome
command.
Also notice that the HTML to display in the Chrome control was set by setting the .html property.
You can either set the object's .html property if you want to specify explicit HTML to display, or you can set the .url property (if you want to show a URL - see next example).
Once the Chrome object has been declared, it can be placed in the Xdialog using this Xdialog command:
{chrome=100,20cp};
In this above example, the width of the Chrome control is set to 100 'characters' and the height to 20 'lines'.
Notice that the 'cp' in the above command is the name of the helper::Chrome object that was defined.
You can put as many Chrome objects on an Xdialog as you want. For exmaple:
dim cp1 as helper::chrome
dim cp2 as helper::chrome
....
dim cpn as helper::chrome
And then in your Xdialog body:
{chrome=100,20cp1};
{chrome=100,20cp2};
{chrome=100,20cpn};
Specifying a URL to load
dim cp as helper::Chrome
cp.url = "http://www.google.com"
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{stretch=height,width}
{chrome=100,30cp};
%dlg%
dim dlg_event as c
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)

Specifying a Dynamic URL
In this next example we show how the URL property can be dynamically changed after the Xdialog has been rendered.
dim cp as helper::Chrome
cp.url = "http://www.google.com"
dim urls as c
urls = <<%txt%
http://www.google.com
http://www.bing.com
http://www.yahoo.com
%txt%
dim url as c
url = word(urls,1,crlf())
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{startup=urlchanged}
{stretch=width}
[.160url^+urls] <Go!urlchanged>;
{stretch=height,width}
{chrome=173,60cp};
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "urlchanged" then
a_dlg_button = ""
cp.url = url
end if
%code%
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
The resulting Xdialog looks like this:
You can type any address into the address bar and then hit the Go button to go to the page.

Notice that in the above code, when the user clicks on the Go button the Xbasic that gets executed is:
cp.url = url
We simply set the URL of the Chrome object to the new URL and Chrome automatically navigates to the target URL.
Using Xbasic to Execute Javascript in the Chrome Control
The Chrome object exposes two methods that allows you to execute Javascript from Xbasic. These are:
<chromeObject>.executeJavascript(codetorun) - executes the Javascript asynchronously
<chromeObject>.executeJavascriptResult(codeToRun) - executes the Javascript synchronously and returns the result to Xbasic
Consider the following example of an Xdialog that is hosting the Chrome control, showing some HTML with an input control. We have to Xdialog buttons, one to set the value in the HTML input, and the other to read the value from the HTML input.
dim cp as helper::Chrome
cp.html = <<%html%
Name: <input id="name" />
%html%
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=40,10cp};
<Set Name!setName> <Read Name!readName>;
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "setName" then
a_dlg_button = ""
dim jstorun as c
dim name as c
name = ui_get_text("Name","Enter name")
jstorun = "document.getElementById('name').value = '" +
js_escape(name) + "';"
cp.ExecuteJavascript(jstorun)
else if a_dlg_button = "readName" then
a_dlg_button = ""
dim jstorun as c = "document.getElementById('name').value"
dim result as c
result = cp.ExecuteJavascriptResult(jstorun)
ui_msg_box("Notice:","Value read from the HTML is: " +
result)
end if
%code%
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
The important thing to notice in this example is that the Javascript that gets executed here is computed by Xbasic and Xbasic is invoking the Javascript.
Using Javascript to Invoke Xbasic
In the previous example, we used Xbasic to invoke Javascript on the Chrome control. In this example, we turn it around and invoke Xbasic from Javascript.
This Xdialog has an event called 'event1' (see code in red below) and the HTML has a button. When the user clicks on the HTML button, the Xdialog event ('event1') is fired.
In order to make this work, a special Javascript function (called xDialogEvent) must be added to the HTML page. The onclick event for the button is then set to:
xDialogEvent('event1')
TIP: Because it is cumbersome to have to have to
add the xDialogEvent() helper function to the HTML yourself, a special
helper function can be called to 'prepare' the HTML you pass into the
chrome object. For example:
dim cp as helper::Chrome
cp.html = a5_html_page_prepare(<<%html%
<button onclick="xdialogEvent('event1');">Invoke Event on My Parent
Xdialog</button>
%html%)
dim cp as helper::Chrome
cp.html = <<%html%
<html>
<head>
<script>
function xDialogEvent(eventName) {
var client =
new XMLHttpRequest();
client.open('GET', 'a5xdialog:' + eventName,false);
client.setRequestHeader('My-Custom-Header', 'Some Value');
client.send();
}
</script>
</head>
<body>
<button onclick="xDialogEvent('event1');">
Invoke
Event on My Parent Xdialog</button>
</body>
</html>
%html%
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=40,10cp};
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "event1" then
a_dlg_button = ""
ui_msg_box("Notice","This is Xbasic here. Event1 has just
been fired.")
end if
%code%
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
Using Built In Images
Alpha Anywhere comes with a large library of built in images and icons that you might want to use in the HTML that is shown in the Chrome control.
You can easily use built in images using this syntax:
<img src="a5res:images/$$application.chrome.png" />
The portion shown in red is the built in image name.
For example
dim cp as helper::Chrome
cp.html = <<%html%
<img src="a5res:images/$$code.aScript.png" />
<img src="a5res:images/$$file.open.png" />
<img src="a5res:images/a5_email_people.png" />
%html%
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=100,20cp};
%dlg%
dim dlg_event as c
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
And the resulting Xdialog:

Referencing Static Resources
To display image files you can either use the special a5file prefix on the filename, or you can use the standard file:// protocol. However, in order to the use file:// protocol, you have to turn Chrome security off using the command shown in red.
dim cp as helper::Chrome
'in order to use the standard file:// protocol you have to turn
'Chrome's web security off.
'otherwise you can use use the special a5file: command.
cp.flag_web_security_disabled = .t.
cp.html = <<%html%
<img src="a5file:C:\Program Files (x86)\a5V12\a5v12logo.jpg" />
<br>
<img src="file://C:\Program Files (x86)\a5V12\a5v12logo.jpg" />
%html%
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=100,20cp};
%dlg%
dim dlg_event as c
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
And the resulting Xdialog:

Using the Chrome Debugger
You can use the Chrome debugger to debug Javascript that is running inside the Chrome control. For example, consider the following Xdialog.
The HTML has a Javascript function that executes a loop. The function uses the 'debugger;' Javascript command to turn on the debugger.
The Xdialog has a button that executes this code:
cp.OpenDevtools()
'cp' is the Chrome object (created by the dim cp as helper::Chrome command), and we are calling the object's .OpenDevTools() method to enable the Chrome Developer tools.
Once the Developer Tools have been opened, we can click the button on the HTML page to run the Javascript and debug into the code.
dim cp as helper::Chrome
cp.html = <<%html%
<script>
function loopTest() {
debugger;
for(var i = 1; i < 10; i++) {
document.getElementById('div1').innerHTML
= 'Count: ' + i ;
}
}
</script>
<button onclick="loopTest();">Start Loop</button>
<div id="div1"></div>
%html%
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=100,20cp};
<Open debugger!openDebugger>;
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "openDebugger" then
'open the Chrome debugger
a_dlg_button = ""
cp.OpenDevtools()
end if
%code%
dlg_title = "Chrome in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
Setting the Zoom Level of the HTML Document
You can set/get the zoom level of the HTML shown in the Chrome control by using these methods:
The level is a numeric value
Binding Events Programmatically
When you write the HTML that is displayed in the Chrome control you can either add events directly into the HTML markup, or you can bind the events programmatically using Xbasic.
For example, if your HTML included this markup:
<button onclick="myclickevent();">Button1</button>
then, when you ran the Xdialog and clicked on the button, the Javascript function myclickevent() would be invoked.
However if your HTML included this markup:
<button >Button1</button>
then, clicking on the button would do nothing because no event had been bound to the button.
Using methods of the Chrome control, you can bind event handlers to any element.
The syntax is:
<chromeObject}.AddEventListner(definition)
Where definition is a string in this format:
elementId|eventName|xdialogEventToFire
For example:
dim definition as c
definition = "btn1|click|xbasicEvent1"
cp.AddEventListeners(definition)
The definition string that you pass into the .AddEventListners() function can be a cr-lf delimited string. This allows you to bind events to multiple elements with a single call to the .AddEventListners() function.
The above code will bind an onClick event to an element with an id of 'btn1'. When the user clicks the button, the Xdialog event called 'xbasicEvent1' will be fired.
Note: We are using the .AddEventListeners() to invoke Xbasic (by calling an event in the parent Xdialog). We are NOT using the method to bind a Javascript event handler, since there are existing Javascript methods to bind Javascript events to elements.
Watch video to see an example of using the .AddEventListners() method.
Download sample code used in video
The .AddEventListners() function can be called before the Xdialog is even instantiated. There is no need to wait for Xdialog and the Chrome control inside the Xdialog to be ready. For example, consider the following script:
dim cp as helper::Chrome
html = <<%html%
<div id="div1">This is div1</div>
<button id="b1">Button1</button>
<button id="b2">Button2</button>
%html%
cp.html = html
'notice that the event binding is defined before the xdialog has
even been rendered!
dim mapping as c
mapping = <<%txt%
b1|click|event1
b2|click|event2
%txt%
cp.AddEventListeners(mapping)
dim dlg_title as c = "Binding Multiple Events Handlers at Once"
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=80,10cp};
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "event1" then
a_dlg_button = ""
ui_msg_box("Notice","Event 1 has fired")
else if a_dlg_button = "event2" then
a_dlg_button = ""
ui_msg_box("Notice","Event 2 has fired")
end if
%code%
ui_dlg_box(dlg_title,dlg_body,

Setting/Getting Attributes and Values Programmatically
When you host a Chrome control in an Xdialog you will often want to manipulate attributes of the HTML that is displayed using Xbasic.
You can obviously do this by using Xbasic to send Javascript to the Chrome control (using the <chromeObject>.executeJavascript() method), but a more direct method is available using methods of the Chrome object that let you directly manipulate the DOM.
For example, say you want to set the Inner HTML of a div with the id of 'div1'.
Your Xdialog could execute this code
dim js as c
js = "document.getElementById('div1').innerHTML = '" + js_escape("some text") + "';
cp.ExecuteJavascript(js)
However, the .SetInnerHTML() method provides a more direct way of accomplishing this. For example
cp.SetInnerHTML("div1","some text");
NOTE: The js_escape() function is a helper function that ensures that all text in the string is properly escaped so as not to cause Javascript errors.
Similarly you can use the following methods:
HasElement(elementId) - indicates whether the specified
elementId is present
HasAttribute(elementId,attributeName) - indicates if the
specified element has the specified attribute
GetAttribute(elementId,attributeName) - gets the
value of the specified attribute from the specified element
SetAttribute(elementId,attributeName,attributeValue) -
sets the value of an attribute
GetInnerText(elementId) - gets the inner text property of
an element
GetValue(elementId) - gets the value of element (for
example, an INPUT control)
SetValue(elementId,value) - sets the value of an
element
GetOuterHtml(elementId) - gets the outer html for an
element
GetInnerHtml(elementId) - gets the inner html for an
element
SetInnerHtml(elementId,value) - sets the inner html
of an element
Example code
dim cp as helper::Chrome
html = "<div id=\"div1\">This is div1</div>"
cp.html = html
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=80,10cp};
<Set Inner HTML of div1!setdiv>;
<Set Attributes on div1!setattr>
%dlg%
dim dlg_event as c
dlg_event = <<%code%
if a_dlg_button = "setdiv" then
a_dlg_button = ""
cp.SetInnerHtml("div1","Test Alpha Anywhere's ability to set
the Inner HTML of an element.")
else if a_dlg_button = "setattr" then
a_dlg_button = ""
cp.SetAttribute("div1","style","border: solid 1px blue;
border-radius: 10px; background: yellow;")
end if
%code%
dlg_title = "Using Google Charts in a Chrome Control
in an Xdialog"
ui_dlg_box(dlg_title,dlg_body,dlg_event)
Using Google Charts in an Xdialog
You can use the Google Charts API to add charting to your Xdialogs. For example, the image below shows an Xdialog with a Google chart.
For example, the image below shows an Xdialog with a Google chart.
TIP: In addition to watching the above videos,
you might also find these videos helpful. They show how Google Charts can
be used in a UX Web component and they give more background information
on using the Google API documentation to get working code samples:
Watch Video - Part 1
Watch Video - Part 2

Using the Alpha Anywhere Javascript Library, Styles and 3rd Party Javascript Libraries
A huge advantage of being able to use the Chrome control in your Xdialogs is the ability to use Alpha Anywhere Javascript libraries and styles and 3rd party libraries and styles in your Xdialog.
A special helper function called a5_html_page_prepare() makes it very easy to create the HTML page that you will load into the Chrome control with all of the libraries and styles that you want.
The function takes some input HTML and then adds the necessary code to your input HTML to load the Javascript and styles that you specify.
The function syntax is:
c html = a5_html_page_prepare(C html [,C javascriptLibrariesPublic [,L flagIncludeA5JSlibraries [,C A5StyleName [,C jQueryTheme [,L flagIncludeGoogleJSAPI ]]]]])
where:
The javascriptLibrariesPublic Parameter
The following libraries can be loaded.
For each library that you load, you can specify an optional build number. The syntax is:
libraryName|buildNumber
If you leave out the buildNumber then the most recent build on the Google CDN as of December 1, 2013 is loaded.
If you set the buildNumber to 'internal' then the code is loaded from the Google CDN and then cached locally so that future loads are faster.
Example
dim html as c
html = ""
html = a5_html_page_prepare(html,"jquery|internal,jquery ui|internal,angularjs|internal",.t., "iOS","Sunny")
In the above example:
IMPORTANT: When you specify that Alpha Anywhere Javascript library and jQuery should be loaded the jQuery object is automatically changed from its default '$' to 'jQuery'.
For example, in the code below, the jQuery date picker is used for the input control.
dim html as c
html = <<%html%
<body class="{style}Page">
<p>This input control uses the jQuery Date Picker</p>
<input id="dt1" name="dt1" value="1/1/2013"/>
<script>
jQuery('#dt1').datepicker(
{
onSelect:
function(dateText, inst) {
$e.execute(this,'change')
}
}
);
</script>
</body>
%html%
html = a5_html_page_prepare(html,"jquery|internal,jquery
ui|internal",.t., "MobBlue","Sunny")
dim cp as helper::Chrome
cp.html = html
ui_dlg_box("Xdalog with Chrome Control - Using jQuery",<<%dlg%
{stretch=width,height}
{chrome=150,50cp};
%dlg%,<<%code%
%code%)
And the resulting Xdialog

Using the .OnReady() Event
The Chrome control has an .OnReady() event that fires, and executes Xbasic, once the control has been initialized.
For example:
dim cp as helper::Chrome
html = <<%html%
<div id="div1">This is div1</div>
%html%
cp.html = html
'the onReady event fires when the chrome control has been
initialized
cp.OnReady = "ui_msg_box(\"Notice\",\"The Chrome control has been initialized.\")"
dim dlg_title as c
dim dlg_body as c
dlg_body = <<%dlg%
{chrome=80,10cp};
%dlg%
dim dlg_event as c
%code%
dlg_title = "Xdialog"
ui_dlg_box(dlg_title,dlg_body,
Notice: The .onReady() event executes Xbasic code, not Javascript. If you want to fire Javascript when the Chrome control is ready, simply put an onload event in the <body> tag of the HTML you display in the control. For example:
<body onload="myfunction()">
</body>
Summary of Properties and Methods of the Chrome Object
When you dim a Chrome object, the resulting object instance has many properties and methods that are exposed to Xbasic.
For example
dim cp as helper::chrome
When the above Xbasic is executed, the resulting Xbasic variable 'cp' has various method and properties, which are summaries here:
Properties
url - allows you to set the URL for the page to
be shown in the Chrome control
html - allows you to set the HTML to be shown in
the Chrome control
error gets set if you call Javascript
and there is an error, or if there is an error loading
the page
flag_web_security_disabled
flag_allow_file_access_from_url
flag_allow_universal_file_access_from_url
flag_page_cache_disabled
flag_caret_browsing_enabled
flag_databases_disabled
flag_plugins_disabled
flag_java_disabled
flag_javascript_disabled
flag_dom_paste_disabled
flag_encoding_detector_enabled
flag_drag_drop_disabled
flag_load_drops_disabled
flag_history_disabled
flag_remote_fonts_disabled
flag_image_load_disabled
Methods
ExecuteJavascript(code) - executes some
Javascript
ExecuteJavascriptResult(code) - executes
some Javascript and returns a result to Xbasic
Print() - invokes the Chrome control's print
dialog
GoBack()
GoForward()
Reload() - reload the current page
Stop() - stops the page loading
GetZoomLevel() - gets the numeric zoom level
SetZoomLevel(level) - sets the zoom level
OpenDevtools() - opens the Chrome developer tools
CloseDevtools() - closes the Chrome developer
tools
OnReady(xBasicCode) - executes Xbasic code
when the Chrome control has been initialized.
NOTE: The tasks performed by the following method could just as well be done by using the .ExecuteJavascript() or .ExecuteJavascriptResult() methods. However, since these methods that go directly against the DOM without having to execute Javascript, they are more convenient to use.
HasElement(elementId) - indicates whether
the specified elementId is present
HasAttribute(elementId,attributeName) -
indicates if the specified element has the specified
attribute
GetAttribute(elementId,attributeName)
- gets the value of the specified attribute from the
specified element
SetAttribute(elementId,attributeName,attributeValue)
- sets the value of an attribute
GetInnerText(elementId) - gets the inner
text property of an element
GetValue(elementId) - gets the value of
element (for example, an INPUT control)
SetValue(elementId,value) - sets
the value of an element
GetOuterHtml(elementId) - gets the outer
html for an element
GetInnerHtml(elementId) - gets the inner
html for an element
SetInnerHtml(elementId,value) -
sets the inner html of an element
AddEventListeners(definition) - binds an
event handler to an element. See section above 'Binding
events programmatically'
DropEventListeners(elementId) - drops an
event listener.
AlphaDAO - SQL Server - Stored Procedures - Output Arguments - If you have a SQL server stored procedure that sets the value of an output argument, reading the value in the output argument, after the stored procedure has executed can be tricky. That's because you have to ensure that you first loop through all of the result sets that are returned by the stored procedure before reading the output arguments.
Consider the following trivial stored procedure:
SET ANSI_NULLS ON
GO
SET QUOTED_IDENTIFIER ON
GO
CREATE PROCEDURE TestSP
-- Add the parameters for the stored procedure here
@InParam CHAR(10),
@OutMessage CHAR(50) OUTPUT
AS
BEGIN
-- SET NOCOUNT ON added to prevent extra result sets
from
-- interfering with SELECT statements.
SET NOCOUNT ON;
SET @OutMessage = 'initialized'
END
GO
From the interactive window:
dim cn as sql::Connection
cn.open("::Name::sqlserver")
delete args
dim args as sql::Arguments
dim Message as c = "test message"
'need to pad out the argument so it matches the
definition in the stored procedure
message = padr(Message,50," ")
args.set("InParam" , "1234567890")
args.set("OutMessage",Message,sql::ArgumentUsage::InputOutputArgument)
?cn.Execute("{CALL TestSP(:InParam, :OutMessage)}",args)
= .T.
Now try to read the output parameter value
?args[2].data
= "Initialized"
Notice that this worked as expected. But it only worked because the stored procedure did not return any resultsets.
Now let's modify the stored procedure so that it returns two resultsets:
USE [Northwind]
GO
/****** Object: StoredProcedure [dbo].[TestSP] Script
Date: 12/6/2013 1:25:13 PM ******/
SET ANSI_NULLS ON
GO
SET QUOTED_IDENTIFIER ON
GO
ALTER PROCEDURE [dbo].[TestSP]
-- Add the parameters for the stored procedure here
@InParam CHAR(10),
@OutMessage CHAR(50) OUTPUT
AS
BEGIN
select * from customers
select * from employees
-- SET NOCOUNT ON added to prevent extra result sets
from
-- interfering with SELECT statements.
select * from customers
SET @OutMessage = 'initialized'
END
Now, From the interactive window:
dim cn as sql::Connection
cn.open("::Name::sqlserver")
delete args
dim args as sql::Arguments
dim Message as c = "test message"
'need to pad out the argument so it matches the
definition in the stored procedure
message = padr(Message,50," ")
args.set("InParam" , "1234567890")
args.set("OutMessage",Message,sql::ArgumentUsage::InputOutputArgument)
?cn.Execute("{CALL TestSP(:InParam, :OutMessage)}",args)
= .T.
Now try to read the output parameter value
?args[2].data
= "test message"
This is not what we expect!. The output parameter cannot yet be read because we have not yet looped through all of the result sets returned by the stored procedure.
So, execute:
?cn.ResultSet.NextResult()
= .t.
and again:
?cn.ResultSet.NextResult()
= .t.
and again (the .f. return value tells you that there are no more resultsets):
?cn.ResultSet.NextResult()
= .f.
Now, that there are no more resultsets, you can read the output arguments:
?args[2].data
= "initialized"
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
UX Component - List - Change in Behavior - Clicking on 'whitespace' in the list (if there are not enough rows to fill the list), the list header, or list footer/header/footer will no longer de-select the current selection. Therefore the onclick event will no longer fire when the user clicks on whitespace, the header, or the footer (which includes the 'Fetch More' button, if the list is paginated using the 'Fetch More' option).
De-selecting the current selection when clicking off the list was an unintended consequence of an important optimization added to the List in a recent update.
Grid and UX Component - Auto-suggest and Edit-combo Controls - SQL Data Sources - Null Values - If the list of data to be shown in the auto-suggest or edit-combo included null values, Javascript errors might occur.
UX Component - Slider Control - Dates - Setting Min and Max Value - If the slider control was configured to return date values, then setting the starting date value on the slider to a date that did not start on the 1st of the month would sometimes fail. This is now fixed. Here is a sample Javascript code that sets the slider start date to a value read from another control on the UX and then sets the end date to the start date + 90 days.
function setStartAndEnd() {
var dob = {dialog.object}.getValue('dob');
var s = {dialog.object}.getControl('sl1');
var d1 = new Date();
d1.fromFormat(dob,'MM-dd-yyyy');
//set min and max with a date string
using the date format specified
s.min = dob;
d1.setDate(d1.getDate() + 90);
s.max = d1.toFormat('MM-dd-yyyy');
s.refresh();
}
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
| UX Component | Using Google Charts as an Alternative to the Built-in Chart Controls |
The UX component contains a powerful built-in
chart control (based on the Microsoft .Net
visualization library). This is a 'server-side'
control (meaning that the chart is rendered on
the server and then the resulting image is sent
to the browser. However, there may be times when
you want 'client-side' charting (i.e. charts
that are rendered using Javascript). The Google
Chart API is perfect for this. (Note: There are
number of high quality open source Javascript
libraries that you can choose from). In this video we show how you can use the Google Chart API to add client-side charts to a UX component. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| UX Component | Using SQL data in a Google Chart |
In previous videos we have shown ho easy it is
to use Google Charts in a UX component by simply
copying code from the Google Charts API
documentation. However, in all of the example in
the Google Chart API documentation, the data
plotted by the chart is static (i.e. it is hard
coded into the Javascript). Of course, in a real application, it is likely that you will want to query a SQL database to get the data to be plotted on the chart. In this video we show an example of how this can be done. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component |
| UX Component | Control Behavior Overrides - Customizing The Data Picker and Edit-Combo Behavior on a Phone |
The UX component allows you to customize the
behavior of certain controls based on the screen
size of the device. For example, normally, the
'picker' for a date control, or an edit-combo
control opens in a drop-down window, immediately
under the control. However, on a phone, which
has a narrow screen, there is not enough room to
display the control's 'picker' in a dropdown
window. Instead, you are likely to want the
control to appear in a window that is docked to
the bottom of the screen, centered horizontally. In this video we show how you can define Javascript to override the behavior of certain controls, depending on the screen size. Watch Video |
Report Server - The Report Server code was previously part of the A5ApplicationServer.exe executable. Now, the Report Server has been moved into its own executable - A5reportserver.exe. When you install the Application Server patch you will notice this new executable has been installed. If you have both the Application Server and the Development version installed on the same computer and you want to be able to use the Report Server when printing reports using the server in the Development version, copy the a5reportserver.exe file from the folder where the Application Server is installed to the folder where the Development version is installed.
HTML Editor - Internet Explorer V11 - As a result of changes Microsoft made to Internet Explorer V11, the HTML editor (which is based on the Internet Explorer ActiveX control) would fail to open under certain circumstances. While it is still not clear exactly what change Microsoft made, a work around has been found and now the HTML editor will work if you have IE11 installed.
UX Component - Absolute Layout Editor - Internet Explorer 11 - Has been re-written to remove its dependency on the Internet Explorer 11 ActiveX control. As a result, this editor will now work correctly even if you have Internet Explorer 11 installed. Previously, the editor would fail if you had Internet Explorer 11 installed.
UX Component - Web Style Builder - Internet Explorer 11 - Has been re-written to remove its dependency on the Internet Explorer 11 ActiveX control. As a result, this editor will now work correctly even if you have Internet Explorer 11 installed. Previously, the editor would fail if you had Internet Explorer 11 installed.
UX Component - List Control - onTap Event - this.value - The previous update introduced a bug causing the this.value in an abstract onTap event to be wrong.
Reports - Absolute Layout - Images - Internet Explorer - The image background on an Absolute Layout cell did not render properly in Internet Explorer under certain circumstances.
Grid Component - DBF Tables - Export to Excel - International Characters - International characters did not export to Excel correctly from a Grid if the Grid was based on a .dbf table. There is no problem with Grids that use SQL tables.
UX Component - Server Side Event Handlers - Data Submitted - JSON - When the UX makes any type of Ajax callback, the data that are submitted (including data in Repeating Sections) are now available in a convenient new property called
e.dataSubmittedJSON
For example, assume your UX had the following controls:
Firstname, Lastname and a Repeating Section called 'CONTAINER_1' with AddressType and Address.
The e.dataSubmittedJSON value might look like this:
{
FIRSTNAME: 'Fred',
LASTNAME: 'Smith',
CONTAINER_1: [
{
ADDRESSTYPE: 'Work',
ADDRESS: '123 Main St'
},
{
ADDRESSTYPE: 'Home',
ADDRESS: '456 Center St'
}
]
}
You can use the Xbasic JSON_Parse() function to parse this JSON string.
UX Component - Mobile Devices - Control Behavior Overrides - The UX component allows you to customize the behavior of certain controls based on the screen size of the device. For example, normally, the 'picker' for a date control, or an edit-combo control opens in a drop-down window, immediately under the control. However, on a phone, which has a narrow screen, there is not enough room to display the control's 'picker' in a dropdown window. Instead, you are likely to want the control to appear in a window that is docked to the bottom of the screen, centered horizontally.
To define control behavior overrides, click the smart field button for the 'Control behavior overrides' property on the UX Properties pane.

This will open a dialog where you can insert the Javascript that defines the behavior override. The behavior override is expressed in the form of Javascript code that uses the A5.override.add() function to define the behavior override.
For example, in the code snippet shown below, the behavior of the 'Edit-combo' control is changed when the screen size is less than 500 pixels.
/*
if the width of the viewport is less than 500px make
datePickers and edit-combos
pop up from the bottom of the screen, centered
horizontally
*/
var vpSize = AUI.u.getVPSize();
if(Math.min(vpSize.width,vpSize.height) < 500){
A5.overrides.add('editCombo',{
base: {
decouple:
true,
window: {
width: '100%',
height: '50%',
pointer: {show: false},
location: ['dock','bottom'],
animation: {
show: {type: 'css-slide'}
}
}
}
}
);
}
NOTE: The 'base' behavior of the control is defined in the style.js file. For example, if you are using the iOS style, then the base behavior is defined in the css/iOS/style.js file in your executable folder.
UX Component - List Control - NULL Values - If your data has NULL values, you can now specify the text to show for the NULL values. For example, you might want to show n/a for null values.
You can include HTML markup in the text to display.
The new property is on the List Properties pane.

UX Component - List Control - onDownHold Event - A new event, onDownHold has been added to the List control.
Add_bus_days() and Bus_days_between() Functions - SQL 'Holidays' Table - These two functions can now use a SQL table as the data source for the list of holiday dates.
To specify a SQL table, the 'holidayTable' argument that is passed into the function is in the form of a JSON string with these properties:
Example:
days = Bus_days_between( {12/1/2013},{12/31/2013},"yes","{connectionstring: 'myconnstring', table: 'holidays', column: 'dates'}")
days = Bus_days_between( {12/1/2013},{12/31/2013},"yes","{connectionstring: 'myconnstring', table: 'holidays', column: 'dates', filterColumn: 'country', filterColumnType: 'c', filterValue: 'USA'}")
a5_sql_nested_query_to_json_document() Function - Queries one or more SQL databases and returns a JSON document with the query result.
This function is inspired by NoSQL databases that return a JSON document with a query result. The JSON document return by such a query often contains nested JSON documents (for example for each customer, show orders for that customer, and for each order, show order details for that order).
For example, here is a sample JSON document returned by this function showing customers, nested orders, and nested order details:
{
"customer": [
{
"customerId": "HUNGO",
"companyName": "Hungry Owl All-Night Grocers",
"orders": [
{
"orderid": "10298",
"customerid": "HUNGO",
"value": "10298",
"orderDetails": [
{
"OrderID": "10298",
"ProductID": "2",
"UnitPrice": "15.2",
"Quantity": "40",
"Discount": "0"
}
]
},
{
"orderid": "10309",
"customerid": "HUNGO",
"value": "10309",
"orderDetails": [
{
"OrderID": "10309",
"ProductID": "4",
"UnitPrice": "17.6",
"Quantity": "20",
"Discount": "0"
},
truncated for brevity....
The syntax for the function is
P result = a5_sql_nested_query_to_json_document( P options, SQL::Arguments Args)
The result object that is returned has these properties
The options object that is passed into the function has these properties:
Example options.SQL parameter:
options.sql =
<<%txt%
{sql: 'select * from customers where country = :whatCountry ', name:
'customer' }
{sql:'select * from orders', name: 'orders', parentKey: 'cId',
key: 'cId'}
%txt%
Notice that the options.sql property is a CRLF delimited string of JSON strings in this format:
options.SQL = <<%txt%
{JSON string 1}
{JSON string2}
%txt%
The fact that {JSON string 2} is indented (using a single Tab character NOT spaces) is significant. The indentation indicates that this query is an immediate child of the query in the line above it.
You can have multiple levels of indentation. and multiple queries with the same parent, for example:
options.SQL = <<%txt%
{JSON string 1}
{JSON string2}
{JSON string 3}
{JSON string 4}
%txt%
In the above example, the SQL query defined by {JSON string 3} is a child of {JSON string2}. The query defined by {JSON string 1} has two child queries. A real world example of an hierarchy that would be defined using the above structure might be:
Customers
` Orders
OrderDetails
Payments
The individual JSON strings each have these properties
Example 1 - Simple two level query
dim ops as p
ops.connectionString = "::Name::northwind"
ops.sql = <<%txt%
{sql: 'select * from customers where country = :whatCountry
', name: 'customer' }
{sql: 'select * from orders', name: 'orders', parentKey: 'customerid',
key: 'customerId'}
%txt%
dim args as sql::Arguments
args.add("whatCountry","France")
p = a5_sql_nested_query_to_json_document(ops,args)
?p.data
=
{
"customer": [
{
"CustomerID": "BLONP",
"CompanyName": "Blondesddsl père et fils",
"ContactName": "Frédérique Citeaux",
"ContactTitle": "Marketing Manager",
"Address": "24, place Kléber",
"City": "Strasbourg",
"Region": null,
"PostalCode": "67000",
"Country": "France",
"Phone": "88.60.15.31",
"Fax": "88.60.15.32",
"image": null,
"imageThumb": null,
"orders": [
{
"OrderID": "10265",
"CustomerID": "BLONP",
"EmployeeID": "2",
"OrderDate": "07/25/1996 12:00:00 00 am",
"RequiredDate": "08/22/1996 12:00:00 00 am",
"ShippedDate": "08/12/1996 12:00:00 00 am",
"ShipVia": "1",
"Freight": "55.28",
"ShipName": "Blondel père et fils",
"ShipAddress": "24, place Kléber",
"ShipCity": "Strasbourg",
"ShipRegion": null,
"ShipPostalCode": "67000",
"ShipCountry": "France"
},
{
"OrderID": "10297",
"CustomerID": "BLONP",
"EmployeeID": "5",
"OrderDate": "09/04/1996 12:00:00 00 am",
"RequiredDate": "10/16/1996 12:00:00 00 am",
"ShippedDate": "09/10/1996 12:00:00 00 am",
"ShipVia": "2",
"Freight": "5.74",
"ShipName": "Blondel père et fils",
"ShipAddress": "24, place Kléber",
truncated for brevity......
Example 2 - Simple three level query
dim ops as p
ops.connectionString = "::Name::northwind"
ops.sql = <<%txt%
{sql: 'select * from customers where country = :whatCountry
', name: 'customer' }
{sql: 'select * from orders', name: 'orders', parentKey:
'customerid', key: 'customerId'}
{sql: 'select * from [order details]', name: 'orderDetails',
parentKey: 'orderId', key: 'orderId'}
%txt%
dim args as sql::Arguments
args.add("whatCountry","France")
p = a5_sql_nested_query_to_json_document(ops,args)
Example 3 - Three level query where each query is in a different database (the connection string is specified for each query).
'since each query specifies its own connection string,
the flagUseSubSelects flag must
'be set to .f.
ops.flagUseSubSelects = .f.
ops.sql = <<%txt%
{sql: 'select * from customers where country = :whatCountry
', name: 'customer' , connectionString:
'::Name::northwind'}
{sql: 'select * from orders', name: 'orders', parentKey:
'customerid', key: 'customerId', connectionString:
'::Name::northwind2'}
{sql: 'select * from [order details]', name: 'orderDetails',
parentKey: 'orderId', key: 'orderId' , connectionString:
'::Name::northwind2'}
%txt%
dim args as sql::Arguments
args.add("whatCountry","France")
p = a5_sql_nested_query_to_json_document(ops,args)
Limiting the Number of Child Records
If you want to limit the number of records retrieved at any level in the hierarchy, you can.
To limit the number of records at the top level of the hierarchy, you would simply use the FIRST clause in your SQL select statement. However, for child queries, using the FIRST clause in the SQL will not work (because you want the FIRST n records within EACH parent group, not the FIRST n records in ALL parent groups).
To limit the number of records in a child query, you use the 'limit' property in the JSON object that defines the query.
For example in the code shown below we are fetching the first 5 orders for each customer:
dim ops as p
ops.connectionString = "::Name::northwind"
ops.sql = <<%txt%
{sql: 'select * from customers', name: 'customer' }
{sql: 'select * from orders', name: 'orders', parentKey: 'customerid',
key: 'customerId', limit: 5}
%txt%
NOTE: If you do use a FIRST clause in a child SQL statement, the SQL statement is automatically parsed and the FIRST clause is removed and converted into a 'limit' property in the JSON definition. So, the following two objects are actually equivalent:
dim ops as p
ops.connectionString = "::Name::northwind"
ops.sql = <<%txt%
{sql: 'select * from customers', name: 'customer' }
{sql: 'select * from orders', name: 'orders', parentKey: 'customerid',
key: 'customerId', limit: 5}
%txt%
dim ops as p
ops.connectionString = "::Name::northwind"
ops.sql = <<%txt%
{sql: 'select * from customers', name: 'customer' }
{sql: 'select FIRST 5 * from
orders', name: 'orders', parentKey: 'customerid', key: 'customerId'}
%txt%
Eliminating Key Values
By default, the JSON that is created shows the parent key value in the child data. For example in the example JSON shown below (which shows a customer, and all of their orders), the 'CustomerID' property is shown n each item in the 'orders' array. This is really not necessary.
=
{
"customer": [
{
"CustomerID": "BLONP",
"CompanyName": "Blondesddsl père et fils",
"ContactName": "Frédérique Citeaux",
"orders": [
{
"OrderID": "10265",
"CustomerID": "BLONP",
"EmployeeID": "2",
"OrderDate": "07/25/1996 12:00:00 00 am",
"ShipVia": "1",
"Freight": "55.28",
In order to suppress parent key values in child records, you can set the 'sparse' property to .t. in the object you pass into the a5_sql_nested_query_to_json_document() function. For example:
dim ops as p
ops.sparse = .t.
ops.connectionString = "::Name::northwind"
ops.sql = <<%txt%
{sql: 'select * from customers', name: 'customer' }
{sql: 'select * from orders', name: 'orders', parentKey: 'customerid',
key: 'customerId', limit: 5}
%txt%
Preserving Data Types in the JSON
You can use the convertToText property in the options that you pass in to control whether the generated JSON converts all data to strings, or preserves data types.
For exmaple:
ops.convertToText = .f.
p = a5_sql_nested_query_to_json_document(ops,args)
would result in JSON that looked like this:
"customer": [
{
"customerId": "GREAL",
"companyName": "Great Lakes Food Market",
"orders": [
{
"orderid": 10528,
"orderdate": new Date(1997,05,06,00,00,0),
"value": 10528,
........
Notice that the 'orderDate, orderId, and value properties are typed.
UX Component - List Controls - onClick Event - List Headers and Footers - If you have defined a header or a footer for List control, and you have also defined an onClick event, you will notice that the onClick event fires when you click on either the header or the footer.
In your application, this might not be desirable. If so, then you can use the onTap event, rather than the onClick event, or alternative, in the onClick event, you can test what row index the user clicked on. The row index is 0 based, and will return -1 if the user clicked on either the header or the footer. Your onClick event would then be:
if( arguments[0] > -1) {
//your onClick code goes here
}
Grid Component - Alphabet Buttons Spacing - Different Browsers - Because of difference in the amount of default margin sizes the different browsers use for buttons, Alphabet button in a Grid will render slightly differently in different browsers, as shown in the image below.

To fix this problem, you can add the following markup to the AboveGrid free-form edit region:
<style>
.{grid.style}Grid button {
margin: 0px;
}
</style>
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
UX Component - Slider Control - Slider Message - If you turned on the slider message, but did not have an onChange event defined, you would get an error when trying to save the component. If you had defined an onChange event, there was no error.
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
Internet Explorer 8 - Fixed an issue that would occasionally result in a page failing to load in Internet Explorer Version 8.
Tabbed UI - Print Reports - HTML - The Breaking Change described in the release notes for build 1788-4225 is no longer true. It is not necessary to recalculate Tabbed UI components.
API_UUIDSEQCREATE Function - Similar to the existing API_UUIDCREATE() function, but creates the GUIDs in sequential order.
? API_UUIDSEQCREATE
= "e220817f-4e10-11e3-8ac1-
? API_UUIDSEQCREATE
= "e2208180-4e10-11e3-8ac1-
? API_UUIDSEQCREATE
= "e2208181-4e10-11e3-8ac1-
? API_UUIDCREATE()
= "e57b36bb-ba36-48a5-990d-
? API_UUIDCREATE()
= "561f9dcf-8c5a-4485-8f65-
? API_UUIDCREATE()
= "2e1f5004-9a83-4d90-8da7-
*guid_seqcreate() Function - Similar to the existing *guid_create() function, but creates the GUIDs in sequential order.
?*guid_create()
= "{c4bc6cbc-d5a8-44a8-aada-3e94cf5e868f}"
?*guid_seqcreate()
= "{ae059bff-51f0-11e3-89bf-f04da23a263b}"
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
Tabbed UI - Print Reports - HTML - If your Tabbed UI has any buttons that print reports with the initial view set to HTML then you will need to recalculate the button that opens the report. To do this, edit the Tabbed UI component, then click the Menu button and select 'Recalculate all controls'. If you don't recalculate the button, you will get this error when you try to print the report: 'phtm.pdfOptions not found'.

| UX and Grid Component | Accordion Control - Changing the Background Color of the Pane Selector |
When you define the properties of an Accordion
control you can specify class names to apply to
the Title Band when the band is opened, closed,
or disabled. This can be used to change the
appearance of the title band depending on its
state. In this video we show how the background color and font title of the title band can be dynamically controlled through custom CSS classes. Watch Video |
Reports - Session Variables - Calculated fields that referenced Session variables were not displaying the value of session variable.
UX Component - Server-side Action Scripting - Send Email Action - If you specified that the e-mail body should be read from the repository table, and that the name of the item in the repository was based on a field in the UX (rather than a hard coded name), the action did not retrieve the entry in the repository correctly.
Web Component - Styles - Global Styles - If you used the Style Editor to create a new global style, the global style folder was not in the correct location. It was placed in a folder called 'Shared Resources' in the current Project. It should have been one folder up in the .WebProjects (plural) folder.
Grid Component - Detail View - Edit On Demand - Date Picker, Edit-Combo, Auto-suggest - Did not work if the Detail View as set to 'Edit on Demand' mode.
sql_lookup() Function - The function will
now accept a blank filter expression and return all
values. Previously, if the "result_Expression" in the
function was a comma delimited list of fields, the
function would return only the first field in the list
for the first record found if the option "flagReturnAllValues"
was false. It now returns all fields listed in "result_Expression"
for the first record found when "flagReturnAllValues" is
false.
The function now has an optional parameter for a column
delimiter that is only added between fields if the
expression is a comma delimited field list. The default
column delimiter is a tab.
IMPORTANT: If sql_lookup() specifies a filter and returns a single field in the return expression, the return value is correctly typed. If more than one value is returned, or no filter is specified, the return value is a character string.
sql_records_get() Function - Now allows a blank
filter expression which will return all records.
UX Component - Client-Side Calculated Fields - In certain cases Javascript rounding errors in math calculations were causing wrong values to be displayed.
Application Server - Report Server - Multiple Application Servers - If you were running multiple instances of the Application Server on a machine, the Report Server did not work correctly.
Reports - Web Applications - Reports - Report Server - If a SQL connection string contained high order characters, it could cause the report to fail.
Forms - Desktop Applications - Web Content Chrome - The Toolbox now has a new item 'Web Content Chrome'. This controls duplicates the functionality of the 'Web Content' control, but uses Chrome and not Internet Explorer to render the content. For example, you can use this control to render Google Maps on the form.
Forms - Desktop Applications - Google Maps Supercontrol - Fixes issues with this control. You now can create a Google Map supercontrol on a form using either the 'Web Content' control (uses Internet Explorer) or 'Web Content Chrome' (uses Chrome).
UX Component - Client-side Calculated Fields - Round() Function - The round() function in client-side calculated fields was using the built-inJavascript Math.round() method to round values. The Javascript Math.round() function rounds negative numbers differently that some people might expect (and differently than Excel does, for example).
For example:
Math.round(-4.5,0) returns -4
However, Excel returns -5.
To be consistent with Excel's behavior (which is likely what most users would expect), when the Round() function is used in a client-side calculation, it now uses the Excel convention.
Behind the scenes, the round() function in a client-side calculation is actually translated into the built-in $u.n.round() function in the Alpha Anywhere Javascript library. This function now takes these optional flags
For example:
$u.n.round(4.25,1)= 4.3
$u.n.round(-4.25,1) = -4.3
$u.n.round(4.25,1,'u') = 4.3
$u.n.round(-4.25,1,'u') = -4.2
$u.n.round(4.25,1,'d') = 4.2
$u.n.round(-4.25,1,'d') = -4.3
$u.n.round(4.25,1,'a') = 4.3
$u.n.round(-4.25,1,'a') = -4.3
$u.n.round(4.25,1,'t') = 4.2
$u.n.round(-4.25,1,'t') = -4.2
UX Component - List Control Performance - The way in which events are bound to List controls elements has been improved. This will result in a improvement in performance when doing an orientation change on the device and switching to a different List layout based on the orientation.
Reports - Layout Table Reports - Project Reports - Text Dictionary - You can now insert text dictionary tags in Layout Table reports defined at the Project level. Workspace reports do not support Text Dictioanries.
For example, you can specify the title of a column in a Layout Table report as
<a5:t>title1</a5:t>
When the report is printed, the text dictionary tags are resolved.
NOTE: To define the Text Dictionary, go to the Project Properties dialog on the Web Control Panel.
To define entries in the Text Dictionary, select the Text Dictionary... command from the Report menu in the Layout Table Report Editor.

When you preview your report, you can specify which Language you want to use by selecting the 'Default Language for Text Dictionary...' command on the Report menu.

When you define a Layout Table report, the Cell Contents dialog allows you to edit the contents of a cell in the Layout Table. If you want to use Text Dictionary tags on some static text, you must check the 'Is Template' checkbox as shown below.

When you click the 'Is Template' checkbox, then <a5:t> ..</a5:/t> tags will be evaluated. In addition, any text enclosed in { } brackets will be evaluated as an Xbasic expression.
Mobile Theme - Slate - A updated version of the new Slate stylesheet is ready for testing.
To download the style click here. Unzip the file into the CSS folder where you have Alpha Anywhere installed. This will create a new folder called Slate in the CSS folder. To use the style, edit a UX component, and then change the style name for the component to 'Slate'.
NOTE: See Release Notes for more information on the Slate stylesheet.
Grid Component - Query By Example Searches - The search performed by the QBE search feature is now case-insensitive on databases that are normally case sensitive.
You can disable this feature by setting this property in the Grid's Advanced Properties section:
tmpl.qbeSearchIsCaseInsensitive = .f.
Grid Component - Alphabet Button Search - Case-insensitive Searches - The search performed by the Alphabet Button search feature is now case-insensitive on databases that are normally case sensitive. To see this change you must make the Grid dirty and then resave it.
UX and Layout Table Report - AbsoluteLayout Editor - The AbsoluteLayout editor is now based on an embedded version of the Chrome Browser. Previous versions were based on the Internet Explorer ActiveX control. However, as a result of some very unfortunate changes that Microsoft apparently made to IE11 (which comes standard on Windows 8.1), the AbsoluteLayout editor did not work correctly on machines where IE11 was installed. Now that the AbsoluteLayout Editor is based on an embedded version of Chrome, there is no dependency on Internet Explorer and no risk that a future update to IE will break some aspect of the AbsoluteLayout editor.
Grid - Search Part - Setting Initial Value of a Checkbox Control - Multiple Values - The Search Part allows you to define the initial value of each control in the Search Part. However, in the case of a multi-valued controls, such as a Checkbox control, you might want to set the initial value of the control to two or more checked values. You can do this by specifying some Javascript in the client-side onSearchRender event. Use the .setValue() method and pass in an array of the initial selections. For example:
{grid.object}.setValue('S','COLOR',['Red','Green']);
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
UX Component - Signature Capture Control - Show in Window - If the Signature Capture control was placed in a Window Container, when the window was opened, the signature capture control was shown but you could not draw on it.
List Control - Microsoft Access - Paginated Lists - There is a bug in Microsoft Access where if you specify a SQL Select statement with a limit clause and an Order By clause, the limit is interpreted as a percentage. For example
SELECT TOP 5 CustomerID, CompanyName, City FROM Customers ORDER BY City
In the above query, Access returns the top 5% of records in the query, not the top 5 records. This bug causes the wrong number of records to be shown in the List when the pagination option is set to .t.
A work around for the above Access bug has been added so that the List now correctly shows the correct number of records.
UX and Grid Controls - Submitting Data with Leading Quote Sign - If you submitted a field value that had a leading quote, the quotes were stripped. For example, if you tried to save this data into a field:
"alpha"
the value that was actually saved was:
alpha
Grid Component - Postgres - UUID Fields - Fixed an error when entering a new record with a primary key that was set to a UUID.
Grid Component - Search Part - Case-insensitive Search Options - The Search Part of the Grid allows you to specify a search option for each search field. These options are:
The above search-options perform a case-insensitive search on databases that are not case-sensitive, and perform a case-sensitive search on databases that are case-sensitive. Oracle and Postgres are examples of databases that are typically configured to perform case-sensitive searches, while MySQL and SQLServer typically perform case-insensitive searches.
Now, new search options are available to force a search to be case-insensitive, regardless of how the database is configured. These options use the portable SQL lower() function to force a case-insensitive search. For example:
lower(name) LIKE lower(:what_name)
The new options are:
AlphaDAO - Postgres - SSL - Support for SSL is now available for PostgreSQL ODBC extension driver variants – these include PostgreSQL, PostgresPlus and FoundationDB (under development):
email_smtp_send() Function - Character Set - You can now specify the character set when using the email_smtp_send() function.
DIM ps as P
DIM pm as P
pm.from = "aaron@alphasoftware.com"
pm.from_alias = "Aaron Brown"
pm.to = "ed@alphasoftware.com"
pm.subject = "This is a test"
' Text that contains non ascii characters - encoded as
UTF8
pm.message = convert_acp_to_utf8("même manière")
' Indicate that we want to send the text with 'utf8'
encoding
pm.charset = "utf8"
IF email_smtp_open(ps, "mail.alphasoftware.com")
email_smtp_send(pm, ps)
END IF
Email_smtp_close(ps)
Mobile Theme - Slate - A updated version of the new Slate stylesheet is ready for testing.
To download the style click here. Unzip the file into the CSS folder where you have Alpha Anywhere installed. This will create a new folder called Slate in the CSS folder. To use the style, edit a UX component, and then change the style name for the component to 'Slate'.
NOTE: See Release Notes for more information on the Slate stylesheet.
Reports - Free-form Reports - Maximum Report Height - The maximum height of a report section was previously limited to 22 inches. This limit has now been substantially expanded. The maximum height of a report section is now approximately 300 inches.
UX Component - Watermarks - High Order Characters (e.g. Hebrew) - Specifying watermark text for a textbox or textarea control using high order characters (for example, Hebrew characters) is possible, but requires the text for the Watermark to be entered as a unicode encoded string, with the {unicode} prefix.
For example, to set the watermark to the characters shown in the screenshot below, enter:
{unicode}05D0{unicode}05D1{unicode}05D2
In the screenshot shown below, the watermark is in Hebrew and it is on the right side of the control.

To get the text flow direction to 'right-to-left' (so that the watermark is on the right side of the control), the following Javascript was added to the client-side onRenderComplete event:
document.body.style.direction = 'rtl';
Display List of all Session Variables and their Values - The following .A5W page shows how you can list all of the session variables in the user's session and also display the value of each session variable.
<%a5
'test variables - you can delete these if you want
session.var1 = "alpha"
session.var2 = "beta"
'get a list of all of the session variables
'!f flag indicates that no functions should be returned
dim vars as c
vars = properties_enum(session.variables,"!f")
dim html as c
html = ""
'loop over each session variable and get its value
for each vn in vars
html =
html+"session."+vn.value+"="+eval("session.variables."+vn.value)+"<br>"
next
'print out the contents of 'html'
?html
%>
IMPORTANT: If you currently have build 1620-4172 from 21 Aug 2013 or an earlier build installed, then this is a required update.
Application Server - Activation - Fixes a bug in build 1755-4125 that prevented an Application Server that had not previously been activated from being activated.
List Control - Microsoft Access - Paginated Lists - There is a bug in Microsoft Access where if you specify a SQL Select statement with a limit clause and an Order By clause, the limit is interpreted as a percentage. For example
SELECT TOP 5 CustomerID, CompanyName, City FROM Customers ORDER BY City
In the above query, Access returns the top 5% of records in the query, not the top 5 records. This bug causes the wrong number of records to be shown in the List when the pagination option is set to .t.
A work around for the above Access bug has been added so that the List now correctly shows the correct number of records.
UX and Grid Controls - Submitting Data with Leading Quote Sign - If you submitted a field value that had a leading quote, the quotes were stripped. For example, if you tried to save this data into a field:
"alpha"
the value that was actually saved was:
alpha
Mobile Theme - Slate - A updated version of the new Slate stylesheet is ready for testing.
To download the style click here. Unzip the file into the CSS folder where you have Alpha Anywhere installed. This will create a new folder called Slate in the CSS folder. To use the style, edit a UX component, and then change the style name for the component to 'Slate'.
NOTE: See Release Notes for more information on the Slate stylesheet.
Reports - Free-form Reports - Maximum Report Height - The maximum height of a report section was previously limited to 22 inches. This limit has now been substantially expanded. The maximum height of a report section is now approximately 300 inches.
UX Component - Watermarks - High Order Characters (e.g. Hebrew) - Specifying watermark text for a textbox or textarea control using high order characters (for example, Hebrew characters) is possible, but requires the text for the Watermark to be entered as a unicode encoded string, with the {unicode} prefix.
For example, to set the watermark to the characters shown in the screenshot below, enter:
{unicode}05D0{unicode}05D1{unicode}05D2
In the screenshot shown below, the watermark is in Hebrew and it is on the right side of the control.

To get the text flow direction to 'right-to-left' (so that the watermark is on the right side of the control), the following Javascript was added to the client-side onRenderComplete event:
document.body.style.direction = 'rtl';
This update is a required update. It must be installed before November 1.
UX Component - Client-side Readonly Expression - If your UX component has a client-side readonly expression you must recalculate the control and then resave the UX component. To recalculate the control, select the control that has the client side readonly expression and then make a change to any property of the control.
| UX Component | Image and File Upload - In Depth Look at What Happens Behind the Scenes When a File is Uploaded |
When you upload a file or image in the UX
component, the binary data that is uploaded is
stored in temporary session storage until the
user commits the record they are editing. This
video discusses what happens when a file is
uploaded and what happens when the record you
are editing is committed. The video also shows how you can write Xbasic to modify the filename that is stored on disk when the Camera is used to capture an image on a mobile device. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Download Component |
| Reports | Printing Data that Contains HTML Markup |
In some cases the data in a report you are
printing might contain HTML markup. You might
want to print the HTML markup in its rendered
form, rather than its raw form. In this video we
show how you can configure the report editor to
print HTML markup as rendered HTML. Watch Video |
| UX and Grid Component | Understanding Component Aliases and the Use of Placeholders in Javascript Code |
When you write your own Javascript code in a
Grid or UX component, you often use
'placeholders' (such as {Dialog.object} ) in
your code. In this video we explain in depth how
these placeholders work and we discuss the
concepts of a component 'alias'. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 |
| UX Component | Consolidate Multiple Ajax Callbacks into a Single Callback |
This video is aimed at advanced developers. It
shows how the a5_ux_action() utility function
can be used to optimize certain types of UX and
List control actions into a single Ajax
callback. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| Xbasic | Working with XML Documents |
Xbasic has always had a powerful XML parser, but
the new *property_from_xml() function and the
new XML document viewer make it ever easier to
work with XML documents. Watch Video |
| Grid and UX Component | Image Upload to a Character Field |
When you upload images in either the Grid or UX
component, the target field can either be a
binary field or a character field. In the case
of a character field, the filename of the image
is stored in the field and the image file itself
is stored in a file in the specified 'upload
folder'. The filename of the image that is stored in the target character field can be a fully qualified filename, or more likely, you will store the 'shortfilename' (i.e. a relative filename). If you choose to store the 'shortfilename', then you must configure an image path property so that the image filename can be resolved. This video discusses this issue. Watch video |
| UX Component | Responsive Layout - Modifying the Design of a Component Automatically Based on the Device and Screen Orientation |
'Responsive' is the term used to refer to
a design that automatically changes its layout
based on the device on which it is running, the
device orientation and the window size (for
desktop browsers). The UX component has very
powerful tools for implementing responsive
layouts. In this video we show how the Responsive Layout Genie can be used to build highly responsive UX component designs. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Advanced settings Watch Video Download Components |
| UX Component | List Controls/Data Series - Using an IN Clause with Array Arguments in a SQL Statement |
List controls, Charts and Data Series in a UX
can all be based on a SQL query. In some cases
you might want to use an IN clause in the SQL
query and reference an argument value to get the
values for the IN clause. This video shows how you can use arrays in a SQL::argument object and then reference the argument in a SQL IN clause. Watch Video Download Component |
| UX Component - List Control | Using the Server-side AfterQuery Event - Computing a Column Total |
For List controls that are based on a SQL query,
the server-side AftterQuery event fires after
the query to get the List data has been
executed. This event is typically used to
compute some Javascript code to return to the
browser. In this video we show how the event can be used to return the total for a column in the List. Since the List is paginated, all of the data in the List query is not currently shown in the List and therefore the calculation of the total must be done on the server. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Components |
| UX Component | Computing a List Column Total using Client-side Calculations |
In cases where the List data is not paginated
(and therefore the List contains all of the data
in the List query), column totals can be
computed client-side. In this video we show how the data in a column in the List is computed using Javascript. Watch Video Download Components |
| UX Component - List Control | Adding Dynamic Bubble Help (tooltips) to a Field in a List |
In this video we show how you can add dynamic
bubble help to a field in a List control using
some Javascript in the onItemDraw event. Watch Video Download Component |
| UX Component | Embedded UX Components - Understanding the onPanelActivateEvent |
A common practice when designing mobile
applications is to break a large application
into multiple smaller UX components and then
embed components in Panel Cards in the 'master'
UX component. When you do this, it is useful to
be able to execute code whenever a child UX
component gets focus. In this video we show how the onPanelActive client-side event in a child UX will fire whenever the Panel Card in which it is embedded gets focus. Watch Video Download Components |
| UX Component | Annotating an Image using the Signature Capture Control |
The signature capture control can be used for
more than capturing images. In this video we
show how a medical application can use the
signature capture control to annotate an image
of the body to indicate affected areas. Watch Video Download Component |
| UX Component - List Control | Server-side Summary Values |
For List controls that are based on SQL data,
you can specify that summary data (e.g. total,
avg, count, min and max) should be computed for
certain columns in the List control. The summary
computations are based on the List query (not on
the rows actually visible in the List). In the
case of a paginated List, there may be more rows
in the query than are visible in the List. For
example, the query might have 1,000,000 rows,
but the list might show 20 rows at a time. This video shows how a List control is configured to compute summary values, and then how the afterServerSideSummaryCompute event in the List is used to update a label on the UX component showing the summary values. Watch Video |
| Grid Component | Locking the Screen while a Long Running Ajax Callback is Executing |
If a Grid or UX component makes an Ajax callback
that takes a long time to complete, you might
want to display a message to the user telling
them to wait and also you might want to 'lock'
the screen to prevent them from firing other
callbacks until the current callback has
completed. In this video we show how this is easily done using a custom modal window. Watch Video |
| Grid Component | Storing State Information |
Both the Grid and the UX allow you to store
'state' variables that are available on both the
client and server-side. The UX has always allowed you to set state variables on the server side (in any server-side event or an Ajax callback) by setting variables in the 'e._state' object. Previously, to set state variables on the server side in the Grid you had to generate Javascript code. Now, you can also set variables in the e._state object on Grid server side events. This video shows how this is done. Watch Video - Part 1 Watch Video - Part 2 |
| UX and Grid Component | Overview of How to Localize a UX or Grid Component |
In this video we give a brief overview on how a
Grid or UX component can be localized so that
the same component can be used for different
languages. The technique involves using either
Language tags (<a5:r>) or Text Dictionary tag
(<a5:t>) around text strings that need to be
localized. Watch Video - Part 1 Watch Video - Part 2 For certain languages, the text flow direction is 'right to left' (e.g. Hebrew, Arabic). In this video we show how you can execute Javascript to change the text flow direction for the whole page. The Javascript is added to the component's render complete event. It sets the text direction using this code: document.body.style.direction= 'rtl' Watch Video - Part 3 |
| UX Component | Show/Hide Buttons in Panel Header/Footer Without Messing Up Button Alignment |
A common pattern in mobile applications is to
have buttons in a Panel header or footer and to
space the buttons so that some are left
justified, some centered and some right
justified. Then you might show/hide one or more
of the buttons, but you don't want the spacing
on the buttons to be affected. This video shows how this can be done. Watch Video |
| UX Component | Building a Menuing System in a UX Component Using Docked Panels in a Panel Layout |
In mobile applications is it common to build
menus that slide in from the right or left of
the screen. In this video we contrast how this
is accomplished in jQuery mobile and Alpha
Anywhere. The approach we have taken in this
video for Alpha Anywhere shows how the menus can
be placed in Panel Cards that are docked inside
a Panel Navigator. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Download Components |
| UX Component | How to Dynamically Change the Code on a Button |
(Advanced Javascript Developers) This video
shows how you can dynamically change the code
associated with a button on a UX component by
'unbinding' the existing code and then 'binding'
new code. Watch Video |
| UX Component - List Control | Edit the Current Row in a List Control in another UX Component |
The Grid component has an option in Action
Javascript to edit the current row in a Grid
using a UX component (that is data bound to the
same table that the Grid is based on). This
option also allows you to add a new record to
the Grid using a UX component. The action for
the Grid is called: "Open a UX component to Edit Current Record in Grid, or add a new Record" Now an analogous action is available in Action Javascript to edit the current row in a List control (for Lists that are based on SQL or DBF data sources) using another UX component that is data bound to the same table that the List is based on. The action for the UX is called: "Open a UX component to Edit Current Record in List Control in a UX, or add a new Record to a List Control in a UX" Watch Video |
| UX Component - Mobile | Panel Layout - Understanding the Different Ways in Which a Docked Panel Can Be Shown - 'Over', 'Slide' and 'Push' |
Using Panel Layouts that contain multiple child
Panels is common when building mobile
applications. One or more of the child Panels
that are shown in a Panel Layout can be 'docked'
(i.e. hidden). Panels can either be explicitly
docked, or conditionally docked (for example, on
an orientation change). Panels that have been docked can be shown (typically by clicking on a 'controller' button in a Panel Header). When a docked Panel is shown, you can specify the method use to show the Panel. This method discusses the various methods - Over, Slide and Push Watch Video |
| UX Component - Mobile | Overview of Different Methods for Specifying the Size of a Panel in a Panel Layout |
When using a Panel Layout you can optionally
specify the size of each Panel that is displayed
within the Panel Layout. When you specify the
size of a Panel, you can use either an absolute,
percentage or relative size. This video
discusses the various options. Watch Video |
| UX Component | Embedding Reports into a UX Component and Dynamically Filtering the Report |
Reports can be 'embedded' into the UX component
and then dynamically filtered based on values
that the user enters into controls on the UX.
This allows for powerful interactive dashboard
type applications where users can interact with
reports. This video shows how this can be done. Watch Video |
| UX Component | Custom Styling for RadioButton and CheckBox Controls |
The standard way in which browsers render
checkbox and radiobutton controls is pretty
drab. In this video we show how the UX component
allows you to apply a rich set of styling
options to radiobutton and checkbox controls. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Component |
| UX Component | Positioning Controls at Absolute Locations on the Screen using the WYSYWIG Builder - Understanding the AbsoluteLayout Container |
By default, the UX component lays out the
controls that have been placed on the component
automatically, 'flowing' the controls from left
to right, top to bottom. All controls are
perfectly aligned. However, there are times when
you want more precise control over the placement
of controls. This is especially true when you
want to use an image (for example, an image
of a PDF form you might have) as the backdrop to
a form and then place your UX component controls
at precise locations exactly over the 'fields'
in the image. This video shows how you can place controls in an an AbsoluteLayout container and the set the absolute position and size of each control. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Watch Video - Part 6 Watch Video - Part 7 |
| UX Component | Understanding the 'NoFloat' Container Type |
By default, all controls in a UX component are
wrapped in a DIV with a class name of
A5CWLayout. This class adds a CSS float and
padding so that the controls 'flow'
automatically, left to right, top to bottom
across the page. If a control has a 'break'
after it, a new 'line' is started. This
automatic lay out of the controls on a UX makes
it very easy to design attractive, perfectly
aligned forms. However, there are cases when the padding that is automatically added to all controls gets in the way of the effect that you are trying to achieve and in these cases you can wrap controls in a special 'NoFloat' container. This video explains how the 'NoFloat' container works. Watch Video |
| UX Component | Adding a 'Flow Collapse' Button to Panels in a Panel Layout to Hide/Show Panels |
Panels in a PanelLayout can be hidden or shown
by adding a 'flow collapse' button to a Panel. A
common reason for doing this is to create a
'full screen' view for the 'primary' Panel in a
PanelLayout. This video shows how this is done. Watch Video Download Component |
| UX and Grid Component - | 'NotInList' Event for Auto-Suggest and Edit-Combo Controls |
The 'NotInList' event fires when the user enters
a value into an Auto-suggest or Edit-combo
control and the value entered is not is the list
of available choices for the control. Watch Video |
| Reports | Printing QR Codes |
Printing QR Codes on Layout Table Reports is now
a built-in feature. Watch Video |
| UX Component | Displaying QR Codes on a UX Component |
A common requirement, especially in mobile
applications, is to display data encoded as a QR
code. The UX component has a built-in QR Code
control that makes it very easy to display any
data in the form of a QR Code. This control uses
Javascript to generate the QR Code. Because it
is a pure Javascript control, no Ajax callback
is required and therefore it is very fast.
However, you can also generate QR codes on the
server. This video shows how QR codes can be shown on a UX component using both client-side and server-side techniques. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| Reports | Absolute Positioning of Objects in a Layout Table Report - Using a Form Image as Report Background |
In a previous video we have shown how the UX
component supports absolute positioning of
controls over a bitmap image of a form
(typically a PDF form). Layout Table reports also offer the ability to also use an image of a form as the report background and to then position the report fields directly over the 'fields' on the background image. This video shows how this is done. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 |
Reports - Printing Reports that Contain HTML Markup
in the Data - In some cases the data in a report you
are printing might contain HTML markup. You might want
to print the HTML markup in its rendered form, rather
than its raw form. In this video we show how you can
configure the report editor to print HTML markup as
rendered HTML.
Watch Video
UX Component - Buttons - How to Programmatically Enable and Disable Buttons - In V12 all buttons on the UX component are 'Adanced Buttons'. (In V11 buttons could either be 'standard' or 'advanced'). Advanced buttons are implemented as Javascript objects and so in order to enable or disable them programmatically, you need to get a pointer to the object and then call the object's .setDisabled() method.
NOTE: All Javascript controls, not just buttons, in the UX (List, ButtonList, SpinList, Tree, etc.) support the .setDisabled() method.
For example:
var bObj = {dialog.object}.getControl('BUTTON_1');
//set the button disabled
bObj.setDisabled(true);
//now enable the button
bObj.setDiabled(false);
If the button is in a Repeating Section, and you want to call the .setDisabled() method for a specific button instance (say the button in row 3), then you can pass in an optional parameter to the .setDisabled() method. For example:
//get a pointer the button element in row 3
var eles = $('{dialog.componentname}.V.R1.BUTTON_2_A5INSTANCE3');
//pass in eles as an optional argument to the .setDisabled()
method
{dialog.object}.getControl('BUTTON_2').setDisabled(true,eles);
NOTE: In the above example, if you did not pass in the optional second argument to the .setDisabled() method, the button in every row of the Repeating Section would have been disabled.
UX Component - Lists and Embedded Components - Delay Render Until Visible - Panel Layouts - Panels and Embedded Objects that were set to delay render until visible were not rendered if they were in a Panel Card inside a Panel Layout if the initial state of the Panel Card was 'docked'.
Forms - Super Controls - Google Maps Supercontrol - Windows 7/8 - If you used the Google Maps Superconrol in a Form on a machine where IE10 was installed, you would get a Javascript error. This error is apparently a bug in IE10 because the same Form runs without error on XP (where IE8 is used). A work around for this IE bug has been found and now the Form will work on Windows 7/8 without error.
Reports - Layout Table Reports - Linked Reports - If a child report uses arguments, and the parent report also uses arguments, then in the dialog where the child report is linked, you can now specify argument bindings to bind a child report argument to a parent report argument. Previously you could only bind child report arguments to literal or field values.
Report - Layout Table Reports - Linked Reports - Arguments in the Report Filter - If a child report (that was based on a SQL query) defined a filter in the report definition that used arguments, when this report was linked by a parent report, the child report arguments were not seen. Child report arguments were only seen if they were part of the report Data Source.
UX Component - List Control - Scrolling - As a result of changes to the change event described in a previous pre-release build, scrolling in he List caused the List's onClick event to fire. This is now fixed. Here is how tapping, and scrolling and List events now work:
ReportMailer and Netmailer - The installers for both have been updated for V12. If you need to use either of these addins with V12, please download the installers from the location specified in your order confirmation email.
UX Component - Data Bound - Security - If a UX component had security on a control so that for certain roles a control was not present on the UX, when doing an insert into a SQL table, you would get an error.
UX Component - Action Javascript - Insert, Update or Delete on an Unbound UX - Fixed some issues with the action.
Grid Component - Detail View - Edit on Demand - Cancelling out of the New Record - If a Grid with a Detail View was configured to only edit on demand when cancelling out of a new record, the Detail view did not return to the correct state (showing controls as labels, and not textboxes).
AlphaDAO - MySQL - Longbinary Fields - Fixes an issue with inserting null blobs inot longbinary fields.
Grid Component - File Export - In the case of an ascii export, was not honoring the extension if you supplied a custom client side filename.
Windows 8.1 - Working Preview - Windows 8.1 has made a change that is causing Working Preview in the Component Builders to fail. You will receive an error message from Javascript ("access denied"). This build has a work around so that Working Preview is now working in Windows 8.1.
Report Server - The 4 core Report Server is now automatically enabled without requiring a Feature Key to be added. Previously, the Report Server was only enabled if you had entered a Feature Key.
TIP: If you want to disable the Report Server, you can go to Project Properties and disable it from there. The setting will apply to the current project.
UX Component - Action Javascript - Map Actions - Add Marker to a Map - If you selected the action to add a marker to a map and you passed in a comma separated latitude/longitude value (e.g. 31.65583, -81.21025) the marker was not positioned correctly on the map. The problem did not occur if you passed in an address. The reason that the marker was not being positioned correctly was that the generated code passed the lat/lng value to the .addMarker() method as a string, when it should have been passed in as an array. To fix the problem you will need to edit and resave the action in your component.
UX Component - Cascading Dropdown Controls - Repeating Sections - If a UX component had Repeating Sections, and had cascading dropdownbox controls in both the top level section of the UX and in a Repeating Section, the cascading dropdown in the Repeating Section was not populated correctly when the UX was populated with an existing record.
UX Component - Opening Child UX Components in Dynamic Panels - Fixed a bug where the Image Upload action in a child UX component that was opened in a Dynamic Panel did not work.
TabbedUI Component - Grid Component - Multi-line Text Area - Under some circumstances when working with a Grid that has a multi-line text-area control in a Tabbed UI, pressing down or up arrow in the text-area would not move the insertion point.
Grid and UX Component - Edit Combo - Did not scroll the current selection into view.
Reports - HTML Reports - SQL Tables with Spaces in Field Names - Fixed a bug in HTML reports when there were spaces in field names.
.Net Framework 4.5 - Alpha Anywhere currently requires .Net 4.0. We will soon be switching to .Net 4.5. In anticipation of this change the Full and Patch installers will now install .Net 4.5 on your machine if it is not already installed.
UX and Grid Component - Javascript Confirmation Windows - Title Direction - By default, all confirmation dialogs show the title on the left and the close icon on the right. For right to left languages, you might want to change this.
To do so, put the following Javascript in the Grid or UX onRenderComplete client-side event:
A5.msgBox.window = {
title: {
direction: 'rtl'
}
}
Reports - Layout Table Reports - Absolute Layout - Layout Table Reports now support absolute positioning of fields. This feature is similar to the absolute positioning of controls in a UX component using an AbsoluteLayout container.
The primary motivation for adding this feature to reports is to allow you to use an image of a form (for example, an image of a IRS 1040 PDF form) as the background for a cell in a Layout Table report, and to then allow you to place the fields in the report at explicit locations so that they print 'on top of' the fields in the image background.
NOTE: This feature is only available for Layout Table reports that are being edited in the full report editor - not in the Quick Report genie.
To access the feature, double click on a cell in the Layout Table report. The 'Cell Contents' dialog opens up. Note a new choice in the dialog - 'Absolute HTML'.

If you select this option, then click the 'Edit...' button, the Absolute Layout editor for the cell opens up:

The editor shows the available fields, a 'canvas' where you can place the fields using drag and drop actions, and a property sheet showing properties of the selected field.
NOTE: Unlike the UX component, the size of the editing region (shown as 312 by 138 pt in the above image) cannot be changed in the editor. The size of the editing region is determined by the size of the cell in the Layout Report.
For each field that you place on the canvas, you can use the Style property in the Property Sheet to define properties (using HTML CSS syntax) to control the appearance of the field in the report.
For example, if you want a field in the absolute layout HTML to appear in red, with a blue border, you would define the following for its Style property:
color: red; border: solid 1px blue;
Placing 'Radio Buttons' and 'Checkbox' Controls
Assume that the background image for a cell uses the image shown below. Consider the 'Filing Status' area. It is likely that in your table, you have single field called 'filingStatus' that might have a value of 1, 2, 3, 4, or 5 stored in the field.
However, when you print a report, you want to print an 'X' above the appropriate box in the image.
To do this, you would need to define five calculated fields in your report. For example:
filingStatus_1 = if(filingStatus = 1, "X","")
filingStatus_2 = if(filingStatus = 2, "X","")
filingStatus_3 = if(filingStatus = 3, "X","")
filingStatus_4 = if(filingStatus = 4, "X","")
filingStatus_5 = if(filingStatus = 5, "X","")
Having done this, when you open the Absolute Layout editor, your field list will show the five calculated fields you have defined, and you can place each one of these fields over the appropriate radio button control on the image.

Defining the Background Image for the Cell
When you are in the Absolute Layout editor, you can define the background image for the cell. When you specify the image, you can specify how the image should be scaled to fit the cell. The options are:
UX Component - Mobile Applications - Location Information - Current location information can be used in several actions in Action Javascript. These actions include Ajax Callbacks, Centering a Map, Placing a Marker on a Map, Filtering a List for Records within the Vicinity of the Current Location.
Now, the Action Javascript builders expose three properties which previously were hard coded to default values. These properties are:
High accuracy - If true, the device will use its most
accurate method to get location information. If false,
the device will use its fastest or lower power
consumption method depending on the device. (Default
true)
Timeout - The amount of time in milliseconds to wait on
the device to acquire location information excluding the
amount of time it takes the user to grant the web page
access to geolocation data. (Default 15000)
Max age - The amount of time in milliseconds to accept a
previously acquired location. 0 means that a new
location must be acquired from the device. (Default
30000).
You can also change the default settings for these properties, by adding Javascript like this (using appropriate values for each of the properties) to the onRenderComplete client-side event:
{dialog.object}.locationMaximumAge = 30000;
{dialog.object}.locationTimeout = 15000;
{dialog.object}.locationHighAccuracy = true;
UX Component - ListControl - onBeforeSelect event - The onBeforeSelect event fires before the Select event. If the event returns false, then the user is prevented from moving off the currently selected row in the List.
Grid and UX Component - Windows, Auto-suggest and Edit-combo - Specifying a Maximum Window Height - When you define the window height for a pop-up window, an auto-suggest control or an edit-combo control, you can specify a window height.
If you leave the height property blank, the window will be sized to accommodate the entire height of the content (which will result in a window that is too high if there is a lot of content).
On the other hand, if you specify an explicit size, then you will end up with a window that looks too big if there is just a small amount of content in the window.
Now, when you specify the window height you can use the 'max' syntax to specify that the window should be automatically sized to fit its content, but should not grow bigger than the specified max size. For example, you can specify the height property as:
max: 300px
UX and Grid Component - Auto-suggest and Edit-combo Controls - 'NotInList' Rule - The 'NotInList' event fires when the user enters a value into an Auto-suggest or Edit-combo control and the value entered is not is the list of available choices for the control.
The primary use case for this event is to allow the developer to add code to the component to add the value that was entered into the control into the table on which the control choices are based so that the next time the user visits the control the value entered will be in the pick list for that control.
UX Component - QRCode Control Type - A new control type has been added to the UX component. The QRCode control displays its value as a QR Code.
The image shown below shows a UX with a QRCode controls.
Watch Video - Part 1
Watch Video - Part 2
Download Component

NOTE: The QRCode control is a client-side control. That means that Javascript is used to generate the QR code. You can also use Xbasic methods to generate servers-side QR codes (as bitmaps or SVG). See ::Qrcode::Creator:: below for more details.
To place a QRCode control on a UX, select the control type from the toolbox.

The QRCode control is just like other data bound controls in that it has a .getValue() and .setValue() method.
To display a QR code, you simply call the .setValue() method of the control. For example:
{dialog.object}.setValue('MYQRCONTROL_1','value to encode');
QRCodes - Xbasic - New methods have been added to Xbasic to generate QRCodes. The methods are:
::Qrcode::Creator::GenerateBmp(c text, c flags)
::Qrcode::Creator::GenerateBmpFile(c text, c filename, c flags)
::Qrcode::Creator::GenerateJpeg(c text, c flags)
::Qrcode::Creator::GenerateJpegFile(c text, c filename, c flags)
::Qrcode::Creator::GeneratePng(c text, c flags)
::Qrcode::Creator::GeneratePngFile(c text, c filename, c flags)
::Qrcode::Creator::GenerateRTF(c text, c flags, n width, n height)
::Qrcode::Creator::GenerateSVG(c text, c flags)
The flags parameter can be set to 'L' (low), 'M' (medium) or 'H' (hight) to indicate the level of error correction in the generated QR Code.
For example, from the Interactive window:
dim svg as c
svg = ::QRCode::Creator::GenerateSVG("http://www.alphasoftware.com","L")
a5_show_html(svg)
To display a QR code in an Xdialog:
svg = ::QRCode::Creator::GeneratePngFile("http://www.alphasoftware.com","c:\myfiles\qr1.png","L")
ui_dlg_box("QRCODE","{image=c:\myfiles\qr1.png}")
Qrcode_bitmap() Function - Generates a bitmap of
a QR Code - This function is a wrapper for the ::QRCode::Creator::GeneratePng()
function. However, it is able to scale the bitmap to an
explicit size.
Returns either binary PNG data or base64 encoded string with 'data:image/png;base64,' prefix
Syntax
A blobOrString = qrcode_bitmap(c text, c flag [,N width , [N height [, L flagBase64encodedWithPrefix]]])
QRCodes - Layout Table Reports - Layout Table Reports now support printing any cell in the Layout Table that contains a text value as a QR code.
To print the contents of a cell as QR code, simply check the 'Display QRCode for text in cell' property at the bottom of the 'Cell Contents' dialog box.

For example, here is a report showing customers in the sample Northwind database:

UX Component - PanelLayout Containers - Flow Collapse Buttons - Allows you to put a button in a Panel (only applies if the Panel is contained within a PanelLayout) to 'collapse the flow' of Panels that come 'before' the current Panel. By 'collapsing the flow' of a Panel, you make the Panel invisible.
The following set of images help to explain the concept:
The image below shows a Panel Layout with 3 child Panel (the child Panels can be PanelCards, PanelNavigators or PanelLayouts). The PanelLayout flow is set to LTR so that the Panels 'flow' from left to right. All of the Panels in the PanelLayout are currently visible. PanelCard1 and PanelCard2 both have an explicit size (say 100px) and PanelCard3 takes up the remaining available space.

Now, let's assume that PanelCard3 has a button (either in the Panel body itself, but more likely in its header or footer) to 'collapse the flow' (of the Panels that come before it).
If this button was pressed, then the Panels that come before it (PanelCard1 and PanelCard2 - because the flow direction is LTR) will get 'collapsed'. Their widths will get set to zero using an animation.

When the animation has completed, Panel Card3 will consume all of the available space in its parent PanelLayout.

The 'Flow collapse' button acts as a toggle. So, if the button were pressed a second time (while PanelCard1 and PanelCard2 are collapsed), then PanelCard1 and PanelCard2 will be re-shown, again, using an animation.

When would you use a 'Flow collapse button'? Assume that in the above example, PanelCard1 and PanelCard2 contain navigation or menu controls and that PanelCard3 is the main 'work' area of your application. By have a 'flow collapse' button in PanelCard3, you can allows you users to toggle 'full screen' mode on and off.
The primary use case for this pattern is when PanelCard1 and PanelCard2 contain 'navigation' or 'menu' controls and
Defining a 'Flow Collapse' Button
To define a 'Flow Collapse' button for any Panel (PanelCard, PanelNavigator or PanelLayout), set the 'Has a 'flow collapse' button' property in the Panel's Property Sheet.
Once you click this property, you can specify the ID of the button that will act as a 'flow collapse' button.
NOTE: If you have defined an onClick event for the flow collapse button, the event will be ignored since the button is being 'hijacked' to perform the 'flow collapse' action.
The builder allows you to define separate icons to use for when the Panels are in the collapsed state and when they are in the expanded state.
IMPORTANT: If you want to display icons on the flow collapse button you must set the button type to the appropriate option in the properties for the button you specify as the 'flow collapse' button.

UX Component - NoFloat Container Type - By
default, all controls in a UX component are wrapped in a
DIV with a class name of A5CWLayout. This class adds a
CSS float and padding so that the controls 'flow'
automatically, left to right, top to bottom across the
page. If a control has a 'break' after it, a new 'line'
is started. This automatic lay out of the controls on a
UX make it very easy to design attractive, perfectly
aligned forms.
However, there are cases when the padding that is
automatically added to all controls gets in the way of
the effect that you are trying to achieve and in these
cases you can wrap controls in a special 'NoFloat'
container.
In the image below, the first container (red) is a standard container. 'Firstname' and 'Lastname' are on the same line (because the break after 'Firstname' was turned off) as are 'City' and 'State'. Also, each control has padding around it.
The second container (blue) has been set to a 'NoFloat' container. Notice that all controls now are on their own line (even though there is no break after 'Firstname' and 'City' and all padding between controls has been removed.

Xdialog - List Control - W=milliseconds Directive to Delay Firing Selected Event - A new directive can be added to a List control to delay firing the selected event for a specified number of milliseconds.
The directive:
W=milliseconds
is inserted in the Listbox commands (between the % symbols).
To test the effect of this directive, create a new Xbasic script and paste this code in. Then click on a row - a message box will show the selected value. Then hold the down arrow down and the selection will move quickly down the list, but the event which shows the current selection will not fire until you have stopped holding down the down key.
Then, repeat the exercise with te W=2000 directive removed. You will see that the message box is shown for every row.
dim colors as c
colors = a5.Color_Enum()
dim selected as c
dim dlg_title as c
dim dlg_body as c
dim dlg_event as c
dlg_title = "Title"
dlg_body = <<%dlg%
{removecomments}
{removeleadingspaces}
[%W=2000%.100,30selected^#colors!selected_changed];
%dlg%
dlg_event = <<%code%
if a_dlg_button = "selected_changed" then
a_dlg_button = ""
ui_msg_box("",selected)
end if
%code%
dim flagOK as l = .f.
ui_dlg_box(dlg_title,dlg_body,dlg_event)
UX Component - Radiobutton and Checkbox Controls - Custom Styling - The standard way in which browsers render checkbox and radiobutton controls is pretty drab. The UX component allows you to apply a rich set of styling options to radiobutton and checkbox controls.
For example, here is an example of how these controls can be styled:

Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Download Component
To style a Radiobutton or Checkbox, check the 'Has custom design' property.

Then click the smart field for the 'Custom appearance designer' to open the builder. The builder gives you control over a large number of appearance properties and also shows a real-time preview of the control's appearance.

UX Component - Embedded Obects - Reports - HTML Reports - When you embed a report into a UX component, you now have the option to specify that the report should be rendered as HTML.
Panel Layout - Display Method - 'Push' Option - A new option for the 'Docked Panel display method' property has been added. The option is 'push'. The 'push' method pushes the Panel that are to the left (or right, above or below - depending on the Flow direction)
Panel Layout - Dock Options - Several new options have been added to specify when a Panel that is contained in a Panel Layout should be docked (i.e. hidden). The complete list of options is shown below:
The options prefixed with 'landscape', 'portrait', and 'self' are new.
If a Panel's dock option is set to 'portrait-collapse-before' then the Panel will be docked (i.e. hidden) when the device is in portrait mode, but not when in landscape mode.
If a Panel's dock option is set to 'self-portrait-collapse-before' then the Panel will be docked when the Panel Layout in which it is contained is in 'portrait' mode (i.e. it has a width that is less than its height), regardless of the orientation of the device itself.
Panel Layout - Size Options - New options have been added for specifying the size of a Panel in a Panel Layout. You can now use percentages and negative sizes.
If you specify a percentage size, the percentage represents the percentage of the available space in the Panel Layout.
If you specify a negative size (e.g. -100px), then the Panel Layout will have a size equal to the size of the Panel Layout (in the flow direction), minus 100px.
Grid Component - Alphabet Button Search - Custom Buttons - The Alphabet Button search feature in the Grid has always allowed custom button definition. For example:
A..C = left({searchfield},1) >= 'A' and left({searchfield},2) <= 'C'
In the above example, a button with a label of 'A..C' is defined with a corresponding filter of:
left({searchfield},1) >= 'A' and left({searchfield},2) <= 'C'
Now, you can specify that the filter expression uses arguments. For example the above custom button can now be defined as:
A..C = left({searchfield},1) >= :arg1 and left({searchfield},2) <= :arg1 && a|||c|arg1
The argument value is defined using the syntax:
argumentValue|||argumentType|argumentName
and is separated from the filter by:
&&
When specifying the argument value you can use an expression by prefixing the argument value with an = sign.
For example:
Today's Orders = orderDate = :d1 && =date()|||d|d1
If you want o use International characters in an argument value, then you must use an expression that uses the *html_to_text() function and an html encoded version of the argument value.
For example:
&;#1489; = left({searchfield},1) = :arg1 && =*html_to_text("&;#1489;")|||c|arg1
UX and Grid Component - CSS Editor - Remember Last Pane Used - The CSS editor now remembers the last pane you were on. If you switched to the Code pane, then closed the editor, the next time you open the editor you will be on the Code pane. Previously, the editor always opened on the Design pane.
UX Component - List Control - Action Javascript - Edit Current Row in List - A new action has been added to Action Javascript to allow you to edit the current row in a List control that is based on a SQL or DBF data source in another UX component.
The action is called:
Open a UX component to Edit Current Record in List Control in a UX, or add a new Record to a List Control in a UX
The UX component that is used to edit the List record
must be data bound to the same table that the List is
based on, and the AfterDialogValidate event in the UX
used to edit the List row must have a server-side Action
Script to save the record when the Submit button is
pressed.
UX Component - Logical Checkbox - Prompt Text - You can now specify an optional label that appears to the right of the logical checkbox.
UX Component - Radiobutton, Checkbox and Logical Checkbox Controls - Now wrap the individual choices and their corresponding label in a <span> element. You can specify the class name for this <span> element. This allows for more styling options on these controls.
Web Projects Control Panel - Find File - A new option on the right click menu allows you to search for a particular file in all of the Web Projects in the current Workspace. This function is useful if you have many Web Projects in a particular Workspace and you are not sure in which Web Project a particular file is located.
UX Component - AbsoluteLayout (WYSIWYG) - You can now position controls in a UX component at absolute locations on the screen.
A common use case for absolutely positioning controls is so that you can display an image of a professionally designed form as a 'backdrop' to your UX and then precisely position your UX controls over the 'fields' in the form image.
By default, when you place controls on a UX component, the controls are positioned on the screen automatically by the UX component. The controls 'flow' from left to right, then top to bottom.
For example, say you have have a UX component that has these controls on it:

As the image shows, there is no break after the 'firstname' field, so 'firstname' and 'lastname' will be on the same 'line'.
'address' will be on its own 'line' because there is a break before and after it. Finally, 'city', 'state' and 'zip' will all be on the same 'line'.
Here is how this UX will render:

Because the UX was in charge of rendering, you can see that the baselines of all controls on the same 'line' are automatically aligned. And the left edges of controls at the start of each line are also automatically aligned. Furthermore, automatic spacing has been placed between the controls so that the form lays out nicely.
NOTE: The amount of spacing between controls is defined by setting the 'A5CWLayout Class Padding' property on the UX Properties Pane. By default this is set to 4px. You can set explicit values for top, right, bottom and left using the standard CSS convention: For example: 4px 4px 0px 0px.
An important (and extremely powerful) aspect of the way Alpha Anywhere lays out controls automatically is how the UX component will react when the window in which it is contained is resized. In the example show above, City, State and Zip are on the same line. However if the window is resized smaller and there is no longer space for all of the controls on the line, the Zip control will automatically 'wrap' to the next line. As the window is further resized smaller, eventually the State field will also automatically 'wrap' to the next line.
When you use Absolute Layout, you turn off the automatic layout of controls that the UX component does and instead you take on responsibility for positioning and sizing controls yourself.
For example, you might lay out the controls in the following (admittedly decidedly odd) fashion:

The way in which you indicate that you want to absolutely position controls in a UX is by wrapping the controls in an AbsoluteLayout container.

The AbsoluteLayout container has these properties:

Absolute positions for controls - The smart field for the 'Absolute positions for controls' property will open the builder where you can visually set the position and size of each control in the container.
Has background image - The 'Has background image' property indicates if the AbsoluteLayout container has a background image.
Control style overrides - The 'Control style overrides' property is a convenience feature. It allows you to automatically add some CSS to use for the in-line style of every control in the AbsoluteLayout container without having to go to individual controls in the AbsoluteLayout container and set the in-line style, control by control. For example, if you wanted every control in the AbsoluteLayout to have a red border, you could just set this property to:
border: solid 1px red;
The layout of controls in the screenshot shown earlier is represented in the AbsoluteLayout builder as follows:

NOTE: Data controls (such as textboxes, textareas, dropdown boxes, etc.) only show the control itself (and not the control Label - if the labels are turned on), when placed in an AbsoluteLayout container.
Working with the AbsoluteLayout Editor
The AbsoluteLayout editor allows you to position controls on a 'canvas'. You also define the size of the control on the canvas. The editor has many advanced features that make positioning and sizing controls precisely extremely quick and easy.
To place an object on the canvas, select the object in the field list on the left. The click on the canvas at the position you want to place the object, and while holding down the mouse button, draw a rectangle that represents the size of the object.
While you are drawing, the current size and position of the object are shown.
You can also edit the size and position of an object in the Property Sheet shown on the right.

To
Toggling the Background Image On/Off
If you have specified that your AbsoluteLayout container has an image background, then when you open the editor, the image background is shown. However, with the image shown, it can be hard to see all of your controls against the image background. You can therefore toggle the image on/off by clicking the 'Background Image' button on the toolbar:

Guidelines
Guidelines make it very easy to position controls relative to other controls. For example in the image shown below, the width of the bottom control is being adjusted and a vertical guide line has been drawn to show the the right edge of the control is aligned with the right edge of the control above it.

Adjusting Multiple Controls as Once
You can select multiple controls by shit-clicking on controls. Once you have more than one control selected, the Edit Selected button on the toolbar becomes enabled.

This button displays a menu that allows you to perform actions on multiple controls at once, such as aligning them, or sizing them.
A useful option is the ability to size multiple controls to a be the same size as a 'reference' control. The 'reference' control is the first control that was selected when you selected multiple controls.

Positioning Individual Radiobutton and Checkbox Controls
Normally when you position a Checkbox or Radiobutton control in an AbsoluteLayout container, you position the control as a single object and then Alpha Anywhere renders the individual radio button or checkbox controls for each choice (either horizontally, vertically, or in snaking columns). However, in certain use cases (typically when using an image as a background), it is necessary to precisely position the individual choice objects.
For example, consider the section of the IRS 1040 form shown below. The checkboxes show on the form (which are really radio buttons - since only a single box is meant to be checked) are laid out in a custom fashion.
When using this image as the background image for an AbsoluteLayout container you would clearly want to have a 'FilingStatus' Radiobutton control and then be able to position each choices over the checkbox shown in the image.
Furthermore, you would want to suppress the label associated with each Radiobutton choice because the image background explains what each option represents.

In order to turn on the ability to individually position choices in a Checkbox or Radiobutton control, you must turn on the Custom layout when in AbsoluteLayout container property for the Checkbox or Radiobutton control:

NOTE: The Custom layout when in AbsoluteLayout container property is only shown if the Radiobutton or Checkbox control is based on a static list of choices.
Once you have checked the Custom layout when in AbsoluteLayout container property, when you open the AbsoluteLayout editor, the individual choices for the control will be available in the field list so that you can place them on the canvas. For example, in the image below the Radiobutton control has 3 choices, and so the AbsoluteLayout builder shows three objects which can be individually placed.

UX Component - {dialog.object}.setFocus() Method - Javascript Controls - Now works for Javascript controls (such as the List control). Previously this only worked for HTML controls (such as a checkbox, textbox, etc). The motivation for adding support for Javascript controls to the .setFocus() method was to enable the following use case:
Assume you have a UX component with a List control on one Panel and some other controls on another Panel. The second Panel has a button that returns focus to the first Panel. However, when focus returns to the first Panel, pressing up and down keys (when running on a desktop browser) did not navigate in the List (even though visually, the List appeared to have focus). By using the .setFocus() method in the event handler for the button that returns focus to the first Panel, you can solve this problem.
UX Component - List Control - Client-side Summary Values - You can specify that client-side summary values should be computed for any column in a list.
To turn on client-side summary values for a field in the List, check the property shown below in the List builder:

NOTE: For Lists based on SQL data, you can also specify server-side summary values. Server-side summary values are only different than client-side summary values if the List is paginated. Server-side summary values compute the summary based on the List query, whereas client-side summary values are based on the data that is currently loaded into the List. In the case of the paginated List, there can be many more records in the List query than are displayed in the List.
When you compute summary data for a List column, you will typically want to display the data on the UX component. The List's afterClientSideSummaryCompute event is useful for this. The afterClientSideSummaryCompute fires after the client-side summary values have been updated.
In this event handler you can reference the summary data that was computed. Here are some examples of how your Javascript code can reference summary values:
csSummary['QTY'].total
csSummary['PRICE'].avg
csSummary['PRICE'].max
The 'csSummary' object contains all of the summary data. The field name must be in uppercase and the summary type (total, avg, count, min, or max) must be in lower case.
You can also use a method of the UX object to read a List summary value using the following method:
{dialog.object}.getListClientSideSummaryValue(listName, fieldName, summaryType)
For example:
var tot = {dialog.object}.getListClientSideSummaryValue('list1','QTY','total');
UX Component - List Control - Static Data - Group Breaks - If your data is already in the the correct sorted order, you can instruct the List not to sort the data on the break field.

Reports - Layout Table Reports - Creating Custom Style Sheets - It is now much easier to create custom style sheets for Layout Table Reports.
In the Quick Report Genie, you can click the 'New Style Sheet...' hyperlink.

In the Layout Table Report editor when you select the 'Apply or Create Stylesheet..' menu, you can then click the 'New Style Sheet' button shown below.


When you select the New Style Sheet option, you get a dialog that allows you to define the color and other properties of the style.

ShowResultSet() Function - The showResultSetFunction() is a useful utility function to quickly show data in an AlphaDAO resultset. It is typically used in the Interactive window, or while debugging code.
Here is an example of an Interactive window session:
dim cn as sql::Connection
cn.open("::Name::sqlserver2012_northwind")
dim sql as c = "select * from customers where city = 'london'"
cn.PortableSQLEnabled = .t.
?cn.Execute(sql)
= .T.
dim rs as sql::ResultSet
rs = cn.ResultSet
showResultSet(rs)

Note: After you have called the showResultSet() function once to show a resultset, you cannot call it a second time to show the same resultset without first executing the query again. That's because AlphaDAO resultsets are 'forward only'.
Grid Component - State Variables - Setting State Variables on the Server-Side Using the e._state Object - Both the Grid and the UX allow you to store 'state' variables that are available on both the client and server-side.
NOTE: State variables are variables whose value can be set or read on either the server-side (using Xbasic), or the client-side (using Javascript). Once a state variable has been set, its value is available on all subsequent Ajax callbacks.
The UX has always allowed you to set state variables on
the server side (in any server-side event or an Ajax
callback) by setting variables in the 'e._state' object.
For example, in a server side event:
e._state.mystatevar1 = "alpha"
However, in the Grid, you could not use this syntax. Instead, you had to generate Javascript to set the state variable and then return that Javascript in the response from your server side event. For example:
{grid.object}.setStateInfo({mystatevar1: 'alpha'});
Now, you can also set variables in the e._state object on Grid server side events.
NOTE: Some Grid events do not take 'e' as the input parameter. These events take 'args' as one of their input parameters. In events that do not take 'e' as in input parameter, you can still set state variables on the server-side by setting
args.rtc._state.mystatevar1 = "alpha"
On a Grid, when a server side event is executing, state variables can be read from the e.__si2 object. (For the few server-side events that take 'args' you can read state variables in the args.rtc.__si2 object).
Watch Video - Part 1
Watch Video - Part 2
The section below summarizes how state variables are set and read on both the server-side and client-side in the Grid and UX:
UX
Server-side (Xbasic)
Set state variable - e._state.myvar1 = "alpha"
Read state variable - myvar = e._state.myvar1
Client-side (Javascirpt)
Set state variable - {dialog.object}.setStateInfo({myvar1: 'alpha'})
Read state variable - var myvar = {dialog.object}.stateInfo['myvar1'];
GRID
Server-side (Xbasic)
Set state variable - e._state.myvar1 = "alpha"
Read state variable - myvar = e.__si2.myvar1
Client-side (Javascirpt)
Set state variable - {grid.object}.setStateInfo({myvar1: 'alpha'})
Read state variable - var myvar = {dialog.object}.stateInfo['myvar1'];
NOTE: The inconsistency between the Grid and the UX in the way state variables are read in server-side code is because of legacy code in the Grid that could not be changed without making a breaking change to Grids. Therefore when you read a state variable in a Grid you read from the e.__si2 object (and not the e._state object). Setting state variables, however, is done in the e._state object.
Mobile Theme - Slate - A updated version of the new Slate stylesheet is ready for testing.
To download the style click here. Unzip the file into the CSS folder where you have Alpha Anywhere installed. This will create a new folder called Slate in the CSS folder. To use the style, edit a UX component, and then change the style name for the component to 'Slate'.
NOTE: See below for more info on the Slate stylesheet.
UX Component - List Control - Server-side Summary Values - For List controls that are based on SQL data, you can specify that summary data (e.g. total, avg, count, min and max - total and avg are only available for numeric fields) should be computed for certain columns in the List control.
NOTE: Client-side summary values can also be computed. Client-side summaries are not limited to SQL data sources.
The summary computations are based on the List query (not on the rows actually visible in the List). In the case of a paginated List, there may be more rows in the query than are visible in the List. For example, the query might have 1,000,000 rows, but the list might show 20 rows at a time. If the List is not paginated, then the number of rows in the List is the same as the number of rows in the List query.
Server-side summary values are automatically updated when the List data is refreshed. If your UX is data-bound and you have specified that the List should be updated when records are updated or saved, the server-side summaries will be updated when data in the List is edited.
To turn on summary calculations for a column in a List, check the 'Compute summary values' property. Once this property is checked, the 'Summary field formatting' property is shown where you can define display formats for the data. For example, to round the average to 2 decimal places, you would use:
round(<value>,2)
You can use any Xbasic function for format the data.

When you compute summary data for a List column, you will typically want to display the data on the UX component. The List's afterServerSideSummaryCompute event is useful for this. The afterServerSideSummaryCompute fires after the server-side summary values have been updated.
In this event handler you can reference the summary data that was computed. Here are some examples of how your Javascript code can reference summary values:
summary['QTY'].total
summary['PRICE'].avg
summary['PRICE'].max
The 'summary' object contains all of the summary data. The field name must be in uppercase and the summary type (total, avg, count, min, or max) must be in lower case.
You can also use a method of the UX object to read a List summary value using the following method:
{dialog.object}.getListServerSideSummaryValue(listName, fieldName, summaryType)
For example:
var tot = {dialog.object}.getListServerSideSummaryValue('list1','QTY','total');
UX Components - Abstract Tap and DoubleTap Events - Two new abstract events have been added to the UX component. These events have been added because the behavior of the click and dblClick events have been changed in an important, but subtle way. (See below for more details on the click and dblClick events.) The tab and dblTap events allow you to get the previous behavior of the click and dblClick events should your application require this behavior.
Assume you have a large button and you click on the button and then, before releasing, you move your finger or mouse by more than the threshold amount (used to be 5px, now upped to 10px). You then released, while still over the button.
Previously, the click event would not have fired. Now it will fire. The tap event, however, will not fire (because you moved by more than the threshold amount).
If you have moved off the button by the time you release, then neither the tap or click events will fire.
NOTE: The List control has also added onTap and onDblTap events. The behavior of the onClick and onDblClick events in the List has been changed.
UX Component - Click and DblClick Event - The behavior of the abstract click and abstract dblClick events have been changed slightly so as to make it consistent with the behavior of a these events on native devices.
Previously, if you clicked (or dblClicked) on a control and then, before releasing, moved your pointer by more than the threshold amount (was 5px, but has not been changed to 10px), then when you released (assuming you will still over the original element), the event did not fire. Now, the event will fire as long as you are still anywhere over the original element at the time you release.
NOTE: If your application need the original click event behavior, use the new tap event.
UX Component - Action Javascript - Delete Record Action - Enhancements - The Delete Record action allows you to delete a record in a UX component that has been data bound.
Previously, this action required that the primary keys for the data bound table had been loaded (normally done in the onDialogInitialize event using the 'Load Primary Keys for Parent Table' server-side action, or by an Ajax callback).
It is no longer necessary for primary keys to have been loaded in order to use this action.
When you use this action now, the builder now gives you these options for specifying the primary key of the record to delete:
The dialog for this action is shown below.

UX Component - Signature Control - Client-side Enable Expression - Now honors the client-side enable expression. When the control is disabled, the buttons are disabled, not the canvas (where the user signs).
UX Component - Signature Control - Client-side Show/Hide Expression - Now honors the client-side show/hide expression.
UX Component - Client-Side Events - onPanelActivate - A common practice when designing mobile applications is to break a large application into multiple smaller UX components and then embed components in Panel Cards in the 'master' UX component. When you do this, it is useful to be able to execute code whenever a child UX component gets focus.
The UX component now has a new client-side event - onPanelActivate. This event fires when the UX gets focus (because the Panel Card in which it is embedded has gotten focus).
IMPORTANT: This event will only fire if you have assigned an explicit alias to the UX component when you embed it into its parent UX component.
Watch Video
Download Components
pdf_exportJPG() function - Converts a PDF file to a JPG image - A new function converts a PDF file into a JPG file. If the PDF file has multiple pages then one .jpg file is created for each page. The .jpg files are numbered sequentially.
Syntax:
L flag = Pdf_exportJPG(c file, c result_file , c resolution)
resolution - 'default', 'low', 'medium', 'high'
result_file - name of the .jpg file to create.
UX Component - Session Timeout Warning - The UX component can now be configured to display a warning to the user that their session is about to expire.

To turn on session timeout warning, check the 'Display warning before session timeout' property on the Properties pane of the UX builder.
Once you turn this property on, there are a number of properties that allow you to customize the feature.

The onSessionTimeoutWarning client-side event will fire just before the warning dialog comes up telling the user that their session is about to expire.
UX Component - List Control - Server-side In-line and Conditional Style - Previously, if you defined a server-side in-line or conditional style for a field in a List control, a span was inserted into the data on the server to format the data. While this gave the required visual appearance, it meant that if you read the value from the control, the value that you read included the HTML markup.
This has now been changed. The server-side style is computed on the server and is now included in a separate (hidden) field in the List data. The style is then applied on the client-side. The net result of this change is that when you read data from a field that has a server-side style, the data no longer includes any HTML markup.
Reports - Double Lines - When setting the style for the border around a cell in a Layout Table, you can now set the style to 'double' to create a double line, as shown in the image below.

Here is how the Properties Pane is configured to set the left edge of the field to a double line:

UX Component - Setting Default Values - Multi-valued Controls - Certain controls in a UX are multi-valued. For example, the checkbox control, a List control that has been configured to allow multi-select, a dropdownbox that has been configured to display more than one line and allow multi-select, etc.
To set the initial (i.e. default value) for a control, you can either set the value in the Default Value property in the control properties, or you can set the value in the onDialogInitialize event, using code like this:
e.control.color = "a"
However, there was no easy way to set the default value to more than a single value.
Now, when you specify the default value for a multi-value control, you can use a special array() keyword.
For example, to set the initial value for a checkbox that displays a list of colors, you can enter this in the Default Value property:
array(red,green,blue)
Or, you can enter this in the onDialogInitialize event:
e.control.selectedColors = "array(red,green,blue)"
UX Component - List Control - Custom Datasource - The Xbasic function that is called to compute the data in a List populated by a Custom data source can now return Javascript to the browser by setting a value in this property in the 'e' object that is passed into the Xbasic function for the Custom data source:
e.javascript
UX Component - List Control - SQL Data Source - AfterQuery Server-side Event - A new server side event is available for List controls that are populated using a SQL data source.
The AfterQuery event fires after the List query has been performed. The typical use case for this event is to compute some Javascript to return to the browser. For example, you might want to compute the total for a column in the List and then update some control on the screen.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Download Components
argument_add_array_argument() Function - Adds or updates an array argument to a sql::arguments object.
The sql::arguments object can be populated with argument arrays (typically used when passing values to a SQL query that uses an IN clause).
Syntax: argument_add_array_argument( sql::arguments argumentObject, c argumentName, c argumentType, c argumentValues)
Example:
dim args as sql::arguments
dim cities as c
cities = <<%txt%
London
Boston
Bulawayo
%txt%
argument_add_array_argument(args,"color","c",cities)
UX Component - List Control and Data Series - Using Argument Arrays in SQL Queries - You can now use an IN clause with an argument array in the SQL query for a Data Series or List Control.
For example
SELECT customerId FROM customers where country IN (:array_whatCountry)
Notice that when using an IN clause with arguments, the argument name must start with array_.
Also notice that the argument reference in the SQL statement is in parentheses.
UX Component - Responsive Layout Genie - Mobile applications must run on multiple device form factors and must respond to orientation changes. You typically want to design a single UX component that will respond automatically (i.e. make layout changes) based on the device it is running on (e.g. phone, small tablet, large tablet, desktop browser) and the orientation of the device (mobile devices) or window size (desktop browsers).
The new Responsive Layout Genie makes it easy to create responsive layout designs.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Download Components
To open the Responsive Layout Genie, click the smart field for the 'Responsive layout settings' property on the UX properties pane.

This will open the builder as shown below:

The builder is divided into three sections. In the first section you define your layout rules. In the second section you define the actions that should take place when a rule is true, and in the third section you define the properties for the action.
Rules
Layout rules are simply Javascript expressions that evaluate to true or false. The rules can reference special system fields, such as screen.width, or device.isWebKit.
IMPORTANT: Since the expression is Javascript, you need to use Javascript syntax, such as == for an equality test, && for an AND operator and || for an OR operator.
You can define as many rules as you want. Each rule you define is given a name. The name is arbitrary, but a meaningful name is recommended as you can refer to the rule name in client-side watch expressions.
For example, in the screen shot show above, there are two rules that have been defined.
To add a new rule click the Add Rule button an give the rule a name and enter its expression. When entering the expression, you can click the Insert Field hyperlink to get a list of available system fields to use in the expression.
The image below shows the system fields that can be used in the rule expression.

You can also save rule sets so that they can easily be imported into other UX components.
Actions
Actions are performed when a rule is true. You can define as many actions as you want. To add a new action, click the Add actions button. A dialog allows you to select the action you want to perform:

Once you have selected an action, the Properties for that action can be defined.
Properties
Action properties must be defined for each rules. Therefore, for a given action, you will select the first rule and define the action properties. Then you will select the next rule and define the action properties for this rule, an so on, moving through all of the rules.
Using Javascript to Specify an Action Property Value
In some cases you can use Javascript to specify the value of a property. For example, in the screenshot shown above, the 'Layout size' property for PANELCARD_2, for the 'portrait' rule has been specified as:
javascript:getpanelwidth(screen,device)
The 'javascript:' prefix indicates that the property value should be computed by calling a Javascript function. This function takes screen and device as inputs so you can reference the special system fields that the Javascript rules expressions reference. In the above case, we are calling a Javascript function, but we could just as easily specified inline Javascript code after the Javascript: prefix.
Viewing Generated Javascript
It can be useful to view the generated Javascript for the actions so that you can learn how certain actions are performed.
To see the generated Javascript, right click on an action in the builder.
The dialog (shown below) shows you:

When are Layout Rules Evaluated
Layout rules are evaluated:
When the Layout Rules are evaluated the rules are evaluated in the order in which they were defined. When a true rule is found, the actions for that rule are performed and a special property in the UX object is set with the name of the rule that was true.
You can reference this property as follows:
{dialog.object}._activeLayoutRule
Using Active Layout Rule Name in a Client-side Watch Expression
Client-side watch expressions (e.g. show/hide, dynamic images, enable and dynamic style) can reference a special system field called:
dialog.activeLayoutRule.
This field has the name of the currently active Layout Rule.
In the screen below, a container in the UX is only being shown if the 'landscape' rule is true.

Rules Mode
By default, the actions associated with the first Layout Rule that is true are executed and then further rules are not checked. However, you can set the Rules Mode to AllRules so that the actions for all true rules (not just the first true rule), are evaluated. To change the Rules Mode, you need to set the Responsive rules mode property in the UX Properties.

Manually Executing a Rule
Regardless of whether a rule is true or not, you can use a method of the UX object to force the actions for a particular rule to fire.
For example:
{dialog.object}.fireLayoutRule(ruleName)
UX, AppLauncher and Custom Component - Page Title Property - The components now have a page title property that allows you to set the page title when the component is run from an .a5w page.

Web Projects Control Panel - Search in Files - This feature has now been enhanced to allow you to specify the type of files to search

UX Component - List Control - Read-only Property - The List control now has a read-only property. This is especially useful if you have configured the list to behave like a carousel and you want to prevent any item in the List from displaying as selected. To find out what row a click, right click, or double-click action occurred on, your Javascript can reference
arguments[0]
This gives the zero based row index of the target row.
UX Component - Action Javascript - Panel Action - A new action to show/hide a Panel header or footer has been added.
ShowXML() Function - Displaying an XML Document Structure - The ShowXML() function is a utility Xbasic function that is helpful in understanding the structure of an XML Document.
The image below shows the user interface displayed by the ShowXML() function.
The first image shows the XML pane where the raw XML is displayed. The second image shows the Xbasic Properties pane is shown where a tree view of the Xbasic variable (into which the XML has been parsed) is shown.


*property_from_xml() Function - Populates an Xbasic Dot Variable with XML Attribute/Element Values - Xbasic has always had very strong XML parsing features (see Help, Open Documentation and search for 'Parsing XML Documents with Xbasic'), however the new *property_from_xml() function provides a new way in working with XML. This function populates an Xbasic dot variable with the data from the XML document. Once you have he Xbasic variable, it is very easy to extract a specific element or attribute value from the XML document.
UX Component - List Control - Word Wrapping Text in a Column - New options are available for controlling how long text in a list column should be handled. By default, long text is truncated and ellipses are displayed to indicate that the text is truncated.
You can turn on the word-wrap option for individual fields. When you turn on word-wrap, you now get a 'wordwrap option' property with these choices:
UX Component - Server Side Actions - Send E-mail - The server-side Send E-mail action now supports the option of using the Mandrill mail service to deliver the e-mail.
a5_ux_action() - New options added to the a5_ux_action() Xbasic Utility Function - The a5_ux_action() is a utility function that generates the Javascript for certain actions that the UX can perform. The use case for this function is to consolidate several Ajax callbacks into a single callback. New options have been added to this method. The full list of options current supported are summarized below:
The actions that can be performed by this utility function are:
List Control Action
Filter List
Refresh List
Refresh row(s) by key value
Append row(s) by key value
Refresh Data Series
Set UX into 'New Record' mode
Populate Controls with Data from a Table
Refresh choices in a dropdownbox control
List Control Action:Filter List
Filters/sorts the data in a List control.
This action is equivalent to the {dialog.object}.filterList() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.Action = "Filter"
ops.filter = "country = :country and city = :city"
ops.order = "companyname desc"
'the arguments are specified in a crlf() delimited string.
'syntax is argumentValue|||type|argumentName
ops.parameters = "UK|||c|country" + crlf() + "London|||c|city"
'specify the id of the list to filter
ops.listId = "list1"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
List Control Action: Refresh List
Refreshes the data in a List control.
This action is equivalent to the {dialog.object}.refreshListData() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.Action = "Refresh"
ops.listId = "list1"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
List Control Action:Refresh Row(s) by key value
Refreshes data in one or more rows of a List control.
This action is equivalent to the {dialog.object}._listRefreshRecordsByKey() mehod.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
'primary keys to refresh (case sensitive!)
ops.primaryKey = "EASTC,GALED,FURIB"
ops.listId = "list1"
ops.action = "refreshRowByKey"
'if the record to be refreshed is not currently in the list,
'should it be added to to the list?
ops.appendRowsNotInList = .f.
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
List Control Action:Append row(s) by key value
Appends data to a List control.
This action is equivalent to the {dialog.object}._listFetchRecordsByKey() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
'primary keys to fetch and add to list (case sensitive!)
ops.primaryKey = "EASTC,GALED,FURIB"
ops.listId = "list1"
ops.action = "appendRowByKey"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
Refresh Data Series
Refreshes one or more data series. All controls that are bound to the data series are refreshed.
This action is equivalent to the {dialog.object}.refreshDataSeries() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.Action = "refreshDataSeries"
ops.seriesNames = "series1,series2,series3"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
Set UX into 'New Record' mode
This action is equivalent to the {dialog.object}.newRecord() method
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
myAjaxCallback = a5_UX_Action(e,ops,"NewRecord")
end function
Populate Controls with Data From a Table
(Applies only if the UX has been data bound). Populates controls on the UX with data from the data bound tables for a specified primary key value.
This action is equivalent to the {dialog.object}.populateControlsFromTable() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.primaryKey = "ALFKI" 'case sensitive!
dim js_getRecord as c
ops.__dtfmt = e.rtc._state.__dtfmt
dim js as c
js = a5_UX_Action(e,ops,"populateControlsFromTable")
myAjaxCallback = js
end function
Refresh choices in a dropdownbox control
This action is equivalent to the {dialog.object}.refreshDropdownBoxChoices() method.
Example:
function myAjaxCallback as c (e as p)
dim js as c
dim ops as p
'name of dropdowncontrol to refresh
ops.controlName = "CITIES"
'if the control is in a repeating section should just the current instance
'be repopulated
ops.currentRepeatingSectionRowOnly = .f.
'filter for query
ops.filter = "country = :whatcountry"
'argument value - format is
value|||type|argumentName
ops.arguments = "USA|||c|whatCountry"
'value in dropdownbox to select
after it has been populated
ops.selectedValueAfterPopulate = ""
js = a5_ux_action(e,ops,"refreshDropDownBox")
myAjaxCallback = js
end function
SQL Query Genie - Export to Excel - The 'Actions' button on the SQL Query Genie toolbar now has a new option - export to Excel.

TabbedUI Object - New methods added to the TabbedUI object - You could previously get the active Pane by examining private variables in the tbiObj object. Now, these new methods provide an easier method.
tbiObj.getCurrentPaneIndex() - zero based pane number for the current pane
tbiObj.getCurrentPaneName() - internal name of the current pane
tbiObj.getCurrentPaneLabel() - HTML label for the tab current pane.
You can also programmatically set the active pane, either by its index (zero based), or by it label.
tbiObj.selectPaneByIndex(index) - set active pane by index
tbiObj.selectPane(label) - set active pane by Label
UX Component - Frame and Container Controls - Client-side Conditional Style and Class - You can now define client-side watch expressions to automatically change the style and/or class of a container or frame control. Previously, conditional client-side style and class were limited to input controls, buttons, etc.
UX Component - Repeating Sections - Setting a Column Width Using Javascript - A new method has been added to the UX control to allow you to programmatically change the width of a Repeating Section column at run-time.
{dialog.object}.setRepeatingSectionColumnWidth(columnName,width);
Width is expressed using CSS units (e.g. '100px'). Percentage widths are not supported.
Mobile Theme - Slate - A new stylesheet for mobile applications is ready for testing. This style (screenshots shown below) is not yet complete and will only work for UX components. If does not contain any CSS classes for Grids or Tabbed UI. We are making this new style available to mobile developers now to get feedback on what you like and don't like about the style.
To download the style click here. Unzip the file into the CSS folder where you have Alpha Anywhere installed. This will create a new folder called Slate in the CSS folder. To use the style, edit a UX component, and then change the style name for the component to 'Slate'.
1![]() | 2![]() |
![]() |
pdf_optimize() Function - Optimize a PDF document to make it smaller. Results may vary based on the compression of the original file, but file size may be reduced by up to 50%.
Syntax:
pdf_optimize(C file [, C NewFile])
If NewFile is not specified the input file is replaced.
json_generate() Function - Performance - The json_generate() function has been re-written and is now considerably faster.
NOTE: Previously the json_generate() function would escape single quotes. However the JSON spec does not require this and so single quotes are no longer escaped. For example:
dim pj as p
pj.text = "some text with ' single quote"
?json_generate(pj)
= {
"text": "some text with ' single quote"
}
UX Component - Spin List Control - Large Data Sets - There has been a significant improvement in the time taken to populate a Spin List control when populating it with a large number of choices.
UX Component - Map Control - Specifying the Map Language - By default, the language used on the Map control is based on the browser setting for language preference. A new property has been added to allow you to specifically set the language preference. To get a list of valid language code go to:
http://msdn.microsoft.com/en-us/library/ms533052(VS.85).aspx
SQL Query Genie - Count Query - When you build a SQL query using the SQL Genie and you preview the query, a count query is automatically performed when your query is executed. This is done so that your preview will show you how many records satisfied the query. However, in some cases the database to which you are connected might take a long time to execute a count query and therefore you might want to turn off the count query when previewing your query. A new property on the Properties pane of the SQL Genie allows you to do this.

UX Component - Action Javascript - Buttons - A new action has been added to Action Javascript to enable or disable a button. This action only applies to Advanced Buttons (all buttons in a UX component are advanced buttons by default).
email_send_mandrill() Function - Setting the Key Value Globally - You can now set the key for this function in the Web Project Properties dialog. If you do set the key in Web Project Properties, then you can pass in a blank key in the email_send_mandrill() function. If you pass in an explicit key when calling email_send_mandrill(), then the key you pass in will override the gloal key.
Grid and UX Component - Field Validation - Xbasic - If you write custom Xbasic code to validate an individual field, your Xbasic code and now send back a Javascript response to the client by setting this property in Xbasic code:
e.javascript
UX Component - Buttons - .getControl() Method - The {dialog.object}.getControl() method can now be used to get a pointer to a button object. Once you have a pointer to the object, you can call the .setDisabled() method.
For example:
var bObj = {dialog.object}.getControl('BUTTON_1');
//set the button disabled
bObj.setDisabled(true);
//now enable the button
bObj.setDiabled(false);
NOTE: As a result of this change, if you have a client-side enable expression for a button in a Repeating Section, you will need to edit the enable expression and resave it in order to re-generate the Javascript code.
ADVANCED NOTE: If you have a button in a Repeating Section, the .getControl() method will point to ALL of button instances (i.e. the button in row1, row2, etc.). If you then call the .setDisabled() method, you will be set the state on the button in each row.
If you want to call the .setDisabled() method for a specific button instance (say the button in row 3), then you can pass in an optional parameter to the .setDisabled() method. For example:
//get a pointer the button element in row 3
var eles = $('{dialog.componentname}.V.R1.BUTTON_2_A5INSTANCE3');
//pass in eles as an optional argument to the .setDisabled()
method
{dialog.object}.getControl('BUTTON_2').setDisabled(true,eles);
| UX Component | Preventing a Panel from Losing Focus |
A common design pattern in a mobile application
is to have multiple Panel Cards inside a Panel
Navigator. If one of the Panel Cards contains a
form, you might want to prevent the user from
navigating to another Panel Card if the form has
been edited, but not yet been saved. In this video we show how this is easily done using the Panel Navigator's onBeforePanelActivate event. The same techniques can be used in a PanelLayout. Watch Video Download Component |
| UX Component | Responsive Design - Dynamically Resizing Controls on Orientation or Window Size Change - Understanding the FlexLayout Container |
A common requirement when designing a UX
component is to have a control dynamically
resize when the orientation of a mobile device
changes or when the window size (in a desktop
browser) changes. This is easily accomplished
using the FlexLayout container on a UX. Any of the controls in a FlexLayout container can have their width specified as a 'relative' size (relative to the size of the other controls in the FlexLayout container). This video shows how to use the FlexLayout container type. Watch Video - Part 1 Watch Video - Part 2 |
UX Component - Image Upload Action - Thumbnails - If you specified that you wanted to create a thumbnail when uploading images, and the target for the thumbnail image was a character field in the target table, the 'image filename transformation expression' was being ignored and the actual filename for the thumbnail image that was stored was always just the short filename.
<Resultset>.ToJSONObjectSyntax() method - The JSON generated by this AlphaDAO method has been changed. Previously, the values in the generated JSON were single quoted. Now, to be consistent with the official JSON syntax, values are double quoted.
UX Component - Tab Control - Genie Style - If a 'genie' style Tab Control was wrapped in a Container control and the [Tab Control End] control came immediately before the [ContainerEnd] control, the genie buttons did not render.
Grid Component - Images - Under some circumstances, if a Grid contained an image control, it would generate an error. This was a newly introduced bug. If you received this error, you will need to edit and resave the Grid.
UX Component - PanelNavigator and PanelLayout - onBeforePanelActivate Event - A new event has been added to the PanelNavigator and the PanelLayout. This event is useful if you want to prevent the Panel that has focus losing focus. For example, if the form fields on a Panel have been edited, but not yet committed, you might want to prevent the Panel from losing focus. This is much like preventing a pop-up window that contains a Grid or UX component from closing if the child component has been edited.
If the Javascript that you define in the onBeforePanelActivate event returns false, then any attempt to activate another Panel will fail and focus will remain on the Panel that currently has focus. If the event returns true, then you will be able to give focus to another Panel.
Watch Video
Download Component
UX and Grid Component - Image Upload - Thumbnails - The Action Javascript builder now has a new option in the Thumbnail Definition Builder to allow you to specify if the thumbnail file that is created should overwrite an existing file, or be renamed, so as not to conflict with existing files.
UX and Grid Component - Image Upload - File Rename - When you upload images or files and store the uploaded images or files in a filename on a server, there is an option to rename the file if there is an existing file with the same name on the server. The algorithm that computes the filename in the case of a conflict has been changed slightly.
Previously, if a filed called "c:\myimages\image1.jpg" existed and you wanted to create a new file called 'image1.jpg', the new file would have been called "c:\myimages\images2.jpg". This is now changed to "c:\myimages\myimage1_1.jpg".
UX Component - FlexLayout Containers - A new container type in the UX component makes it easy to dynamically size controls when the orientation of the device changes (mobile devices), or the window size changes (desktop browsers).
Watch Video - Part 1
Watch Video - Part 2
The purpose of the FlexLayout container is to dynamically size the widths of controls that are on a single line. This container does not size the height of controls.
NOTE FlexLayout containers are not supported in Repeating Sections.
For example in the image below, the device is in portrait mode. The button to the right of the textbox control is set to have a fixed size of 80px. The text box has been set to have a flexible width, so it consumes all of the available space (less the built-in padding between controls, defined by the A5CWLayout class padding property).

Notice in the image below, when the device orientation is changed to landscape, the button size has not changed - it is still 80px wide. But the textbox had grown in width.

Here is how the textbox and button control are represented in the builder. Note that the controls are wrapped in a container with a sub-type of 'FlexLayout'.

When you set the container sub-type to FlexLayout, a new property in the Property Grid is exposed. The image shows that the 'Flexible layout width settings' have been set to:
flex(1),80px
This means that the first control in the FlexLayout container will have relative width of flex(1) (this is the textbox), and the second control (i.e. the button) will have a fixed width of 80px.

The property has a smart field which brings up a builder to help you set the control widths.
Notice that the builder also shows the 'Defined Width' for each control. The 'Defined Width' is the width that was defined for each individual control.
Typically when you wrap controls in a FlexLayout container, you will want to set each control's Defined Width to 100%. The builder will show you at a glance if any of the top-level controls in the FlexLayout container have not been set to 100%.
The 'Break' column will also show you at a glance if any of the top-level controls in the FlexLayout have breaks after them. You should not have breaks after top-level controls, so the builder will give you a warning to fix this problem.

In the case where only one control in a FlexLayout container has a 'flex' width, the meaning of the flex setting is simply to fill the available space on the line (after allocating space to the fixed size controls).
However, if you have two or more controls with a 'flex' setting, then all of the flex controls together will fill the available space (after allotting space to any fixed size controls), and each 'flex' control will have a relative size based on its 'flex' setting.
For example, if you have two flex controls with settings of flex(1) and flex(2), then the second control will always be twice the width of the first control.
| UX Component | Storing and Restoring the 'state' of a UX Component with multiple Panels |
UX Components can use complex layouts that
involve multiple Panel Cards inside Panel
Navigators and Panel Layouts. You might want to
persist the state of the Panel (i.e. remember
which Panel Card in a particular Panel Navigator
is active and which Panels in a Panel Navigator
have been docked) so that you can later restore
this state. This video shows how this can be
done. Watch Video Download Component |
SQL Server 2008 - Date Fields - Occasionally, users report a problem when trying to update a MS SQL table that has a 'Date' field. The problem is caused because the correct Microsoft files are not installed on the machine where SQL Server is running. The error reported by SQL Server is:
"Function requested is not supported"
The correct MIcrosoft drivers can be downloaded here:
Here are the links to the download on the Microsoft web site:
X86
Package(sqlncli.msi) - 4549 KB
X64
Package(sqlncli.msi) - 7963 KB
IA64
Package (sqlncli.msi) -
11112 KB
Forms - Embedded Browse - Data Entry - Fixed a cosmetic issue with data entry when working with a set that has a one-to-one link off a table that is linked to the parent in a one-to-many link.
UX - Signature Capture - If the UX component was not using Panels, and if the component had been vertically scrolled, the signature capture area did not scroll with the window. This only affected UX components that did not use Panels.
UX Component - Image and File Upload Actions in Action Javascript - As a result of a change made in a recent update to make the value in the client side controls available to the server side Xbasic events, when you clicked the button to upload a file or image, the popup window which was displayed did not have any controls in it. This bug, however, only happened if there were a large number of controls on the UX component. It also only happened in IE. The reason it happened is that the maximum length for a query string was exceeded. This is now fixed.
UX Component - Image and File Upload Actions in Action Javascript - Xbasic Event Handlers - When the Xbasic event handlers execute, the value of the control on the UX component are now available in the
e.formData
property. Previously, the data was made available in another of the e object's properties. If you have an event handler that references client side control values, you will need to change your code.
UX Component - Image Controls (Data Bound) - Repeating Sections - Fixed a bug that was introduced in the last update.
Email - Sending Email Using the Mandrill Email Service - Alpha Anywhere has always offered Xbasic functions to send email. However, these functions require that you have access to a SMTP mail server. The existing functions in Xbasic include:
With the emergence of email services, such as Mandrill (www.mandrillapp.com) an alternative, possibly easier, certainly more powerful, way of sending emails from your applications is now possible.
A new function,
email_send_mandrill()
allows you to send email using the Mandrill service.
Benefits of using a 3rd party emailing service include the easier setup, better deliverability, and access to powerful value added features offered by the service, such as tracking whether people open your email message, etc.
The full functionality of the Mandrill email service can be read by navigating to this address:
https://mandrillapp.com/api/docs/index.JSON.html
In order to use the Mandrill email server, you will have to visit their web site and apply for a key. The key allows you to send a certain number of free emails each month. Beyond that, there is a fee.
NOTE: Alpha Software is not involved in any way at all in the fee and does not receive any payment at all if you use the Mandrill service.
There are two different ways in which you can use the email_send_mandrill() function.
1. Simple Method: Define Message Using Xbasic Dot Variable
In the simple method, you define an Xbasic dot variable that defines the properties of the message you want to send and then you call email_send_mandrill(), passing in your Mandrill key and the dot variable. This simple method does not expose all of the functionality of the Mandrill service, but it is very easy to set up and use, and it is great for simple email messages.
For example:
'create a .dot variable to define the message
dim ms as p
ms.send_to = "john@acme.com:John Smith,sally@acme.com:Sally Jones"
ms.send_to_cc = ""
ms.send_to_bcc = ""
ms.from_email = "sales@alpha.com"
ms.from_name = "Sales at Alpha" 'friendly name - optional
ms.subject = "Information You Requested"
ms.message_html = "Here is the <b>information</b> you requested."
ms.message_text = "Plain text version of the message"
ms.attachments = "c:\files\mychart1.pdf,c:\files\mytext1.txt"
Notes About the Properties in the Dot Variable
CC and BCC Addresses
Even though the Dot variable allows you to specify separate comma delimited lists for the TO and CC addresses, in reality, Mandrill does not support CC addresses. Furthermore, Mandrill only supports a single BCC address.
If you specify any CC addressesl, the TO list and the CC list of addresses is combined into a single list and the emails are sent to all addresses in the combined list. However, the Mandrill internal .preserve_recipients property is set to false, so that none of the recipients will see the names of any other recipients.
If you provided a list of names in the TO list, and no names in the CC list, the recipients of the email would all be able to see the names of the other recipients.
Once you have defined the .dot variable, you can send the message. For example
dim pResult as p
pResult = email_send_mandrill("mysecretkey",ms)
The function returns a .dot variable with several properties:
Here is what a typical item in the .result array looks like:
result[1].email = "john@acme.com"
result[1].status = "sent"
result[1]._id = "some message id" --- used to make queries against the Mandrill API for message status
Here is a complete example of sending an email in the simplest possible way (eliminating all optional properties in the Xbasic .dot variable). As you can see, it just a few lines of code.
'create a .dot variable to define the message
dim ms as p
ms.send_to = "john@acme.com:John Smith,sally@acme.com:Sally Jones"
ms.from_email = "sales@alpha.com"
ms.from_name = "Sales at Alpha" 'friendly name - optional
ms.subject = "Information You Requested"
ms.message_html = "Here is the <b>information</b> you requested."
dim pResult as p
pResult = email_send_mandrill("mysecretkey",ms)
Alternative Method for Specifying Attachments - Specifying the Attachment Data
We have previously indicated that attachments are specified by setting the .attachments property to a comma delimited list of filenames. An alternative method is to set the .attachmentsArray property as a property array with .name, .type and .content properties.
Where:
For Example
dim ms.attachmentsArray[1] as p
ms.attachmentsArray[1].name = "chart.pdf"
ms.attachmentsArray[1].type = resolve_mime_type("pdf")
ms.attachmentsArray[1].content = base64encode(file.to_blob("c:\myfiles\chart.pdf"))
Merge Variables - Mail Merge Variables into the Message Body and Subject
An advanced feature of the Mandrill service is to allow you to specify placeholders in the message subject and body that will be replaced with variables that you supply at the time Mandrill sends out the email to each recipient.
The format for the placeholders is:
*|VariableName|*
For example, here is how the message subject or body could have been specified using placeholders:
ms.subject = "*|Fname|*, here is the Information You
Requested"
ms.message_html = "*|Fname|* *|Lname|* here is the information you requested."
When you use placeholders in the subject or body, you must specify the placeholder values. Obviously, you need to specify placeholder values for each recipient.
For example, assume that you had specified two recipients as follows:
ms.send_to = "john@acme.com:John Smith,sally@acme.com:Sally Jones"
You would then need to specify the FName and LName variables for john@acme.com and for sally@acme.com.
Here is how you would do this:
'define the .merge_vars[] array with 2 items
dim ms.merge_vars[2] as p
'define the actual variables for the first recipient.
'since there are two variables, we define a sub-array with two items
dim ms.merge_vars[1].vars[2] as p
'here are the variables for the first recipient
ms.merge_vars[1].vars[1].name = "FName"
ms.merge_vars[1].vars[1].content = "John"
ms.merge_vars[1].vars[2].name = "LName"
ms.merge_vars[1].vars[2].content = "Smith"
ms.merge_vars[1].rcpt = "john@acme.com
'here are the variables for the second recipient
dim ms.merge_vars[2].vars[2] as p
ms.merge_vars[2].vars[1].name = "FName"
ms.merge_vars[2].vars[1].content = "Sally"
ms.merge_vars[2].vars[2].name = "LName"
ms.merge_vars[2].vars[2].content = "Jones"
ms.merge_vars[2].rcpt = "sally@acme.com
In addition to supplying merge variables for each recipient, you can also supply global merge variables - for all recipients. You do this by specifying the .global_merge_vars property array. If a merge variable is defined at the individual recipient level, it will override the corresponding global merge variable.
For example:
dim ms.global_merge_vars[1] as p
ms.global_merge_vars[1].name = "Company"
ms.global_merge_vars[1].content = "Alpha Software"
Using a DataSource Property
Instead of supplying the actual email addresses and merge variables directly in the dot variable you can pass in a 'dataSource' (an array of JSON objects), and then indicate that the .send_to property should be populated from the data source.
For example, consider the following definition of the .dataSource property:
ms.dataSource = <<%txt%
[
{email: "sam@acme.com", firstName: "Sam", lastname: "Smith"},
{email: "joe@acme.com", firstName: "Joe", lastname: "Jones"}
]
%txt%
If the above .dataSource property has been defined, then you can define the .sent_to property as follows:
ms.send_to = "{datasource:email}"
This indicates that the .send_to property should be populated from the 'email' property in the dataSource.
If you pass in a .dataSource property, then there is no need to pass in the .merge_vars property - these properties are automatically generated from the data in the .dataSource property.
Here is what happens if you pass in a .dataSource property: The .message_html, .message_text and .subject properties are scanned to see if any merge-variables are used. If any merge variables are found in any of these properties, then the merge variables for each address are automatically extracted from the .dataSource property.
Using the .dataSource property, it is extremely easy to create a mass mailing with custom merge variables for each recipient.
2. Advanced Method: Define Message Using a JSON String
The JSON method exposes the full functionality of the Mandrill service. To see all of the options that are available, please see the Mandrill API documentation.
If you want to use advanced features, like track opens, or schedule delivery, you will need to use this option.
Here is an example of how you can use this method:
DIM json as C = <<%str%
{
"message": {
"to": [
{
"email": "john@acme.com",
"name": "John Smith"
}
],
"from_email": "Sales@alpha.com",
"subject": "Information You Requested",
"html": "Here is the <b>information</b> you requested",
"text": "Plain Text Message",
"preserve_recipients": false
},
"asynch": false,
"ip_pool": null,
"send_at": null
}
%str%
dim pResult as p
pResult = email_send_mandrill("mysecretkey",json)
Generating the JSON String From Xbasic
Xbasic has powerful functions for generating JSON from an Xbasic dot variable. For example, the json_generate() function will generate JSON from a .dot variable. A powerful way to programmatically construct the JSON string that you pass into the email_send_mandrill() function is to build up an Xbasic .dot variable with the various properties that you want to set, then call json_generate() to generate the JSON.
UX Component - Panels - New Methods - Some new methods have been added to the UX component that allow you to save and restore the state of a complex Panel Layout.
.getPanelObject()
If the UX component use Panels, gets a pointer to the Panel object. Once you have a pointer to the Panel Object you can call methods of the Panel Object (such as .getState() and .setState()). For example:
var pno = {dialog.object}.getPanelObject();
<panelObject>.getState()
Gets the 'state' of the Panel Object so that it can later be restored.
An object is returned. The active Panel in all Panel Navigators is
stored as well as the dock state of Panels in Panel Layouts.
The purpose of getting the Panel State is so that you can later restore
is using the .setState() method. For example:
//Get a pointer to the Panel Object
var pnObj = {dialog.object}.getPanelObject();
//Get the current state of the Panel Object
var state = pnObj.getState();
//See what's in the 'state' object
alert($u.o.toJSON(pnObj.getState());
<panelObject>.setState();
Restores the state of a Panel Object from a previously created
//Get a pointer to the Panel Object
var pnObj = {dialog.object}.getPanelObject();
//Restore the state of the Panel Object. (Assume that the state is in a
variable called 'state')
pnObj.setState(state);
Video Player Component - SSL - A new property to use SSL has been added.
UX Component - List Control - Data Source - A new option has been added for specifying the data source of a List control. The 'Javascript Function' option allows you to specify the name of a Javascript function. This function must return an array of JSON objects that contain the data for the List.
When you choose this option, you must specify the name of the Javascript function as well as a list of columns that the List has.
For example, assume that you specify that the List has these columns:
Firstname,Lastname,City
Your Javascipt function could then be defined as follows:
function getListData() {
var data = [
{Firstname: 'Jim', Lastname: 'Smith', City: 'Boston'},
{Firstname: 'Cecelia', Lastname: 'Dawkins', City: 'Denver'}
]
return data;
}
Ux Component - Client-side Conditional Style and Text - Repeating Section - If you set a text property (as opposed to a style property) for a control that was in a Repeating Section, you would get a Javascript error.
Web Applications - Publishing - FTP Optimized - AEX Files - If you used Optimized FTP publishing to publish a web application that used .aex files, the functions in the .aex file would not be seen until the server had been stopped and restarted. This is now fixed.
UX Component - Image Upload Action Javascript - A bug introduced in build 1605 was fixed.
| UX Component | Chart Control - Dynamically Changing the Chart Appearance by Changing the Stylesheet |
In the previous video we showed how aspects of
the chart appearance could be changed at
run-time. In this video we show how a dynamic
stylesheet can be applied to the chart to
control even more aspects of the chart
appearance. Watch video Download Component TIP: To get started creating a custom stylesheet for a chart, you should start with the style builder, then convert to CSS. See video. |
| UX Component | User-defined Sub-themes to Style UX Component Controls |
Many of the controls on a UX component allow you
to specify a sub-theme. The sub-theme controls
various aspects of a control's appearance and
also behavior. For most of the controls there
are several built-in sub-themes to chose from.
For example, buttons have sub-themes that can
make the button look like a 'back' or 'next'
button. A powerful aspect of sub-themes is the
fact that it is very easy for developers to
create their own sub-themes to create highly
customized appearances for controls on a UX. In this video we show how a custom sub-theme for a window can be created and used. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| UX Component | Getting a Pointer to a Parent or Child Component So You Can Call Methods of the Parent or Child Component |
The ability to re-use components and open a
child component in a window, div, TabbedUI pane,
Panel, or embed into a parent component is one
of the most powerful aspects of the Alpha
Anywhere architecture. When you open a component from a parent component, you will often want to get a pointer to the child component so you can manipulate it in your Javascript code in some way. For example, you might want some code in the parent component to read a control in the child, or set a value in the child. Similarly, you might want some code in the child component to read or set a control in its parent. The .getParentObject() and .getChildObject() methods are used to get pointer to an object's parent or child objects. In this video, we show how this is done. Watch Video - Part 1 Watch Video - Part 2 Download Component |
| Grid Component | Putting the Search Part in a Pop-up Window |
In this video we show how the Search part of a
Grid component can be shown in a window. By
default, the Search part is shown on the page
directly above the Grid part, but by showing the
Search Part on in a window, you can save space
on the page. Watch Video Download Component (requires a connection string called 'Northwind' that points to the sample Northwind.mdb files database in the MDBFiles folder). |
| UX Component | Example App Showing How to Synchronize an Embedded UX Component when a Value in a Parent UX Component Changes |
A common pattern when building mobile
applications is to break the application into
multiple sub-components and then embed child
components into the parent component. Using this
pattern, you break your application into
manageable pieces. However, when you follow this
pattern, it is often necessary to synchronize
the embedded child component when a value in the
parent component changes. In this video we show a sample application that shows customers in the sample Northwind database. An embedded UX component shows the orders for the selected customer. When the user selects a different customer, the embedded 'Orders' UX component is synchronized. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Download Components (requires a connection string called 'Northwind' that points to the sample Northwind.mdb files database in the MDBFiles folder). |
| UX and Grid Component | Handling Missing Images |
When a UX or Grid component displays images,
there is a possibility that an image referenced
in an image tag is missing. A new onImageError
client side event allows a developer to
programmatically handle this situation and
decide what image to display in place of the
missing image. Watch Video |
| UX Component - List Control | Custom Layout - Setting a List Item Size to Fill the Screen - Understanding the 'Fill' Option for List item size and Custom Scrolling Options. |
When you are working with a List control that
uses a free-form layout for the List, you can
set the height (and width in the case where the
List is set to scroll horizontally) of each
'row' (i.e. 'item') in the List. In addition to
setting an explicit size (say 200px) for an item
height or width, you can also use the special
'fill' keyword to indicate that the item should
fill the viewport. When you use the 'fill' option, it is often desirable to customize the way in which the List scrolls, so that it scrolls in discrete amounts (for example the size of the viewport) rather than scrolling continuously. By setting the item size to use the 'fill' keyword, and by customizing the List scrolling, it is possible to make a List behave much like a Panel Card in a Panel Navigator. In this video we show how these options are used. Watch Video - Part 1 Watch Video - Part 2 |
| UX Component | Signature Capture Control |
A common requirement in mobile applications is
the ability to capture a signature and store the
signature in a database. In this video we show
how this is easily achieved by placing a
Signature Capture control on a UX component. Watch Video - Part 1 Watch Video - Part 2 |
| Reports | Printing QR Codes |
Video shows how to print a QR Code on a report. Watch video |
| UX Component | Using a UX Component to Create a Login Component for a Mobile Application |
A common requirement for any application, Mobile
included, is to authenticate users before they
can interact with the application. There are
several ways in which authentication can be
performed in Alpha Anywhere. These include using
the standard Login component, or using the
AppLauncher. In addition to the above two
techniques, you can also build a UX component
for performing the authentication. The advantage of building the Login screens using a UX component is that you can make a much richer UI for the login and it can include standard mobile elements like Panel Headers, etc. In this video we show how an authentication layer has been added to a mobile application. Watch Video - Part 1 Watch Video - Part 2 Watch Video - Part 3 Watch Video - Part 4 Watch Video - Part 5 Download Web Project Used in Videos - Note: To use the project, create a new, empty Web Project, then click the 'Open Project Folder in Windows Explorer' button and paste these files into the folder. The passwords for the sample accounts are: a@a.com - aalpha, s@a.com - salpha m@a.com - malpha |
Xbasic - Running External Programs from Within Alpha Anywhere - .NET Framework- A common requirement is to run external programs from with Alpha Anywhere. Xbasic has had the sys_shell() and sys_shell_wait() command for many versions, but you can also use .Net framework methods. The method is:
System::Diagnostics::Process::Start()
For example, say you want to log onto a VPN programmatically from within Alpha Anywhere:
System::Diagnostics::Process::Start("rasdial.exe", "MyVPN MyUsername MyPassword")
To disconnect:
System::Diagnostics::Process::Start("rasdial.exe", "MyVPN /d")
AlphaDAO - Customizing the Connection String - The AlphaDAO connection string builder might not expose some setting that you would like to use. For example, in the case of Postgres, the connection string builder does not expose the option to use SSL.
Here is what an connection string for Postgres might look like:
{A5API=PostgreSQL,Server='localhost',Port='5432',UserName='postgres',Password='mypassword',Database='postgres'}
The properties that we would like to set are:
ssl=true
sslmode=require
In general, any values Alpha Anywhere doesn’t recognize
in the connection string are passed directly through.
This makes it possible to provide values we don’t
support in the user interface yet.
The above connection string can therefore be modified as follows:
{A5API=PostgreSQL,Server='localhost',Port='5432',UserName='postgres',Password='mypassowrd',Database='postgres',ssl=true,sslmode=require}
Xbasic - Making RESTful API Calls - Xbasic offers
quite a number of functions and methods for using the
HTTP protocol to make various requests from web servers.
Sending a RESTful request to a web service is becoming
increasingly popular, but is not always as
straightforward a s requesting a simple resource from a
web server.
REST (representational state transfer) is a general
architectural concept, and specific REST APIs will vary
from web service to web service, so there is no "one
size fits all" solution. However, the Xbasic HTTP
functionality still offers all of the requisite
components. The HTTP method used by the API will define
how you send any required information to the service,
and therefore dictate which Xbasic function to use.
GET is very common because it allows you to simply send
data as part of a query string. The My Movie API is a
good example of this. To search IMDB for the movie
titled "Casablanca", a simple GET request needs to be
sent to http://imdbapi.org/?q=Casablanca.
The easiest way to do this would be by using http_get(), though http_get_page2() and http_fetch() will also work.
For example:
dim MyResponse as p
MyResponse = http_get("http://imdbapi.org/?q=Casablanca")
The response body will be in the MyResponse.body variable. In the above case, the response is JSON data, so you can then use the json_parse() function to parse the response values.
PUT and POST are typically used when more information is
being sent to the web service and generally to be stored
there. http_put() and http_post() are the simplest
functions to use here:
dim Response as p
Response = http_put(<url>,<put_body>)
However, the limitation of both http_put() and http_post()
is that they will always use
application/x-www-form-urlencoded as the body's
content type. If the service to be accessed requires a
body in a different format, http_fetch() must be used so
that the alternate content type may be specified.
For example:
dim Response as p
dim Request as p
Request.Host = "<server>"
Request.Page = "<page>"
Request.Header = "Content-Type: application/json"
Request.Body = "<JSON formatted body>"
Response = http_fetch(Request)
DELETE generally operates the same as GET, just taking
data in a query string. In these cases, http_delete()
may be used just like http_get() would be.
UX Component - Image Upload - Thumbnails - If you had configured the image upload to upload to a binary field in the target table and you had set the stored type to (say) PNG, but you uploaded a file of a different type (say JPG), the code that created the thumbnail image would create a garbage image. This bug only happened if the upload file type was different than the stored file type and the image was stored in a binary field.
Report Editor - Fixed several bugs when editing Workspace reports.
Tabbed UI - UX Components with Panels - UX Components that used Panels did not render properly in the Tabbed UI.
Grid Component - Linking Grids - Fixed an issue were, under some circumstances, the wrong linking value was written into new records in a linked Grid.
a5_getImageSize() Function - Was failing on very large images.
AppLauncher Component - Fixed a number of bugs. If the AppLauncher loaded a TabbedUI, the TabbedUI did not operate properly. The device.isMobile and device.isTablet flags were not getting set correctly for Google Nexus devices.
UX and Grid Component - In-line Style Property - Many of the controls in both the UX and Grid components allow you to define an in-line style. The in-line style builder now has two links at the bottom of the screen that allow you to save commonly used in-line style definitions in a library and then retrieve from the library.

UX and Grid Component - Password Controls - Watermark - When you set a textbox control to be a 'password' control and you also turn on the watermark property, previously, the watermark was not readable because it was displayed using the same characters used to hide the text that the user typed into the field. Now, when no text has been typed into the field, the watermark is displayed in clear text, so it is readable.
Demo Mobile Application - Step-by-step Tutorial - A new step-by-step tutorial on how to build the Demo Mobile Application that ships with Alpha Anywhere is now available. Currently, the tutorial has 16 lessons. More lessons are being added, so be sure to check back from time to time.
http://downloads.alphasoftware.com/a5v12download/BuildingSampleMobileApp.htm
NOTE: If you install Alpha Anywhere updates (as opposed to using the Full Installer), changes that have been made to the Demo Mobile App since your initial full install have not been installed on your machine. You can get an up-to-date version of the sample app here. Unzip this into the Samples\DemoMobileApp folder where Alpha Anyhwere is installed.
Grid and UX Component - Action Javascript - File Download - A number of improvements have been made to this action.
NOTE: You will need to edit and re-save the action to get the new features.
Web Applications - Project Properties Dialog - Allowed File Download Folders - When defining the folders from which files are allowed to be downloaded, you can now use the <ApplicationRoot> placeholder. This placeholder is replaced at run-time with the value for the webroot.
Web Project Properties - Linked CSS Files - The Web Project Properties dialog now allows you to specify linked CSS files. This is useful if you have some CSS that you want to have available to all of the component in your project. Instead of linking the CSS files in the individual components, you can not link the CSS in a central location. The same comments apply for linked JS files.
Grid Component - Detail View - Method for Opening Detail View - A new option has been added for the method for opening the Detail View. The 'programmatic' option allows you to add your own button or event handler to open the Detail View. For example, you might want to have a button in the Grid row that opens the Detail View. The event handler for this would be:
{grid.object}.detailView({grid.rowNumber});
If the button to open the Detail View as not placed in each row of the Grid, but instead was placed (for example), in the Grid header or footer, then the {grid.rownumber} placeholder is meaningless and cannot be used to indicate the row for which the Detail View should be opened. In this case, your Javascript would be:
//get the row number of the currently selected row
var rowNum = {grid.object}._selectedRow;
{grid.object}.detailView(rowNum);
Reports - Printing QR Codes - You can now print QR codes in a report, new printQRCode() function.

To print a QR Code in a report you define a calculated field using the printQRCode() function and then place the calculated field on the report.
The printQRCode() function takes three arguments - the value to encode, the size of the QR code (in pixels) and a flag that indicates if the value should be url encoded (set to .t. by default).
Note: The QR Code function calls into the Google charts api, so an Internet connection is required.
For example, here is how you can define the calculated field to print the 'serialnumber' field:
qrcode = printQRCode(serialnumber,400)
UX Component - Integrated Login Functionality - The UX Component can include integrated login/logout functionality.
This means you don't have to use a separate Login Component, or (AppLauncher with login turned on) to authenticate users in your application.
In this video we show how an authentication layer has
been added to a mobile application.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
Watch Video - Part 5
The primary use case for integrated login in the UX component is for mobile applications where the application is typically built using a UX component.
However, another use case for the integrated login in the UX is to build a custom login dialog to replace the built-in Login component.
To turn on the integrated login feature, go to the Properties pane on the UX Builder and check the 'Has integrated login functionality' property, as shown in the image below:

Once you check this property you get prompted for some additional properties.
'User name control' and 'Password control' - You must specify which controls on the UX component are used for entering the username and password. Your UX component will therefore need to have two controls (likely textbox controls) where the username and password are entered.
TIP: For the password control, be sure to check the 'Password' property so that the password is hidden when the user is entering it.
Placeholder for login errors - You must put a placeholder control on the UX (see [Placeholder] in the Other Controls section of the UX Builder toolbox) to indicate where login errors should be shown. Use this property to specify the name of the placeholder.
Customize login failure messages - You can customize the various messages that the security framework displays when login errors occur.
Logout does a full page reload - When the user logs out, do you want this UX component to reload?
If you check this option, the component's layout is re-computed on the server (and controls on the UX for which membership in security groups are required are hidden).
Here is why this is an important property to understand:
Assume that when you design the UX component you set the security property on certain controls in the component so that they are only visible to users who are in a certain group (i.e. security role). For example, you might have a button called 'Increase Salary' and you might have set the security on this button to only show the button for users who are in the 'Manager' group.
Assume that the current user is logged in as a member of the 'Manager' group - so she sees this button.
After this user logs out, you will want to ensure that this button is no longer visible. So, forcing the component to reload will cause the server to re-compute the layout of the UX component, and the button will be removed when the server sends back a re-rendered version of the component - because the user will no longer be logged in as a member of the 'Manager' group.
Login/Logout Buttons
Once you have configured your UX component to turn on integrated login functionality, you will also need to add buttons to the UX component to login and logout.
The event Javascript code that will need for these buttons is shown below:
Login
{dialog.object}.login();
Logout
{dialog.object}.logout();
Tip: You can select the 'Login-Logout' item in the 'Defined Controls section of the toolbox to automatically add login/logout buttons and also the placeholder for login errors.

Server-side Events
When the user clicks the 'login' button to login, an Ajax callback is made to authenticate the user. There are several
server-side events for login and logout.

beforeLogin - This event fires before any attempt is made to authenticate the user. A possible use for this event is to log out any user who might be logged in (use the A5WS_LogoutUser() function).
onLogin - Fires after the user is authenticated. The event fires regardless of whether the authentication was successful or not. The e.loginSucceeded flag indicates if the login was successful or not. An important use of this event is to force a reload of the component on login. See the discussion below on 'Forcing a Reload of the UX Component After Login' for more details. This event can also be used to set the 'friendly user name'. The 'friendly user name' is made available in client-side 'afterLogin' event. It can also be used in client-side watch expressions.
onLogout - Fires after the user logs in.
Client-side Events
When the user logs in or logs out there are several client-side events that fire, as shown in the image below.

The afterLogin event can be used to display a message on the screen indicating the (friendly) name of the logged in user.
For example, assume you have a static text control on the UX with this text:
Logged in as: <span id="loggedinusername"></span>
In the afterLogin event, you could add this code:
var ele = $('loggedinusername');
ele.innerHTML = e.userNameFriendly;
You might also put a client-side show/hide expression on the label as follows:
dialog.isLoggedIn = true
This will cause the static text control to be hidden when there is no logged in user.
In a Mobile application, a common design pattern is to put the login screen in a Panel Card and the application in one or more additional Panel Cards. The Panel Cards would then all be wrapped in a Panel Navigator that was set to 'programmatic' mode for the method of navigating the Panels. In the afterLogin event you would set focus to the first Panel Card in the application. In the afterLogout event, you would set focus back to the Panel Card that contains the logn form.
Forcing a Reload of the UX Component After Login
After the user has logged in you might want to force the UX component to reload. Consider the following scenario which explains a use case for this option:
Assume that the application you have built is a single UX component, and it has integrated login functionality. Assume also that this component has certain controls that have security on them (for example a 'Set Salary' button that is only visible to member of the 'Manager' group).
When the UX is initially loaded, the 'Set Salary' button will not be visible (because the user is not yet logged in).
Now assume that the user enters their username and password and clicks the login button. This will fire an Ajax callback and the user will be authenticated. Assume that the user is now authenticated and is part of the 'Manager' group.
This user should now see the 'Set Salary' button, but does not because when the UX was originally rendered, the user was not logged in.
However, by forcing a reload after login, the component will be re-rendered on the server and the user will see the 'Set salary' button.
The way in which you force a reload of the UX component after login is by setting the e.url property in the onLogin server-side event. For example, you could add this code to the onLogin server-side event:
e.url = "<thisComponent>"
NOTE: If you are forcing a reload after the UX
component loads, you will likely also want to set the
'Logout does full page reload' property to true.

Friendly User Name
For security reasons, it is not a good idea to expose the logged in user name on the client-side after the user has logged in. In the onLogin server-side event you can execute code to translate the user name that the user logged in with into a 'friendly' user name which can be safely displayed on the client-side.
For example, assume that you had a table that had two columns - 'userName' and 'friendlyUserName'
An example entry in the table might be:
jsmith23 John Smith
In your onLogin server-side event you would execute code to set e.userNameFriendly by looking up the friendly name for the user name.
Once you have set e.userNameFriendly in the server-side event, it can be used in the afterLogin client-side event and also in watch expressions.
TIP: If you do want to have the real logged in user name available on the client-side (for example, so that you can display it in a message like 'Logged in as: james@acme.com'), then you can always set the friendly name to the same as the user name in the onLogin server-side event.
Client-side Watch Expressions
The client-side watch expressions (e.g. the show/hide, enable, conditional style) can reference the following system fields that are populated with login information:
dialog.isLoggedIn
dialog.loggedInUserNameFriendly
Note: The system fields that you can use in watch expressions also include dialog.loggedInUserName, but this value is always set to 'hidden_for_security_reasons'. If you want to make the real logged in name available on the client-side, then you can set the friendly user name to the real logged in user name in your server-side onLogin event.
Mobile Applications - Adding Login/Logout
The following section describes a common design pattern for adding authentication to a mobile application.
In the image below we show the structure of the UX component that contains the login/logout logic.
NOTE: You can get a quick start building this component for yourself by selecting it from the list of available templates when you create a new UX component. Select the 'Security Framework - LoginComponentMobileApp' template.

The basic structure of this UX component is a Panel Navigator with two Panel Cards. The Panel Navigator has been set to 'Programmatic' (meaning that a Javascript command, and NOT a user 'swipe' on the screen is needed to navigate from one Panel Card to another).
The first Panel Card contains the login and password prompts.
The second Panel Card contains an embedded UX component. This component is your application.
After the user has successfully authenticated, the client-side afterLogin event fires and set focus to the Panel Card that contains the embedded UX (i.e. the application). The client side event executes this code:
{dialog.object}.panelSetActive('PANEL_APPLICATION');
The [Embedded Object] control (i.e. the UX component for your application) is set to only render when the Panel gets focus. This is very important. It means that the embedded component is not rendered until AFTER the user is authenticated. At that point, the server knows what role (i.e. groups) the user is a member of, and when the component is rendered, any controls that are conditioned on membership of specific security groups can be included or excluded in the component.
When the user logs out of the application, the PANEL_LOGIN panel in the parent UX component is shown.
In this video we show how an authentication layer has
been added to a mobile application.
Watch Video - Part 1
Watch Video - Part 2
Watch Video - Part 3
Watch Video - Part 4
Watch Video - Part 5
Xbasic - helper::HTMLProcess Class - A powerful new class has been added to Xbasic to help write code that processes and transforms text. The class is mainly used for processing HTML or XML documents, but it can be applied to other types of documents.
NOTE: See the Documentation Viewer (Help,Open Documentation) for a full list of methods. You might need to click the refresh button on the Documentation viewer if you don't see the topics.
Here are some examples showing ways in which the class can be used.
Example 1: Manipulating attribute values in an HTML document.
Assume that you have a simple HTML document with this content:
<html>
<body>
<img src="Logo.png" >
<img src="Signature.png" >
</body>
</html>
You would like to modify all of the img tags to add a prefix to the src attribute. You would like the resulting document to look like this:
<html>
<body>
<img src="http://myimages.net/Logo.png"
>
<img src="http://myimages.net/Signature.png"
>
</body>
</html>
Here is how the helper::HTMLProcessor class can be used to solve this problem:
dim oldHTML as c
oldHTML = <<%html%
<html>
<body>
<img src="Logo.png" >
<img src="Signature.png" >
</body>
</html>
%html%
'dim an instance of the class
dim hh as helper::HtmlProcessor
'define a handler to call the changeSrc() callback function
'every time an attribute called 'src' is encountered.
hh.AddTagAttributeFilter("src","changeSrc(<tag>,<value>)")
'call the object's .processHTML() method
dim newHtml as c = hh.ProcessHTML(oldHtml)
'define the callback function
function changeSrc as c(tagName as c,tagValue as c)
if tagName = "img" then
tagValue = "http://myimages.net/" + tagValue
end if
changeSrc = tagValue
end function
Here is how the code works:
hh is an instance of the helper::HTMLProcessor object.
hh as a number of methods (see the Documentation viewer for a full list of methods - you might need to click the refresh button on the Documentation viewer if you don't see the topics.).
the .AddTagAttributeFilter() allows you to define a 'callback' function that gets called every time a specified attribute is encountered when processing the document. In this case we specify the 'src' tag (first argument). The second argument is the callback function.
When you define the callback function you can use special placeholders. For example, the callback function is specified here as:
"changeSrc(<tag>,<value>)"
<tag> is the element that contains the 'src' attribute.
<value> is the attribute value.
The actual processing of the input document takes place when the .processHTML() method of the object is called.
Inside the callback handler the code checks to see if the element name is 'img'. If so, then it returns a new value for the 'src' element.
Example 2: Manipulating Elements in an HTML Document
In the previous example, we manipulated attributes in an element. In this example we manipulate all of the text for an element.
For example, assume that the input HTML document looks like this:
<html>
<body>
<code>
var myvar =
'';
myvar =
'alpha';
</code>
</body>
</html>
<code> is some arbitrary element that we want to transform. The resulting document should look like this:
<html>
<body>
[
var myvar = '';
myvar = 'alpha';
]
</body>
</html>
The solution is very similar to example 1. The difference is that instead of adding a callback handler using the .AddTagAttributeFilter() method, this time we add a callback handler using the .AddTagPair() method.
Here is the working example:
dim hh as helper::HtmlProcessor
'define the callback handler.
'the callback handler will be called whenever a 'code' element is encountered
'note that <value> is passed into the callback function. this is the contents of
'the element (including the tags).
hh.AddTagPairFilter("code","","processBlock(<value>)")
dim newtxt as c
'process the document
newtxt = hh.ProcessHTML(txt)
function processBlock as c (txt as c )
dim doc as p
'get a DOM from the text
doc = *xml_document(txt)
dim txtInner as c
txtInner = doc.top.innerXML
processBlock = "[" + txtInner + "]"
end function
The helper::HTMLProcessor class also has some static method that we demonstrate in the next example.
Example 3: Extract Attribute Values
This example shows how you can quickly dump out attribute values for a given element.
Say we have an HTML document that looks like this and we want to extract information about the src and style attributes for each element:
dim HTML as c
HTML = <<%html%
<html>
<body>
<img src="Logo.png"
style="width:200px;">
<img src="Signature.png" >
</body>
</html>
%html%
Here is how we can do this using a static method of the class:
'get list of all image sources
dim images as c
images =
helper::HtmlProcessor::ExtractTagAttributes("img",HTML,"src|||style")
?images
Logo.png|||width:200px;
Signature.png|||
The .ExtractTagAttributes() takes three arguments:
tagName - the tag from which you want to extract attribute values - in this case the 'img' tag
text - the text you want to process
outputFormat - a definition or the output format. In this was we have specified 'src|||style' which means we ant to dump out the value of the src attribute, then 3 pipe characters, then the value of the style attribute.
Example 4: Extracting Elements
In the previous example we dumped the values of attributes of a specified element.
We can also dump out the text (inner or outer) of a particular element using another static method of the class - .extractTags()
For example, assume this input document:
dim html as c
html = <<%html%
<html>
<body>
<div id="id1">
<a href="page1">Go
to page 1</a>
<a href="page2">Go
to page 2</a>
<a href="page3">Go
to page 3</a>
</div>
<div id="id2">
<a href="page10">Go
to page 10</a>
<a href="page20">Go
to page 20</a>
<a href="page30">Go
to page 30</a>
</div>
</body>
</html>
%html%
'Get the outer HTML for all 'a' elements:
outerHTML = helper::HtmlProcessor::ExtractTags("a",HTML,-1,.t.)
?outerHTML
<a href="page1">Go to page 1</a>
<a href="page2">Go to page 2</a>
<a href="page3">Go to page 3</a>
<a href="page10">Go to page 10</a>
<a href="page20">Go to page 20</a>
<a href="page30">Go to page 30</a>
The .extractTags() method takes the tag name, input document, instance number and a logical flag indicating if you want outer or inner html of the tag.
In the above example, the instance number is set to -1, indicating all instances.
To get the inner HTML for all 'a' elements
innerHTML = helper::HtmlProcessor::ExtractTags("a",HTML,-1,.f.)
?innerHTML
Go to page 1
Go to page 2
Go to page 3
Go to page 10
Go to page 20
Go to page 30
Now, lets take this example a little further and assume that we only want to extract the data from 'a' elements that are inside the div with the id of 'id2'.
We can use the .getTagInnerHTML() method to get the inner HTML for the div tag with an id of 'id2'. However, this method takes a tag instance number. We first need to find out what instance number the div with an id of 'id2' is.
'Extract the ids of all div elements
dim allIds as c
allIds =
helper::HtmlProcessor::ExtractTagAttributes("div",HTML,"[id]")
?allIds
= [id1]
[id2]
Now find out what instance number 'id2' is. We wrapped the output from .extractTagAttributes() in [ ] so we actually search for [id2]
dim lineNum as n
lineNum = word_number_get(allIds,"[id2]",crlf())
?lineNum
=2
Now that we know that the instance number of id2, we can extract the innerHTML of this div
dim txtDiv as c = ""
txtDiv =
helper::HtmlProcessor::GetTagInnerHTML("div",HTML,lineNum)
Now get the text for the 'a' attributes in 'txtDiv'
dim innerHTML = helper::HtmlProcessor::ExtractTags("a",txtDiv,-1,.f.)
Example 5: Stripping <span> tags
Another useful static method of the class is the .removeSpans() method which strips <span> tags from HTML.
For example:
dim html as c
html = <<%html%
<html>
<body>
Here is some sample text <span
class="myclass">this is in a
span</span>
and now we are out of the span.
</body>
</html>
%html%
'strip out the span but retain the text inside the span
?helper::HtmlProcessor::RemoveSpans(html)
<html>
<body>
Here is some sample text this is in a
span and now
we are out of the span.
</body>
</html>
UX Component - Signature Capture - A common requirement in mobile applications is the ability to capture a signature and store the signature in a database.
A new Signature Capture control has been added to the UX
component.
Watch Video - Part 1
Watch Video - Part 2
To add a Signature Capture control to a UX component, select the control from the 'Data Controls' section of the toolbox.

You can then define properties of the control in the property grid.
The signature control contains two HTML elements, only one of which is visible at any time:
For example, in the image below, the signature capture control is showing a previously entered signature, so the image element is displayed.
The 'Sign' button that appears below the image is a built-in button (i.e. it is automatically generated by the Signature Control - you can optionally turn it off).

When the user clicks the 'Sign' button, the 'Image' element that displays the signature is hidden and the 'Canvas' element (where the user can sign) is displayed, as shown in the image below:

The 'Clear', 'Cancel' and 'Accept' buttons (like the 'Sign' button in the previous image) are automatically generated by the Signature Capture Control. Like the 'Sign' button, you can optionally turn off these buttons and add your own buttons to control the Signature Capture Control. The buttons perform the following actions:
The image and canvas elements that make up the Signature Capture control are contained within an outer container. When you define the properties of the Signature Capture control you specify the dimensions of the outer container separately from the dimensions of the signature capture area.
The dimensions of the signature capture area must be smaller than the dimensions of the outer container (because the signature capture area has to fit within the outer container) and must not use percentage sizes. For example you can't set the width of the signature capture area to (say) '80%'. The reason for this is that you never want the signature capture area to resize (for example, when the orientation of a mobile device changes), or else a signature captured when the device was using (say) portrait mode would look distorted when you were in landscape mode.
Storing Signatures in a Database
When the user submits the UX component, you can store the signature that the user entered in a field in a table. The signature control must be bound to a binary field. When the UX component is submitted, the value in the signature capture control is submitted as a base64 encoded PNG image. The value is converted to a binary value before it is stored in the table field.
NOTE: In the case where you are storing data in a .dbf table, you must store the data in a PNG image field.
Defining Your Own Buttons to Control the Signature Capture Control
The property sheet for the Signature Capture control allows you to turn off the system generated buttons. If you do this, then you must add your own buttons. Here is the Javascript code that each button must call:
Sign Button
{dialog.object}._functions._toggleCanvas(signatureControlId,'canvas');
{dialog.object}._functions._clearCanvas(signatureControlId);
Clear Button
{dialog.object}._functions._clearCanvas(signatureControlId);
Cancel Button
{dialog.object}._functions._toggleCanvas(signatureControlId,'image');
Accept Button
{dialog.object}._functions._saveCanvas(signatureControlId);
{dialog.object}._functions._toggleCanvas(signatureControlId,'image');
Where 'signatureControlId' is the id of the control.
In order to hide the 'Sign' button when the 'Clear', 'Capture' and 'Accept' buttons are shown, and vice versa, you can hook into the 'onSignatureCaptureToggle' client-side event.
Validating Signature
A common requirement in a UX component is to validate that the user has signed the form when the UX is submitted. You can check that there is data in a signature capture control by adding code to the server-side dialogValidate event. When the UX is submitted, the signature (in base64 encoded form) will be submitted in a special hidden field with the same name as the signature control and a '_HIDDENA5FN' suffix.
The following code in the dialogValidate event will check to see that the user has signed the UX (assuming that the signature control was called 'SIG':
function dialogValidate as p (e as p)
dialogValidate.hasError = .f.
dialogValidate.errorText = ""
if e.dataSubmitted.SIG_HIDDENA5FN = "" then
dialogValidate.hasError = .t.
dialogValidate.errorText = "You have not signed the form."
end if
end function
UX and Grid Component - onImageError Client-side Event - Missing Images - A new client-side event has been added to allow you to handle errors caused by missing images.
UX Component - Repeating Sections - Populating - There has been a substantial improvement in the time taken to populate a repeating section with data. This is especially noticeable when the Repeating Section has a large number of rows and there are multiple client-side watch events in the Repeating Section.
UX Component - List Control - Freeform Layout - 'Fill' Option for List Height or Width - By default, when you define a freeform layout for a List, each item (i.e. row) in the list has a default size (the amount of space taken by the item content), or an explicit size (that you specify - e.g. 200px). A new option has been added when you specify an exlicit size. You can now use the 'fill' keyword (in place of an explicit size).
For example, in a List that is set to scroll horizontally, you can set both the height and width to 'fill'. This will result in each item on the List completely filling the List. You will only be able to see one List item at a time.
The image below shows a List set to scroll horizontally. The item width is set to 150px and the item height has not been set.

In the next image, the item width has been changed to 'fill'. Notice now that each item has the full width of the 'viewport' (i.e. the List).
When you use the 'fill' keyword for a List item dimension (height or width), you can also specify a modifier - an amount by which the dimension should be less than the viewport dimension. E.g. fill-10px.

In the next image, the item height has also been changed from 'blank' (ie. not height specified, so base the height on the item content) to 'fill'. Notice now that the item completely fills the 'viewport'.

When you set a width or height dimension to 'fill' you might want to turn on custom scroll settings, to prevent a situation like the one shown below from happening.
In the image below (for a List set to scroll horizontally), the item width has been set to 'fill' and the user has scrolled the List so that some of row 1 and some of row 2 are shown.
You can set the List so that it scrolls in discrete amounts to prevent this from happening. See the topic 'UX Component - List Control - Custom Scroll Settings' for details.

In the image below, custom scroll settings have been defined so that the List scrolls in discrete amounts (in this case, the width of the viewport). As a result, when you stop drag scrolling, the List animates a complete item into view. A partial item (as in the above image) will never be shown.

UX Component - List Control - Custom Scroll Settings - Normally drag-scrolling on a List is continuous. In other word, when you drag-scroll the List, you can stop dragging at any time and the List will remain scrolled in the position where you stopped dragging. However, you might want the List to scroll in discrete amounts, rather than continuously.
You can define custom scroll settings for a List, or for an individual Layout in a List (if the List has more than one Layout).
When you define custom scroll settings, you can define these properties:
The 'Scroll step size' and 'Offset' can be defined for both the x and y axes.
UX Component - List Control - Freeform Layout - Dynamic Templates - When you define a freeform template for a List control you can now define multiple sub-templates and then automatically select which sub-template to use depending on the data in the current row.
For example, here is a very simple freeform template:
{Firstname} {Lastname}, {State}
Every row of data in the List will be rendered using the same template. So, row 1 of the List might look like this:
John Smith, MA
and row 2 of the List might look like this:
Fred Tyson, CA
However, say you want the template for the row to be completely different for all people in the state of MA and CA. Here is how you would define the freeform template:
{condition:data.state == 'MA'}
put template for 'MA' here
{conditionEnd}
{condition:data.state == 'CA'}
{conditionEnd}
{condition:else}
{conditionEnd}
The condition that follows the {condition: directive is a Javascript logical expression. You can use the 'data' object to reference data values in the current row.
Application Server - Analyze Web Access Logs -
A5W_AnalyzeWebAccessLogs() Function - A new
function A5W_AnalyzeWebAccessLogs() has been added to
analyze web access logs and find the number of requests
per minute. This is a good tool to estimate the loads
being placed on a server. The Enable server Logging
option must be checked in the server configuration on
the Logging tab to create the access logs.
The function is context aware and can be run on the
desktop or on a web page. The function can output the
requests per minute on a chart or in a list showing the
requests for each minute. The list option can include a
list of all IP addresses that accessed the system and
sort the IP addresses by the number of requests.
When run on the desktop, a genie will allow selecting
any access log stored on the computer and select the
output options. If a list is selected, it can be saved
in a file if desired.
To run on a web page, create a page with only this in
the source HTML
<%a5
?A5W_AnalyzeWebAccessLogs()
%>
The function will create the complete page HTML code. A
dropdown control on the page allows selecting any of the
last 50 logs created by the app server running the page.
The web page can create the same chart or list as the
desktop genie. The desired output is displayed on the
page.
An example of the output generated by this function is shown below:

UX Component - Comments - You can insert comments into your UX component to document your component. Components can be inserted at two levels:
To add a comment to any control in the list of selected controls, click the comment icon on the toolbar at the top of the list. The comment icon is shown with a yellow highlight in the image below.
This will open an editor where you can enter your comment.
You can either create a plain text comment, or you can use HTML to create richly formatted comments.
The comment shows up on the right edge of the control list. For example in the image below, the [Panel Card CUSTOMERFORM] control has a comment. You must set the width of the UX builder to be wide enough to see the comment.
The indent level of the comments is set to 6 inches by default, but you can control this value by going to the Properties pane, Advanced section in the UX builder.
You can also turn off comment display if you want by going to the Properties pane, Advanced section.
The comment control is a new control type. You can insert a comment control by selecting it from the 'Other Controls' section in the control toolbox on the left edge of the UX builder. As a shortcut for inserting a comment control, you can select the 'Insert comment' menu from the drop down menu. See the 'Menu' button in the toolbar on the image below.
To edit the comment for a comment control you can either click on the comment icon on the toolbar, or you can double click on the control in the control list.
In the image below three comment controls are shown directly above the [Panel Card: CUSTOMERFORM] control.

UX Component - Comments - Printing Comments - You can print all of the comments in a uX component by selecting the 'Print comments' command on the dropdown menu.

UX Component - Adding Controls - Watermark - Shortcut - A common pattern when building mobile applications is to set control label position to 'None' and then turn on the watermark property. This saves valuable screen real estate.
For example:

Now, a new shortcut when adding controls makes this even easier to do. When you add new controls, the component, the dialog allows you to set the label position to 'watermark'

UX Component - Windows - Drag Scrolling on Window Contents - If a pop-up window contains more content than can be displayed in the window, you can now turn on drag scrolling of the window so that the window contents can be scrolled on touch enabled devices. You can also define 'pull past end' settings (for example, you can define an event when the user drags up on the window contents past the end of the contents).

UX and Grid Components - Client-side Watch Expressions - User Defined Javascript Functions - When defining client-side watch expressions (e.g. show/hide, enable, client-side dynamic style, dynamic images), you have always been able to use user defined Javascript functions in the expression. However, if you put your functions in a private name space in the Grid or Dialog object, the expression would not parse correctly in the builder.
Now, you can use Javascript functions that are in your own namespace within the Grid or Dialog object.
For example, say you defined the following function in the Javascript Function definitions
{dialog.object}._functions.myfunction = function() {
return true;
}
In a show/hide expression, you can now specify this as the expression:
{dialog.object}._functions.myfunction() = true
UX Component - List Control - Long Data Values - Word-Wrap - By default, when a long character value is shown in a List control the data in the list are truncated, not word-wrapped. A new property in the List builder, allows you to turn on word-wrapping.



Xdialog - Double Buffering to Reduce Flicker - {composited} Directive - On large Xdialogs, when you change the display in a list, you might notice some screen flickering. A new Xdialog directive can be used to turn on double-buffering for the screen display to eliminate, or reduce, screen flickering. The directive is:
{composited}
This directive can be placed anywhere in the dialog body. For example:
dlg_body = <<%dlg%
{removecomments}
{composited}
[%O={@@}%.130,40indx^#arr[\].display];
<up><down>
%dlg%
You can download a sample Xbasic script here to demonstrate the effect of this directive.
Component Builders - Preview Pane - The Preview pane has been removed from the builders as it is not necessary. The Live Preview and Working Preview provide a better preview of how your design will look.
UX Component - Data Bound - SQL Tables - Refresh Schema for SQL Tables - When you open a UX component for editing, if the UX has been data bound to SQL tables, the schema that is stored in the UX for each bound table is now automatically refreshed. If you want to turn off this behavior, there is a new property in the Properties Pane, Data Binding section to do so.
Grid Component - SQL Tables - GUID as Primary Key - If you had a Grid based on a table that used a GUID as the primary key, you had to previously add code to the CanInsertRecord event to set the value in the GUID field.
For example:
function CanInsertRecord as v (DataSubmitted as P, Args
as p, PageVariables as p, Result as p)
with PageVariables
Result.Cancel = .f.
Result.ErrorHTML = ""
DataSubmitted.MYGUIDFIELD = *guid_create()
end with
end function
This is now no longer necessary. If no value was supplied for the GUID field, an GUID value will be automatically generated (only if the GUID field is the primary key).
A5W/HTML Page Editor - Remote Test on Mobile Device - You can now do a remote test of an A5W or HTML page directly from the editor.
When you click on the 'Execute Page' button (the yellow lightening bolt), you now get a menu allowing you to select 'Live Preview' or 'Remote Test'. If you select the 'Remote Test' option you will get the standard 'Remote Test' dialog that allows you to easily open the page in the browser on a remote device (e.g. a mobile device).

UX Component - Populating Controls with Data in a Data Bound UX - Ajax Callback - In a data bound UX component, you can make call this method of the UX component to do an Ajax callback and populate the UX component with data for the specified primary key value:
{dialog.object}.populateControlsFromTable
However, if you have your own, user defined Ajax callback, you might want to generate the Javascript to populate the controls with table data in your own callback, rather than triggering a second Ajax callback. A new option in the a5_UX_Action() server-side function allows you to do this. In the example below we show the Xbasic function to handle a custom Ajax callback. Assume the Xbasic function is called myXB.
function myXB as c (e as p)
dim ops as p
ops.primaryKey = primaryKeyValue
ops.showDebugInfo = flagValue
dim javascriptCode as c
javascriptCode = a5_UX_Action(e.ops,"populateControlsFromTable")
dim jsOther as c
jsOther = "any other javascript you want your callback to return"
myXB = javascriptCode + jsOther
end function
UX Component - Embedded UX Component in a Panel Card - Synchronize UX - A new property has been added to the embedded UX component that allows you to automatically synchronize the UX every time the Panel Card gets focus (assuming that the Panel Card is contained in a Panel Navigator).
If this option is checked, the embedded UX component's server-side onSynchronize event and client-side onSynchronizeDialog events are fired.

Dynamically Adding Panels to a Panel Navigator - Closing the Dynamically Added Panel - If the dynamic panel is added to a Panel Navigator that has been configured to use Tab Bands as the method for navigating the child Panels, you can allow the user to close a dynamically added Panel. When the .addPanel() method is called, the JSON object that defines the new Panel should include:
close: true
For example
//get a pointer to the Panel Navigator where the new Panel
will be added
var pNav = {dialog.object}.panelGet('PANELNAVIGATOR_1');
//add the new Panel Card to the Panel Navigator
pNav.addPanel({
name: panelName ,
title: panelTitle,
src : myNewPanelCard,
close: true
});
In the image below, Pane4 was added dynamically with the close option set to true. As you can see, the Tab Band label for the Pane includes a close icon. If you tap on the close icon, the Pane is closed and is removed from the Panel Navigator.

UX Component - Slider Control - onSlide and onChange Events - Previously, when you defined these events you specified the name of a Javascript function and you put your event handler in the Javascript function. Now, in order to make the slider more consistent with how event handlers for other controls (e.g. Switch, ButtonList, List, etc) are defined, the code for the event handlers can now be added directly to the property (you no longer need to call a Javascript function). For backwards compatibility, the old method is still supported. So, if you define the following Javascript for the event handler:
myChangeFunction
This is assumed to be the name of the function that you want to call.
UX Component - Image and File Upload - Xbasic Event Handlers - Control Values - In a UX component, when the server-side Xbasic events defined in the Action Javascript builder fire, the control values for all of the controls on the UX are available to the Xbasic code. For example, assume that the UX had a control called 'FIELD1'. In the Xbasic event handlers, you can reference this value as follows
request.variables.v.r1.field1
UX and Grid Component - Image and File Upload - Filename for Uploaded File - When you upload an image or a file to a target character field (rather than a binary field), the uploaded file is saved in a file in the UploadFolder (defined in the builder) and the filename of the file is saved in the target character field. The filename is derived from the filename of the file on the client machine.
Now, a new property in the builder allows you to define an Xbasic function in which you can compute the filename to use for the uploaded file.
As shown in the screenshot below, the new 'OnStoredFilename Compute Xbasic Function' property allows you to define the name of an Xbasic function. The Xbasic function exposes the 'e' object which has these properties:
You Xbasic function can change the value in the e.targetFileName
property. If you do change this value, the uploaded flle will be stored
in the filename specified by the new value in e.targetFileName
IMPORTANT: The transformation expression (defined in Action
Javascript at design time) will be applied to whatever value is in
e.targetFilename. So, if your event handler changes the value in
e.targetFilename, the transformation expression is applied to this new
value.
Your code can optionally set a value for e.storedValue property in the e
object
If you set the e.storedValue property, this value will be stored in the
target field in the record (and the transformation expression will be
ignored).

A5_imageURL_from_blob() Function - Takes a blob (image data) and creates a URL for the image. A use case for this function would be if you had a table that contained a binary field with some image data in it. You would like to display this image in some html.
Syntax
c URL = a5_imageURL_from_blob(blob as b, imageTypeIn as c, imageTypeOut = "" )
Where imageTypeIn is the image type (jpg, bmp, png) and imageTypeOut is the image type you want to return.
Example
<%a5
dim cn as sql::connection
cn.open("::name::myconnection")
dim sql as c
sql = "select imageblob from products where productid = 1")
cn.execute(sql)
dim b as b
b = cn.resultset.data("imageblob")
dim url as c
url = a5_imageURL_from_blob(b,"jpg","jpg")
?"<img src=" + quote(url) + " />"
%>
AppLauncher Component - The AppLauncher component is designed to address the following problem:
You have designed an application that is accessed through some URL. For example:
www.mycompany.com/salesApp
Some of the users of this application will be
launching your app in a desktop browser, some will be
launching it in a browser running on an iOS phone,
others on an iOS tablet, other on an Android tablet and
so on.
You do not want to have a different URL for each class
of user. However, you want each class of user to launch
a different startup component or page.
By using the AppLauncher component, you can automatically determine what type of device the user is using and then launch the appropriate component, or .a5w page, using the appropriate stylesheet. You can even navigate to a different URL.
For example, if a user us using a desktop browser, you might want to launch a TabbedUI component. If the user is using a phone, you might want to launch a particular UX component, but with one stylesheet for the users on an iOS device, another stylesheet for users on an Android device, and so on.
The AppLauncher component can also, optionally, prompt for username and password, and it can authenticate the user before it launches the startup component.
How the AppLauncher Component Works
The App Launcher component makes an Ajax callback to the server after it is launched. When the callback is made, information about the device that the user is on is passed back to the server. This information is available to determine what startup component to load.
How to Define the Startup Component
To define the Startup Component, click the smart field for the 'Startup component' property.

This will open a builder where you can define a series of logical expressions. When the Ajax callback to the server is made, these logical expressions are evaluated in the order in which they are defined.
For example, in the screen shown below, if 'logicalExpression1' is true, then the UX component called 'ux1' is loaded using the GrBlue stylesheet.
The logical expressions are Xbasic expressions that can reference 'system fields' (such as client.isIPad, client.isAndroid, etc.)

The system fields that the logical expression can reference are actually properties in the A5.flags global Javascript object.
You can add you own system fields in the AppLauncher by adding your own code to the client-side 'beforeTargetIsLoaded' event. Your code would add new properties to the global A5.flags object.
For example, you could add this code to the event:
A5.flags.__myvar = "alpha"
Then, in the logical expressions you define to select the startup component, you could reference this value as follows:
client.__myvar
Two Ways to Launch the Startup Component

There are two ways to load the application launcher:
If the target component is a TabbedUI, PageLayout, or a5w page, then
you have to use the full page reload option.
If you do not use the full page reload option and the style you want to
use for the target component is not the same as the style used in the
AppLauncher you will have to add the target component style name to the
'Additional styles' property.
UX Component - User-Defined Sub-Themes - Most
of the Javascript controls on a UX component support the
concept of 'sub-themes'. This topic discusses how
user-defined sub-themes can be added to a UX component.
Watch Video - Part 1
Watch Video - Part 2
Download Component
NOTE: Javascript controls on a UX component include Panel Cards, Panel Navigators, Panel Layouts, Tabs, Accordions, Buttons, Sliders, SpinLists, ButtonLists, Switches, Lists, Trees, Edit-combos, Auto-suggest, etc.
The sub-theme sets style and behavior properties of the control. Out of the box, each control type comes with one or more built-in sub-theme. For example, the Button control type comes with the following built-in sub-themes:
Every control type has a sub-theme of 'base' and this sub-theme is implied if no sub-theme is explicitly set.
The sub-themes for a given style (e.g. iOS, MobBlue, etc.) are defined in the style.js file in the folder with the same name as the style. (e.g. CSS\iOS\style.js)
Developers can define their own sub-themes by adding code to the style.js file, (in which case the new sub-theme will be available to all components that use a particular style), or by adding the sub-theme in as a 'locally' defined sub-theme as part of the UX component.
To define a local sub-theme, use these properties in the UX builder:

A sub-theme typically has both a Javascript aspect to it and a CSS aspect.
In the image below, a window with the default appearance for a window using the iOS theme is shown. In the builder where this window was defined, no sub-theme was specified (which means that the 'base' window sub-theme was used).

However, in this next image, a custom sub-theme for the window was used. The appearance of the window has been completely changed as a result of applying the sub-theme. Notice that the window does not have a title, it is semi transparent (you can see the controls that are behind it), and the close button is positioned slightly above and to the right of the top right corner of the window.

To define this new window sub-theme, the following code was added in the 'Local sub-themes definition - Javascript' property of the UX component:
{
window: {
customSubTheme: {
className: 'customWindow',
title: {
className: 'customWindowTitle',
tools: {
inset: '-12px',
verticalInset: '-12px'
}
},
body: {
className: 'customWindowBody'},
_defaultTools: {
'close' : {
action: 'close',
name: 'close',
image: 'css/iOS/winClose.png'
}
}
}
}
}
NOTE: The above Javascript was not written from scratch. It was copied, then modified, from the style.js file for the style (in the CSS folder)
In addition, the following code was added in the 'Local sub-themes definition - CSS' property:
.customWindow {
background:rgba(0,0,0,.5);
color: white;
border-radius: 10px;
}
.customWindowBody { padding: 10px; text-shadow: none;}
.customWindowTitle { overflow:hidden; height: 0px; }
The Javascript shown above for the local sub-theme definition is a simple JSON object. The JSON object defines an object called 'window' which is the type of control for which the sub-theme is being defined. Within the 'window' object, a sub-theme called 'customSubTheme' has been defined. In this case only additional sub-theme for the 'window' class was defined, but you would define an unlimited number of window sub-themes.
The sub-theme simply defines CSS class names to use for various aspects of the window and also defines other properties. For example, the 'inset' and 'verticalInset' properties define the placement of the window 'tools' relative to the top, right corner of the window (in this case, the only 'tool' is the close button).
UX Component - Chart Control - Dynamically Changing Chart Appearance at Run-time - You can now dynamically change certain chart properties at run-time to alter the chart appearance.
Watch Video - Part 1
Watch Video - Part 2
Download Component
Changing the chart stylesheet:
Watch video
Download Component
The properties in the chart that can be changed can be bound to controls on the UX component. When the chart is refreshed, the value for these 'bound' properties are read from the corresponding UX component controls.
Certain chart properties (such as the chart title) are defined by an expression (e.g. "My Chart Title" - this is an expression because it is enclosed in quotes). However, if you have a control on the UX (called say 'chartTitle'), then you can set the chart title expression to: chartTitle (no quotes). This means that the chart title will be read from the chartTitle control on the UX component.
Other properties (such as whether the chart is 3D or 2D) are not controlled by expressions. To bind these properties to UX controls, you need to open the 'Binding - Dynamic Charts' builder in the chart builder.

Once you open the builder for Dynamic Charts, you will see a dialog like this:

This allows you to define a CR-LF delimited list of chart bindings. For example, in the image shown above, the
ChartType property of the chart control is bound to a control on the UX component called chartType
UX Component - Slider - Date and Character Values - The slider
control by default allows you to select a numeric value in a range of
numbers. But it can also be configured to select a date value from a
range of date values, or a string value from a pre-defined list of
choices (e.g. Poor, Average, Good).
This video shows how the Slider can be configured as a numeric,
character or date slider. It also shows how the range of allowed values
(numeric and date sliders) or the list of choices (character sliders)
can be dynamically changed at runtime.
Watch Video
Grid Component - Search Part - Hide Grid if No Active Search - If a Grid that had a search part was configured to not show the Grid part if there was no active search was opened from a button that set a base filter of a link to the child Grid, the base filter or link would not be applied when a search was performed in the child Grid.
UX Component - List Control - Group Breaks - If a custom List control was being used as a record navigator in a UX that was data bound, if the List had group breaks turned on, clicking on a row in the List would navigate to the wrong record.
UX Builder - Low Resolution Screens - When working on a machine that has less than 768px vertical resolution, the OK and Cancel buttons on the dialog were not visible.
UX Builder - Remote Test - Under certain circumstances, an error would occur when clicking on the Remote Test icon on the toolbar.
UX Component - Action Javascript - 'Google Map Methods (UX Component)' Action - Resize Map - A new option has been added to the 'Google Map Methods (UX Component)' action that allows you to resize the map. You can set the map height and width to an explicit size, or you can read the size from controls on the component, or you can call a Javascript function that returns the height and width.
NOTE: In many cases where a Map is used in a UX that has Panels, you will set the 'Fill container' property on the Map and so the map will resize automatically. You will not need this new action.
UX and Grid Component - Image Upload - Thumbnails - When you define how thumbnails are to be created, you can specify if the thumbnail is to be stored as a file on disk, or as binary data in a record. In the case where you specify a file on disk, the builder allows you to specify a 'suffix' that is automatically added to the filename. For example if the suffix is 'thumb1', then the file on disk might called 'image_thumb1.jpg'. However, there may be situations where you don't want the suffix. Previously, if you set the suffix to a blank value, the file on disk was created as 'image_.jpg'. Now, if you set the suffix to a blank value, the file on disk has no suffix at all (e.g. 'image.jpg').
Of course, if you set the suffix to a blank value, the upload folder for the thumbnails needs to be different than the upload folder for the main image you are uploading, or else when the thumbnail is created, it will overwrite the main image.
UX Component - Accordion Controls - Icons to Show Open/Close Status - You can now display icons on Accordion Panes to indicate if the pane is open or closed.
NOTE 2: If you have previously installed Alpha Anywhere, you will need to run a Full Install to get the new istyle sheets. The Patch Install does not update stylesheets.
For example, in the image below, the first Accordion pane is open, and so an icon pointing down is shown. The second Accordion pane is closed, so an icon pointing to the right is shown.
![]()
In order to enable this functionality, you simply select the appropriate sub-theme for the Accordion, as shown in the image below.
This sub-theme is defined in the style.js and style.css file in the css\iOS folder. If you wanted to add this behavior to Accordions for other styles (e.g. MobBlue, GrGray, etc.), you would need to modify the style.css and style.js files for these styles as described below.

The text in red below shows the code that was added to the style.js file in the css/iOS folder in order to add a new sub-theme called 'icon' to the Accordion control.
If you wanted to add the accordion icon functionality to a custom style of your own, you would need to edit the corresponding style.js file for that style and make a similar modification.
accordion: {
base: {
titleClassName: 'iOSAccordionButton',
titleSelectedClassName: 'iOSAccordionButtonSelected',
titleDisabledClassName: 'iOSAccordionButtonDisabled',
paneClassName: 'iOSAccordionPane'
},
icon: {
titleClassName: 'iOSAccordionIconButton',
titleSelectedClassName: 'iOSAccordionIconButtonSelected',
titleDisabledClassName: 'iOSAccordionIconButtonDisabled',
paneClassName: 'iOSAccordionPane'
}
},
The text below shows the CSS that was added to the style.css file in the css/iOS folder.
If you wanted to add the accordion icon functionality to a custom style of your own, you would need to edit the corresponding style.css file for that style and make a similar modification.
.iOSAccordionIconButton {
display: block;
text-decoration: none;
font: 14px Arial;
font-weight: bold;
color: #6a6a6a;
text-shadow: 0px 2px #d9dbe0;
background-color: #c8c8c8;
background-image: url('accordionClosed.png'), url('button.jpg');
background-position: left, center;
background-repeat: no-repeat, repeat;
background-size: auto, 100% 100%;
border-bottom: #ababab 1px solid;
padding: 8px;
padding-left: 28px;
}
.iOSAccordionIconButtonSelected {
display: block;
text-decoration: none;
font: 14px Arial;
font-weight: bold;
color: #6a6a6a;
text-shadow: 0px 2px #d9dbe0;
background-color: #c8c8c8;
background-image: url('accordionOpened.png'), url('button.jpg');
background-position: left, center;
background-repeat: no-repeat, repeat;
background-size: auto, 100% 100%;
border-bottom: #ababab 1px solid;
padding: 8px;
padding-left: 28px;
}
.iOSAccordionIconButtonDisabled {
display: block;
text-decoration: none;
font: 14px Arial;
font-weight: bold;
color: #aaa;
text-shadow: 0px 2px #d9dbe0;
background: #c8c8c8 url('button.jpg');
background-size: 100% 100%;
border-bottom: #ababab 1px solid;
padding: 8px;
padding-left: 28px;
}
UX Component - List Control - Refresh and Filter Operations - User Defined Ajax Callbacks - The List control has methods that allow you to refresh the data or filter the data. For example:
{dialog.object}.refreshListData('list1')
{dialog.object}._filterList('list1','country = "usa" ');
Each of these methods causes an Ajax callback.
Say you had a button on a UX that did a user-defined Ajax callback. Let's also assume that you want the button to refresh one list and filter another list. In the Javascript returned by the Ajax callback, you could certainly include the Javascript code to refresh the list and filter the other list, but then you would be triggering two additional Ajax callbacks. It would be preferable to have only a single Ajax callback.
This is now possible using a new Xbasic function:
a5_UX_Action()
The following examples show how this function can be used in an Xbasic function that handles a custom Ajax callback.
Function myCallbackXB as c (e as p)
'compute the Javascript to filter a list.
'we need to set properties in an object that will be passed to a5_ux_action()
dim ops as p
ops.Action = "Filter"
ops.filter = "country = :country and city = :city"
ops.order = "companyname desc"
'the arguments are specified in a crlf() delimited string.
'syntax is argumentValue|||type|argumentName
ops.parameters = "UK|||c|country" + crlf() + "London|||c|city"
'specify the id of the list to filter
ops.listId = "list1"
'compute the Javascript to filter the list
'the 3rd parameter 'ajaxListAction' indicates that the UX action
'we are going to perform is on a List.
'the default value for this parameter is 'ajaxListAction' so in
'this case, we could have omitted it.
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
'you can include other Javascript in the response that this callback returns.
'for example:
xb = xb + crlf() + "alert('List was filtered');"
myCallbackXB = xb
end function
Example 2:
Function myCallbackXB2 as c (e as p)
'compute the Javascript to refresh a list.
'we need to set properties in an object that will be passed to a5_ux_action()
dim ops as p
ops.Action = "Refresh"
ops.listId = "list1"
'compute the javascript to refresh the list
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myCallbackXB2 = xb
end function
Example 3:
Function myCallbackXB3 as c (e as p)
'compute the Javascript to refresh data series
dim ops as p
ops.Action = "refreshDataSeries"
ops.seriesNames = "series1,series2,series3"
dim xb as c
xb = a5_UX_Action(e,ops)
myCallbackXB3 = xb
end function
A5_UX_Action() Function - Summary of Actions that Can Be Performed - The a5_ux_action() Xbasic function is a utility function that can be used in an Ajax callback to generate the Javascript commands to perform certain actions on a UX component.
The purpose of this command is to allow you to consolidate several actions that would normally be performed by distinct Ajax callbacks into a single Ajax callback.
The actions that can be performed by this utility function are:
List Control Action
Filter List
Refresh List
Refresh row(s) by key value
Append row(s) by key value
Refresh Data Series
Set UX into 'New Record' mode
Populate Controls with Data from a Table
Refresh choices in a dropdownbox control
List Control Action:Filter List
Filters/sorts the data in a List control.
This action is equivalent to the {dialog.object}.filterList() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.Action = "Filter"
ops.filter = "country = :country and city = :city"
ops.order = "companyname desc"
'the arguments are specified in a crlf() delimited string.
'syntax is argumentValue|||type|argumentName
ops.parameters = "UK|||c|country" + crlf() + "London|||c|city"
'specify the id of the list to filter
ops.listId = "list1"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
List Control Action: Refresh List
Refreshes the data in a List control.
This action is equivalent to the {dialog.object}.refreshListData() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.Action = "Refresh"
ops.listId = "list1"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
List Control Action:Refresh Row(s) by key value
Refreshes data in one or more rows of a List control.
This action is equivalent to the {dialog.object}._listRefreshRecordsByKey() mehod.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
'primary keys to refresh (case sensitive!)
ops.primaryKey = "EASTC,GALED,FURIB"
ops.listId = "list1"
ops.action = "refreshRowByKey"
'if the record to be refreshed is not currently in the list,
'should it be added to to the list?
ops.appendRowsNotInList = .f.
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
List Control Action:Append row(s) by key value
Appends data to a List control.
This action is equivalent to the {dialog.object}._listFetchRecordsByKey() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
'primary keys to fetch and add to list (case sensitive!)
ops.primaryKey = "EASTC,GALED,FURIB"
ops.listId = "list1"
ops.action = "appendRowByKey"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
Refresh Data Series
Refreshes one or more data series. All controls that are bound to the data series are refreshed.
This action is equivalent to the {dialog.object}.refreshDataSeries() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.Action = "refreshDataSeries"
ops.seriesNames = "series1,series2,series3"
dim xb as c
xb = a5_UX_Action(e,ops,"ajaxListAction")
myAjaxCallback = xb
end function
Set UX into 'New Record' mode
This action is equivalent to the {dialog.object}.newRecord() method
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
myAjaxCallback = a5_UX_Action(e,ops,"NewRecord")
end function
Populate Controls with Data From a Table
(Applies only if the UX has been data bound). Populates controls on the UX with data from the data bound tables for a specified primary key value.
This action is equivalent to the {dialog.object}.populateControlsFromTable() method.
Example:
Function myAjaxCallback as c (e as p)
dim ops as p
ops.primaryKey = "ALFKI" 'case sensitive!
dim js_getRecord as c
ops.__dtfmt = e.rtc._state.__dtfmt
dim js as c
js = a5_UX_Action(e,ops,"populateControlsFromTable")
myAjaxCallback = js
end function
Refresh choices in a dropdownbox control
This action is equivalent to the {dialog.object}.refreshDropdownBoxChoices() method.
Example:
function myAjaxCallback as c (e as p)
dim js as c
dim ops as p
'name of dropdowncontrol to refresh
ops.controlName = "CITIES"
'if the control is in a repeating section should just the current instance
'be repopulated
ops.currentRepeatingSectionRowOnly = .f.
'filter for query
ops.filter = "country = :whatcountry"
'argument value - format is
value|||type|argumentName
ops.arguments = "USA|||c|whatCountry"
'value in dropdownbox to select
after it has been populated
ops.selectedValueAfterPopulate = ""
js = a5_ux_action(e,ops,"refreshDropDownBox")
myAjaxCallback = js
end function